Beruflich Dokumente
Kultur Dokumente
Boiler Replacement
Feasibility Study
July 2014
Medite Statistics
Built in 1982
First board Sept 1983
Total site area 64 ha
Area under concrete 18 ha
Employees 160
Who we are..
What we do
Medite Medium Density Fibreboard (MDF).
Brand Leader in International Markets
Pioneered a range of New products
Technologically Advanced Production
Facility
Thermal Energy from Biomass
Daily Inputs
Outputs
(420,000m3, 12,500 truck loads)
Line2 3mm
1800 panels/hr 43,200 daily
Equivalent to 4.39Km/hr 105.4Km daily
Equivalent to 38,495Km/year
Line1 18mm
900panels/ hr 21,600 daily
Equivalent to 2.12Km/hr 50.88Km daily
4.6 hours of production to cover Croke Park
Overview
M.D.F.
Process
Medite Products
Premier
Moisture Resistant
Exterior
Flame Retardant
Ultralite
Flooring Quality
Ecologique
Trade
Tricoya
Thickness availability 3mm 45mm
Number of matrix Items available >350
Uses of Medite
EN13986 CE Mark
EN 622 parts 1 & 5
FSC 70%
Medite Europe
Overview of Boiler Replacement
Feasibility Study
July 2014
Drivers
Minimise the business interruption risk
Maximise Medite competitiveness and
profitability
Resin etc
30%
Wood
30%
16
17
18
Line 2 Refiner
Line 2 Dryer
Exhaust gases
Biomass Fuel
Energy
Centre
Line 2 Press
Thermal oil
Core Refiner
Face Refiner
EVOJet
Biomass Fuel
Line 1
Boilers
Metso Sifter
Steam
Gas Boiler
Gas
Boiler
Line 1 Press
Thermal oil
Losses
Losses
19
Sander Dust
& MDF Trim
Sawmill
Co-products
Bark
Available as part
of the
manufacturing
process
Dust can act
similar to a gas Modulation
Expensive as
energy if reusing in
product possible
Harvest
Residues
Energy
Crops
Recovered
Wood
Sawdust
By-product of
sawmilling
Availability
fluctuates
High MC%
Seasonal
fluctuations in
moisture
Limited availability
Waste material
from clear-fells
High establishment
costs
Further potential
for market share
along with Short
Rotation Forestry
Boiler must be
suitable to use these
Limited
availability
Boiler must be
WID compliant
to burn lower
grades
Site Layout