Beruflich Dokumente
Kultur Dokumente
Objectives:
1. Enter Synchronous Generator Data
2. Set Up Study Case Parameters
3. Check One-Line Display, Plots, Reports
4. Simulate A Bus Fault
5. Determine Critical System Separation Time
6. Perform Fault Isolation / System Separation
7. Perform Bus Transfer by Checking Bus Voltage/Hz Vector Difference
8. Perform Load Shedding Using Frequency Relay
Steps:
1. Load Project
TS_Example2
2. Enter Generator Data:
Generator
Gen1
Imp/Model Page
Rotor Type
Dynamic Model
Round-Rotor
Subtransient (Typical Data)
Inertia Page
Generator Inertia
Exciter Page
Exciter Type
0.9 MW-sec/MVA
1 (Sample Data)
Governor Page
Governor Type
PSS Page
PSS Type
None
ID
FaultMainBus
0.5 sec.
Time
Type
ID
Bus
Main Bus
3 Phase Fault
Action
Plot Page
Plot
Syn. Generator
Ind. Machines, MV
Plot Bus
Plot
Gen1
Mtr2, Pump 1
Main Bus, Sub2B, Sub22, Sub23.
Page 1 of 3
ID (new)
SysSeparate
0.7 sec.
Time
Device
Type (1 )
Device ID
Action
nd
Device
Type (2 )
Device ID
Action
rd
Device
Type (3 )
Device ID
Action
Circuit Breaker
CB2
Open
Circuit Breaker
CB10
Open
Generator
Gen1
Isoch.
Machine
ID (new)
BusTransfer
0.75 sec. (3 cycles)
Time
Type
ID
Circuit Breaker
CB25
Close
Page 2 of 3
Option
Page 3 of 3