Sie sind auf Seite 1von 2

.

RISK ASSESSMENT

PT. SWIBER BERJAYA

CHECK PPE & CONTROLS REQUIRED


Hard Hats

Safety Shoes

Safety Glasses

Hearing Protection
Cotton Gloves
Leather Gloves

Respirator
Work Vest
Safety Harness
Face Shield
Goggles
Ventilation

Fire Extinguisher
Lockout / Tag-out
Permit to Work
Stokes Basket
Life Rings
Barricades

WORK ACTIVITY:

VESSEL:

WORKING OVER-SIDE.

Falling overboard; bodily


injury, drowning.
Get crushed if other vessel
coming alongside.

*S

*E

REGISTERED NO :- 042

INITIAL
RISK

REQUIRED CONTROLS

Describe fully all equipment, facility, and/or procedure controls applicable for each
hazard (i.e. if PPE is used as control, it must be specifically describe.) If a control can
only be verified by documentation then it must be available. All controls must be valid
in that they reduce severity, probability of both.

S: PTW System, Toolbox Talk and proper PPE.


Work to be done only at safe sea side, never quay side.
Watchman to standby for look out and inform concerned of any danger.
Life buoy deployed in water and work vest to be worn.
Proper staging erected or good bosun chair to be used.
Safety belt/harness to be worn and condition inspected before use.

HAZARD DESCRIPTION
*H

Preparing and fixing the


staging.

REV. DATE: 02 / 28 Dec 2009


Risk to
WHAT?

JOB STEPS / TASKS

Other - List

RESIDUAL
RISK

Page 1 of 2

Working to lower and


fixing the tyre fender, etc,
etc.

Heavy tyre, back pain.


Slip, trip and fall.
Failure of staging rigging;
crew falling overboard, bodily
injure, drowning.
Pinched between ship and
wharf.
Sudden movement of vessel
when fast boat passing by;
fall, bodily injury or drowning.
Other boat may come
alongside and crushed the
working crew.
Washed by overboard
discharge.

Falling overboard.
Bodily injury, drowning.
Removing the staging.

S: Use chain block to lift and lower heavy tyres.


More than one person to carry heavy load.
Work in good coordination with colleagues to avoid.
Working area and adjacent to be made clean and clear of any
obstruction.
Staging condition must be carefully examined by senior officer to ensure
suitability.
Attachment point carefully tested to ensure adequate strength.
Good safety belt/harness to be worn.
Standby crew to inform working colleagues if any big waves or other
vessel coming towards own vessel.
Notify other approaching vessel that there are crews working over-side
and do not allow to come alongside until working crew clear from the ship
side.
Duty engineer to be notified of men working below ship side discharges
and notices attached to relevant valves.
Work clear of overboard discharges if possible.
H: Increased fluid intake (Awareness)
Provision of shade where possible
Scheduling of tasks
Ship captains medical guide
COSWP.
Sun block
Sun shade brims on hats
Tinted glasses
Long sleeve coveralls.
S: Wear safety belt/harness.
Wear work vest.
Buddy system, work cooperatively with other crew.
Work carefully, do not rush.

Page 2 of 2