Sie sind auf Seite 1von 37

RebarfixCalculation

OCEC CARILLION
SyedMuzaffer

20140921TECOMNSMOCECCARILLIONREBARFIXR0

FischerFZE
P.O.Box261738,
JebelAlifreeZone,
Dubai,UAE
Tel.:+96824503915
Fax:+96824503920
Mob:+96892881260

SUMMARY
TITLE
PROJECT
CLIENT
CONT

GradeofConcrete:
GradeofRebar:

OCEC
OMRAN
CARILLION

C40
FY460

Dia
(mm)

MaxForce
(kN)

MinCover
(mm)

Min.Embedment
(mm)

8
10

10
13
18.5
28
33
48
71

40
40
40
45
45
50
55

100
100
120
150
160
200
250

12

14
16
20
25

REBAR FIX
BY
DATE
REV

Remarks

SMA
21/09/2014
0

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 8 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0
20140921-TEC-OMN-SM-OCEC -CARILLION-RebarCalculation-R0

REF :

Calculation of post installed rebar according to


rebar theory , acc. to EC 2
Application: Post Installed Rebar fixing for 8 Dia
calculation parameters:
Rebar

BST 460

ds =

diameter

Design load in tension:


NRd=
Calculated with fischer injection mortar:
Attached calculation with
Calculation result:

mm

10.00 kN
FIS EM 390S
attachments

Anchorage depth:

100 mm

Conditions has to be checked on site - if it's matching with the Rebar approval for FIS EM
Min. spacing between bars:
5xds
50mm
actual spacing between the bars 40 mm> =5 x 8 mm
minimum concrete cover to be observed:
40 mm
Note:

Shear loads can not be transferred via the post installed rebars! To transmit
shear loads the joint shall be roughened! (depending on the aggregate size
of the concrete)
Manufacturer guideline has to be considered for installation

NOTE:
1. Concrete is C40 Grade.
2. Reinforcement is FY460.
3. Design Based on maximum force for embedment of 10xDia.

Calculation provided by:

Muzaffer Ahmed, Syed


Sr. Technical Engineer
92881260
muzaffer@fischer.ae

The user has the responsibility to check whether the present conditions on site and the anchors,
setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting
the product for the individual application is with the customer.

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory , acc.


to EC 2 for 8 mm Rebar
OCEC
PROJECT
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

Clickonsizetochangeit

Bardiameter

mm

InputdesignactionNsd

Requiredload

10.00 kN
Max bar strength =
20.11 kN

Clickongradetochangeit

Concretegrade

C30/37

Bondconditions

Good
Clicktoselect

Rebaryieldstrength

460

N/mm2

Input value for cover

Concretecover

40

mm

Min cover =
38 mm

Requiredbardepth

100

mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 8 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

NRd,s = / 4 x 2 x fyk / s

s=
NRd,s =

1.15
20.11 kN

5.5.4.2 Design resistance of the bond strength


fbd = 2.25 x 1 x 2 x fctd

3.00

fctd = ct x fctk,0.05 / c

1.3

ct = influence of long term performance

1.0

fctk,0.05 = lower limit characteristic tensile strength =

c =

2.0

1.5

1 = coefficient relative to the quality of the bond conditions


1.0 (good bond conditions)
1 =
0.7 (all other conditions)
1 =
1.0 (for < 32 mm)
2 =
NA
(for 40 mm - NOT ALLOWED FOR FIS V)
2 =
Lower limit characteristic tensile strength [N/mm 2]
fctk,0.05
fbd
Concrete strength
C12/ 15
1.1
1.65
C16/ 20
1.3
1.95
C20/ 25
1.5
2.25
C25/ 30
1.8
2.70
C30/ 37
2.0
3.00
C35/ 45
2.2
3.30
C40/ 50
2.5
3.75
C45/ 55
2.7
4.05
C50/ 60
2.9
4.35
5.5.4.3 Basic value of the required anchorage length
lb,rqd = (/4) x (sd/fbd)

267 mm

diameter of rebar [mm] =


Calculated stress in bar [kN] =

sd =

Calculated stress / s

8 mm
460 N/mm2
400 N/mm3

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar


theory , acc. to EC 2 for 8 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE 21/09/2014
CARILLION
CONT
REV
0

Anchoring rebar
Determine anchorage length l bd
lbd = 1 x 2 x 3 x 4 x 5 x lb,req > lb,min
for bars in tension
lbd =
100 mm
Where 1 x 2 x 3 x 4 x 5 are determined in accordance with
EN 1992-1-1. Table 8.2
EN 1992-1-1. Table 8.2 and 8.3

1
2

Influence of shape or rebar.

1.0 for straight bar

Influence of the concrete cover.


Influence of the confinement by transverse
reinforcement not welded to the main rebar
Influence of the confinement by welded transverse
reinforcement.

0.70
1.0
no transverse
rebar.
1.0
no welded
transverse rebar.

51)

Influence of the confinement by transverse pressure.

1)

1.0

This is the case when the longitudinal cracks are confined by pressure and / or the edge distance
in all directions > 10 x

Minimum allowable anchorages


Anchoring rebar
Determine min anchorage length l b,min
for bars in tension
lb,min = Max (0.3 lb,req : 10 : 100 mm)
0.3 lb,req =
10 =
100 mm
=>

80.00 mm
80.00 mm
100.00 mm
100 mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

ExamplesofapplicationsfromTR23

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 10 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0
20140921-TEC-OMN-SM-OCEC -CARILLION-RebarCalculation-R0

REF :

Calculation of post installed rebar according to


rebar theory , acc. to EC 2
Application: Post Installed Rebar fixing for 10 Dia
calculation parameters:
Rebar

BST 460

ds =

diameter

Design load in tension:


NRd=
Calculated with fischer injection mortar:
Attached calculation with
Calculation result:

10

mm

13.00 kN
FIS EM 390S
attachments

Anchorage depth:

100 mm

Conditions has to be checked on site - if it's matching with the Rebar approval for FIS EM
Min. spacing between bars:
5xds
50mm
actual spacing between the bars 50 mm> =5 x 10 mm
minimum concrete cover to be observed:
40 mm
Note:

Shear loads can not be transferred via the post installed rebars! To transmit
shear loads the joint shall be roughened! (depending on the aggregate size
of the concrete)
Manufacturer guideline has to be considered for installation

NOTE:
1. Concrete is C40 Grade.
2. Reinforcement is FY460.
3. Design Based on maximum force for embedment of 10xDia.

Calculation provided by:

Muzaffer Ahmed, Syed


Sr. Technical Engineer
92881260
muzaffer@fischer.ae

The user has the responsibility to check whether the present conditions on site and the anchors,
setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting
the product for the individual application is with the customer.

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory , acc.


to EC 2 for 10 mm Rebar
OCEC
PROJECT
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

Clickonsizetochangeit

Bardiameter

10

mm

InputdesignactionNsd

Requiredload

13.00 kN
Max bar strength =
31.42 kN

Clickongradetochangeit

Concretegrade

C30/37

Bondconditions

Good
Clicktoselect

Rebaryieldstrength

460

N/mm2

Input value for cover

Concretecover

40

mm

Min cover =
39 mm

Requiredbardepth

100

mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 10 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

NRd,s = / 4 x 2 x fyk / s

s=
NRd,s =

1.15
31.42 kN

5.5.4.2 Design resistance of the bond strength


fbd = 2.25 x 1 x 2 x fctd

3.00

fctd = ct x fctk,0.05 / c

1.3

ct = influence of long term performance

1.0

fctk,0.05 = lower limit characteristic tensile strength =

c =

2.0

1.5

1 = coefficient relative to the quality of the bond conditions


1.0 (good bond conditions)
1 =
0.7 (all other conditions)
1 =
1.0 (for < 32 mm)
2 =
NA
(for 40 mm - NOT ALLOWED FOR FIS V)
2 =
Lower limit characteristic tensile strength [N/mm 2]
fctk,0.05
fbd
Concrete strength
C12/ 15
1.1
1.65
C16/ 20
1.3
1.95
C20/ 25
1.5
2.25
C25/ 30
1.8
2.70
C30/ 37
2.0
3.00
C35/ 45
2.2
3.30
C40/ 50
2.5
3.75
C45/ 55
2.7
4.05
C50/ 60
2.9
4.35
5.5.4.3 Basic value of the required anchorage length
lb,rqd = (/4) x (sd/fbd)

333 mm

diameter of rebar [mm] =


Calculated stress in bar [kN] =

sd =

Calculated stress / s

10 mm
460 N/mm2
400 N/mm3

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar


theory , acc. to EC 2 for 10 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE 21/09/2014
CARILLION
CONT
REV
0

Anchoring rebar
Determine anchorage length l bd
lbd = 1 x 2 x 3 x 4 x 5 x lb,req > lb,min
for bars in tension
lbd =
100 mm
Where 1 x 2 x 3 x 4 x 5 are determined in accordance with
EN 1992-1-1. Table 8.2
EN 1992-1-1. Table 8.2 and 8.3

1
2

Influence of shape or rebar.

1.0 for straight bar

Influence of the concrete cover.


Influence of the confinement by transverse
reinforcement not welded to the main rebar
Influence of the confinement by welded transverse
reinforcement.

0.70
1.0
no transverse
rebar.
1.0
no welded
transverse rebar.

51)

Influence of the confinement by transverse pressure.

1)

1.0

This is the case when the longitudinal cracks are confined by pressure and / or the edge distance
in all directions > 10 x

Minimum allowable anchorages


Anchoring rebar
Determine min anchorage length l b,min
for bars in tension
lb,min = Max (0.3 lb,req : 10 : 100 mm)
0.3 lb,req =
10 =
100 mm
=>

100.00 mm
100.00 mm
100.00 mm
100 mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

ExamplesofapplicationsfromTR23

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 12 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0
20140921-TEC-OMN-SM-OCEC -CARILLION-RebarCalculation-R0

REF :

Calculation of post installed rebar according to


rebar theory , acc. to EC 2
Application: Post Installed Rebar fixing for 12 Dia
calculation parameters:
Rebar

BST 460

ds =

diameter

Design load in tension:


NRd=
Calculated with fischer injection mortar:
Attached calculation with
Calculation result:

12

mm

18.50 kN
FIS EM 390S
attachments

Anchorage depth:

120 mm

Conditions has to be checked on site - if it's matching with the Rebar approval for FIS EM
Min. spacing between bars:
5xds
50mm
actual spacing between the bars 60 mm> =5 x 12 mm
minimum concrete cover to be observed:
40 mm
Note:

Shear loads can not be transferred via the post installed rebars! To transmit
shear loads the joint shall be roughened! (depending on the aggregate size
of the concrete)
Manufacturer guideline has to be considered for installation

NOTE:
1. Concrete is C40 Grade.
2. Reinforcement is FY460.
3. Design Based on maximum force for embedment of 10xDia.

Calculation provided by:

Muzaffer Ahmed, Syed


Sr. Technical Engineer
92881260
muzaffer@fischer.ae

The user has the responsibility to check whether the present conditions on site and the anchors,
setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting
the product for the individual application is with the customer.

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory , acc.


to EC 2 for 12 mm Rebar
OCEC
PROJECT
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

Clickonsizetochangeit

Bardiameter

12

mm

InputdesignactionNsd

Requiredload

18.50 kN
Max bar strength =
45.24 kN

Clickongradetochangeit

Concretegrade

C30/37

Bondconditions

Good
Clicktoselect

Rebaryieldstrength

460

N/mm2

Input value for cover

Concretecover

40

mm

Min cover =
40 mm

Requiredbardepth

120

mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 12 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

NRd,s = / 4 x 2 x fyk / s

s=
NRd,s =

1.15
45.24 kN

5.5.4.2 Design resistance of the bond strength


fbd = 2.25 x 1 x 2 x fctd

3.00

fctd = ct x fctk,0.05 / c

1.3

ct = influence of long term performance

1.0

fctk,0.05 = lower limit characteristic tensile strength =

c =

2.0

1.5

1 = coefficient relative to the quality of the bond conditions


1.0 (good bond conditions)
1 =
0.7 (all other conditions)
1 =
1.0 (for < 32 mm)
2 =
NA
(for 40 mm - NOT ALLOWED FOR FIS V)
2 =
Lower limit characteristic tensile strength [N/mm 2]
fctk,0.05
fbd
Concrete strength
C12/ 15
1.1
1.65
C16/ 20
1.3
1.95
C20/ 25
1.5
2.25
C25/ 30
1.8
2.70
C30/ 37
2.0
3.00
C35/ 45
2.2
3.30
C40/ 50
2.5
3.75
C45/ 55
2.7
4.05
C50/ 60
2.9
4.35
5.5.4.3 Basic value of the required anchorage length
lb,rqd = (/4) x (sd/fbd)

400 mm

diameter of rebar [mm] =


Calculated stress in bar [kN] =

sd =

Calculated stress / s

12 mm
460 N/mm2
400 N/mm3

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar


theory , acc. to EC 2 for 12 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE 21/09/2014
CARILLION
CONT
REV
0

Anchoring rebar
Determine anchorage length l bd
lbd = 1 x 2 x 3 x 4 x 5 x lb,req > lb,min
for bars in tension
lbd =
120 mm
Where 1 x 2 x 3 x 4 x 5 are determined in accordance with
EN 1992-1-1. Table 8.2
EN 1992-1-1. Table 8.2 and 8.3

1
2

Influence of shape or rebar.

1.0 for straight bar

Influence of the concrete cover.


Influence of the confinement by transverse
reinforcement not welded to the main rebar
Influence of the confinement by welded transverse
reinforcement.

0.70
1.0
no transverse
rebar.
1.0
no welded
transverse rebar.

51)

Influence of the confinement by transverse pressure.

1)

1.0

This is the case when the longitudinal cracks are confined by pressure and / or the edge distance
in all directions > 10 x

Minimum allowable anchorages


Anchoring rebar
Determine min anchorage length l b,min
for bars in tension
lb,min = Max (0.3 lb,req : 10 : 100 mm)
0.3 lb,req =
10 =
100 mm
=>

120.00 mm
120.00 mm
100.00 mm
120 mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

ExamplesofapplicationsfromTR23

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 14 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0
20140921-TEC-OMN-SM-OCEC -CARILLION-RebarCalculation-R0

REF :

Calculation of post installed rebar according to


rebar theory , acc. to EC 2
Application: Post Installed Rebar fixing for 14 Dia
calculation parameters:
Rebar

BST 460

ds =

diameter

Design load in tension:


NRd=
Calculated with fischer injection mortar:
Attached calculation with
Calculation result:

14

mm

28.00 kN
FIS EM 390S
attachments

Anchorage depth:

150 mm

Conditions has to be checked on site - if it's matching with the Rebar approval for FIS EM
Min. spacing between bars:
5xds
50mm
actual spacing between the bars 70 mm> =5 x 14 mm
minimum concrete cover to be observed:
45 mm
Note:

Shear loads can not be transferred via the post installed rebars! To transmit
shear loads the joint shall be roughened! (depending on the aggregate size
of the concrete)
Manufacturer guideline has to be considered for installation

NOTE:
1. Concrete is C40 Grade.
2. Reinforcement is FY460.
3. Design Based on maximum force for embedment of 10xDia.

Calculation provided by:

Muzaffer Ahmed, Syed


Sr. Technical Engineer
92881260
muzaffer@fischer.ae

The user has the responsibility to check whether the present conditions on site and the anchors,
setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting
the product for the individual application is with the customer.

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory , acc.


to EC 2 for 14 mm Rebar
OCEC
PROJECT
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

Clickonsizetochangeit

Bardiameter

14

mm

InputdesignactionNsd

Requiredload

28.00 kN
Max bar strength =
61.58 kN

Clickongradetochangeit

Concretegrade

C30/37

Bondconditions

Good
Clicktoselect

Rebaryieldstrength

460

N/mm2

Input value for cover

Concretecover

45

mm

Min cover =
43 mm

Requiredbardepth

150

mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 14 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

NRd,s = / 4 x 2 x fyk / s

s=
NRd,s =

1.15
61.58 kN

5.5.4.2 Design resistance of the bond strength


fbd = 2.25 x 1 x 2 x fctd

3.00

fctd = ct x fctk,0.05 / c

1.3

ct = influence of long term performance

1.0

fctk,0.05 = lower limit characteristic tensile strength =

c =

2.0

1.5

1 = coefficient relative to the quality of the bond conditions


1.0 (good bond conditions)
1 =
0.7 (all other conditions)
1 =
1.0 (for < 32 mm)
2 =
NA
(for 40 mm - NOT ALLOWED FOR FIS V)
2 =
Lower limit characteristic tensile strength [N/mm 2]
fctk,0.05
fbd
Concrete strength
C12/ 15
1.1
1.65
C16/ 20
1.3
1.95
C20/ 25
1.5
2.25
C25/ 30
1.8
2.70
C30/ 37
2.0
3.00
C35/ 45
2.2
3.30
C40/ 50
2.5
3.75
C45/ 55
2.7
4.05
C50/ 60
2.9
4.35
5.5.4.3 Basic value of the required anchorage length
lb,rqd = (/4) x (sd/fbd)

467 mm

diameter of rebar [mm] =


Calculated stress in bar [kN] =

sd =

Calculated stress / s

14 mm
460 N/mm2
400 N/mm3

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar


theory , acc. to EC 2 for 14 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE 21/09/2014
CARILLION
CONT
REV
0

Anchoring rebar
Determine anchorage length l bd
lbd = 1 x 2 x 3 x 4 x 5 x lb,req > lb,min
for bars in tension
lbd =
149 mm
Where 1 x 2 x 3 x 4 x 5 are determined in accordance with
EN 1992-1-1. Table 8.2
EN 1992-1-1. Table 8.2 and 8.3

1
2

Influence of shape or rebar.

1.0 for straight bar

Influence of the concrete cover.


Influence of the confinement by transverse
reinforcement not welded to the main rebar
Influence of the confinement by welded transverse
reinforcement.

0.70
1.0
no transverse
rebar.
1.0
no welded
transverse rebar.

51)

Influence of the confinement by transverse pressure.

1)

1.0

This is the case when the longitudinal cracks are confined by pressure and / or the edge distance
in all directions > 10 x

Minimum allowable anchorages


Anchoring rebar
Determine min anchorage length l b,min
for bars in tension
lb,min = Max (0.3 lb,req : 10 : 100 mm)
0.3 lb,req =
10 =
100 mm
=>

140.00 mm
140.00 mm
100.00 mm
140 mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

ExamplesofapplicationsfromTR23

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 16 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0
20140921-TEC-OMN-SM-OCEC -CARILLION-RebarCalculation-R0

REF :

Calculation of post installed rebar according to


rebar theory , acc. to EC 2
Application: Post Installed Rebar fixing for 16 Dia
calculation parameters:
Rebar

BST 460

ds =

diameter

Design load in tension:


NRd=
Calculated with fischer injection mortar:
Attached calculation with
Calculation result:

16

mm

33.00 kN
FIS EM 390S
attachments

Anchorage depth:

160 mm

Conditions has to be checked on site - if it's matching with the Rebar approval for FIS EM
Min. spacing between bars:
5xds
50mm
actual spacing between the bars 80 mm> =5 x 16 mm
minimum concrete cover to be observed:
45 mm
Note:

Shear loads can not be transferred via the post installed rebars! To transmit
shear loads the joint shall be roughened! (depending on the aggregate size
of the concrete)
Manufacturer guideline has to be considered for installation

NOTE:
1. Concrete is C40 Grade.
2. Reinforcement is FY460.
3. Design Based on maximum force for embedment of 10xDia.

Calculation provided by:

Muzaffer Ahmed, Syed


Sr. Technical Engineer
92881260
muzaffer@fischer.ae

The user has the responsibility to check whether the present conditions on site and the anchors,
setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting
the product for the individual application is with the customer.

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory , acc.


to EC 2 for 16 mm Rebar
OCEC
PROJECT
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

Clickonsizetochangeit

Bardiameter

16

mm

InputdesignactionNsd

Requiredload

33.00 kN
Max bar strength =
80.42 kN

Clickongradetochangeit

Concretegrade

C30/37

Bondconditions

Good
Clicktoselect

Rebaryieldstrength

460

N/mm2

Input value for cover

Concretecover

45

mm

Min cover =
44 mm

Requiredbardepth

160

mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 16 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

NRd,s = / 4 x 2 x fyk / s

s=
NRd,s =

1.15
80.42 kN

5.5.4.2 Design resistance of the bond strength


fbd = 2.25 x 1 x 2 x fctd

3.00

fctd = ct x fctk,0.05 / c

1.3

ct = influence of long term performance

1.0

fctk,0.05 = lower limit characteristic tensile strength =

c =

2.0

1.5

1 = coefficient relative to the quality of the bond conditions


1.0 (good bond conditions)
1 =
0.7 (all other conditions)
1 =
1.0 (for < 32 mm)
2 =
NA
(for 40 mm - NOT ALLOWED FOR FIS V)
2 =
Lower limit characteristic tensile strength [N/mm 2]
fctk,0.05
fbd
Concrete strength
C12/ 15
1.1
1.65
C16/ 20
1.3
1.95
C20/ 25
1.5
2.25
C25/ 30
1.8
2.70
C30/ 37
2.0
3.00
C35/ 45
2.2
3.30
C40/ 50
2.5
3.75
C45/ 55
2.7
4.05
C50/ 60
2.9
4.35
5.5.4.3 Basic value of the required anchorage length
lb,rqd = (/4) x (sd/fbd)

533 mm

diameter of rebar [mm] =


Calculated stress in bar [kN] =

sd =

Calculated stress / s

16 mm
460 N/mm2
400 N/mm3

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar


theory , acc. to EC 2 for 16 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE 21/09/2014
CARILLION
CONT
REV
0

Anchoring rebar
Determine anchorage length l bd
lbd = 1 x 2 x 3 x 4 x 5 x lb,req > lb,min
for bars in tension
lbd =
160 mm
Where 1 x 2 x 3 x 4 x 5 are determined in accordance with
EN 1992-1-1. Table 8.2
EN 1992-1-1. Table 8.2 and 8.3

1
2

Influence of shape or rebar.

1.0 for straight bar

Influence of the concrete cover.


Influence of the confinement by transverse
reinforcement not welded to the main rebar
Influence of the confinement by welded transverse
reinforcement.

0.73
1.0
no transverse
rebar.
1.0
no welded
transverse rebar.

51)

Influence of the confinement by transverse pressure.

1)

1.0

This is the case when the longitudinal cracks are confined by pressure and / or the edge distance
in all directions > 10 x

Minimum allowable anchorages


Anchoring rebar
Determine min anchorage length l b,min
for bars in tension
lb,min = Max (0.3 lb,req : 10 : 100 mm)
0.3 lb,req =
10 =
100 mm
=>

160.00 mm
160.00 mm
100.00 mm
160 mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

ExamplesofapplicationsfromTR23

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 20 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0
20140921-TEC-OMN-SM-OCEC -CARILLION-RebarCalculation-R0

REF :

Calculation of post installed rebar according to


rebar theory , acc. to EC 2
Application: Post Installed Rebar fixing for 20 Dia
calculation parameters:
Rebar

BST 460

ds =

diameter

Design load in tension:


NRd=
Calculated with fischer injection mortar:
Attached calculation with
Calculation result:

20

mm

48.00 kN
FIS EM 390S
attachments

Anchorage depth:

200 mm

Conditions has to be checked on site - if it's matching with the Rebar approval for FIS EM
Min. spacing between bars:
5xds
50mm
actual spacing between the bars 100 mm> =5 x 20 mm
minimum concrete cover to be observed:
50 mm
Note:

Shear loads can not be transferred via the post installed rebars! To transmit
shear loads the joint shall be roughened! (depending on the aggregate size
of the concrete)
Manufacturer guideline has to be considered for installation

NOTE:
1. Concrete is C40 Grade.
2. Reinforcement is FY460.
3. Design Based on maximum force for embedment of 10xDia.

Calculation provided by:

Muzaffer Ahmed, Syed


Sr. Technical Engineer
92881260
muzaffer@fischer.ae

The user has the responsibility to check whether the present conditions on site and the anchors,
setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting
the product for the individual application is with the customer.

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory , acc.


to EC 2 for 20 mm Rebar
OCEC
PROJECT
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

Clickonsizetochangeit

Bardiameter

20

mm

InputdesignactionNsd

Requiredload

48.00 kN
Max bar strength =
125.66 kN

Clickongradetochangeit

Concretegrade

C30/37

Bondconditions

Good
Clicktoselect

Rebaryieldstrength

460

N/mm2

Input value for cover

Concretecover

50

mm

Min cover =
46 mm

Requiredbardepth

200

mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 20 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

NRd,s = / 4 x 2 x fyk / s

s=
NRd,s =

1.15
125.66 kN

5.5.4.2 Design resistance of the bond strength


fbd = 2.25 x 1 x 2 x fctd

3.00

fctd = ct x fctk,0.05 / c

1.3

ct = influence of long term performance

1.0

fctk,0.05 = lower limit characteristic tensile strength =

c =

2.0

1.5

1 = coefficient relative to the quality of the bond conditions


1.0 (good bond conditions)
1 =
0.7 (all other conditions)
1 =
1.0 (for < 32 mm)
2 =
NA
(for 40 mm - NOT ALLOWED FOR FIS V)
2 =
Lower limit characteristic tensile strength [N/mm 2]
fctk,0.05
fbd
Concrete strength
C12/ 15
1.1
1.65
C16/ 20
1.3
1.95
C20/ 25
1.5
2.25
C25/ 30
1.8
2.70
C30/ 37
2.0
3.00
C35/ 45
2.2
3.30
C40/ 50
2.5
3.75
C45/ 55
2.7
4.05
C50/ 60
2.9
4.35
5.5.4.3 Basic value of the required anchorage length
lb,rqd = (/4) x (sd/fbd)

667 mm

diameter of rebar [mm] =


Calculated stress in bar [kN] =

sd =

Calculated stress / s

20 mm
460 N/mm2
400 N/mm3

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar


theory , acc. to EC 2 for 20 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE 21/09/2014
CARILLION
CONT
REV
0

Anchoring rebar
Determine anchorage length l bd
lbd = 1 x 2 x 3 x 4 x 5 x lb,req > lb,min
for bars in tension
lbd =
200 mm
Where 1 x 2 x 3 x 4 x 5 are determined in accordance with
EN 1992-1-1. Table 8.2
EN 1992-1-1. Table 8.2 and 8.3

1
2

Influence of shape or rebar.

1.0 for straight bar

Influence of the concrete cover.


Influence of the confinement by transverse
reinforcement not welded to the main rebar
Influence of the confinement by welded transverse
reinforcement.

0.78
1.0
no transverse
rebar.
1.0
no welded
transverse rebar.

51)

Influence of the confinement by transverse pressure.

1)

1.0

This is the case when the longitudinal cracks are confined by pressure and / or the edge distance
in all directions > 10 x

Minimum allowable anchorages


Anchoring rebar
Determine min anchorage length l b,min
for bars in tension
lb,min = Max (0.3 lb,req : 10 : 100 mm)
0.3 lb,req =
10 =
100 mm
=>

200.00 mm
200.00 mm
100.00 mm
200 mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

ExamplesofapplicationsfromTR23

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 25 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0
20140921-TEC-OMN-SM-OCEC -CARILLION-RebarCalculation-R0

REF :

Calculation of post installed rebar according to


rebar theory , acc. to EC 2
Application: Post Installed Rebar fixing for 25 Dia
calculation parameters:
Rebar

BST 460

ds =

diameter

Design load in tension:


NRd=
Calculated with fischer injection mortar:
Attached calculation with
Calculation result:

25

mm

71.00 kN
FIS EM 390S
attachments

Anchorage depth:

250 mm

Conditions has to be checked on site - if it's matching with the Rebar approval for FIS EM
Min. spacing between bars:
5xds
50mm
actual spacing between the bars 125 mm> =5 x 25 mm
minimum concrete cover to be observed:
55 mm
Note:

Shear loads can not be transferred via the post installed rebars! To transmit
shear loads the joint shall be roughened! (depending on the aggregate size
of the concrete)
Manufacturer guideline has to be considered for installation

NOTE:
1. Concrete is C40 Grade.
2. Reinforcement is FY460.
3. Design Based on maximum force for embedment of 10xDia.

Calculation provided by:

Muzaffer Ahmed, Syed


Sr. Technical Engineer
92881260
muzaffer@fischer.ae

The user has the responsibility to check whether the present conditions on site and the anchors,
setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting
the product for the individual application is with the customer.

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory , acc.


to EC 2 for 25 mm Rebar
OCEC
PROJECT
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

Clickonsizetochangeit

Bardiameter

25

mm

InputdesignactionNsd

Requiredload

71.00 kN
Max bar strength =
196.35 kN

Clickongradetochangeit

Concretegrade

C30/37

Bondconditions

Good
Clicktoselect

Rebaryieldstrength

460

N/mm2

Input value for cover

Concretecover

55

mm

Min cover =
50 mm

Requiredbardepth

250

mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar theory ,


acc. to EC 2 for 25 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE
21/09/2014
CARILLION
CONT
REV
0

NRd,s = / 4 x 2 x fyk / s

s=
NRd,s =

1.15
196.35 kN

5.5.4.2 Design resistance of the bond strength


fbd = 2.25 x 1 x 2 x fctd

3.00

fctd = ct x fctk,0.05 / c

1.3

ct = influence of long term performance

1.0

fctk,0.05 = lower limit characteristic tensile strength =

c =

2.0

1.5

1 = coefficient relative to the quality of the bond conditions


1.0 (good bond conditions)
1 =
0.7 (all other conditions)
1 =
1.0 (for < 32 mm)
2 =
NA
(for 40 mm - NOT ALLOWED FOR FIS V)
2 =
Lower limit characteristic tensile strength [N/mm 2]
fctk,0.05
fbd
Concrete strength
C12/ 15
1.1
1.65
C16/ 20
1.3
1.95
C20/ 25
1.5
2.25
C25/ 30
1.8
2.70
C30/ 37
2.0
3.00
C35/ 45
2.2
3.30
C40/ 50
2.5
3.75
C45/ 55
2.7
4.05
C50/ 60
2.9
4.35
5.5.4.3 Basic value of the required anchorage length
lb,rqd = (/4) x (sd/fbd)

833 mm

diameter of rebar [mm] =


Calculated stress in bar [kN] =

sd =

Calculated stress / s

25 mm
460 N/mm2
400 N/mm3

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Calculation of post installed rebar according to rebar


theory , acc. to EC 2 for 25 mm Rebar
PROJECT OCEC
BY
SMA
OMRAN
CLIENT
DATE 21/09/2014
CARILLION
CONT
REV
0

Anchoring rebar
Determine anchorage length l bd
lbd = 1 x 2 x 3 x 4 x 5 x lb,req > lb,min
for bars in tension
lbd =
250 mm
Where 1 x 2 x 3 x 4 x 5 are determined in accordance with
EN 1992-1-1. Table 8.2
EN 1992-1-1. Table 8.2 and 8.3

1
2

Influence of shape or rebar.

1.0 for straight bar

Influence of the concrete cover.


Influence of the confinement by transverse
reinforcement not welded to the main rebar
Influence of the confinement by welded transverse
reinforcement.

0.82
1.0
no transverse
rebar.
1.0
no welded
transverse rebar.

51)

Influence of the confinement by transverse pressure.

1)

1.0

This is the case when the longitudinal cracks are confined by pressure and / or the edge distance
in all directions > 10 x

Minimum allowable anchorages


Anchoring rebar
Determine min anchorage length l b,min
for bars in tension
lb,min = Max (0.3 lb,req : 10 : 100 mm)
0.3 lb,req =
10 =
100 mm
=>

250.00 mm
250.00 mm
100.00 mm
250 mm

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

ExamplesofapplicationsfromTR23

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae

Das könnte Ihnen auch gefallen