Sie sind auf Seite 1von 29

SEMESTER I

I Year B.E. / B.Tech.


GE 2115 COMPUTER PRACTICE LABORATORY I
Requirements for a batch of 30 students

S.No.

Description of Equipment

Quantity
required

Quantity
available

Hardware
1.

LAN system with 33 nodes (OR) stand


alone PCs

33 Nos.

2.

Printer

3 Nos.

Software
1.

Operating System

Windows /
Unix Clone

Available / Not
Available

2.

Compiler

C compiler

Available / Not
Available

3.

Application package

Office suite

Available / Not
Available

Deficiency %

SEMESTER I
I Year B.E./ B.Tech.
GE 2116 Engineering Practices Laboratory
Requirements for a batch of 30 students

Sl.No.

Description of Equipment

Quantity
required

CIVIL

1.

Assorted components for plumbing


consisting of metallic pipes, plastic
pipes, flexible pipes, couplings, unions,
elbows, plugs and other fittings.

15 sets

2.

Carpentry vice (fitted to work bench)

15 No.

3.

Standard woodworking tools

15 sets

4.

Models of industrial trusses, door joints,


furniture joints

5 each

5.

Power Tools:
(a) Rotary Hammer
(b) Demolition Hammer
(c) Circular Saw
(d) Planer
(e) Hand Drilling Machine
(f) Jigsaw

2
2
2
2
2
2

Nos
Nos
Nos
Nos
Nos
Nos

MECHANICAL
1.

Arc welding transformer with cables and


holders

5 No.

2.

Welding booth with exhaust facility

5 No.

3.

Welding accessories like welding shield,


chipping hammer, wire brush, etc.

5 sets

4.

Oxygen and acetylene gas cylinders,


blow pipe and other welding outfit.

2 No.

Quantity
available

Deficiency %

5.

Centre lathe

2 No.

6.

Hearth furnace, anvil and smithy tools

2 sets

7.

Moulding table, foundry tools

2 sets

8.

Power Tool: Angle Grinder

2 Nos

9.

Study-purpose items: centrifugal pump,


air-conditioner

One Each.

ELECTRICAL
1.

Assorted electrical components for


house wiring

15 sets

2.

Electrical measuring instruments

10 sets

3.

Study purpose items: Iron box, fan and


regulator, emergency lamp

4.

Megger (250V/500V)

1 No.

5.

Power Tools:
(a) Range Finder
(b) Digital Live-wire detector

2 Nos
2 Nos

One each

ELECTRONICS
1.

Soldering guns

10 No.

2.

Assorted electronic components for


making circuits

50 No.

3.

Small PCBs

10 No.

4.

Multi Meters

10 No.

5.

Study purpose items: Telephone, FM


radio, low-voltage power supply

2 each

SEMESTER I
I Year B.E. / B.Tech.
PHYSICS & CHEMISTRY LABORATORY - I
Requirements for a batch of 30 students
Physics Laboratory

S.No.

1.
2.

3.

Description of Equipment

Lees disc apparatus


(With accessories)
Air Wedge apparatus
(With traveling microscopes and
accessories)
Spectrometer
(With grating, prism and accessories)

Quantity
required

5 Nos
5 Nos

5 Nos

4.

Diode laser (2 mW power) or


He-Ne laser (2mW)
(Lycopodium powder, Optical fibre Kit
and accessories)

5 Nos

5.

Ultrasonic interferometer
(With accessories)

5 Nos

6.

B-H Curve traces apparatus

5 Nos

Quantity
available

Deficiency %

Chemistry Laboratory

S.No.

Description of Equipment

Quantity
required

1.

Electronic balance

1 No.

2.

pH meter

8 Nos.

3.

Conductivity bridge

8 Nos.

4.

Potentiometer

8 Nos.

5.

Platinum electrodes

8 Nos.

6.

Calomel electrodes

8 Nos.

7.

Spectrophotometer

1 No.

8.

Flame photometer

1 No.

9.

Oswald viscometer

15 Nos.

10.

Glassware

Sufficient
Quantity

Quantity
available

Deficiency %

SEMESTER II
I Year B.E. / B.Tech.
GE 2155 COMPUTER PRACTICE LABORATORY - II
Requirements for a batch of 30 students

Sl.No.

Description of Equipment

Quantity
required

Quantity
available

Hardware
1.

UNIX Clone Server

1 No.

2.

33 Nodes (thin client or PCs)

33 Nos.

3.

Printer

3 Nos.

Software

4.

Operating System
(33 user license or License free Linux)

Unix Clone

Available /
Not Available

5.

Compiler

C compiler

Available /
Not Available

Deficiency
%

SEMESTER II
I Year B.E. / B.Tech.
GS 2165 PHYSICS & CHEMISTRY LABORATORY - II
Requirements for a batch of 30 students Physics
Laboratory

Sl.No.

Description of Equipment

Quantity
required

1.

Torsional Pendulum apparatus


(With accessories)

5 Nos.

2.

Non-uniform Bending apparatus


(With accessories)

5 Nos.

3.

Viscosity (Poiseuilles flow) apparatus


(With accessories)

5 Nos.

4.

Band gap apparatus/ Post office box

5 Nos.

5.

Spectrometer
(With grating, prism and accessories)

5 Nos.

6.

Carey Foster Bridge

5 Nos.

Quantity
available

Deficiency %

Chemistry Laboratory

S.No.

Description of Equipment

Quantity
required

1.

Electronic balance

1 No.

2.

pH meter

8 Nos.

3.

Conductivity bridge

8 Nos.

4.

Potentiometer

8 Nos.

5.

Platinum electrodes

8 Nos.

6.

Calomel electrodes

8 Nos.

7.

Spectrophotometer

1 No.

8.

Flame photometer

1 No.

9.

Oswald viscometer

15 Nos.

10.

Glassware

Sufficient
Quantity

Quantity
available

Deficiency %

SEMESTER II
I Year B.E. /B.Tech.
EE 2155 Electrical Circuits Laboratory
Requirement for a batch of 30 students

Sl.
No.

Name of the
Equipment

Range / Spec

Quantity
required

1. C.R.O

30MHZ

2. D.C, Power
Supply
(regulated)
3. Function
Generator

0-30 V

Frequency: 1 MHZ

Amplitude: Max volt:


20V
Min volt:
20mV
Waveforms: Sine,
Square,
triangular

4. Digital Storage
Oscilloscope

Quantity
available

Deficienc
y%

SEMESTER III
Faculty of Electrical Engineering
B.E. Electrical and Electronics Engineering
EE 2207 Electron Devices and Circuits Laboratory
Requirement for a batch of 30 students
S.No.
Description of Equipment

Quantity
required

1.

Regulated Power Supply

15

2.

Dual Tree CRO (20 MHz)

15

3.

Function Generator

15

4.

31/2 Digit digital multimeter

10

5.

Bread Boards

40

6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

Transistor

25 Nos.

JFET

10 Nos.

Diode

10 Nos.

Zener Diode

5 Nos.

UJT

5 Nos.

Photo Diode

5 Nos.

Photo Transistor

5 Nos.

Thermistors

5 Nos.

OP-amp

10 Nos.

Milli Ammeter (0-100mA)

15 Nos.

Micro Ammeter (0-50A)

10 Nos.

Low range voltmeter (0-30V)

10 Nos.

Quantity
available

Deficiency
%

18.
19.
20.

Resistor of various ranges

50 Nos.

Capacitors of various ranges

50 Nos.

Connecting wires

Sufficient Nos

SEMESTER III
Faculty of Electrical Engineering
B.E. Electrical and Electronics Engineering
EE 2209 Data Structures and Algorithms Laboratory
Requirement for a batch of 30 students
S.No.

Description of Equipment

Quantity
required

Hardware Required
1.

Computer (Pentium 4)

40 Nos with
one server
3 Nos

2.

Dot matrix printer

3.

Laser Printer

2 Nos

4.

UPS (5 KVA)

5.

Software Required
Turbo C

40 Nodes

Quantity
available

Deficiency
%

SEMESTER III
Faculty of Electrical Engineering
B.E. Electrical and Electronics Engineering
EE 2208 Measurements & Instrumentation Laboratory
Requirement for a batch of 30 students
Sl.
No.
1.

Description of Equipment

Quantity
required
1 No.

LVDT kit

2.

Multimeter

8 No.

3.

Bourdon pressure transducer kit

1 No.

4.

Foot pump

1 No.

5.

Voltmeter

4 No.

6.

Maxwells inductance Capacitance Bridge kit

1 No.

7.

Unknown Inductance

1 No.

8.

Schering Bridge kit

1 No.

9.

Unknown capacitance

1 No.

10.

Wheat stone Bridge kit

1 No.

11.

Unknown resistance

1 No.

12.

Kelvin Double bridge kit

1 No.

13.

Unknown resistance

1 No.

14.

Operational Amplifier

1 No.

15.

Resistors

3 No.

16.

RPS

4 No.

17.

IC 741

2 No.

18.

DC trainer kit

2 No.

19.

CRO

2 No.

20.

Resistance

1 No.

21.

Capacitance

1 No.

22.

Energy meter

1 No.

23.

Wattmeter

2 No.

24.

Stop watch

1 No.

25.

M.I Ammeter

2 No.

26.

M.I Voltmeter

2 No.

Quantity
available

Deficiency
%

Sl.
No.
27.

Description of Equipment

Quantity
required
1 No.

Current Transformer

28.

Lamp Load

1 No.

29.

Ammeter

2 No.

30.

3 phase Auto transformer

1 No.

31.

Maxwell bridge set up

1 No.

32.

Ring specimen

1 No.

33.

Galvanometer

1 No.

Quantity
available

Deficiency
%

SEMESTER IV
Faculty of Electrical Engineering
B.E. Electrical and Electronics Engineering
EE 2257 Control Systems Laboratory
Requirement for a batch of 30 students
S.No.

1.

2.

3.

Description of Equipment

DC servo motor

field separately excited


loading facility variable
voltage source - 1 No

Tachometer
Multimeter
Stop watch

1 No
2 Nos
1 No

AC Servo Motor

Minimum
of
100w

necessary sources for main


winding and
control winding 1 No

Tachometer
Stopwatch
Voltmeter

1 No
1 No
1 No

Rigged up models of type-0 and type-1


system using analog components
Variable frequency square wave
generator and a normal CRO
(Or)
DC source and storage Oscilloscope

4.

5.

6.

Quantity required

DC Generator
Tachometer
Various meters
Stop watch
DC Motor
Tachometer
Various meters
Stop watch
System with MATLAB / MATHCAD (or)
equivalent software

1 No

minimum 3 user license

Quantity
available

Deficiency
%

S.No.

Description of Equipment

7.

AC and DC position control kit with DC


servo motor
Power transistor
Adder
Stepping Motor
Microprocessor kit
Interfacing card
Power supply
System with MATLAB / MATHCAD (or)
other equivalent software

minimum 3 user license

System with MATLAB / MATHCAD /


equivalent software

Minimum 3 user license

8.

9.

10.

Quantity required

Quantity
available

Deficiency
%

SEMESTER IV
Faculty of Electrical Engineering
B.E. Electrical and Electronics Engineering
EE 2258 Linear and Digital Integrated Circuits Laboratory
Requirement for a batch of 30 students
S.No.

1.

Description of Equipment

Quantity
required
4 each

2.

Interface such as, A/D, D/A converter,


DMA, PIC Serial, Interface,
Temperatures controller, Stepper
motor, Key board
CRO and function generator

3.

IC trainer Kit

15

4.

Analog AC trainer kit

5.

Components and bread boards

6.

Chips IC 7400

10

7.

Chips IC 7402

10

8.

Chips IC 7408

10

9.

Chips IC 7432

10

10. Chips IC 7410

25

11. Chips IC 555

10

12. Chips IC 741

10

13. Chips IC 74153

10

14. Chips IC 7474

10

15. Chips IC 7490

10

16. Chips IC 7447

10

3 each

10 each

Quantity
available

Deficiency
%

S.No.

Description of Equipment

Quantity
required

17. Chips IC 7476

10

18. Chips IC 7420

10

19. Chips IC 7404

15

20. Chips LM 317

10

21. Chips LM 723

10

22. Chips MA 7840

10

23. Chips LM 380

10

24. Chips ICL - 8038

10

25. Traffic light control kit

26. VDU

27. 7 segment Display

28. Interfacing card such as keyboard etc.


29. Work tables

3 each
15

Quantity
available

Deficiency
%

SEMESTER IV
Faculty of Electrical Engineering
B.E. Electrical and Electronics Engineering
EE 2259 Electrical Machines Laboratory I
Requirement for a batch of 30 students
S.No.

Description of Equipment

Quantity
required

4.
5.
6.

D.C motor Generator set


D.C motor Shunt Generator
D.C motor Compound Generator
D.C. Shunt Motor
D.C. Series Motor
D.C. Compound Motor
Single phase transformers
Three phase transformers

2
2
2
1
1
7
2

7.

D.C. Motor Alternator set

4 sets

8.

Three phase Induction Motor (Squirrel cage)

3 Nos.

9.

Three phase slip ring Induction Motor


Single phase Induction Motor
Resistive load
3 phase 2 , single phase - 3
Inductive load
Single phase Auto transformer

1 No.
2 Nos.

Three phase Auto transformer


Moving Coil Ammeter of different ranges
Moving Coil Voltmeter of different ranges
Moving Iron Ammeter of different ranges
Moving Iron voltmeter of different ranges
Wire wound Rheostats of different ratings
Tachometers
Single element wattmeters of different ranges
UPF / LPF
Double element wattmeters of different ranges
Power factor meter
Digital multimeter
Three point starter, four point starter,DOL starter,
manual star / delta starter, semi automatic and fully
automatic star / delta starter

3 Nos.
20 Nos.
20 Nos.
20 Nos.
20 Nos.
30 Nos.
10 Nos.

1.

2.
3.

10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.

set
set
Nos.
No.
No.
Nos.
Nos.

5 Nos.
1 No.
5 Nos.

20 Nos.
4 Nos.
2 Nos.
5 Nos.
1 No each
for study
experiment

Quantity
available

Deficiency
%

SEMESTER V
Faculty of Electrical Engineering
B. E. Electrical and Electronics Engineering
CS2312 Object Oriented Programming Laboratory
Requirement for a batch of 30 students
S.No.

Description of Equipment

Quantity
required

Hardware Required
40 Nos. with
one server

1.

Computer(Pentium 4)

2.

Dot matrix printer

3 Nos

3.

Laser Printer

2 Nos

4.

UPS (5 KVA)

Software Required
5.

Turbo C ++

6.

(Java 2 SDK)
JDK 5.0 update 6 (1.5.0-Internal
Version No.)

40 Nodes

40 Nos

Quantity
available

Deficiency
%

SEMESTER V
Faculty of Electrical Engineering
B.E. - Electrical and Electronics Engineering (R 2008)
GE2321 Communication Skills Laboratory
Requirement for a batch of 60 students

Sl.No.
1.

2.

Description of Equipment
Server
o
o
o
o

PIV system
1 GB RAM / 40 GB HDD
OS: Win 2000 server
Audio card with headphones (with
mike)
o JRE 1.3
Client Systems

Quantity
required

Quantity
available

Deficiency %

1 No.

o
o
o
o

3.

4.

5.
6.
7.
8.
9.
10.

PIII or above
256 or 512 MB RAM /40 GB HDD
60 No.
OS: Win 2000
Audio card with headphones (with
mike)
o JRE 1.3
Softwares
a) Interactive Teacher Control Software
Available / Not Available
b) English Language Lab Software
Available / Not Available
c) Career Lab software
Available / Not Available
Handicam Video Camera (with video lights
and mic input)

1 No.

Television - 29
Collar mike
Cordless mikes
Audio Mixer
DVD Recorder / Player
LCD Projector with MP3 /CD /DVD provision
for audio / video facility - Desirable

1
1
1
1
1

No.
No.
No.
No.
No.

1 No.

Available / Not Available

SEMESTER V
Faculty of Electrical Engineering
B. E. Electrical and Electronics Engineering (R 2008)
EE2304 Power Electronics Laboratory Requirement
for a batch of 30 students

S.No.
1.

Description of Equipment
Device characteristics (for SCR,
MOSFET, TRIAC and IGBT) kit with
built in power supply & meters

2.

SCR firing circuit module

3.

12.

Single phase SCR based controlled


converter & fully controlled converter
along with built-in / separate / firing
circuit / module and meter
MOSFET based step up and step
down choppers
IGBT based single phase PWM
inverter module
IGBT based three phase PWM
inverter module
IGBT based high switching frequency
chopper module with built-in controller
Resonant DC-DC conveter module
with built in power supply and
controller
SCR & TRIAC based 1 phase
A.C.phase controller along with lamp
or rheostat load
SCR based V/I commuted chopper
module with relevant firing module
(separate or built-in)
Dual regulated DC power supply with
common ground
Cathode Ray Oscilloscope

13.

Isolation Transformer

14.

Single phase Auto transformer

4.
5.
6.
7.
8.

9.

10.

11.

Quantity
required

2 each
2

2 each

1 each
2
2
2
2

4
4
5
5
3

Quantity
available

Deficiency
%

S.No.
15.

Description of Equipment

16.

Components (Inductance,
Capacitance)
Multi meter

17.

LCR meter

18.

Rheostats of various ranges

19.

Work tables

20.

DC and AC metes of required ranges

Quantity
required
3 sets for each
5
3
2 sets of 10
value
12
20

Quantity
available

Deficiency
%

SEMESTER V
Faculty of Electrical Engineering
B. E. Electrical and Electronics Engineering (R 2008)
EE2305 Electrical Machines II Laboratory
Requirement for a batch of 30 students
S.No.

1.

Description of Equipment

Quantity
required
2

5.

DC shunt motor coupled three phase


alternator
Synchronous motor coupled to DC
motor
Three phase induction motorsSquirrel cage
Slip ring
DC Shunt motor coupled salient pole
three phase alternator
Single phase induction motors

6.

Air core inductor to do ZPF

7.

StarterThree phase induction motor starters


Single phase induction motor starters
MetersVoltmeter (AC)
Ammeter (AC)
Wattmeter (lpf)
Wattmeter (upf)
Single phase auto transformer

2.
3.

4.

8.

9.

2
1
1
2

1
1
15
15
15
30
2

10. Three phase auto transformer

11. Rheostats of various range

30

12. DC panel boards (220V, 36V)

1 each

13. AC panel board

14. Work tables

12

Quantity
available

Deficiency
%

SEMESTER IV
Faculty of Electrical Engineering
B. E. Electrical and Electronics Engineering EE2356
Microprocessor and Microcontroller Laboratory
Requirement for a batch of 30 students

S.No.

Description of Equipment

Quantity
required

30. 8085 Microprocessor Trainer with


Power supply
31. 8051 Micro controller Trainer Kit with
power supply
32. 8255 Interface board

15

33. 8251 Interface board

34. 8259 Interface board

35. 8279 Keyboard/Display Interface


Board
36. 8254 timer counter

37. ADC and DAC card

38. Stepper motor with Controller

39. Traffic Light Control System

40. Regulation power supply

30

41. Universal ADD-ON modules

42. 8 Digit Multiplexed Display Card

43. Function Generator

10

44. Multimeter

20

45. C.R.O.

10

46. Quad 2-input AND gate (IC7408)

50

15
5

Quantity
available

Deficiency
%

S.No.

Description of Equipment

Quantity
required

47. Quad 2-input OR gate (IC7432)

50

48. Quad 2-input XOR gate (IC7486)

50

49. Hex inverter / NOR gate (IC 7404)

50

50. Quad 2-input NOR gate (IC 7402)

50

51. Quad 2-input NAND gate (IC 7400)

50

52. Dual J-K Flip flop with clear (IC7473)

50

53. Dual D Flip flop with clear/preset


(IC7474)
54. 4-bit Adder (IC 7483)

50

55. 4-bit magnitude comparator (IC 7485)

50

56. BCD to 7-segment code converter


(IC7447)
57. 3 to 8 Decoder / Demultiplexer
(IC 74138)
58. Decade / Modulo-n counter (IC7490)

50

59. 4-bit serial / parallel in/out shift register


(IC7495)
60. General purpose OPAMP (IC741)

50
100

61. TIMER (IC555)

100

62. Voltage controlled oscillator (VCO)


(IC566)
63. Phase Locked Loop (PLL) (IC565)

25

64. Diode (IN4007)

25

65. Zener Diode (5 V)

25

66. Light Emitting Diode (LED)

25

50

50
50

25

67. Resistors (Quarter watt):10K, 33k ohm

50 each

68. Capacitor: 0.1microfarad,


0.01 microfarad & 0.47 microfarad

50 each

Quantity
available

Deficiency
%

S.No.

Description of Equipment

69. Bread board


70. Single strand wire
71. Wire stripper

Quantity
required
30
10 packet
10

Quantity
available

Deficiency
%

SEMESTER IV
Faculty of Electrical Engineering
B. E. Electrical and Electronics Engineering
EE 2357 Presentation Skills and Technical Seminar

Details will be given later

SEMESTER VII
Faculty of Electrical Engineering
B.E. Electrical and Electronics Engineering
EE 2404 - Power System Simulation Laboratory
Requirement for a batch of 30 students
S.No.

Description of Equipment

1.

25

2.

Personal computers (Pentium-IV,


80GB, 512 MBRAM)
Printer laser

3.

Dotmatrix

4.

Server (Pentium IV, 80GB, 1GBRAM)


(High Speed Processor)
Software:
E.M.T.P/ETAP/CYME/MIPOWER /any
power system simulation software
Compliers: C, C++, VB, VC++

5.

6.

Quantity
required

5 licenses

25 users

Quantity
available

Deficiency
%

Das könnte Ihnen auch gefallen