Sie sind auf Seite 1von 51

Kota Kinabalu

16 November 2013
www.mgbc.org.my
hplooi@unifi.my

CONTENT

1 The Construction Process

2 The GBI Rating Tool


3 Affordable Green Builing
4 Check List Templates

16th November 2013

16th November 2013

THE CONSTRUCTION PROCEDURE

Authorities

Client / Design Team

Construction Team

16th November 2013

THE CONSTRUCTION FLOW PROCESS

16th November 2013

THE CONSTRUCTION PROCEDURE

4 Universal Concepts of
P r o f e s s i o n a l i s m
Public Interest

Clients Interest
Code of Conduct
Expert Knowledge
16th November 2013

THE PROFESSIONAL IN CONSTRUCTION

16th November 2013

THE PROFESSIONAL IN CONSTRUCTION

16th November 2013

16th November 2013

10 THE BUILDING IMPACT ON THE ENVIRONMENT

16th November 2013

11 THE LIFE CYCLE

16th November 2013

12 TYPICAL LCA BOUNDARIES FOR UPVC PIPES

16th November 2013

13 THE BUILDING IMPACT ON THE ENVIRONMENT

Energy

waste

Water
Sewage
16th November 2013

14 THE BUILDING IMPACT ON THE ENVIRONMENT

16th November 2013

15 THE BUILDING IMPACT ON THE ENVIRONMENT

Approx
10%-15%
Building
Sector

The Building sector consumes approx 10% -15% of total energy


nationally.
16 November 2013
th

16 THE BUILDING IMPACT ON THE ENVIRONMENT

Building Sector Indicators?


10% - 20% Energy
15% to 20% Green House Gas
Emission (GHG)
25% 40% solid waste (construction)
50% of natural resources
Construction = 10% - 15% GDP

16th November 2013

16th November 2013

18 GBI ASSESSMENT TOOLS


1.
2.

NRNC (Non Residential New Construction)


RNC (Residential New Construction)
3.
4.

NREB (Non Residential Existing Building)


RNC V2 (Residential New Construction, Version 2)

5.
6.
7.

GBI Township (Township Development)


IEB (Industrial Existing Building)
INC (Industrial New Construction)
8.

NRNC Data Centre

10.

NRNC Retail

11.

Under Development
(a) Health Care
(b) Interior
(c) Resort / Hotel

2009
2010

2011
2012
2013

2013 - 2014
16th November 2013

19 THE RNC TOOL

R ES I D E N T I A L N E W
CONSTRUCTION
VERSION 3.0

16th November 2013

20 THE NRNC TOOL

NON-RESIDENTIAL NEW
CONSTRUCTION
VERSION 1.0

16th November 2013

21 GBI GREEN GOALS IN CONSTRUCTION

Measures can be Broken Down into the following

Compliance to Minimum Legal Standards No


additional Cost.
Good Practice Measures No additional Cost.

Best Practice Standard Some Additional Cost


Best Available Technology Additional Cost

16th November 2013

22 CRITERIA RELATING TO CONSTRUCTOR

16th November 2013

23 CRITERIA RELATING TO CONSTRUCTOR

16th November 2013

24 CRITERIA RELATING TO CONSTRUCTOR

16th November 2013

25 CRITERIA RELATING TO CONSTRUCTOR

16th November 2013

26 CRITERIA RELATING TO CONSTRUCTOR

16th November 2013

27 CONSTRUCTOR CRITERIA
Minimum Legal & Safety Standards No Additional Cost
1.

EE1 - Minimum Energy Efficiency Standards

2.

EQ1 Minimum Air Quality

3.

Sufficient window views required under building code


Common area with natural lighting

EQ5 External Views

Provide sufficient windows and cross ventilation to building code

EQ4 Daylighting

4.

OTTV<50, building thermal sheel.


Sun shading on glazing rather than low-e glass
Orient building away from sun
If possible put min. Standard bricks for curtain wall

Sufficient window views required under building code

16th November 2013

28 CONSTRUCTOR CRITERIA
Minimum Legal & Safety Standards No Additional Cost
5.

SM4 Earthworks Construction Activity Pollution Control

6.

SM6 Workers Site Amenities

7.

Mandatory under law. Protect site from pollution and

Provide proper facilities and housing to construction workers on site

SM10 Storm Water Design

Score 1 out of 3 available points. Design storm water runoff to comply


with technical Manual MSMA (Manual Natural Storm Water)

Total Score Minimum Legal & Safety Standards

11 POINTS

16th November 2013

29 CONSTRUCTOR CRITERIA
GOOD PRACTICE Standards No Additional Cost
1.

2.

3.

EE6 Sustainable Maintenance & Building User Manual


Provide space for maintenance office
Ensure maintenance staff (50%) appointed early
Provide documented proof of maintenance plan

2
1

EQ6 Sound Insulation


Partitions between units and rooms with sound insulation quality
(STC>45)
EQ7 Post Occupancy Survey
1
Implement post occupany survey

4.

SM1 Sustainable Site


Select sites not environmentally sensitive

5.

SM3 Community Connectivity


4
Locate site where at least 10 public amenities are available (e.g.
Library, grocery, supermarket, police station etc.

6.

4
SM8 Public Transportation Access
Covered waiting area and public transportation score 4 out of 8

7.

SM11 Greenscape & Water Bodies


At least 15% of land area to score 1 out of 5 points.

1
16th November 2013

30 CONSTRUCTOR CRITERIA
GOOD PRACTICE Standards No Additional Cost 1
8. SM14 Composting

9.

Plan for composting of landscape and/or organic waste

MR2 Recycled Content Material


Select concrete, steel, glass with recycled content; target at least 10%
of total building material cost to score 1 out of 2 points

2
10. MR3 Regional Materials
Select building material at least 75% supplied from region (500km
radius from site). Exclude M&E items.
2

11. MR5 Storage & Collection of Recyclables.


During construction provide recycling bins & plan
For permanent design provide bins and collection centre

1
12. MR6 Construction Waste Management
Recover at least 50% of construction waste e.g. Steel, waste concrete,
pile cut-off, timber waste etc to score 1 out of 2 points.
1

12. WE3 Water Efficient Irrigation & Landscape


Select native plants which do not use water to reduce irrigation need
by at least 50% to score 1 out of 2 points.

Total Score GOOD Practice Standards 22 POINTS


16th November 2013

31 CONSTRUCTOR CRITERIA
BEST PRACTICE Standards Some Additional Cost
Minimum Legal & Safety Standards 11 POINTS

GOOD Practice Standards

22 POINTS

TOTAL NO COST MEASURES

33 POINTS

Additional Point for certification 17 POINTS


1.

EE2 Advanced EE Performance

2.

EE4 External Lighting & Control

3.

OTTV < 42 and RTTV < 0.5W/mK. Score 2 out of 12 points.


Additional cost for roof insulation or insulation embedded in r.c. Flat
roof.
High efficiency lighting to external lightings and photo sensors for
control. Some cost for LED or high efficiency fluorescent or SON lamps

SM8 Public Transportation Access

Dedicated, covered walkway to station score another 2 out of 8


points
16th November 2013

32 CONSTRUCTOR CRITERIA
BEST PRACTICE Standards Some Additional Cost
4.

SM9 Dedicated Cycling Lane

5.

6.

8.

Select low impact building material at least 2% to score 2nd point.


Some cost possibly

MR6 Construction Waste Management

Select roof material with good SRI at least 75% of roof area (may be
no cost or some cost)

MR1 Materials Reuse and Selection

At least 25% of land area (normal local authority requirements is 15%).


This will score additional 1 out of 5 points

SM13 Heat Island Effect - Roof

7.

Provide cycling lanes, bicycle parking bays


Some small additional cost.

SM11 Heat Island Effect

Recover at least 75% of construction waste e.g. Steel, waste concrete,


pile cut-off, timber waste etc to score the 2nd point.
16th November 2013

33 CONSTRUCTOR CRITERIA
BEST PRACTICE Standards Some Additional Cost
4.

WE1 Rain Water Harvesting (for common areas)

5.

6.

Design bioswale 25% of building perimeter


External shading device for 50% of glazed area (this will also help in
EE1 and EE2)
Recycle fire system water (minimal cost)
Herb and Food garden

IN2 Appoint GBI Facilitator

Recycle grey water. To keep cost down use grey water only for
landscape irrigation. 10% common water reduction score 1 out of 2
points.

Innovation Total available 7 Points

7.

RWH to reduce common area water by 30%, score 2 out of 4


Some small additional cost.

WE2 Waste Water Recycling

Some cost. The advantage is the GBIF can advice on the best
measures with optimal cost for adoption.

Total Score BEST Practice Standards 20 POINTS


16th November 2013

34 CONSTRUCTOR CRITERIA
Code

Description

Total

Min .
Standards

Good
Practice

Best
Practice

EE1

Min EE Performance

EE2

Advanced EE Performance

12

EE3

Renewable Energy

EE4

External Lighting and Control

EE5

Internet Connectivity

EE6

Sustainable Maintenance & Building User Manual

EQ1

Minimum Indoor Air Quality Performance

EQ2

Volatile Organic Compounds Minimisation

EQ3

Formaldehyde Minimisation

EQ4

Daylighting

EQ5

External Views

EQ6

Sound Insulation

EQ7

Post Occupancy Evaluation

Sub Total

35

4
16th November 2013

35 CONSTRUCTOR CRITERIA
Code

Description

Total

Min .
Standards

Good
Practice

Best
Practice

SM1

Site Selection & Planning

SM2

Rehabilitation of Brownfield OR redevelopment of


Existing Building

SM3

Community Connectivity

SM4

Earthworks Construction Activity Pollution Control

SM5

QLASSIC Quality Assessment System for Building


Construction Works

SM6

Workers Site Amenities

SM7

IBS Industrialised Building System

SM8

Public Transportation Access

SM9

Dedicated Cycling Network

SM10

Stormwater Design Quantity & Quality Control

SM11

Heat Island Effect Greenscape & Water Bodies

SM12

Heat Island Effect - Hardscape

SM13

Heat Island Effect Roof

SM14

Composting

68

12

13

Sub Total (cumulative)

cumulative

14
16th November 2013

36 CONSTRUCTOR CRITERIA
Code

Description

Total

Min .
Standards

Good
Practice

Best
Practice

MR1

Materials Reuse and Selection

MR2

Recycled Content Materials

MR3

Regional Materials

MR4

Sustainable Timber

MR5

Storage and Collection of Recyclables

MR6

Construction Waste Management

WE1

Rainwater Harvesting

WE2

Waste Water Recycling

WE3

Water Efficient Irrigation & Landscaping

WE4

Waste Efficient Fittings

IN1

Innovation

Bioswale 25% of perimeter

External shading device for 50% of glazing area

Recycle fire system water

Herb & Food Garden

100

13

20

IN2

GBI Facilitator

Sub Total

24
16th November 2013

37 CONSTRUCTOR CRITERIA
Code

Description

Total

Min .
Standards

Good
Practice

Best
Practice

EE

Energy Efficiency

23

EQ

Indoor Environmental Quality

12

SM

Sustainable Site Planning & Management

33

10

MR

Material & Resources

12

WE

Water Efficiency

12

IN

Innovation

Sub Total

100

Up Minimum Safety Standard


Up to Good Practice Standards

13
33

Up to Best Practice Standards

57

Certified at Minimum or NO COST.


Or additional cost < 1% of normal construction cost.
16th November 2013

38 CONSTRUCTOR CRITERIA
Description

Total

Min .
Standards

Good
Practice

Best
Practice

EE

Energy Efficiency

23

EQ

Indoor Environmental Quality

11

SM

Sustainable Site Planning & Management

39

12

MR

Material & Resources

WE

Water Efficiency

12

IN

Innovation

Sub Total

100

Min. Safety Standard


Good Practice Std.
Best Practice Std.

20
37
50

16th November 2013

39 SUMMARY OF GOVERNMENT INCENTIVES

Passive
Design

L a n d
s c ap e

????

OTTV
Compliance
(MS1525)

25% more
Green Space

Water
Efficient
Fittings

RTTV
Compliance
(MS1525)

Make
Mandatory

Rain Water
Harvesting

Min openings
for
ventilation

Water

Recently
Mandatory

Min openings
for day
lighting

(over current
requirements)

Energy
Energy
Calculations
to MS1525

Mandatory only
on sectors or
via incentives

G r e e n
Building
Certification
GBI Gold or
Platinum

GBI Certified

Already Mandatory
under UBBL

The above are


only beginning for
discussions
16th November 2013

ESC Plan Check


List

CWM Plan Check


List

CoW
Contractors,
S.O.

Contractors,
S.O.

CxS Plan &


Check List

Material Check
List

Quality Check
List

Contractors,
Engineer
Briefing/Training

Recycled Material
ReUsed Material
Regional Material

Contractor
CIDB
QLASSIC

GBI Check List


Deliverables by
Consultants,
Clients,
Contractors,
Owner/Developer

16th November 2013

41 CWMP CHECK LIST

16th November 2013

42 CHECK LIST

16th November 2013

43 CWMP CHECK LIST


Date:

Waste Form No.:

Person In Charge:

Container Type:

No. of Trips

Source of Waste

Reuse
Recycle
Disposal
Onsite
Offsite
Percentage of Waste in the Container
Concrete
Wood
Metals
Cardboard
Gypsum
Plastic
Destination of waste
Sub-Contractor

% Insulation
% Glass
% Electrical
%
%
%
Waste Receipt No./Photo
No.
Signature

%
%
%
%
%
%

16th November 2013

44 MR2 RECYCLED CONTENT CHECK LIST


Recycled Content Materials to be used in this project:Post Consumer
1. Galvanized iron door frame
2. Aluminum frame for window
3. Mild steel railing to the staircase
4. Dry wall partition*
5. Carpet *
6. Suspended ceiling*
7. Reinforcement steel bars
8. Cement with fly-ash mixture
Pre Consumer
1. Waste Concrete
2. Pile stump cut-off
16th November 2013

45 ESC CHECK LIST

16th November 2013

46 ESC CHECK LIST

16th November 2013

47 ESC CHECK LIST

16th November 2013

48 ESC CHECK LIST

16th November 2013

49 ESC CHECK LIST

16th November 2013

50 GREENPAGESMALAYSIA

www.greenpagesmalaysia.com
hplooi@unifi.my, 10th October-2012

Kota Kinabalu
16 November 2013
www.mgbc.org.my
hplooi@unifi.my

Das könnte Ihnen auch gefallen