CONTENT
Authorities
Construction Team
4 Universal Concepts of
P r o f e s s i o n a l i s m
Public Interest
Clients Interest
Code of Conduct
Expert Knowledge
16th November 2013
Energy
waste
Water
Sewage
16th November 2013
Approx
10%-15%
Building
Sector
5.
6.
7.
10.
NRNC Retail
11.
Under Development
(a) Health Care
(b) Interior
(c) Resort / Hotel
2009
2010
2011
2012
2013
2013 - 2014
16th November 2013
R ES I D E N T I A L N E W
CONSTRUCTION
VERSION 3.0
NON-RESIDENTIAL NEW
CONSTRUCTION
VERSION 1.0
27 CONSTRUCTOR CRITERIA
Minimum Legal & Safety Standards No Additional Cost
1.
2.
3.
EQ4 Daylighting
4.
28 CONSTRUCTOR CRITERIA
Minimum Legal & Safety Standards No Additional Cost
5.
6.
7.
11 POINTS
29 CONSTRUCTOR CRITERIA
GOOD PRACTICE Standards No Additional Cost
1.
2.
3.
2
1
4.
5.
6.
4
SM8 Public Transportation Access
Covered waiting area and public transportation score 4 out of 8
7.
1
16th November 2013
30 CONSTRUCTOR CRITERIA
GOOD PRACTICE Standards No Additional Cost 1
8. SM14 Composting
9.
2
10. MR3 Regional Materials
Select building material at least 75% supplied from region (500km
radius from site). Exclude M&E items.
2
1
12. MR6 Construction Waste Management
Recover at least 50% of construction waste e.g. Steel, waste concrete,
pile cut-off, timber waste etc to score 1 out of 2 points.
1
31 CONSTRUCTOR CRITERIA
BEST PRACTICE Standards Some Additional Cost
Minimum Legal & Safety Standards 11 POINTS
22 POINTS
33 POINTS
2.
3.
32 CONSTRUCTOR CRITERIA
BEST PRACTICE Standards Some Additional Cost
4.
5.
6.
8.
Select roof material with good SRI at least 75% of roof area (may be
no cost or some cost)
7.
33 CONSTRUCTOR CRITERIA
BEST PRACTICE Standards Some Additional Cost
4.
5.
6.
Recycle grey water. To keep cost down use grey water only for
landscape irrigation. 10% common water reduction score 1 out of 2
points.
7.
Some cost. The advantage is the GBIF can advice on the best
measures with optimal cost for adoption.
34 CONSTRUCTOR CRITERIA
Code
Description
Total
Min .
Standards
Good
Practice
Best
Practice
EE1
Min EE Performance
EE2
Advanced EE Performance
12
EE3
Renewable Energy
EE4
EE5
Internet Connectivity
EE6
EQ1
EQ2
EQ3
Formaldehyde Minimisation
EQ4
Daylighting
EQ5
External Views
EQ6
Sound Insulation
EQ7
Sub Total
35
4
16th November 2013
35 CONSTRUCTOR CRITERIA
Code
Description
Total
Min .
Standards
Good
Practice
Best
Practice
SM1
SM2
SM3
Community Connectivity
SM4
SM5
SM6
SM7
SM8
SM9
SM10
SM11
SM12
SM13
SM14
Composting
68
12
13
cumulative
14
16th November 2013
36 CONSTRUCTOR CRITERIA
Code
Description
Total
Min .
Standards
Good
Practice
Best
Practice
MR1
MR2
MR3
Regional Materials
MR4
Sustainable Timber
MR5
MR6
WE1
Rainwater Harvesting
WE2
WE3
WE4
IN1
Innovation
100
13
20
IN2
GBI Facilitator
Sub Total
24
16th November 2013
37 CONSTRUCTOR CRITERIA
Code
Description
Total
Min .
Standards
Good
Practice
Best
Practice
EE
Energy Efficiency
23
EQ
12
SM
33
10
MR
12
WE
Water Efficiency
12
IN
Innovation
Sub Total
100
13
33
57
38 CONSTRUCTOR CRITERIA
Description
Total
Min .
Standards
Good
Practice
Best
Practice
EE
Energy Efficiency
23
EQ
11
SM
39
12
MR
WE
Water Efficiency
12
IN
Innovation
Sub Total
100
20
37
50
Passive
Design
L a n d
s c ap e
????
OTTV
Compliance
(MS1525)
25% more
Green Space
Water
Efficient
Fittings
RTTV
Compliance
(MS1525)
Make
Mandatory
Rain Water
Harvesting
Min openings
for
ventilation
Water
Recently
Mandatory
Min openings
for day
lighting
(over current
requirements)
Energy
Energy
Calculations
to MS1525
Mandatory only
on sectors or
via incentives
G r e e n
Building
Certification
GBI Gold or
Platinum
GBI Certified
Already Mandatory
under UBBL
CoW
Contractors,
S.O.
Contractors,
S.O.
Material Check
List
Quality Check
List
Contractors,
Engineer
Briefing/Training
Recycled Material
ReUsed Material
Regional Material
Contractor
CIDB
QLASSIC
42 CHECK LIST
Person In Charge:
Container Type:
No. of Trips
Source of Waste
Reuse
Recycle
Disposal
Onsite
Offsite
Percentage of Waste in the Container
Concrete
Wood
Metals
Cardboard
Gypsum
Plastic
Destination of waste
Sub-Contractor
% Insulation
% Glass
% Electrical
%
%
%
Waste Receipt No./Photo
No.
Signature
%
%
%
%
%
%
50 GREENPAGESMALAYSIA