Sie sind auf Seite 1von 119

CONTRACT NO:

1-14-2410/59

CALCULATION NO: 2411-8320-CA-WA15-0001

CLIENT:

PETRORabigh

SAFETY CALCULATION: YES

PROJECT TITLE: PETRORabigh - UOU PROJECT

COMP. PROG:

DISCIPLINE:

CALCULATION CLASS: 1

CIVIL & STRUCTURAL ENGINEERING

EXCEL

DSN NO:
PAGE:

6598
1 OF

SUBJECT

WEST AREA PIPE RACK - WA15, DESIGN CALCULATIONS

DRAWING Nos.
2411-8310-43-WA15-0001

WA15 PIPE RACK FOUNDATION LAYOUT AND R.C.DETAILS

2411-8320-46-WA15-0001

WA15 PIPE RACK ARRANGEMENT PLAN AT EL +7.845,8.4,10.5,11.4,12.4

2411-8320-46-WA15-0002

14 & 20.95
WA15 PIPE RACK ARRANGEMENT ELEVATIONS & SECTIONS

REMARKS

REV

DATE

O1

5-Jan-07

DESCRIPTION
Issued For Comments

ORIGINATOR

CHECKER

TPR

Ashokan

APPROVER

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


Rev
O1

PETRORabigh, UOU PROJECT


1-14-2410/59
YES
2411-8320-CA-WA15-0001

Date
17-Nov-06

Sheet No :
Originator

Checker

TPR

Ashokan

1 of 8

CONTENTS

SECTION

SUBJECT

SHEET NO

1.0

SCOPE

2.0

REFERENCES

3.0

DESIGN DATA

4.0

DESIGN BASIS

5.0

LOADS & LOAD COMBINATIONS

6.0

STAAD MODEL

7.0

ANALYSIS & DESIGN

8.0

SUMMARY

APPENDIX - A

Typical cross section of the Piperack

A1

APPENDIX - B

Piping stress report

B1 to B7

APPENDIX - C

Wind Load Calculation

C1 To C2

APPENDIX - D

Seismic analysis-load data

APPENDIX - E

Effective Length Factor Calculation

E1 to E2

APPENDIX - F

Staad Model

APPENDIX - G

Staad Input and Output file

APPENDIX - H

Base Plate Design

APPENDIX - J

Anchor Bolt Design

APPENDIX - K

Shear Key Design

APPENDIX - L

Foundations and Pedestals

Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

1.0

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


Rev
O1

PETRORabigh, UOU PROJECT


1-14-2410/59
YES
2411-8320-CA-WA15-0001

Date
17-Nov-06

Sheet No :
Originator

Checker

TPR

Ashokan

2 of 8
Approver

SCOPE
This calculation covers the analysis and design of Piperack of West Area
(WA15) of PETRORabigh Project, The Kingdom of Saudi Arabia. The superstructure is of steel and is analysed and
designed using STAAD Pro-2004 for various load combinations.

2.0

REFERENCES
2.1

2.2

2.3

3.0

Codes & Standards


Industry Codes and Standards
AISC -LRFD
ASCE 7 - 02
Saudi Aramco Standards
SAES-A-112
SAES-A-204
SAES-M-100
SAES-M-001-AMD (R2)
SABP-006
SABP-007
Project Standards
2411-8310-DI-0001

- Civil Disipline Design Instruction

Drawings
2411-8320-46-O000-0001
2411-8310-43-O000-0001
2411-8230-46-CA00-0031
2411-8230-01-CA00-0001
2411- 8230-02-CA00-0001

Other References
2411-8230-01-O000-0001
2411-8230-02-O000-0001

- Overall Plot Plan


- Overall UOU Scope- Area Key plan

- Manual of Steel construction LRFD-Third Edition.


- Minimum Design Loads for Buildings and Other Structures
-

Meteorological and Seismic Design Data


Preparation of Structural Calculations
Saudi Aramco Building Code
Structural Design criteria for Non-building structures
Wind loads on Piperacks and Open frame structures.
Steel piperack design.

Steel work-General Notes


Civil General Notes
Piping layout- Construction area-CA10-Rack section
Plot Plan- Construction area -CA00
Central Sub area Plot plan Keyplan

DESIGN DATA
3.1
Material Data
The grade of structural steel used shall confirm EN10025 S355J0.
2
2
The yield strength of the steel is assumed to be 355N/mm and 275N/mm for beam and angle sections respectively.
The European sections are used for the member design.
3.2
Soil Data
The soil data is obtained from "The Geo Technical Investigation & survey report " by Osaimi Engineering, Saudi Arabia. A
detailed study and a thorough investigation has been carried out by them and all necessary data required for foundation design
like Soil parameters and location of existing and new bore holes are obtained from the same report and taken into account for
foundation and analysis for this rack.
3.3

4.0

Mateorological Data
The meterological datas are obtained from SAES-A-112 and the same has been taken into account in the design.

DESIGN BASIS
Description of the Structure
The WA15 piperack is a steel structure and is located in the West Area of PETRORabigh Project Site. This is
22m long in East-West directions, 18.35 m high and 7 m wide structure with two racks. It consists of portal frames of
at 4.5m,10.5 and 7m intervals with vertical bracing in the longitudinal direction and rigid frame in the transverse direction.
The Finished grade level of this area is at EL +2.60 m for grids A and B and 0.85m for grids C and D. The first rack level is
at EL+10.5m and the second rack is at +12.4m lvl.The typical cross section of the piperack is attached in Appendix A.
The pipe rack is supported with Isolated and combined footings

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


Rev
O1

PETRORabigh, UOU PROJECT


1-14-2410/59
YES
2411-8320-CA-WA15-0001

Date
17-Nov-06

Sheet No :
Originator

Checker

TPR

Ashokan

3 of 8
Approver

Location of piperacks is represented in key plan Dwg no: 2411-8230-02-CA00-0001.


Design Philosophy
Piperack structure is modeled as a 3-dimensional frame. The columns are considered as pinned at base. The structure is
analyzed through STAAD PRO 2004 for dead load, operating load, hydro-test load and surge load of pipe, dead load of cable
tray, wind load and seismic load on structure and their various combinations. It is designed as per AISC-Manual of Steel
Construction - LRFD 3rd edition.
In STAAD Model, the +ve X-axis is oriented towards North direction of the piperack.
The structure is checked for lateral deflection of H/100 as per SAES -M-001-AMD-Rev D2.
5.0

LOADS & LOAD COMBINATIONS


5.1

Primary Load Cases


Load Case
(Staad)
1
2
3
4

5.2

Description
SEISMIC LOAD +X
SEISMIC LOAD -X
SEISMIC LOAD +Z
SEISMIC LOAD -Z

EX
E-X
EZ
E-Z

11
12

DEAD LOAD (Self Weight of Structure)


OPERATING LOAD-PIPING/EQUIPMENT

DS
DO

21

DEAD LOAD - PIPING / EQUIPMENT

DE

22

TEST LOAD- PIPING/EQUIPMENT

DT

31
32

ANCHOR LOAD IN +VE DIR.


ANCHOR LOADI IN -VE DIR.

AF1
AF2

33
34
35

FRICTION LOAD IN +VE DIR.


FRICTION LOAD IN -VE DIR.
TEMPERATURE LOAD

FT1
FT2
T

41
42

WIND LOAD +Z
WIND LOAD -Z

WZ
W- Z

51
52

SURGE LOAD +X
SURGE LOAD -X

SX
S-X

Load Combinations

a) For Strength check

The piperack is designed based on Strength Design ( LRFD )method. The Load combinations and
load factors which are considered for the analysis and design are as follows. This is as per
SAES-M-001 Cl. 6.2.4- Table 8
1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load
101 1.4(DS+D0+AF1)+0.23FT1+1.4T
102 1.4(DS+D0+AF2)+0.23FT2+1.4T
1.2(Dead+Operating Load+Anchor)+ (1.6Wind or 1.0 Seismic Load)
103 1.2(DS+DO+AF1)+1.6W Z
104 1.2(DS+DO+AF1)+1.6W -Z
105 1.2(DS+DO+AF1)+1.0EX
106 1.2(DS+DO+AF1)+1.0E-X
107 1.2(DS+DO+AF1)+1.0EZ
108 1.2(DS+DO+AF1)+1.0E-Z
109 1.2(DS+DO+AF2)+1.6W Z
110 1.2(DS+DO+AF2)+1.6W -Z
111 1.2(DS+DO+AF2)+1.0EX
112 1.2(DS+DO+AF2)+1.0E-X
113 1.2(DS+DO+AF2)+1.0EZ
114 1.2(DS+DO+AF2)+1.0E-Z

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

Date
17-Nov-06

Sheet No :
Originator

Checker

TPR

Ashokan

4 of 8

0.9 Dead Load + 1.6Wind


115 0.9(DS+DE)+1.6W Z
116 0.9(DS+DE)+1.6W -Z
0.9 Dead Load +0.6 Operating+ 1.0 Seismic (operating)
117 0.9DS+0.6DO+1.0EX
118 0.9DS+0.6DO+1.0E-X
119 0.9DS+0.6DO+1.0EZ
120 0.9DS+0.6DO+1.0E-Z
0.9 Dead Load + 1.0 Seismic (empty)
~ 0.9 Dead Load + 0.67 Seismic (operating)
121 0.9(DS+DE)+0.67EX
122 0.9(DS+DE)+0.67E-X
123 0.9(DS+DE)+0.67EZ
124 0.9(DS+DE)+0.67E-Z
1.4(Dead Load )+ 1.4(Test Load)
125 1.4(DS+DT)
1.2(Dead Load )+ 1.2(Test Load) +(Wind @50MPH)
126 1.2(DS+DT)+0.29W Z
127 1.2(DS+DT)+0.29W -Z
1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load+1.0(Surge Load)
128 1.4(DS+D0+AF1)+0.23FT1+1.4T+1.0S X
129 1.4(DS+D0+AF2)+0.23FT2+1.4T+1.0S -X
1.2(Dead+Operating Load+Anchor)+ 1.0(Surge Load)
130 1.2(DS+DO+AF1)+1.0SX
131 1.2(DS+DO+AF1)+1.0S-x
132 1.2(DS+DO+AF2)+1.0SX
133 1.2(DS+DO+AF2)+1.S-x
1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load
151 1.4(DS+D0+AF1)+0.47FT1+1.4T
152 1.4(DS+D0+AF2)+0.47FT2+1.4T
1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load+1.0(Surge Load)
153 1.4(DS+D0+AF1)+0.47FT1+1.4T+1.0S X
154 1.4(DS+D0+AF2)+0.47FT2+1.4T+1.0S -X
b) For Serviceability check

1.0(Dead Load +Operating Load+anchor Load)+0.17 Friction Load+1.0 Temperature Load


201 1.0(DS+D0+AF1)+0.17FT1+1.0T
202 1.0(DS+D0+AF2)+0.17FT2+1.0T
1.0(Dead+Operating Load+Anchor)+ (1.0Wind or 0.7 Seismic Load)
203 1.0(DS+DO+AF1)+1.0W Z
204 1.0(DS+DO+AF1)+1.0W -Z
205 1.0(DS+DO+AF1)+0.7EX
206 1.0(DS+DO+AF1)+0.7E-X
207 1.0(DS+DO+AF1)+0.7EZ
208 1.0(DS+DO+AF1)+0.7E-Z
209 1.0(DS+DO+AF2)+1.0W Z
210 1.0(DS+DO+AF2)+1.0W -Z
211 1.0(DS+DO+AF2)+0.7EX
212 1.0(DS+DO+AF2)+0.7E-X
213 1.0(DS+DO+AF2)+0.7EZ
214 1.0(DS+DO+AF2)+0.7E-Z
1.0 Dead Load + 1.0Wind
215 1.0(DS+DE)+1.0W Z
216 1.0(DS+DE)+1.0W -Z

Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

Date
17-Nov-06

Sheet No :
Originator

Checker

TPR

Ashokan

5 of 8
Approver

0.9 Dead Load +0.6 Operating+ 0.7Seismic (operating)


217 0.9DS+0.6DO+0.7EX
218 0.9DS+0.6DO+0.7E-X
219 0.9DS+0.6DO+0.7EZ
220 0.9DS+0.6DO+0.7E-Z
0.9 Dead Load + 0.7 Seismic (empty)
~ 0.9 Dead Load + 0.5 Seismic (operating)
221 0.9(DS+DE)+0.5EX
222 0.9(DS+DE)+0.5E-X
223 0.9(DS+DE)+0.5EZ
224 0.9(DS+DE)+0.5E-Z
1.0(Dead Load )+ 1.0(Test Load)
225 1.0(DS+DT)
1.2(Dead Load )+ 1.2(Test Load) +(Wind @50MPH)
226 1.2(DS+DT)+0.29W Z
227 1.2(DS+DT)+0.29W -Z
1.0(Dead Load +Operating Load+anchor Load)+0.17 Friction Load+1.0 Temperature Load+1.0(Surge Load)
228 1.0(DS+D0+AF1)+0.17FT1+1.0T+1.0S X
229 1.0(DS+D0+AF2)+0.17FT2+1.0T+1.0S -X
1.2(Dead+Operating Load+Anchor)+ 1.0(Surge Load)
230 1.2(DS+DO+AF1)+1.0SX
231 1.2(DS+DO+AF1)+1.0S-x
232 1.2(DS+DO+AF2)+1.0SX
233 1.2(DS+DO+AF2)+1.S-x
1.0(Dead Load +Operating Load+anchor Load)+0.33 Friction Load+1.0 Temperature Load
251 1.0(DS+D0+AF1)+0.33FT1+1.0T
252 1.0(DS+D0+AF2)+0.33FT2+1.0T
1.0(Dead Load +Operating Load+anchor Load)+0.33 Friction Load+1.0 Temperature Load+1.0(Surge Load)
253 1.0(DS+D0+AF1)+0.33FT1+1.0T+1.0S X
254 1.0(DS+D0+AF2)+0.33FT2+1.0T+1.0S -X

5.3

Load Calculations

5.3.1 Dead Load of Structure (STAAD Primary Load Case No :11)


Dead load due to self weight of structure is considered through STAAD command "SELF WEIGHT Y -1.1".
The self weight is increased by 10% to allocate the weight of connections.
5.3.2 Piping Loads
The preliminary piping loads are taken as per Stress Input Load Data and is shown in Appendix B.
a) Dead Load
Th empty weight of pipe is taken as 0.6 times the pipe operating weight as per Saudi Aramco Standards,
SAES-M-001-AMD.Rev.D2.clause 5.2.4.8.
b) Operating Load (STAAD Primary Load Case No :12)
The piping operating loads are taken as per Stress Input load data from piping department.
2

For pipes less than 12" and for future load, a load intensity of 1.91 kN/m is applied as per SABP -007
Cl. 4.1.2 & 4.2.2 and SAES-M-001 AMD Cl. 5.2.4.8. For pipes >12" the load is applied as concentrated
load and is as per pipe stress report. The load calculation is as per SABP-007, Cl.4.1.2.
c) Thermal Load
c1) Piping Friction Loads in Longitudinal Dir.
For pipe with diameter less than 12", a udl of 10% of the operating load is applied as friction force on the
supporting beam. For pipes with diameter greater than 12", the piping friction force in the longitudinal direction
is taken as per Stress Input Load Data.

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


Rev
O1

PETRORabigh, UOU PROJECT


1-14-2410/59
YES
2411-8320-CA-WA15-0001

Date
17-Nov-06

Sheet No :
Originator

Checker

TPR

Ashokan

6 of 8
Approver

c2) Piping Friction Loads in Transverse Dir.


The piping friction load in transverse direction are taken as per Stress Input Load Data.
c3) Piping Anchor Loads in Longitudinal Dir.
The piping anchor load in longitudinal direction are taken as per Stress Input Load Data.
c4) Piping Anchor Loads in Transverse Dir.
The piping anchor load in transverse direction are taken as per Stress Input Load Data.
c5) Temperature load on structure
O
As per the SABP-007, Cl.4.4.3 and SAES-A-112 Table1, design temperature of 38 C is used in the calculation.
Highest one day mean temperature,
Lowest one day mean temperature,
Metal temperature due to sun heating,
(Thigh-Tlow)+Tmetal
Design temperature
=

Thigh
Tlow
Tmetal

=
=
=
=

35
17
20
38

C
C
C
0
C
0
0

d) Hydro test loads (STAAD Primary Load Case No :22)


The hydro test loads are taken as per Stress Input Load Data.( Refer appendix-B)
e) Surge Load
The surge load of 15 T is applied for pipe line >12" at the anchor location. This is applied on the structure as if
surging action for single pipe will occur at a time.
5.4

Wind Loads

5.4.1 Wind Loads on Frame


The Wind load intensity is calculated as per ASCE 7-02 and the same is referred in Appendix-C. The wind load is
applied on the effective solid area of the frame, i.e., on columns, on beams and on vertical bracings as udl. Wind
loads are calculated based on no shielding. For all structural members the wind force coefficient, Cf is 1.8, except
for columns, for which Cf is 2.0. Wind load is applied only in the transverse direction of the piperack as per
SABP-007, Cl. 4.5.4.
5.4.2 Wind Loads on Pipes
Wind loads on pipes are calculated by Tributary area method as per SABP-006,Cl 4.1.1 and same is as shown in
Appendix C. Considering rough insulation (approximately 100mm thickness), a force coefficient of 0.7 is used for
pipe area calculation as per SABP-006 Cl. 4.1.3.
5.5

Seismic Loads

Seismic Load calculation is based on ASCE 7-02. Seismic data is as per as per SAES-A-112 Rev. D2. All gravity loads (self
weight, piping dead load, equipment dead load(if any), piping opereating load and equipment operating load(if any), cable tray
dead load) are considered for the Base shear calculation.(Refer Appendix -D)
6.0

STAAD MODEL
The sketches of staad model is attached in Appendix-F

7.0

ANALYSIS & DESIGN


The output of STAAD File gives the analysis and design of the pipe rack structure, in which transverse beams design for
critical force Load combinations Nos. 103 to 127, 130 to 133 and 151 to 154. and rest of members like columns, longitudinal
beams and bracings for critical force Load combination Nos. 101 to 133. STAAD Files are enclosed in Appendix G.

7.1

Analysis and design of foundation

Isolated Footing foundations are adopted. The design and analysis for the foundation will be covered under Appendix-J

7.2
Analysis and design of beams
The main transverse beams are designed as moment restrained beams.The longitudinal and secondary beams are designed
as simply supported beams. The vertical deflection in all these beams are limited to L/240 as per SAES -M-001-AMD- Rev- D2,
Cl. 7.8. The horizontal deflection of anchor beam (beam on which the pipe is anchored) is limited to H/500 as per pipe stress
analysis procedure, 2411-8230-PR-0002,R1, Cl.8.4. and the stress ratio's of anchor beams are limited within 0.75

7.3
Analysis and design of Columns
The effective length factor for the column is calculated as per AISC-ASD Commentary and is shown in Appendix E.
The lateral deflection is limited to H/100 as per SAES-M-00A-AMD, CL.7.7 and SABP -007.

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

8.0

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


Rev
O1

PETRORabigh, UOU PROJECT


1-14-2410/59
YES
2411-8320-CA-WA15-0001

Date
17-Nov-06

Sheet No :
Originator

Checker

TPR

Ashokan

7 of 8
Approver

BASEPLATE DESIGN
Baseplate design is based on AISC-LRFD method. For typical calculation of baseplate at braced and unbraced part of
columns, refer Appendix H.

9.0

ANCHOR BOLT DESIGN


The calculation is based on ACI 318-2002, Appendix D. For anchor bolt design at braced and unbraced areas, refer Appendix
J.

10.0

SHEAR KEY DESIGN


Shear keys are provided with baseplate where the shear at column base is more,i.e., at braced areas of columns. Refer
Appendix K for typical calculations.

11.0

Summary

11.1.a

Interaction ratio's of critical members for WA15

Member

Interaction
ratio

Load Case

HEA400

27

0.619

104

HE300B

523

0.790

110

IPE360
HEA280
IPE360

155
131
128

0.864
0.598
0.408

104
110
110

IPE360
HEA280
IPE360

291
290
289

0.790
0.570
0.412

104
110
110

HE140A
IPE300
IPE300

320
264
183

0.540
0.440
0.550

103
153
125

IPE300
IPE450

255
103

0.240
0.400

110
102

IPE360
IPE450
IPE300

487
94
272

0.120
0.600
0.250

125
125
110

IPE300

323

0.190

129

IPE360
IPE300
HE280A

558
301
374

0.190
0.068
0.200

109
110
110

HEA280
IPE300

540
368

0.56
0.1

128
104

IPE400 -Tee
IPE400

484
570

0.68
0.372

128
129

L130X130X12
L130X130X12

500
506

0.761
0.56

110
129

Item
Columns
Columns
Main Transverse bent beams @ EL. +5.90m
Main beams
Main Transverse bent beams @ EL. +10.500m
Main Beams at braced bay
Anchor beam
Main beams Non- braced bay
Main Transverse bent beams @ EL. +12.400m
Main Beams at braced bay
Anchor beam
Main beams Non- braced bay
Main Transverse bent beams @ EL. +14.0m
Main beams
Intermediate Transverse beams @ EL. +10.50
Intermediate Transverse beams @ EL. +12.40
Main longitudinal beams @EL. +10.500
Main Longitudinal beams
Main Longitudinal beams
Main longitudinal beams @EL. +12.400 m
Main Longitudinal beams
Main Longitudinal beams
Main Longitudinal beams
Main longitudinal beams @EL. +14.00 m
Main Longitudinal beams
Longitudinal Tie beams@ EL. +17.475/20.95 m
Longitudinal Tie beams
Longitudinal Tie beams
Longitudinal Tie beams
Longitudinal Tie beams@ EL. +5.9/7.845 m
Longitudinal Tie beams
Longitudinal Tie beams
Vertical Bracing
All bracings
Bottom bracing
Horizontal Bracing
Bracing @ EL. 10.500 m
Bracing @ EL. 12.500 m

b)

Section

Displacement / Deflection of Structure

Z-direction displacement (For beams)


For beams at anchor bays
Length Absolute X Displacement
Level
Node
Case
Disp.
(m)
Lvl. 10.50
7
253
70
1.802
Lvl. 12.40
253
7
22
3.215

Disp.
14
14

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


Rev
O1

PETRORabigh, UOU PROJECT


1-14-2410/59
YES
2411-8320-CA-WA15-0001

Y-direction displacement (For beams)


Length Absolute Y Displacement
Level
(m)
Node
Case
Disp.
12
Lvl. 10.50
7
78
230
226
24
Lvl.12.40
7
92

Date
17-Nov-06

Sheet No :
Originator

Checker

TPR

Ashokan

8 of 8

Disp.
29
29

X-direction displacement (For Columns)


Height
Absolute Z Displacement
Level
(m)
Node
Case
Disp
Allowable
6.95
19
210
37.00
Lvl. 10.50
70
Lvl. 10.50
7.18
28
210
48.00
72
Lvl. 10.50
9.27
37
204
56.00
93
Lvl. 12.4
8.85
21
210
45.00
89
Lvl. 12.4
9.07
30
210
55.00
91
Lvl. 12.4
11.17
39
204
62.50
112

c)

Anchor beam- Interaction ratio check

Beam no

mnz
(kNm)

MNZ
(kNm)

mny
(kNm)

MNY
(kNm)

pnt/pnc
(kNm)

131
290

109.76
139.72

253.31
253.31

17.58
0.10

115.24
115.24

16.12
18.36

Where
mnz
MNZ
mny
MNY
pnt
PNT
pnc
PNC

=
=
=
=
=
=
=
=

Actual Bending Moment in Z dir.


Design Bending Moment in Z dir.
Actual Bending Moment in Y dir.
Design Bending Moment in Z dir.
Actual axial capacity in compression
Design compressive force
Actual axial capacity in tension
Design tensile force

PNT/PN
C
(kNm)
678.00
493.41

r=(mnz/MNZ)+(mny*2/MNY)
+(pnt/PNT)
0.76
0.59

Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


Rev
O1

PETRORabigh, UOU PROJECT


1-14-2412/59
YES
2411-8320-CA-WA15-0001

1
of 2
Sheet No :
Date
Originator Checker Approver
TPR
Ashokan
17-Nov-06

APPENDIX - A
Typical cross section of the Piperack

CALC. NO:

B36 M BE - 867623

Rev

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2412/59
YES
2411-8320-CA-WA15-0001

Rev
O1

2
of 2
Sheet No :
Date
Originator Checker Approver
TPR
Ashokan
17-Nov-06

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

RABIGH DEVELOPMENT PROJECT, Saudi Arabia

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Sheet No :
Rev

Date

Originator

Checker

O1

17-Nov-06

TPR

Ashokan

Approver

APPENDIX - B
Piping stress report
( Received from Stress Dept. on 7th November 2006 )

CALC. NO:

B36 M BE - 867623

Rev

Project:Petro-Rabigh
Piping Load Data Sheet

SL.
No.

Service

Grid From - To

10"-P-O000-091-1SC0P01-NI

6"-OW-O000-007-12LC1U16-NI

Between S3 and S20


Between S5 and S20
Between S3 and S20

3"-CA-O000-011-1CC2C06-NI

3"-FG-O000-028-1CC1P01-NI

3"-G-O000-010-3CC1P01-NI

8"-G-O000-017-3CC1P01-NI

Between S5 and S20


Between S5 and S20

Pipe Support Load Data Sheet for Elevation _10.5 m (AREA WA-15)
For Non analysed lines along Grid S10-S20
Operating wt Hydrotest
Axial Operating support loads Fz at Rack Grids (KN) [ Note-7]
(KN/M)
wt (KN/M)
Vertically
Vertically
S10
S11
S12
S13
S14
S15
S16
S17
Down (Q)
Down (G)
0.272

0.272

0.277

0.277

0.111

0.111

3(0.55)

0.111

0.157

3(0.55)

0.111

0.157

S18

S19

3(0.55)
Stress analysed line

NORTH

NOTE :
1.
2.
3.
4.
5.
6.
7.
8.

OVER ALL REPORT FOR WA15.xls

Remarks

All Forces are in KN until and unless specified.


G= Permanent load (Maximum of Sustained and operating)
Q= Test load
X,Y and Z are the direction of force
Combination of above loads are to be carried out by Structural Designer.
Horizontal load of 30% of Vertical load to be considered for the non-analysed lines
Number in paranthesis indicates the maximum seismic load.(without combination with operating load) .
Explanation of grid numbering in row 4 is as follows:
As an examle, 85-86-1 means the first steel beam as we proceed from grid 85 to 86.

Page 1 of 1

Y (UP)

Project: Petro-Rabigh
Piping Load Data Sheet

Date: 14/09/2006

SL.
No.

Service

Grid From - To

4"-DMW-O000-012-1SC0U16-NI

3"-IA-O000-027-12CG0U01-NI

3"-UA-O000-028-12CG0U01-NI

3"-UW-O000-033-1CS2U16-NI

3"-SWS-O000-033-1CS4U16-NI

8"-LC-O000-028-1CS1P05-PP

6"-N-O000-030-1CC1P01-NI

24"-MS-O000-017-3CS1P05-IH

24"-LS-O000-037-1CS1P05-IH

10

8"-HS-O000-018-6CS1P05-IH

Between Grid S5 and S20


Between Grid S5 and S20
Between Grid S5 and S20
Between Grid S5 and S20
Between Grid S5 and S20
Between Grid S5 and S20
Between Grid S5 and S20

Pipe Support Load Data Sheet for Elevation _12.4 m (AREA WA-15)
For Non analysed lines along Grid S10 - S20
Operating wt Hydrotest
Axial Operating support loads Fz at Rack Grids (KN) [ Note-7]
(KN/M)
wt (KN/M)
Vertically
Vertically
S10
S11
S12
S13
S14
S15
S16
S17
Down (Q)
Down (G)
0.082

0.082

4(0.41)

0.111

0.157

3(0.55)

0.111

0.157

3(0.55)

0.111

0.111

3(0.55)

0.111

0.111

3(0.55)

0.416

0.416

0.277

0.277

S18

S19

Stress analysed line


Stress analysed line
Stress analysed line

NOTE :

NORTH
1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Z are the direction of force
5. Combination of above loads are to be carried out by Structural Designer.
6. Horizontal load of 30% of Vertical load to be considered for the non-analysed lines
7. Number in paranthesis indicates the maximum seismic load.(without combination with operating load) .
8. Explanation of grid numbering in row 4 is as follows:
As an examle, 85-86-1 means the first steel beam as we proceed from grid 85 to 86.

OVER ALL REPORT FOR WA15.xls

Remarks

Page 1 of 1

Y (UP)

Project: Petro-Rabigh
Piping Load Data Sheet

No.

1
2
3
4
5
6
7
8

Rack
Column
No.
/ Node
Name
10380
10387
19000
19010
19050
19070
20025
20070

Note :

Support Description

Rigid +Y Rigid Z
Rigid +Y Rigid X
Rigid +Y
Rigid +Y
Rigid +Y Rigid X
Rigid +Y Rigid X
Rigid +Y
Rigid X RigidY Rigid Z

1.
2.
3.
4.
5.
6.

CALCULATION No. : CA-C099


Pipe Support Load Data Sheet for 24"-LS-O000-037-1CS1P05-IH (Area WA15)
TOS EL.+12.4m; Design Pressure 6 kg/cm 2; Design Temperature200 OC
Occasional Loads (See Note 5)
Operating

G
(Vertically
Down)

Q
(Vertically
Down)

24.99
28.74
19.84
46.86
19.65
15.23
15.74
4.09

61.45
41.45
48.79
54.19
48.25
37.71
24.27
7.13

Horizontal Load
X

1.61 / -9.6
-7.80

-12.03
10.96
1.20
-11.07
-2.54
-2.90
-4.50
27.05

-3.30
6.61 / -1.05
-1.42

Wind(X)
X

7.26

2.43
-2.05

3.26
7.63
6.65

Wind(Z)
Y

1.32

4.70

Seismic(X)
Y

Date: 07/11/2006

Rev R3

Seismic(Z)
Y

Remarks

12.01

CA07

11.60
4.04

-2.09
-1.89

All Forces are in KN until and unless specified.


G= Permanent load (Maximum of Sustained and operating)
Q= Test load
X,Y and Y are the direction of force
Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
Combination of above loads are to be carried out by Structural Designer.

9.73
3.11

2.05
-4.89
4.60
-1.86

-2.21
2.51
-1.24

NORTH

S10-S11- A
S10-S11- B
S12
S16
S19
INTERFACE

Y (UP)

7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae

OVER ALL REPORT FOR WA15.xls

Page 1 of 1

Project: Petro Rabigh


Piping Load Data Sheet

No.

1
2
3
4
5
6
7
8
9
10

Rack
Column
No.
/ Node
Name
16130
16160
16180
16220
16250
16290
16395
16400
16410
16480

Note :

Support Description

Rigid +Y
Rigid +Y
Rigid Y Rigid +Y
Rigid +Y
Rigid +Y
Rigid X Rigid +Y
Rigid +Y
Rigid +Y
Rigid X Rigid +Y
Rigid Z Rigid Y Rigid X

1.
2.
3.
4.
5.
6.

CALCULATION No. : CA-C102


Pipe Support Load Data Sheet for 24"-MS-O000-017-3CS1P05-IH (Area WA15)
TOS EL.+12.4m; Design Pressure 25 kg/cm 2; Design Temperature 295 OC
Occasional Loads (See Note 5)
Operating

G
(Vertically
Down)

Q
(Vertically
Down)

27.21
18.56
10.07
27.31
27.71
13.10
12.66
6.54
13.59
8.15

47.29
48.58
16.31
53.59
65.67
34.32
33.00
12.80
32.90
12.95

Horizontal Load
X

-8.07
-4.06
-5.69
-7.31
3.76
4.35

-1.25

-1.32
1.25

-8.90
3.69
-7.42
-3.32
-1.18
-1.96
-3.72
32.40

Wind(X)
X

-2.18
18.42

7.42
1.37

Wind(Z)

-6.07
4.89
5.82
-9.88
1.05

4.76
-12.27
20.24
-14.51
3.50

1.86

11.27

-2.56

-2.14
1.88

-1.37
8.58

5.28

All Forces are in KN until and unless specified.


G= Permanent load (Maximum of Sustained and operating)
Q= Test load
X,Y and Y are the direction of force
Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
Combination of above loads are to be carried out by Structural Designer.

Seismic(X)
Y

3.74
-7.56
3.71
1.22

3.53
1.49

Seismic(Z)
Y

4.53
-11.94
17.19
-11.53
2.16

16.07

Date: 07/11/2006

Rev R4

Remarks

14.45

1.02
-1.51
1.43

1.06

15.18

NORTH

-1.13

CA07
S10-S11- A
S11
S14
S16
S18
INTERFACE

Y (UP)

7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae

OVER ALL REPORT FOR WA15.xls

Page 1 of 1

Project: PETRO-RABIGH
Piping Load Data Sheet

No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Rack
Column
No.
/ Node
Name
10
80
90
100
110
120
130
140
150
160
170
200
210
220
230
260
270
280

Support Description

Rigid Z Rigid X Rigid Y


Rigid +Y
Rigid +Y
Rigid +Y Rigid X
Rigid +Y
Rigid +Y
Rigid +Y
Rigid +Y Rigid X
Rigid +Y
Rigid +Y
Rigid +Y Rigid X
Rigid +Y
Rigid +Y
Rigid +Y Rigid X
Rigid +Y Rigid Z
Rigid +Y
Rigid +Y Rigid Z
Rigid +Y Rigid X

G
(Vertically
Down)

Q
(Vertically
Down)

5.28
7.07

2.51
6.42

2.08
2.67
2.22
3.48
2.51
1.95

1.89
2.08
2.02
1.94
2.29
1.77

CALCULATION No. : CA-C097


Pipe Support Load Data Sheet for 8"-G-O000-017-3CC1P01-NI (Area WA15)
TOS EL.+10.5m; Design Pressure 45 kg/cm 2; Design Temperature165 OC
Occasional Loads (See Note 5)
Operating
Horizontal Load
X

Wind(X)
X

Wind(Z)
Y

7.54

Seismic(X)
Y

1.24

1.
2.
3.
4.
5.
6.

Date: 07/11/2006

Seismic(Z)
Y

Remarks

5.80

-1.27

1.47

S16

1.80

S16-S14 INTERMEDIATE

S14
-1.05

S14-S12-INTERMEDIATE

1.64

S12
S11

2.35

S11-S10-INTERMEDIATE

S10

9.62
18.74
3.03
1.51
5.17
8.63

8.74
2.66
2.75
1.38
4.70
6.23

1.05
-3.68
-2.51

1.37

1.25

6.11

5.62

1.36
1.35

-8.82

4.17
1.17

CA-07

4.31

-2.12
1.05

1.12

Y (UP)

All Forces are in KN until and unless specified.


G= Permanent load (Maximum of Sustained and operating)
Q= Test load
X,Y and Y are the direction of force
Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
Combination of above loads are to be carried out by Structural Designer.

7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae

OVER ALL REPORT FOR WA15.xls

INTERFACE
S18
S18-S16 INTERMEDIATE

1.73

NORTH
Note :

Rev R1

Page 1 of 1

Project: PETRO-RABIGH
Piping Load Data Sheet

No.

1
2
3
4
5
6
7
8
9
10

Rack
Column
No.
/ Node
Name
6615
6635
6645
6675
6685
6725
6755
6757
23011
6810

Note :

Support Description

Rigid +Y
Rigid Z Rigid +Y
Rigid X Rigid +Y
Rigid +Y
Rigid +Y
Rigid X Rigid +Y
Rigid +Y
Rigid X Rigid +Y
Rigid +Y
Rigid Z Rigid Y Rigid X

1.
2.
3.
4.
5.
6.

G
(Vertically
Down)

Q
(Vertically
Down)

7.70
7.38
15.14
4.23
11.07
7.38
7.73
3.38
9.54
2.11

6.41
9.27
11.14
5.32
13.91
9.28
9.71
4.25
10.55
2.93

CALCULATION No. : CA-C101


Pipe Support Load Data Sheet for 8"-HS-O000-018-6CS1P05-IH (Area WA15)
Design Pressure 48 kg/cm 2; Design Temperature 400 OC
Occasional Loads (See Note 5)
Operating
Horizontal Load

Wind(X)

-2.29
-4.35
-6.03

-9.82
6.35

4.22

1.44
-1.36

3.24 / -1.06
1.45

-2.30
-1.74

-1.02
5.08

-2.20

Wind(Z)
Y

1.18

Seismic(Z)
Y

3.15

Remarks

Y
CA07

5.74
3.48

-1.73
3.45
-2.25

1.27

-1.27
4.21

4.46
-2.82
12.03

Seismic(X)
Y

Date: 07/11/2006

Rev R2

-1.45
2.99
-1.95

-1.34

S10-S11-INTERMEDIATE

2.89
3.17

2.53

All Forces are in KN until and unless specified.


G= Permanent load (Maximum of Sustained and operating)
Q= Test load
X,Y and Y are the direction of force
Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
Combination of above loads are to be carried out by Structural Designer.

S10
S10-S11-A

7.10

NORTH

S14
S16
S18
INTERFACE

Y (UP)

7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae

OVER ALL REPORT FOR WA15.xls

Page 1 of 1

Petro Rabigh
Piping Load Data Sheet
Date: 06/10/2006

CALCULATION No. : CA-C0035


Rev A1
Pipe Support Load Data Sheet for 6"-RLL-S130-XXX-1CC2P03-NI (Area CA08/CA10/WA15)
Design Pressure = 3.5/-0.33 kg/cm 2; Design Temperature = 250 Oc
Rack
Column No.
No.
/ Node Name
(see note 7)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

1855
1875
1880
1890
1895
1910
1920
1940
1960
1970
1980
1990
1995
2000
2002
2005
2007
2035
2040
2050
2060
2070
2105
2110
2120
2130

Support Description

Rigid +Y
Rigid +Y
Rigid +Y
Rigid +Y Rigid X
Rigid +Y
Rigid +Y Rigid X
Rigid +Y
Rigid +Y Rigid X
Rigid +Y Rigid Z
Rigid +Y
Rigid +Y Rigid X
Rigid +Y
Rigid +Y
Rigid +Y Rigid X
Rigid +Y
Rigid +Y
Rigid +Y
Rigid +Y
Rigid +Y Rigid Z
Rigid +Y Rigid Z
Rigid +Y Rigid X
Rigid +Y Rigid Z
Rigid +Y
Rigid +Y Rigid X
Rigid +Y
Rigid +Y

G
(Vertically
Down)
2.59
2.90
3.48
2.87
3.61
3.58
2.01
3.74
3.60
3.11
3.90
3.37
3.35
3.15
2.33
2.97
1.31
3.23
4.09
3.92
3.89
4.18
3.52
3.12
4.69
1.52

Q
Operating Horizondal Loads
(Vertically
Down)
X
Z

-1.52

-1.99
-1.65
2.25
2.26

Occasional Loads (See Note 5)


Wind(X)
X

Wind(Z)
Y

Seismic(X)
Y

-1.32
-1.06
-1.27

1.99

-1.18
1.77

1.36
1.32

1.23

2.18

2.32

1.09

2.46

2.03

2.55
-1.57
1.37
-3.31
-1.61
-1.29

OVER ALL REPORT FOR WA15.xls

Remarks
Y
ON D B/W 21-22
0N D& 21
ON C& 21
ON B & 21
B/W B TO A 6.0m FROM B
B/W A TO L 5.0m FROM B
B/W L TO K 2.75m FROM L
B/W L TO K 8.25m FROM L
ON K
0N J
ON H
ON G
B/W G TO F 6.5m FROM G
ON F
B/W F TO E 5.25m FROM F
B/W F TO E 10.5m FROM F
ON E
A FRAME
A FRAME
A FRAME
A FRAME
A FRAME

1.65

1.66
1.82
1.11

10.83

1.27
1.73
1.35

1.35
4.98

1.91
1.98

1.49
1.76

1. All Forces are in KN until and unless specified.


2. G= Permanent load (Maximum of Sustained and operating)
3. Q= No Test load (Pnematic testing only)
4. X,Y and Z are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.
7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Caesar
input sheet

Page 1 of 1

CA08
CA08
CA08
CA08
CA08
CA10
CA10
CA10
CA10
CA10
CA10
CA10
CA10
CA10
CA10
CA10
CA10
CA10 TO WA15
CA10 TO WA15
CA10 TO WA15
CA10 TO WA15
CA10 TO WA15
WA 15

NORTH
Note :

Seismic(Z)

Y (UP)

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Sheet No :

Rev

Date

Originator

Checker

O1

17-Nov-06

TPR

Ashokan

B36 M BE - 867623

Rev

of 3
Approver

APPENDIX - C
Wind Load Calculation

CALC. NO:

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Sheet No :
Rev

Date

Originator

Checker

O1

17-Nov-06

TPR

Ashokan

of 3
Approver

Wind Load Analysis


Load data and calculation is based on ASCE 7-02
Basic Wind Speed
V = 93 mph
Exposure Category(A,B,C or D)
Building & other structure Category
Height of the Structure

Kzt
Kz
Kd
Gf
I

Topographic Factor
Velocity Exposure Coefficient
Wind Directionality Factor
Gust Effect Factor
Importance Factor

Eqn. 6-1

Velocity Pressure

Eq 6-25

Design Wind Force

=
=
=
h=

where

1) Wind force on Pipes


Width of the Pipe Rack
Spacing of the Pipe rack Main frame
Force Coefficient for pipes
10.5
Force to be applied @
Largest pipe dia In this level
Projected Area
Wind force

EL.

12.4
Force to be applied @
Largest pipe dia In this level
Projected Area
Wind force

EL.

qz =
=
=
F=
Af =
=
Cf =
W =
L =
Cf =

Depth of the longitudinal beam


Force Coefficient for flexural members
Projected Area
Wind force

3) Wind force on Longitudinal Beam @ EL.


Spacing of the Pipe rack Main frame
Depth of the longitudinal beam
Force Coefficient for flexural members
Projected Area
Wind force

m/sec

Ref SAES-A-112 Table 1-Rabigh Plant Site


Ref SAES-A-112 Table 1-Rabigh Plant Site
Ref SABP-006, Cl.3.6
(EL.20.95-EL.2.600)

1
0.99
1
0.85
1.15

Ref SABP-006, Cl.3.6


Ref.Table 6.3-ASCE 7-02
Ref Table 6.4-ASCE 7-02
Ref. SABP-006, Cl.3.7
Ref Table 6.1-ASCE 7-02

0.613 Kz Kzt KdV I


1207.27
N/m
1.21
kN/m
qz Gf Cf Af
Projected Area for pipes
L [ d + 10%(W)]
As per SABP-006,Cl. 4.1
Force Coefficient
7
6.125
0.7

m
m
As per SABP-006,Cl. 4.1.3

F
d
A
F

=
=
=
=
=

qz Gf Cf Af
0.254 m
(Pipe dia =
5.84325 m2
1.21x0.85x0.9x5.84325
4.2
kN

F
d
A
F

=
=
=
=
=

qz Gf Cf Af
0.809 m
(Pipe dia =
9.24263 m2
1.21x0.85x0.7x9.242625
6.64 kN

10.5

2) Wind force on Longitudinal Beam @ EL.


Spacing of the Pipe rack Main frame

=
=
=
=
=

41.59
C
IV
18.35

d =
Cf =
A
F

=
=
=
=

10" , insulation=

24" , insulation=

m level
7

(section: IPE300/IPE450

0.375
1.8

14.7 Inch)
(Depth:
As per SABP-006,Cl. 4.1

0.375 m2
qz G Cf Af
1.21x0.85x1.8x0.38
0.58 kN/m

12.40 m level
L

d =
Cf =
A
F

=
=
=

(section: IPE300/IPE450

0.375
1.8

14.7 Inch)
(Depth:
As per SABP-006,Cl. 4.1

0.375 m2
qz G Cf Af
0.58 kN/m

mm)

100 mm)

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

4) Wind force on Column


Spacing of the Pipe rack Main frame
Force Coefficient for columns
Width of the column
Projected Area
Wind force

L =
Cf =
d =
A
F

=
=
=
=

7
2
0.300

Date

Originator

Checker

O1

17-Nov-06

TPR

Ashokan

m
(section: HE400A
12 Inch)
(Width:
As per SABP-006,Cl. 4.1

0.300 m2
qz G Cf Af
1.21x0.85x2x0.3
0.55 kN/m

6) Wind force on Vertical Bracings up to EL. 12.40 m level


Length of the bracing
Force Coefficient for bracing
Depth of the bracing member
Projected Area
Wind force

L =
Cf =
d =
A
F

=
=
=
=

6
m
1.8
0.1778 m

(section:
IPE400 -Tee
7
(Depth:
Inch)
As per SABP-006,Cl. 4.1

0.1778 m2
qz G Cf Af
1.207x0.85x1.8x0.178
0.28 kN/m

Note:1) Wind load is not applied in the longitudinal direction


2) Wind loads are applied based on no-sheilding effect

Rev

of 3
Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Sheet No :

Rev

Date

Originator

Checker

O1

17-Nov-06

TPR

Ashokan

B36 M BE - 867623

Rev

of 3
Approver

APPENDIX - C
Wind Load Calculation

CALC. NO:

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Sheet No :
Rev

Date

Originator

Checker

O1

17-Nov-06

TPR

Ashokan

of 3
Approver

Wind Load Analysis


Load data and calculation is based on ASCE 7-02
Basic Wind Speed
V = 93 mph
Exposure Category(A,B,C or D)
Building & other structure Category
Height of the Structure

Kzt
Kz
Kd
Gf
I

Topographic Factor
Velocity Exposure Coefficient
Wind Directionality Factor
Gust Effect Factor
Importance Factor

Eqn. 6-1

Velocity Pressure

Eq 6-25

Design Wind Force


where

1) Wind force on Pipes


Width of the Pipe Rack
Spacing of the Pipe rack Main frame
Force Coefficient for pipes
20.95
Force to be applied @
Largest pipe dia In this level
Projected Area
Wind force

EL.

2) Wind force on Longitudinal Beam @ EL.


Spacing of the Pipe rack Main frame
Depth of the longitudinal beam
Force Coefficient for flexural members
Projected Area
Wind force

3) Wind force on Longitudinal Beam @ EL.


Spacing of the Pipe rack Main frame
Depth of the longitudinal beam
Force Coefficient for flexural members
Projected Area
Wind force

=
=
=
h=
=
=
=
=
=

qz =
=
=
F=
Af =
=
Cf =
W =
L =
Cf =
F
d
A
F

=
=
=
=
=

41.59
C
IV
18.35

m/sec

Ref SAES-A-112 Table 1-Rabigh Plant Site


Ref SAES-A-112 Table 1-Rabigh Plant Site
Ref SABP-006, Cl.3.6
(EL.20.95-EL.2.600)

1
1.16
1
0.85
1.15

Ref SABP-006, Cl.3.6


Ref.Table 6.3-ASCE 7-02
Ref Table 6.4-ASCE 7-02
Ref. SABP-006, Cl.3.7
Ref Table 6.1-ASCE 7-02

0.613 Kz Kzt KdV I


1414.58
N/m
1.41
kN/m
qz Gf Cf Af
Projected Area for pipes
L [ d + 10%(W)]
As per SABP-006,Cl. 4.1
Force Coefficient
0.2
6.125
0.7

m
m
As per SABP-006,Cl. 4.1.3

qz Gf Cf Af
0.152 m
(Pipe dia =
1.0535 m2
1.41x0.85x0.9x1.0535
0.89 kN

6" , insulation=

14.00 m level
L

d =
Cf =
A
F

=
=
=
=

(section: IPE300

0.30
1.8

12 Inch)
(Depth:
As per SABP-006,Cl. 4.1

0.300 m2
qz G Cf Af
1.41x0.85x1.8x0.3
0.54 kN/m

20.95 m level
L

d =
Cf =
A
F

=
=
=

(section: IPE300/HE280A

0.300
1.8

12 Inch)
(Depth:
As per SABP-006,Cl. 4.1

0.300 m2
qz G Cf Af
0.54 kN/m

mm)

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

4) Wind force on Column


Spacing of the Pipe rack Main frame
Force Coefficient for columns
Width of the column
Projected Area
Wind force

L =
Cf =
d =
A
F

=
=
=
=

7
2
0.300

Date

Originator

Checker

O1

17-Nov-06

TPR

Ashokan

m
(section: HE400A
12 Inch)
(Width:
As per SABP-006,Cl. 4.1

0.300 m2
qz G Cf Af
1.41x0.85x2x0.3
0.65 kN/m

6) Wind force on Vertical Bracings Above EL. 12.40 m level


Length of the bracing
Force Coefficient for bracing
Depth of the bracing member
Projected Area
Wind force

L =
Cf =
d =
A
F

=
=
=
=

6
m
1.8
0.1778 m

(section:
IPE400 -Tee
7
(Depth:
Inch)
As per SABP-006,Cl. 4.1

0.1778 m2
qz G Cf Af
1.415x0.85x1.8x0.178
0.33 kN/m

Note:1) Wind load is not applied in the longitudinal direction


2) Wind loads are applied based on no-sheilding effect

Rev

of 3
Approver

FOSTER WHEELER
Sheet No :

SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

Rev

Date

Originator

Checker

CONTRACT NO :

1-14-2410/59

O1

17-Nov-06

TPR

Ashokan

SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

of 3
Approver

APPENDIX - D
Seismic analysis-load data

CALC. NO:

B36 M BE - 867623

Rev

FOSTER WHEELER
Sheet No :

SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

Rev

Date

Originator

Checker

CONTRACT NO :

1-14-2410/59

O1

17-Nov-06

TPR

Ashokan

SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

of 3
Approver

Seismic Analysis
Load data
Seismic Load is calculated as per ASCE-7-02
Site Data:Seismic Load data is as per SAES-A-112 Rev. D2 and SAES-M-001-AMD, Rev.D2
D
Seismic use group:
II soil type :
Therefore From ASCE -7-02
Response modification coefficient
Response modification coefficient
Importance factor

RWX = 3.50
RWZ = 5.00
I
= 1.25

Table 9. 5.2.2, ASCE 7-02


Table 9. 5.2.2, ASCE 7-02
SAES-M-001-AMD, Rev.2, Cl. 5.5.4

Response acceleration at short period


Response acceleration at one second
Height above base

Ss =
0.176
S1 =
0.07
hn
= 18.35

SAES-A-112, Rev. D2, Cl. 4.4


SAES-A-112, Rev. D2, Cl. 4.4
m (Max Ht taken)

Basic equations
Basic equations used for the base shear calculation of nonbuilding structures are as follows
Base shear

V =
Cs =
Cs,max =
and

where

Cs,min =
or =
Cs =
Fa =
=
SMS =
=
SDS =
=
R=
I=
Fv =
=
SM1 =
=
SD1 =
=
T=
Tmax
Cu
Ta
Ct
x
hn
W

=
=
=
=
=
=
=

Cs * W
SD1
(R/I)
SD1
T(R/I)
0.14*SDS*I
0.8*S1*I/R

Eq. 9.5.5.2-1
Eq. 9.5.5.2-1-1
Eq. 9.5.5.2-1-2
Eq. 9.14.5.1-1
Eq. 9.14.5.1-2

Seismic Response coefficient.


Function of site class and Ss, From Table 9.4.1.2.4a
1.6
The maximum considered earthquake spectral response
acceleration for short periods.
Fa* Ss
Eq. 9.4.1.2.4-1
The design spectral responese acceleration in short period
(2/3)*SMS
= 0.19
Eq. 9.4.1.2.5-1
Response modification factor.
Occupancy importance factor.
Function of site class and S1, From Table 9.4.1.2.4b
2.4
The maximum considered earthquake spectral response
acceleration for one second period.
Fv*S1
Eq. 9.4.1.2.4-2
The design spectral responese acceleration in one second
(2/3)*SM1 =
0.11
Eq. 9.4.1.2.5-2
Fundamental period of the structure. (As per section 9.5.5.3)
(Calculation by Rayleigh Method)
Cu*Ta
Coefficient for upper limit on calculated period = 1.676
x
= Approximate fundamental time period
Ct*(hn)
0.028
As per Table 9.5.5.3.2
0.8
As per Table 9.5.5.3.2
Height of the structure above the base to the heighest level in ft.
Total Seismic load (sel weight, piping dead load, cable tray dead load,
piping opereating load and cable tray live load)

The piperack is designed for earthquake resistance using Staad pro 2004 in accordance with International Building Code -2003
CHECK
Calculations
Total load
Time period

W
Ta
Tmax
T
T used

=
=
=
=
=

1648.52
0.743
1.245
0.996
0.996

kN
s
s
s (As per Staad result-by Rayleigh Method)
s (As per Cl.9.5.5.3)

FOSTER WHEELER
Sheet No :

SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

PROJECT:

PETRO RABIGH, UOU PROJECT

Rev

Date

Originator

Checker

CONTRACT NO :

1-14-2410/59

O1

17-Nov-06

TPR

Ashokan

SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

In X Direction

So

In Z Direction
Time period

So

Load case
Seismic force
(X Dir.)
Seismic force
(Z Dir.)

=
=

*W
0.067
110.529 kN

Vmax

=
=

0.040
66.206

*W
kN

Vmin

=
=

0.033
54.159

*W
kN

=
=

0.040
66.206

*W
kN

Ta
Tmax
T
T

=
=
=
=

0.743
1.245
0.392
0.392

s
s
s
s

Vz

=
=

0.047
77.371

*W
kN

Vmax

=
=

*W
0.071
117.751 kN

Vmin

=
=

0.033
54.159

*W
kN

=
=

0.047
77.371

*W
kN

Coefficient
By
Staad
Formulae
0.0402 0.039

0.047

0.047

Load(W)

(As per Staad result-by Rayleigh Method)


(As per Cl.9.5.5.3)

Staad

DL

Empirical formula
(kN)

Staad result

1648.52

1648.52

66.206

65.03

1648.52

1648.52

77.371

78.3

of 3
Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

Sheet No :

PROJECT:

PETRORabigh, UOU PROJECT

Originator

Rev. Date
O1

CONTRACT NO 1-14-2410/59

17-Nov-06

TPR

SAFETY CALC. YES


CALC. NO

2411-8320-CA-WA15-0001

APPENDIX - E
Effective Length Factor Calculation

E1 OF E3
Checker

Ashokan

Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

Sheet No :

PROJECT:

PETRORabigh, UOU PROJECT

Originator

Rev. Date
O1

CONTRACT NO 1-14-2410/59

17-Nov-06

TPR

E2 OF E3
Checker

Ashokan

SAFETY CALC. YES


CALC. NO

2411-8320-CA-WA15-0001

Calculation is based on AISC-Manual of steel construction- ASD-9th Edition, Part 3, Column Design
and ACI 318- 02 Commentary.
For sway frames
If
m < 2
If

m > 2

k = (20-m)Sqrt(1+ m)
20
k = 0.9*Sqrt(1+m)
(c/Lc)
= ( /L )
b b

where indicates the summation of all members rigidly connected to that joint and lying in the plane
in which buckling of the column is being considered.
c = Moment of ineria of the column
Lc = Unsupported length of first column
b = Moment of ineria of the beam.
Lb = Unsupported length of the beam.

= Average of the values at the two ends of the


compression member

Calculation
Case:
Support Condition

Side sway uninhibited


Pinned

:
:

FOR 4 LATERAL BEAMS


Iz= 13670 inch

8.55

1.9

Kz = 2.8 Kz = 2.3

= 3.08
# 13670 5.6
HE280A
4
Iz= 28860 inch

= 8.04
# 28860 8.7
IPE360

Iz= 28860 inch

4.6

Kz = 2.8

= 9.29
# 28860
#

IPE360

Iz= 25170 inch

= 8.67
# 25170 9.3

2.58

Kz = 2.89

HE300B

Iz= 45070 inch

# 45070
HE400A

Support :

Pinned
8

= 10.00

Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

Sheet No :

PROJECT:

PETRORabigh, UOU PROJECT

Originator

Rev. Date
O1

CONTRACT NO 1-14-2410/59

17-Nov-06

TPR

SAFETY CALC. YES


CALC. NO

2411-8320-CA-WA15-0001

FOR 3 LATERAL BEAMS

1.9

Kz = 2.4

= 4.93
# 28860
#
IPE360

4
Iz= 28860 inch

4.6

Kz = 2.5

= 6.97
# 28860 6.9
IPE360

Iz= 25170 inch

= 6.91
# 25170 8.5

2.35

Kz = 2.77

HE300B

4
Iz= 45070 inch
# 45070

HE400A

Support :

Pinned
6

= 10.00

E3 OF E3
Checker

Ashokan

Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS

Sheet No :

PROJECT:

PETRORabigh, UOU PROJECT

Originator

Rev. Date
O1

CONTRACT NO 1-14-2410/59

17-Nov-06

TPR

SAFETY CALC. YES


CALC. NO

2411-8320-CA-WA15-0001

FOR 4 LATERAL BEAMS

8.6

1.9

Kz = 2.8 Kz = 2.3

Iz= 13670 inch

= 3.08

# 13670 5.6
HE280A

Iz= 28860 inch

= 8.04
# 28860 8.7
IPE360

Iz= 28860 inch

4.6

Kz = 2.7

= 9.29
# 28860 7.7
#

IPE360

Iz= 25170 inch

= 6.18

# 25170 8.1

Kz

4.68

= 2.71

HE300B

Iz= 45070 inch


# 45070

HE400A

Support :

= 10.00

Pinned
8

FOR 3 LATERAL BEAMS

1.9

Kz = 3.3

= 10.41
# 13670 13
#
HE280A
Iz= 13670 inch

4.6

Kz = 3.1

= 14.71
# 13670 11
HE280A

Iz= 25170 inch

= 6.91
# 25170 8.5

2.35

Kz = 2.77

HE300B

Iz= 45070 inch


# 45070

HE400A

Support :

Pinned
6

= 10.00

E1 OF E1
Checker

Ashokan

Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

APPENDIX F
STAAD MODEL

Rev
O1

Sheet No :
Originator
Date
TPR
17-Nov-06

1 OF 3
Checker
Ashokan

Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

Sheet No :
Originator
Date
TPR
17-Nov-06

Y
X
Z

Loa d 31

TYPICAL 3D MODEL

Load 31

Y X

Load 31

PLAN AT EL.+10.500 M

PLAN AT EL +12.40M

Load 31

Y X

Load 31

X Z

PLAN AT EL+14.00M

ELEVATION ALONG GRID 1

2 OF 3
Checker
Ashokan

Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

Sheet No :
Originator
Date
TPR
17-Nov-06

3 OF 3
Checker
Ashokan

Y
X

Load 31

ELEVATION ALONG GRID 2

Y
Z X

Load 31

CROSS SECTION ON GRIDS A & B

Load 31

CROSS SECTION ON GRIDS C & D

Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

APPENDIX G
STAAD INPUT AND OUTPUT FILE

Rev
O1

1
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

2
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

****************************************************
*
*
*
STAAD.Pro
*
*
Version 2004 Bld 1002.UK.1001
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date= JAN 3, 2007
*
*
Time= 18:46:32
*
*
*
*
USER ID: Foster Wheeler
*
****************************************************

1. STAAD SPACE
INPUT FILE: WA15.STD
2. START JOB INFORMATION
3. JOB NAME WA15
4. JOB CLIENT PETRO RABIGH
5. ENGINEER NAME PRAKASH
6. CHECKER NAME ASHOKAN
7. ENGINEER DATE 01-NOV-06
8. END JOB INFORMATION
9. INPUT WIDTH 79
10. UNIT METER KN
11. JOINT COORDINATES
12. 1 -7 3.55 -7; 2 0 3.55 -7; 3 -7 3.55 -11.5; 4 0 3.55 -11.5; 5 -7 3.325 -22
13. 6 0 3.325 -22; 9 -7 10.5 -7; 10 0 10.5 -7; 11 -7 12.4 -7; 12 0 12.4 -7
14. 13 -3.5 12.4 -7; 18 -7 10.5 -11.5; 19 0 10.5 -11.5; 20 -7 12.4 -11.5
15. 21 0 12.4 -11.5; 22 -3.5 12.4 -11.5; 27 -7 10.5 -22; 28 0 10.5 -22
16. 29 -7 12.4 -22; 30 0 12.4 -22; 31 -3.5 12.4 -22; 36 -7 10.5 -29; 37 0 10.5 -29
17. 38 -7 12.4 -29; 39 0 12.4 -29; 40 -3.5 12.4 -29; 55 0 10.5 -13.75
18. 56 0 10.5 -16.5; 57 0 10.5 -19.25; 58 0 12.4 -13.75; 59 0 12.4 -16.5
19. 60 0 12.4 -19.25; 61 -7 10.5 -13.75; 62 -7 10.5 -16.5; 63 -7 10.5 -19.25
20. 64 -7 12.4 -13.75; 65 -7 12.4 -16.5; 66 -7 12.4 -19.25; 68 -3.5 10.5 -7
21. 70 -3.5 10.5 -11.5; 77 -3.5 10.5 -13.75; 78 -3.5 10.5 -16.5
22. 79 -3.5 10.5 -19.25; 80 -3.5 10.5 -22; 82 -3.5 10.5 -29; 91 -3.5 12.4 -13.75
23. 92 -3.5 12.4 -16.5; 93 -3.5 12.4 -19.25; 117 0 10.5 -9.25; 118 -3.5 10.5 -9.25
24. 119 -7 10.5 -9.25; 120 0 10.5 -24.5; 121 0 10.5 -26.5; 122 -3.5 10.5 -24.5
25. 123 -7 10.5 -24.5; 124 -3.5 10.5 -26.5; 125 -7 10.5 -26.5; 126 0 12.4 -9.25
26. 127 -3.5 12.4 -9.25; 128 -7 12.4 -9.25; 129 0 12.4 -24.5; 130 0 12.4 -26.5
27. 131 -3.5 12.4 -24.5; 132 -7 12.4 -24.5; 133 -3.5 12.4 -26.5; 134 -7 12.4 -26.5
28. 139 -2.5 12.4 -7; 140 -2.5 12.4 -11.5; 141 -2.5 12.4 -22; 142 -2.5 12.4 -29
29. 143 0 20.95 -7; 144 0 20.95 -11.5; 145 0 20.95 -22; 146 0 20.95 -29
30. 147 -2.5 14 -7; 148 -2.5 14 -11.5; 149 -2.5 14 -22; 150 -2.5 14 -29
31. 151 0 14 -7; 152 0 14 -11.5; 153 0 14 -22; 154 0 14 -29; 155 0 14 -13.75
32. 156 0 14 -16.5; 157 0 14 -19.25; 158 -2.5 14 -13.75; 159 -2.5 14 -16.5
33. 160 -2.5 14 -19.25; 161 0 14 -24.5; 162 0 14 -26.5; 163 -2.5 14 -24.5
34. 164 -2.5 14 -26.5; 165 0 14 -9.25; 166 -2.5 14 -9.25; 169 0 20.95 -25.5
35. 170 0 5.9 -11.5; 171 -7 5.9 -11.5; 172 0 5.9 -7; 173 -7 5.9 -7
36. 178 0 17.325 -29; 179 0 17.325 -22; 180 0 17.325 -25.5; 181 -7 20.95 -29

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

3
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

37. 190 0 8.4 -7; 191 -7 8.4 -7; 192 0 8.4 -4.4; 193 -7 8.4 -4.4
38. 194 -3.5 8.4 -4.5; 195 -3.5 8.4 -7; 196 0 11.4 -7; 197 -7 11.4 -7
39. 198 0 11.4 -4.4; 199 -7 11.4 -4.4; 200 -3.5 11.4 -7; 201 -3.5 11.4 -4.4
40. 202 0 7.845 -29; 203 -7 7.845 -29; 204 0 7.845 -29.8; 205 -7 7.845 -29.8
41. 216 -7 10.5 -25.5; 217 0 10.5 -25.5; 218 0 14 -25.5; 219 0 12.4 -23.9
42. 220 0 12.4 -27.1; 221 -7 12.4 -25.5; 222 0 9.4 -7; 223 -7 9.35 -7
43. 224 -7 12.4 -23.75; 225 -7 12.4 -27.25; 226 0 5.9 -29; 227 0 5.9 -22
44. 228 0 8 -22; 229 0 8 -29; 230 0 5.9 -25.5; 231 0 8 -25.5; 232 -7 5.9 -29
45. 233 -7 5.9 -22; 234 -7 5.9 -25.5; 235 -7 8 -29; 236 -7 8 -22; 237 -7 8 -25.5
46. 238 -7 1.225 -29; 239 0 1.225 -29; 240 -7 20.95 -22; 241 -7 17.325 -29
47. 242 -7 17.325 -22; 243 -7 17.325 -25.5; 244 -7 20.95 -25.5; 245 -7 3.563 -29
48. 246 0 3.563 -29; 249 -7 3.5625 -25.5; 250 0 3.5625 -25.5
49. MEMBER INCIDENCES
50. 1 1 173; 2 2 172; 3 9 197; 4 10 196; 5 10 68; 6 12 139; 14 3 171; 15 4 170
51. 16 18 20; 17 19 21; 18 19 70; 19 21 140; 27 5 233; 28 6 227; 29 27 29
52. 30 28 30; 31 28 80; 32 30 141; 40 238 245; 41 239 246; 42 36 38; 43 37 39
53. 44 37 82; 45 39 142; 53 10 117; 54 19 55; 55 28 120; 56 9 119; 57 18 61
54. 58 27 123; 59 12 126; 60 21 58; 61 30 219; 62 11 128; 63 20 64; 64 29 224
55. 89 55 56; 90 56 57; 91 57 28; 92 58 59; 94 59 60; 96 60 30; 102 61 62
56. 103 62 63; 104 63 27; 105 64 65; 107 65 66; 109 66 29; 128 68 9; 131 70 18
57. 132 68 118; 133 55 77; 135 57 79; 139 56 78; 149 77 61; 150 70 77; 151 78 62
58. 152 77 78; 153 79 63; 154 78 79; 155 80 27; 156 79 80; 158 80 122; 159 82 36
59. 162 58 91; 163 59 92; 164 60 93; 180 13 127; 181 91 64; 182 22 91; 183 92 65
60. 184 91 92; 185 93 66; 186 92 93; 187 93 31; 189 31 131; 192 18 77; 193 77 62
61. 194 62 79; 195 79 27; 201 20 91; 202 91 65; 203 65 93; 204 93 29; 255 117 19
62. 256 118 70; 257 117 118; 258 119 18; 259 118 119; 261 120 217; 262 121 37
63. 263 122 124; 264 120 122; 265 123 216; 266 122 123; 267 124 82; 268 121 124
64. 269 125 36; 270 124 125; 272 126 21; 273 127 22; 274 126 127; 275 128 20
65. 276 127 128; 277 129 130; 278 130 220; 279 131 133; 280 129 131; 281 132 221
66. 282 131 132; 283 133 40; 284 130 133; 285 134 225; 286 133 134; 289 13 11
67. 290 22 20; 291 31 29; 292 40 38; 293 139 13; 294 140 22; 295 141 31
68. 296 142 40; 297 12 151; 298 21 152; 299 30 153; 300 39 154; 301 143 144
69. 303 145 169; 304 139 147; 305 140 148; 306 141 149; 307 142 150; 308 147 166
70. 309 148 158; 310 149 163; 311 151 143; 312 152 144; 313 151 165; 314 153 179
71. 315 152 155; 316 154 178; 317 153 161; 318 154 150; 319 153 149; 320 152 148
72. 321 151 147; 322 155 156; 323 156 157; 324 157 153; 325 158 159; 326 155 158
73. 327 159 160; 328 156 159; 329 160 149; 330 157 160; 331 161 218; 332 162 154
74. 333 163 164; 334 161 163; 335 164 150; 336 162 164; 337 165 152; 338 166 148
75. 339 165 166; 340 152 158; 341 158 156; 342 156 160; 343 160 153; 353 153 163
76. 354 163 162; 355 162 150; 356 169 146; 357 179 169; 358 178 169; 364 170 19
77. 365 171 18; 366 172 190; 367 173 191; 368 173 171; 369 172 170; 374 144 145
78. 378 178 146; 379 179 145; 380 179 180; 381 180 178; 382 153 180; 383 154 180
79. 384 146 181; 385 38 241; 406 190 222; 407 191 223; 408 190 192; 409 191 193
80. 410 173 193; 411 172 192; 412 190 195; 413 192 194; 414 194 193; 415 195 191
81. 416 194 195; 417 194 191; 418 194 190; 419 196 12; 420 197 11; 421 196 198
82. 422 197 199; 425 198 201; 426 196 200; 427 200 197; 428 201 199; 429 201 200
83. 430 201 197; 431 196 201; 432 202 229; 433 203 235; 434 202 204; 435 203 205
84. 436 204 205; 477 238 249; 479 239 250; 480 216 125; 481 217 121; 482 228 217
85. 483 229 217; 484 236 216; 485 235 216; 486 218 162; 487 219 129; 488 28 219
86. 489 219 218; 490 220 39; 491 37 220; 492 220 218; 493 221 134; 496 222 10
87. 497 223 9; 500 120 80; 501 123 80; 502 121 122; 503 125 122; 504 37 124
88. 505 36 124; 506 129 31; 507 132 31; 508 130 131; 509 134 131; 510 39 133
89. 511 38 133; 512 192 198; 513 193 199; 518 27 224; 519 216 224; 520 216 225
90. 521 36 225; 522 226 232; 523 227 233; 524 170 171; 525 172 173; 526 224 132
91. 527 225 38; 528 226 202; 529 227 228; 530 228 28; 531 229 37; 532 229 231
92. 533 226 230; 534 230 227; 535 231 228; 536 228 230; 537 232 203; 538 233 236

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

4
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

93. 539 232 234; 540 234 233; 541 235 36; 543 236 27; 544 235 237; 545 237 236
94. 546 234 236; 551 217 219; 552 217 220; 553 29 242; 554 181 244; 555 241 181
95. 556 242 240; 557 241 243; 558 243 242; 559 244 240; 560 29 243; 561 38 243
96. 562 242 244; 563 241 244; 564 145 240; 566 245 232; 567 246 226; 568 232 249
97. 569 226 250; 570 249 233; 571 250 227; 572 245 249; 573 246 250; 574 234 237
98. 575 230 231
99. DEFINE MATERIAL START
100. ISOTROPIC STEEL
101. E 2.05E+008
102. POISSON 0.3
103. DENSITY 76.8195
104. ALPHA 1.2E-005
105. DAMP 0.03
106. END DEFINE MATERIAL
107. MEMBER PROPERTY EUROPEAN
108. 53 55 56 58 59 62 255 258 261 262 265 269 272 275 301 308 TO 310 313 315 317 109. 322 TO 325 327 329 331 TO 333 335 337 338 368 369 480 481 110. 486 TABLE ST IPE300
111. 1 TO 4 14 TO 17 27 TO 30 40 TO 43 297 TO 300 311 312 314 316 364 TO 367 378 112. 379 385 406 407 419 420 432 433 496 497 528 TO 531 537 538 541 543 553 555 113. 556 566 567 TABLE ST HE400A
114. 192 TO 195 201 TO 204 326 328 330 334 336 339 TO 343 353 TO 355 417 418 430 115. 431 500 TO 511 TABLE ST L130X130X12
116. 132 150 152 154 156 158 180 182 184 186 187 189 256 263 267 273 279 283 416 117. 429 TABLE ST HE100A
118. 304 TO 307 318 TO 321 TABLE ST HE140A
119. 61 64 277 278 281 285 303 356 380 381 487 490 493 526 527 554 557 TO 558 120. 559 TABLE ST IPE360
121. 133 135 139 149 151 153 162 TO 164 181 183 185 257 259 264 266 268 270 274 122. 276 280 282 284 286 TABLE ST IPE300
123. 18 19 131 290 294 374 384 532 TO 535 539 540 544 545 564 TABLE ST HE280A
124. 5 6 31 32 44 45 128 155 159 289 291 TO 293 295 296 TABLE ST IPE360
125. 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 TABLE ST IPE450
126. 408 409 412 TO 415 421 422 425 TO 428 434 TO 436 512 513 TABLE ST HE200A
127. 522 TO 525 TABLE ST HE300B
128. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 129. 552 560 TO 563 568 569 572 TO 575 TABLE T IPE400
130. 477 479 570 571 TABLE ST IPE400
131. CONSTANTS
132. BETA 90 MEMB 436 477 479 522 570 571
133. MATERIAL STEEL MEMB 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 134. 96 102 TO 105 107 109 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 135. 180 TO 187 189 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 136. 290 TO 301 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 137. 426 TO 436 477 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 138. 551 TO 564 566 TO 575
139. SUPPORTS
140. 1 TO 6 238 239 PINNED
141. MEMBER RELEASE
142. 53 TO 64 132 133 135 139 150 152 154 156 158 162 TO 164 180 182 184 186 187 143. 189 256 257 263 264 267 268 273 274 279 280 283 284 301 303 TO 310 313 315 144. 317 326 328 330 334 336 339 368 369 374 380 408 409 412 413 416 421 422 425 145. 426 429 436 512 513 532 533 539 544 554 557 START MY MZ
146. 91 96 104 109 132 149 TO 154 156 158 180 TO 187 189 255 256 258 259 262 263 147. 266 267 269 270 272 273 275 276 279 282 283 286 301 324 326 328 TO 330 332 148. 334 TO 339 356 368 369 374 381 414 TO 416 427 TO 429 436 490 512 513 527 -

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

5
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

149. 534 535 540 545 558 559 END MY MZ


150. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 151. 552 560 TO 563 568 569 572 TO 575 START MY MZ
152. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 153. 552 560 TO 563 568 TO 575 END MY MZ
154. MEMBER TRUSS
155. 192 TO 195 201 TO 204 340 TO 343 353 TO 355 417 418 430 431 500 TO 511
156. *******************************************************************************
157. *----------------------------------------------------------------------------158. *PRIMARY LOAD CASES
159. *----------------------------------------------------------------------------160. *LOAD 1 SEISMIC LOAD IN +X DIRECTION
E(+X)
161. *LOAD 2 SEISMIC LOAD IN -X DIRECTION
E(-X)
162. *LOAD 3 SEISMIC LOAD IN +Z DIRECTION
E(+Z)
163. *LOAD 4 SEISMIC LOAD IN -Z DIRECTION
E(-Z)
164. *----------------------------------------------------------------------------165. *LOAD 11 DEAD LOAD (SELF WEIGHT OF STRUCTURE)
DS
166. *LOAD 12 OPERATING LOAD- PIPING/EQUIPMENT
DO
167. *----------------------------------------------------------------------------168. *LOAD 21 DEAD LOAD- PIPING/EQUIPMENT
DE
169. *LOAD 22 PIPING TEST LOAD
DT
170. *----------------------------------------------------------------------------171. *LOAD 31 THERMAL-ANCHOR LOAD IN +VE DIR.
AF1
172. *LOAD 32 THERMAL-ANCHOR LOADI IN -VE DIR.
AF2
173. *LOAD 33 THERMAL-FRICTION- IN +VE DIR.
FF1
174. *LOAD 34 THERMAL-FRICTION- IN -VE DIR.
FF2
175. *LOAD 35 TEMPERATURE LOAD
T
176. *---------------------------------------------------- ------------------------177. *LOAD 41 WIND LOAD IN +X DIRECTION
W(+X)
178. *LOAD 42 WIND LOAD IN -X DIRECTION
W(-X)
179. *----------------------------------------------------------------------------180. *LOAD 51 SURGE LOAD +X
S(X)
181. *LOAD 52 SURGE LOAD -X
S(-X)
182. ******************************************************************************
183. *LOADING
184. *****************************************************************************
185. *SEISMIC LOAD
186. *CALCULATIONS ARE AS PER ASCE-7 2002
187. **REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX D
188. DEFINE IBC 2003
189. SDS 0.19 SD1 0.11 S1 0.07 IE 1.25 RX 3.5 RZ 5 SCLASS 4
190. SELFWEIGHT
191. MEMBER WEIGHT
192. *******FOR BEAMS AT EL.+10.500 & 12.4 M
193. *FOR PIPES <12"
194. *UDL=1.9*3=5.7 KN/M
195. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 196. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 296 UNI 5.7
197. *FOR BEAMS AT +14.00M LVL
198. * FOR SINGLE LEVEL CABLE TRAY OPERATING DEAD LOAD = 1.0 KPA
199. * 1.0*0.5*3 = 1.5KN (0.5M WIDTH OF TRAY AND 3M BEAM SPACING ARE CONSIDERED )
200. 318 TO 321 326 328 330 334 336 339 CON 1.5 0.5
201. 318 TO 321 326 328 330 334 336 339 CON 1.5 1.5
202. *FOR PIPES >12"

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

203. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)


204. *G
205. 533 CON 20 2.2
206. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
207. *G
208. 539 CON 43.86 2.2
209. *24"-LS-O000-037-1CS1P05-IH
210. *G-(5.7*24"*25.4/1000)=16.176KN
211. 291 CON 16.176 2.79
212. *24"-LS-O000-037-1CS1P05-IH
213. *G-(5.7*24"*25.4/1000)=11.756KN
214. 290 CON 11.756 2.79
215. *24"-MS-O000-017-3CS1P05-IH
216. *G
217. 533 CON 27.71 1.225
218. *24"-MS-O000-017-3CS1P05-IH
219. *G-(5.7*24"*25.4/1000)=9.63KN
220. 280 CON 9.63 0.92
221. *24"-MS-O000-017-3CS1P05-IH
222. *G-(5.7*24"*25.4/1000)=9.186KN
223. 163 CON 9.186 0.92
224. *24"-MS-O000-017-3CS1P05-IH
225. *G-(5.7*24"*25.4/1000)=3.066KN
226. 19 CON 3.066 0.92
227. *24"-MS-O000-017-3CS1P05-IH
228. *G-(5.7*24"*25.4/1000)=10.116KN
229. 6 CON 10.116 0.92
230. *8"-G-O000-017-3CC1P01-NI
231. *G-(5.7*8"*25.4/1000)=8.462KN
232. 44 CON 8.462 1.4
233. *8"-G-O000-017-3CC1P01-NI
234. *G-(5.7*8"*25.4/1000)=0.792KN
235. 264 CON 0.792 1.4
236. *8"-G-O000-017-3CC1P01-NI
237. *G-(5.7*8"*25.4/1000)=1.352KN
238. 31 CON 1.352 1.4
239. *8"-G-O000-017-3CC1P01-NI
240. *G-(5.7*8"*25.4/1000)=2.322KN
241. 135 CON 2.322 1.4
242. *8"-G-O000-017-3CC1P01-NI
243. *G-(5.7*8"*25.4/1000)=1.068KN
244. 139 CON 1.068 1.4
245. *8"-G-O000-017-3CC1P01-NI
246. *G-(5.7*8"*25.4/1000)=1.512KN

Rev
O1

6
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

7
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

247. 133 CON 1.512 1.4


248. *8"-G-O000-017-3CC1P01-NI
249. *G-(5.7*8"*25.4/1000)=0.922KN
250. 18 CON 0.922 1.4
251. *8"-G-O000-017-3CC1P01-NI
252. *G-(5.7*8"*25.4/1000)=5.91KN
253. 5 CON 5.91 1.4
254. *8"-HS-O000-018-6CS1P05-IH
255. *G-(5.7*8"*25.4/1000)=3.072KN
256. 45 CON 3.072 1.8
257. *8"-HS-O000-018-6CS1P05-IH
258. *G=11.07KN
259. 533 CON 11.07 0.5
260. *8"-HS-O000-018-6CS1P05-IH
261. *G-(5.7*8"*25.4/1000)=6.222KN
262. 284 CON 6.22 1.8
263. *8"-HS-O000-018-6CS1P05-IH
264. *G-(5.7*8"*25.4/1000)=6.572KN
265. 163 CON 6.572 1.8
266. *8"-HS-O000-018-6CS1P05-IH
267. *G-(5.7*8"*25.4/1000)=2.222KN
268. 19 CON 2.222 1.8
269. *8"-HS-O000-018-6CS1P05-IH
270. *G-(5.7*8"*25.4/1000)=8.382KN
271. 6 CON 8.382 1.8
272. *LOAD FROM FLARE LINE
273. *FOR 6"-RLL-S130-XXX-1CC2P03-NI
274. 356 CON 3.52 2
275. 303 CON 3.12 0.01
276. 374 CON 4.69 2.25
277. *IN PROJECTED AREA
278. *FROM 24"-LS-O000-037-1CS1P05-IH
279. 413 414 425 428 UNI 5.7
280. 436 UNI 2
281. SET NL 100
282. LOAD 1 SEISMIC LOAD +X
283. IBC LOAD X 1
284. PERFORM ANALYSIS

PROBLEM STATISTICS
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 152/ 302/ 8
ORIGINAL/FINAL BAND-WIDTH= 132/ 21/ 129 DOF
TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 888
SIZE OF STIFFNESS MATRIX =
115 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 13.7/ 61586.0 MB

************************************************************
* IBC 2003 SEISMIC LOAD ALONG X :

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

* CT = 0.035 Cu = 1.660
*
* TIME PERIODS :
*
* Ta = 0.799 T = 0.996 Tuser = 0.000
*
* TIME PERIOD USED (T) = 0.996
*
* LOAD FACTOR
= 1.000
*
* DESIGN BASE SHEAR = 1.000 X 0.039 X
1648.52 *
*
=
65.03 KN
*
************************************************************

285. CHANGE
286. LOAD 2 SEISMIC LOAD -X
287. IBC LOAD X -1.
288. PERFORM ANALYSIS

************************************************************
* IBC 2003 SEISMIC LOAD ALONG X :
*
* CT = 0.035 Cu = 1.660
*
* TIME PERIODS :
*
* Ta = 0.799 T = 0.996 Tuser = 0.000
*
* TIME PERIOD USED (T) = 0.996
*
* LOAD FACTOR
= -1.000
*
* DESIGN BASE SHEAR = -1.000 X 0.039 X
1648.52 *
*
=
-65.03 KN
*
************************************************************

289. CHANGE
290. LOAD 3 SEISMIC LOAD +Z
291. IBC LOAD Z 1
292. PERFORM ANALYSIS

************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z :
*
* CT = 0.035 Cu = 1.660
*
* TIME PERIODS :
*
* Ta = 0.799 T = 0.392 Tuser = 0.000
*
* TIME PERIOD USED (T) = 0.392
*
* LOAD FACTOR
= 1.000
*
* DESIGN BASE SHEAR = 1.000 X 0.047 X
1648.52 *
*
=
78.30 KN
*
************************************************************

293. CHANGE
294. LOAD 4 SEISMIC LOAD -Z

Rev
O1

8
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

9
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

295. IBC LOAD Z -1.


296. PERFORM ANALYSIS

************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z :
*
* CT = 0.035 Cu = 1.660
*
* TIME PERIODS :
*
*
* Ta = 0.799 T = 0.392 Tuser = 0.000
* TIME PERIOD USED (T) = 0.392
*
* LOAD FACTOR
= -1.000
*
* DESIGN BASE SHEAR = -1.000 X 0.047 X
1648.52 *
*
=
-78.30 KN
*
************************************************************

297. CHANGE
298. *******************************************************************************
299. LOAD 11 DEAD LOAD
300. *******************************************************************************
301. *SELFWEIGHT OF THE STRUCTURE INCLUDING 10% EXTRA CONSIDERED TO ACCOUNT
302. *FOR CONNECTIONS
303. SELFWEIGHT Y -1.1
304. ***************************************************************************
305. LOAD 12 OPERATING LOAD-PIPING
306. *******************************************************************************
307. *FOR PIPES <12" , LOAD INTENSITY = 1.9 KN/M2. THIS IS AS PER SABP-007
308. *CL. 4.1.2 & 4.2.2 AND SAES -M-001 AMD CL. 5.2.4.8
309. *FOR PIPES >12" , LOAD APPLIED AS CONCENTRATED LOAD AND LOAD DATA IS AS PER
310. *PIPING INPUT DATA AND THE LOAD CALCULATION IS AS PER SABP07, CL. 4.1.2
311. *FOR CABLE TRAY, LOAD INTENSITY = 1.9 KN/M2. (AS PER SAES-M-001 -AMD CL. 5.2.5
312. *AND SABP-007 CL. 4.1.2)
313. *FUTURE PIPE LOAD OF 1.9 KN/M2 IS CONSIDERED FOR THE ANALYSIS.
314. MEMBER LOAD
315. *******FOR BEAMS AT EL.+10.500 & 12.4 M
316. *FOR PIPES <12"
317. *UDL=1.9*3=5.7 KN/M
318. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 319. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 320. 296 UNI GY -5.7
321. *FOR BEAMS AT +14.00M LVL
322. * FOR SINGLE LEVEL CABLE TRAY OPERATING DEAD LOAD = 1.0 KPA
323. * 1.0*0.5*3 = 1.5KN (0.5M WIDTH OF TRAY AND 3M BEAM SPACING ARE CONSIDERED )
324. 318 TO 321 326 328 330 334 336 339 CON GY -1.5 0.5
325. 318 TO 321 326 328 330 334 336 339 CON GY -1.5 1.5
326. *FOR PIPES >12"
327. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
328. *G
329. 533 CON GY -20 2.2
330. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
331. *G
332. 539 CON GY -43.86 2.2
333. *24"-LS-O000-037-1CS1P05-IH

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

334. *G-(5.7*24"*25.4/1000)=16.176KN
335. 291 CON GY -16.176 2.79
336. *24"-LS-O000-037-1CS1P05-IH
337. *G-(5.7*24"*25.4/1000)=11.756KN
338. 290 CON GY -11.756 2.79
339. *24"-MS-O000-017-3CS1P05-IH
340. *G
341. 533 CON GY -27.71 1.225
342. *24"-MS-O000-017-3CS1P05-IH
343. *G-(5.7*24"*25.4/1000)=9.63KN
344. 280 CON GY -9.63 0.92
345. *24"-MS-O000-017-3CS1P05-IH
346. *G-(5.7*24"*25.4/1000)=9.186KN
347. 163 CON GY -9.186 0.92
348. *24"-MS-O000-017-3CS1P05-IH
349. *G-(5.7*24"*25.4/1000)=3.066KN
350. 19 CON GY -3.066 0.92
351. *24"-MS-O000-017-3CS1P05-IH
352. *G-(5.7*24"*25.4/1000)=10.116KN
353. 6 CON GY -10.116 0.92
354. *8"-G-O000-017-3CC1P01-NI
355. *G-(5.7*8"*25.4/1000)=8.462KN
356. 44 CON GY -8.462 1.4
357. *8"-G-O000-017-3CC1P01-NI
358. *G-(5.7*8"*25.4/1000)=0.792KN
359. 264 CON GY -0.792 1.4
360. *8"-G-O000-017-3CC1P01-NI
361. *G-(5.7*8"*25.4/1000)=1.352KN
362. 31 CON GY -1.352 1.4
363. *8"-G-O000-017-3CC1P01-NI
364. *G-(5.7*8"*25.4/1000)=2.322KN
365. 135 CON GY -2.322 1.4
366. *8"-G-O000-017-3CC1P01-NI
367. *G-(5.7*8"*25.4/1000)=1.068KN
368. 139 CON GY -1.068 1.4
369. *8"-G-O000-017-3CC1P01-NI
370. *G-(5.7*8"*25.4/1000)=1.512KN
371. 133 CON GY -1.512 1.4
372. *8"-G-O000-017-3CC1P01-NI
373. *G-(5.7*8"*25.4/1000)=0.922KN
374. 18 CON GY -0.922 1.4
375. *8"-G-O000-017-3CC1P01-NI
376. *G-(5.7*8"*25.4/1000)=5.91KN
377. 5 CON GY -5.91 1.4
378. *8"-HS-O000-018-6CS1P05-IH
379. *G-(5.7*8"*25.4/1000)=3.072KN
380. 45 CON GY -3.072 1.8
381. *8"-HS-O000-018-6CS1P05-IH
382. *G=11.07KN
383. 533 CON GY -11.07 0.5
384. *8"-HS-O000-018-6CS1P05-IH
385. *G-(5.7*8"*25.4/1000)=6.222KN
386. 284 CON GY -6.22 1.8
387. *8"-HS-O000-018-6CS1P05-IH
388. *G-(5.7*8"*25.4/1000)=6.572KN
389. 163 CON GY -6.572 1.8

Rev
O1

10
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

11
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

390. *8"-HS-O000-018-6CS1P05-IH
391. *G-(5.7*8"*25.4/1000)=2.222KN
392. 19 CON GY -2.222 1.8
393. *8"-HS-O000-018-6CS1P05-IH
394. *G-(5.7*8"*25.4/1000)=8.382KN
395. 6 CON GY -8.382 1.8
396. *LOAD FROM FLARE LINE
397. *FOR 6"-RLL-S130-XXX-1CC2P03-NI
398. 356 CON GY -3.52 2
399. 303 CON GY 3.12 0.01
400. 374 CON GY -4.69 2.25
401. *IN PROJECTED AREA
402. *FROM 24"-LS-O000-037-1CS1P05-IH
403. 413 414 425 428 UNI GY -5.7
404. 436 UNI GY -2
405. ******************************************************************************
406. LOAD 21 PIPING EMPTY LOAD
407. *******************************************************************************
408. *FOR PIPING EMPTY CONDITION 0.6*OPERATING LOAD IS CONSIDERED AS PER
409. *SAES-M-001 AMD
410. REPEAT LOAD
411. 12 0.6
412. *******************************************************************************
413. LOAD 22 PIPING TEST LOAD
414. *******************************************************************************
415. *FOR PIPES <12" , LOAD INTENSITY = 1.9 KN/M2
416. *FOR PIPES >12" , LOAD APPLIED AS CONCENTRATED LOAD AND LOAD DATA IS AS PER
417. *PIPING INPUT DATA AND THE LOAD CALCULATION IS AS PER SABP07, CL. 4.1.2
418. *FOR CABLE TRAY, LOAD INTENSITY = 1.9 KN/M2. (AS PER SAES-M-001 -AMD CL. 5.2.5
419. *AND SABP-007 CL. 4.1.2)
420. *FUTURE PIPE LOAD OF 1.9 KN/M2 IS CONSIDERED FOR THE ANALYSIS.
421. MEMBER LOAD
422. *******FOR BEAMS AT EL.+10.500 & 12.400 M
423. *FOR PIPES <12"
424. *UDL=1.9*3=5.7 KN/M
425. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 426. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 427. 296 UNI GY -5.7
428. *FOR PIPES >12"
429. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
430. *G-0=48.79KN
431. 539 CON GY -48.79 2.5
432. *24"-LS-O000-037-1CS1P05-IH (S10-S11-B)
433. *G-0=54.19KN
434. 533 CON GY -54.19 2.5
435. *24"-LS-O000-037-1CS1P05-IH
436. *G-(5.7*24"*25.4/1000)=44.176KN
437. 291 CON GY -45 2.79
438. *24"-LS-O000-037-1CS1P05-IH
439. *G-(5.7*24"*25.4/1000)=34.236KN
440. 290 CON GY -34.236 2.79
441. *24"-MS-O000-017-3CS1P05-IH (S10-S11-A)
442. *G-0=65.67KN
443. 533 CON GY -65.67 2.5
444. *24"-MS-O000-017-3CS1P05-IH
445. *G-(5.7*24"*25.4/1000)=30.846KN

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

12
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

446. 280 CON GY -30.846 0.92


447. *24"-MS-O000-017-3CS1P05-IH
448. *G-(5.7*24"*25.4/1000)=29.526KN
449. 163 CON GY -29.526 0.92
450. *24"-MS-O000-017-3CS1P05-IH
451. *G-(5.7*24"*25.4/1000)=9.326KN
452. 19 CON GY -9.326 0.92
453. *24"-MS-O000-017-3CS1P05-IH
454. *G-(5.7*24"*25.4/1000)=29.426KN
455. 6 CON GY -29.426 0.92
456. *8"-G-O000-017-3CC1P01-NI
457. *G-(5.7*8"*25.4/1000)=5.26KN
458. 5 CON GY -5.26 1.4
459. *8"-G-O000-017-3CC1P01-NI
460. *G-(5.7*8"*25.4/1000)=0.732KN
461. 18 CON GY -0.732 1.4
462. *8"-G-O000-017-3CC1P01-NI
463. *G-(5.7*8"*25.4/1000)=0.922KN
464. 133 CON GY -0.922 1.4
465. *8"-G-O000-017-3CC1P01-NI
466. *G-(5.7*8"*25.4/1000)=0.862KN
467. 139 CON GY -0.862 1.4
468. *8"-G-O000-017-3CC1P01-NI
469. *G-(5.7*8"*25.4/1000)=0.782KN
470. 135 CON GY -0.782 1.4
471. *8"-G-O000-017-3CC1P01-NI
472. *G-(5.7*8"*25.4/1000)=1.132KN
473. 31 CON GY -1.132 1.4
474. *8"-G-O000-017-3CC1P01-NI
475. *G-(5.7*8"*25.4/1000)=0.612KN
476. 264 CON GY -0.612 1.4
477. *8"-G-O000-017-3CC1P01-NI
478. *G-(5.7*8"*25.4/1000)=7.582KN
479. 44 CON GY -7.582 1.4
480. *8"-HS-O000-018-6CS1P05-IH
481. *G-(5.7*8"*25.4/1000)=4.162KN
482. 45 CON GY -4.162 1.8
483. *8"-HS-O000-018-6CS1P05-IH
484. *G-0=13.91KN
485. 533 CON GY -13.91 0.5
486. *8"-HS-O000-018-6CS1P05-IH
487. *G-(5.7*8"*25.4/1000)=8.122KN
488. 284 CON GY -8.122 1.8
489. *8"-HS-O000-018-6CS1P05-IH
490. *G-(5.7*8"*25.4/1000)=8.552KN
491. 163 CON GY -8.552 1.8
492. *8"-HS-O000-018-6CS1P05-IH
493. *G-(5.7*8"*25.4/1000)=3.092KN
494. 19 CON GY -3.092 1.8
495. *8"-HS-O000-018-6CS1P05-IH
496. *G-(5.7*8"*25.4/1000)=9.392KN
497. 6 CON GY -9.392 1.8
498. ******************************************************************************
499. LOAD 31 ANCHOR LOAD IN +VE DIR
500. ******************************************************************************
501. *PIPING THERMAL-ANCHOR LOADS -IN LONGITUDINAL DIRECTION

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

13
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

502. *PIPE ANCHOR LOADS AS PER PIPING INPUT DATA


503. MEMBER LOAD
504. *AT EL. +10.500
505. *3"-CA-0000-011-1CC2C06-NI
506. 18 CON GZ 3 1.15
507. *3"-FG-0000-026-1CC1P01-NI
508. 18 CON GZ 3 1.7
509. *3"-G-0000-010-3CC1P01-NI
510. 18 CON GZ 3 1.92
511. *FOR FUTURE
512. 18 CON GZ 10 2.2
513. 18 CON GZ 10 2.6
514. 18 CON GZ 10 3
515. 18 CON GZ 10 3.3
516. 131 CON GZ 10 0.1
517. 131 CON GZ 10 0.5
518. 131 CON GZ 10 0.8
519. 131 CON GZ 10 1.2
520. 131 CON GZ 10 1.6
521. 131 CON GZ 10 1.9
522. 131 CON GZ 10 2.3
523. 131 CON GZ 10 2.6
524. 131 CON GZ 10 3
525. 131 CON GZ 10 3.3
526. *AT EL. +12.400
527. *4"-DMW-0000-011-1CC2C06-NI
528. 294 CON GZ 4 0.19
529. *3"-IA-0000-027-12CG0U01-NI
530. 294 CON GZ 3 0.4
531. *3"-UA-0000-028-12CG0U01-NI
532. 294 CON GZ 3 0.57
533. *3"-UW-0000-033-1CS2U16-NI
534. 294 CON GZ 3 0.72
535. *3"-SWS-0000-033-1CS4U16-NI
536. 290 CON GZ 3 0.01
537. *FOR FUTURE
538. 290 CON GZ 10 0.29
539. 290 CON GZ 10 0.65
540. 290 CON GZ 10 0.9
541. 290 CON GZ 10 1.25
542. 290 CON GZ 10 1.55
543. 290 CON GZ 10 1.9
544. ******************************************************************************
545. LOAD 32 ANCHOR LOAD IN -VE DIR
546. ******************************************************************************
547. REPEAT LOAD
548. 31 -1.0
549. ******************************************************************************
550. LOAD 33 FRICTION LOAD IN +VE DIR
551. ******************************************************************************
552. *30% OF THE OPERATING LOAD IS CONSIDERED FOR PIPES <L2" AS PER PIPING INPUT DAT
553. *FOR PIPES >12", LOAD IS AS PER PIPING INPUT DATA AND THE LOAD CALCULATION
554. *IS AS PER SABP07, CL. 4.1.2
555. *PIPING THERMAL-FRICTION LOADS -IN LONGITUDINAL DIRECTION
556. MEMBER LOAD
557. *******FOR BEAMS AT EL.+12.500 M

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

14
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

558. *FOR PIPES <12"


559. **UDL = 30% OF 5.7 = (30/100)*5.7 = 1.71 KN/M
560. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 561. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 562. 296 UNI GZ 1.71
563. *8"-G-O000-017-3CC1P01-NI
564. *-HL-(1.7*8"*25.4/1000)=-1.397KN
565. 135 CON GZ -1.397 1.4
566. *8"-HS-O000-018-6CS1P05-IH
567. *HL=1.45KN
568. 284 CON GX 1.45 1.8
569. *8"-HS-O000-018-6CS1P05-IH
570. *-HL-(1.7*8"*25.4/1000)=-2.645KN
571. 284 CON GZ -2.645 1.8
572. *8"-HS-O000-018-6CS1P05-IH
573. *-HL-(1.7*8"*25.4/1000)=-2.0865KN
574. 163 CON GZ -2.086 1.8
575. *8"-HS-O000-018-6CS1P05-IH
576. *-HL-(1.7*8"*25.4/1000)=-3.165KN
577. 6 CON GZ -3.165 1.8
578. *8"-HS-O000-018-6CS1P05-IH
579. *HL-0=3.24KN
580. 533 CON GX 3.24 0.5
581. *24"-LS-O000-037-1CS1P05-IH
582. 291 CON GZ -1.62 2.79
583. 291 CON GX -1.05 2.79
584. 290 CON GZ -2.9 2.79
585. 533 CON GZ 1.2 2.5
586. 539 CON GZ -11.07 2.5
587. 539 CON GX -3.3 2.5
588. *24"-MS-O000-017-3CS1P05-IH
589. 280 CON GX -4.35 0.92
590. 280 CON GZ -3.32 0.92
591. 163 CON GZ -1.18 0.92
592. 19 CON GZ -1.96 0.92
593. 6 CON GX -1.32 0.92
594. 6 CON GX -3.72 0.92
595. 533 CON GZ -7.42 1.25
596. 533 CON GX 3.76 1.25
597. ******************************************************************************
598. LOAD 34 FRICTION LOAD IN -VE DIR
599. ******************************************************************************
600. *30% OF THE OPERATING LOAD IS CONSIDERED FOR PIPES <L2" AS PER PIPING INPUT DAT
601. *FOR PIPES >12", LOAD IS AS PER PIPING INPUT DATA AND THE LOAD CALCULATION
602. *IS AS PER SABP07, CL. 4.1.2
603. *PIPING THERMAL-FRICTION LOADS -IN LONGITUDINAL DIRECTION
604. *MEMBER LOAD
605. *******FOR BEAMS AT EL.+12.500 M
606. *FOR PIPES <12"
607. **UDL = 30% OF 5.7 = (30/100)*5.7 = 1.71 KN/M
608. REPEAT LOAD
609. 33 -1.0
610. *******************************************************************************
611. LOAD 35 TEMPERATURE LOAD
612. *******************************************************************************
613. *REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX B

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

15
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

614. TEMPERATURE LOAD


615. 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 96 102 TO 105 107 109 616. 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 180 TO 187 189 617. 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 TO 301 618. 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 TO 436 477 619. 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 551 TO 564 566 TO 574 620. 575 TEMP 38
621. ******************************************************************************
622. LOAD 41 WIND LOAD IN +X DIR
623. *CALCULATION BASED ON SABP-006
624. *ALSO REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX C
625. *WIND LOAD IN TRANSVERSE DIRECTION ALONE CONSIDERED
626. *WIND ON PIPES
627. *WINDWARD
628. JOINT LOAD
629. 19 28 56 FX 4.65
630. 10 37 FX 2.71
631. 21 30 59 FX 6.4
632. 12 39 FX 3.72
633. 145 144 FX 0.89
634. 146 143 FX 0.51
635. MEMBER LOAD
636. 374 CON GX 0.89
637. *WINDWARD
638. MEMBER LOAD
639. *ON BEAMS
640. 53 TO 64 89 TO 92 94 96 102 TO 105 107 109 255 258 261 262 265 269 272 275 641. 277 278 281 285 368 369 408 409 421 422 480 481 487 490 493 526 527 642. 532 TO 535 539 540 544 545 572 573 UNI GX 0.58
643. 301 303 308 TO 310 313 315 317 322 TO 325 327 329 331 TO 333 335 337 338 356 644. 374 380 381 486 554 557 TO 559 UNI GX 0.54
645. *ON COLUMNS
646. 1 TO 4 14 TO 17 27 TO 30 40 TO 43 364 TO 367 406 407 419 420 432 433 496 497 647. 528 TO 531 537 538 541 543 566 567 UNI GX 0.55
648. 297 TO 300 311 312 314 316 378 379 385 553 555 556 UNI GX 0.65
649. *ON VERTICAL BRACING
650. 410 411 477 479 482 TO 485 488 489 491 492 512 513 518 TO 521 536 546 551 651. 552 568 TO 571 574 575 UNI GX 0.28
652. 304 TO 307 357 358 382 383 560 TO 563 UNI GX 0.33
653. *IN PROJECTED AREA
654. *FROM 24"-LS-O000-037-1CS1P05-IH
655. **************************************************************************
656. LOAD 42 WIND LOAD IN -X DIR
657. REPEAT LOAD

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

16
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

658. 41 -1.0
659. LOAD 51 SURGE LOAD (+VE)
660. *****************************************************************************
661. *CONSIDERING 150KN OF SURGE LOAD FOR 24" PIPELINE @0.869 M FROM THE COLUMN
662. MEMBER LOAD
663. 290 CON GZ 150 0.29
664. *646 CON GZ 150 0.869
665. *1010 CON GX 150 0.869
666. *1007 CON GX 150 0.869
667. *1021 CON GX 150 0.869
668. *******************************************************************************
669. LOAD 52 SURGE LOAD (-VE)
670. ******************************************************************************
671. REPEAT LOAD
672. 51 -1.0
673. *******************************************************************************
674. *LOAD COMBINATION FOR STEEL STRUCTURES DESIGN-STRENGTH DESIGN (LRFD)
675. *******************************************************************************
676. *AS PER SAES-M-001 CL. 6.2
677. **1.4(DEAD LOAD +OPERATING LOAD+THERMAL LOAD)
678. **1.2(DEAD+OPERATING LOAD+ANCHOR)+ (1.6WIND OR 1.0 SEISMIC LOAD)
679. **0.9 DEAD LOAD(EMPTY) + 1.6WIND
680. **0.9 DEAD LOAD +0.6 OPERATING+ 1.0 SEISMIC (OPERATING)
681. **0.9 DEAD LOAD + 1.0 SEISMIC (EMPTY)
682. *~ 0.9 DEAD LOAD + 0.6 SEISMIC (OPERATING)
683. **1.4(DEAD LOAD )+ 1.4(TEST LOAD)
684. **1.2(DEAD LOAD )+ 1.2(TEST LOAD) +(WIND @50MPH)
685. *~ 1.2(DEAD LOAD )+ 1.2(TEST LOAD) +0.25WIND
686. *******************************************************************************
687. *LOAD COMBINATIONS
688. *******************************************************************************
689. *LOAD COMBINATION FOR STRENGTH CHECK
690. *FOR COLUMN,LONGITUDINAL BEAM,STRUT,BRACING
691. *(WITH FRICTION LOAD AS 5% OF OPERATING)
692. *******************************************************************************
693. LOAD 101 1.4DS+1.4DO+1.4AF(+VE)+0.23FF(+VE)+1.4T(+VE)
694. REPEAT LOAD
695. 11 1.4 12 1.4 31 1.4 33 0.23 35 1.4
696. LOAD 102 1.4DS+1.4DO+1.4AF(-VE)+0.23FF(-VE)+1.4T(-VE)
697. REPEAT LOAD
698. 11 1.4 12 1.4 32 1.4 34 0.23 35 1.4
699. *******************************************************************************
700. LOAD 103 1.2DS+1.2DO+1.2AF(+VE)+1.6W(+Z)
701. REPEAT LOAD
702. 11 1.2 12 1.2 31 1.2 41 1.6

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

17
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

703. LOAD 104 1.2DS+1.2DO+1.2AF(+VE)+1.6WL(-Z)


704. REPEAT LOAD
705. 11 1.2 12 1.2 31 1.2 42 1.6
706. LOAD 105 1.2DS+1.2DO+1.2AF(+VE)+1.0E(+X)
707. REPEAT LOAD
708. 11 1.2 12 1.2 31 1.2 1 1.0
709. LOAD 106 1.2DS+1.2DO+1.2AF(+VE)+1.0E(-X)
710. REPEAT LOAD
711. 11 1.2 12 1.2 31 1.2 2 1.0
712. LOAD 107 1.2DS+1.2DO+1.2AF(+VE)+1.0E(+Z)
713. REPEAT LOAD
714. 11 1.2 12 1.2 31 1.2 3 1.0
715. LOAD 108 1.2DS+1.2DO+1.2AF(+VE)+1.0E(-Z)
716. REPEAT LOAD
717. 11 1.2 12 1.2 31 1.2 4 1.0
718. LOAD 109 1.2DS+1.2DO+1.2AF(-VE)+1.6W(+Z)
719. REPEAT LOAD
720. 11 1.2 12 1.2 32 1.2 41 1.6
721. LOAD 110 1.2DS+1.2DO+1.2AF(-VE)+1.6WL(-Z)
722. REPEAT LOAD
723. 11 1.2 12 1.2 32 1.2 42 1.6
724. LOAD 111 1.2DS+1.2DO+1.2AF(-VE)+1.0E(+X)
725. REPEAT LOAD
726. 11 1.2 12 1.2 32 1.2 1 1.0
727. LOAD 112 1.2DS+1.2DO+1.2AF(-VE)+1.0E(-X)
728. REPEAT LOAD
729. 11 1.2 12 1.2 32 1.2 2 1.0
730. LOAD 113 1.2DS+1.2DO+1.2AF(-VE)+1.0E(+Z)
731. REPEAT LOAD
732. 11 1.2 12 1.2 32 1.2 3 1.0
733. LOAD 114 1.2DS+1.2DO+1.2AF(-VE)+1.0E(-Z)
734. REPEAT LOAD
735. 11 1.2 12 1.2 32 1.2 4 1.0
736. *******************************************************************************
737. LOAD 115 0.9DS+0.9DE+1.6W(+Z)
738. REPEAT LOAD
739. 11 0.9 21 0.9 41 1.6
740. LOAD 116 0.9DS+0.9DE+1.6W(-Z)
741. REPEAT LOAD
742. 11 0.9 21 0.9 42 1.6
743. *******************************************************************************
744. LOAD 117 0.9DS+0.6DO+1.0EO(+X)
745. REPEAT LOAD
746. 11 0.9 12 0.6 1 1.0
747. LOAD 118 0.9DS+0.6DO+1.0EO(-X)
748. REPEAT LOAD
749. 11 0.9 12 0.6 2 1.0
750. LOAD 119 0.9DS+0.6DO+1.0EO(+Z)
751. REPEAT LOAD
752. 11 0.9 12 0.6 3 1.0
753. LOAD 120 0.9DS+0.6DO+1.0EO(-Z)
754. REPEAT LOAD
755. 11 0.9 12 0.6 4 1.0
756. *******************************************************************************
757. LOAD 121 0.9DS+0.9DE+0.67EO(+X)
758. REPEAT LOAD
759. 11 0.9 21 0.9 1 0.7
760. LOAD 122 0.9DS+0.9DE+0.67EO(-X)

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

18
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

761. REPEAT LOAD


762. 11 0.9 21 0.9 2 0.7
763. LOAD 123 0.9DS+0.9DE+0.67EO(+Z)
764. REPEAT LOAD
765. 11 0.9 21 0.9 3 0.7
766. LOAD 124 0.9DS+0.9DE+0.67EO(-Z)
767. REPEAT LOAD
768. 11 0.9 21 0.9 4 0.7
769. *******************************************************************************
770. LOAD 125 1.4(DS+DT)
771. REPEAT LOAD
772. 11 1.4 22 1.4
773. *******************************************************************************
774. LOAD 126 1.2(DS+DT)+0.29W(+Z)
775. REPEAT LOAD
776. 11 1.2 22 1.2 41 0.29
777. LOAD 127 1.2(DS+DT)+0.29W(-Z)
778. REPEAT LOAD
779. 11 1.2 22 1.2 42 0.29
780. *******************************************************************************
781. LOAD 128 1.4DS+1.4DO+1.4AF(+VE)+0.23FF(+VE)+1.4T(+VE)+1.0SL(+VE)
782. REPEAT LOAD
783. 11 1.4 12 1.4 31 1.4 33 0.23 51 1.4 35 1.4
784. LOAD 129 1.4DS+1.4DO+1.4AF(-VE)+0.23FF(-VE)+1.4T(-VE)+1.0SL(-VE)
785. REPEAT LOAD
786. 11 1.4 12 1.4 32 1.4 34 0.23 35 1.4 52 1.0
787. *******************************************************************************
788. LOAD 130 1.2DS+1.2DO+1.2AF(+VE)+1.0SL(+VE)
789. REPEAT LOAD
790. 11 1.2 12 1.2 31 1.2 51 1.0
791. LOAD 131 1.2DS+1.2DO+1.2AF(+VE)+1.0SL(-VE)

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

19
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

792. REPEAT LOAD


793. 11 1.2 12 1.2 31 1.2 52 1.0
794. LOAD 132 1.2DS+1.2DO+1.2AF(-VE)+1.0SL(+VE)
795. REPEAT LOAD
796. 11 1.2 12 1.2 32 1.2 51 1.0
797. LOAD 133 1.2DS+1.2DO+1.2AF(-VE)+1.0SL(-VE)
798. REPEAT LOAD
799. 11 1.2 12 1.2 32 1.2 52 1.0
800. *******************************************************************************
801. *LOAD COMBINATION FOR STRENGTH CHECK
802. *FOR TRANSVERSE BEAM DESIGN
803. *(WITH FRICTION LOAD AS 10% OF OPERATING)
804. *******************************************************************************
805. LOAD 151 1.4DS+1.4DO+1.4AF(+VE)+0.47FF(+VE)+1.4T(+VE)
806. REPEAT LOAD
807. 11 1.4 12 1.4 31 1.4 33 0.47 35 1.4
808. LOAD 152 1.4DS+1.4DO+1.4AF(-VE)+0.47FF(-VE)+1.4T(-VE)
809. REPEAT LOAD
810. 11 1.4 12 1.4 32 1.4 34 0.47 35 1.4
811. *******************************************************************************
812. LOAD 153 1.4DS+1.4DO+1.4AF(+VE)+0.47FF(+VE)+1.4T(+VE)+1.0SL(+VE)
813. REPEAT LOAD
814. 11 1.4 12 1.4 31 1.4 33 0.47 35 1.4 51 1.0
815. LOAD 154 1.4DS+1.4DO+1.4AF(-VE)+0.47FF(-VE)+1.4T(-VE)+1.0SL(-VE)
816. REPEAT LOAD
817. 11 1.4 12 1.4 32 1.4 34 0.47 35 1.4 52 1.0
818. *******************************************************************************
819. *LOAD COMBINATION FOR SERVICEABILITY CHECK
820. *FOR LONGITUDINAL BEAMS, STRUTS, COLUMNS AND FOUNDATION
821. *(WITH FRICTION LOAD AS 5% OF OPERATING)
822. *******************************************************************************
823. LOAD 201 1.0DS+1.0DO+1.0AF(+VE) )+0.17FF(+VE)+1.0T(+VE)
824. REPEAT LOAD
825. 11 1.0 12 1.0 31 1.0 33 0.17 35 1.0
826. LOAD 202 1.0DS+1.0DO+1.0AF(-VE) +0.17FF(-VE)+1.0T(-VE)
827. REPEAT LOAD
828. 11 1.0 12 1.0 32 1.0 34 0.17 35 1.0
829. *******************************************************************************
830. LOAD 203 1.0DS+1.0DO+1.0AF(+VE)+1.0W(+Z)
831. REPEAT LOAD
832. 11 1.0 12 1.0 31 1.0 41 1.0
833. LOAD 204 1.0DS+1.0DO+1.0AF(+VE)+1.0WL(-Z)
834. REPEAT LOAD
835. 11 1.0 12 1.0 31 1.0 42 1.0
836. LOAD 205 1.0DS+1.0DO+1.0AF(+VE)+0.7E(+X)
837. REPEAT LOAD
838. 11 1.0 12 1.0 31 1.0 1 0.7
839. LOAD 206 1.0DS+1.0DO+1.0AF(+VE)+0.7E(-X)
840. REPEAT LOAD
841. 11 1.0 12 1.0 31 1.0 2 0.7
842. LOAD 207 1.0DS+1.0DO+1.0AF(+VE)+0.7E(+Z)
843. REPEAT LOAD
844. 11 1.0 12 1.0 31 1.0 3 0.7
845. LOAD 208 1.0DS+1.0DO+1.0AF(+VE)+0.7E(-Z)
846. REPEAT LOAD
847. 11 1.0 12 1.0 31 1.0 4 0.7

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

20
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

848. LOAD 209 1.0DS+1.0DO+1.0AF(-VE)+1.0W(+Z)


849. REPEAT LOAD
850. 11 1.0 12 1.0 32 1.0 41 1.0
851. LOAD 210 1.0DS+1.0DO+1.0AF(-VE)+1.0WL(-Z)
852. REPEAT LOAD
853. 11 1.0 12 1.0 32 1.0 42 1.0
854. LOAD 211 1.0DS+1.0DO+1.0AF(-VE)+0.7E(+X)
855. REPEAT LOAD
856. 11 1.0 12 1.0 32 1.0 1 0.7
857. LOAD 212 1.0DS+1.0DO+1.0AF(-VE)+0.7E(-X)
858. REPEAT LOAD
859. 11 1.0 12 1.0 32 1.0 2 0.7
860. LOAD 213 1.0DS+1.0DO+1.0AF(-VE)+0.7E(+Z)
861. REPEAT LOAD
862. 11 1.0 12 1.0 32 1.0 3 0.7
863. LOAD 214 1.0DS+1.0DO+1.0AF(-VE)+0.7E(-Z)
864. REPEAT LOAD
865. 11 1.0 12 1.0 32 1.0 4 0.7
866. *******************************************************************************
867. LOAD 215 1.0DS+1.0DE+1.0W(+Z)
868. REPEAT LOAD
869. 11 1.0 21 1.0 41 1.0
870. LOAD 216 1.0DS+1.0DE+1.0W(-Z)
871. REPEAT LOAD
872. 11 1.0 21 1.0 42 1.0
873. *******************************************************************************
874. LOAD 217 0.9DS+0.6DO+0.7EO(+X)
875. REPEAT LOAD
876. 11 0.9 12 0.6 1 0.7
877. LOAD 218 0.9DS+0.6DO+0.7EO(-X)
878. REPEAT LOAD
879. 11 0.9 12 0.6 2 0.7
880. LOAD 219 0.9DS+0.6DO+0.7EO(+Z)
881. REPEAT LOAD
882. 11 0.9 12 0.6 3 0.7
883. LOAD 220 0.9DS+0.6DO+0.7EO(-Z)
884. REPEAT LOAD
885. 11 0.9 12 0.6 4 0.7
886. *******************************************************************************
887. LOAD 221 0.9DS+0.9DE+0.5EO(+X)
888. REPEAT LOAD
889. 11 0.9 21 0.9 1 0.5
890. LOAD 222 0.9DS+0.9DE+0.5EO(-X)
891. REPEAT LOAD
892. 11 0.9 21 0.9 2 0.5
893. LOAD 223 0.9DS+0.9DE+0.5EO(+Z)
894. REPEAT LOAD
895. 11 0.9 21 0.9 3 0.5
896. LOAD 224 0.9DS+0.9DE+0.5EO(-Z)
897. REPEAT LOAD
898. 11 0.9 21 0.9 4 0.5

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

21
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

899. *******************************************************************************
900. LOAD 225 1.0DS+DT
901. REPEAT LOAD
902. 11 1.0 22 1.0
903. *******************************************************************************
904. LOAD 226 1.0DS+1.0DT+0.29W(+Z)
905. REPEAT LOAD
906. 11 1.0 22 1.0 41 0.29
907. LOAD 227 1.0DS+1.0DT+0.29W(-Z)
908. REPEAT LOAD
909. 11 1.0 22 1.0 42 0.29
910. *******************************************************************************
911. LOAD 228 1.0DS+1.0DO+1.0AF(+VE)++0.17FF(+VE)+1.0T(+VE)+1.0SL(+VE)
912. REPEAT LOAD
913. 11 1.0 12 1.0 31 1.0 33 0.17 35 1.0 51 1.0
914. LOAD 229 1.0DS+1.0DO+1.0AF(-VE)+0.17FF(-VE)+1.0T(-VE)+1.0SL(-VE)
915. REPEAT LOAD
916. 11 1.0 12 1.0 32 1.0 34 0.17 35 1.0 52 1.0
917. *******************************************************************************
918. LOAD 230 1.0DS+1.0DO+1.0AF(+VE)+1.0SL(+VE)
919. REPEAT LOAD
920. 11 1.0 12 1.0 31 1.0 51 1.0
921. LOAD 231 1.0DS+1.0DO+1.0AF(+VE)+1.0SL(-VE)
922. REPEAT LOAD
923. 11 1.0 12 1.0 31 1.0 52 1.0
924. LOAD 232 1.0DS+1.0DO+1.0AF(-VE)+1.0SL(+VE)
925. REPEAT LOAD
926. 11 1.0 12 1.0 32 1.0 51 1.0
927. LOAD 233 1.0DS+1.0DO+1.0AF(-VE)+1.0SL(-VE)
928. REPEAT LOAD
929. 11 1.0 12 1.0 32 1.0 52 1.0
930. *******************************************************************************
931. *LOAD COMBINATION FOR SERVICEABILITY CHECK
932. *FOR TRANSVERSE BEAM AND FOUNDATION(FOR BEARING CAPACITY AND STABILITY CHECK) D
933. *(WITH FRICTION LOAD AS 10% OF OPERATING)
934. *******************************************************************************
935. LOAD 251 1.0DS+1.0DO+1.0AF(+VE)+0.33FF(+VE)+1.0T(+VE)
936. REPEAT LOAD
937. 11 1.0 12 1.0 31 1.0 33 0.33 35 1.0
938. LOAD 252 1.0DS+1.0DO+1.0AF(-VE)+0.33FF(-VE)+1.0T(-VE)
939. REPEAT LOAD
940. 11 1.0 12 1.0 32 1.0 34 0.33 35 1.0
941. *******************************************************************************
942. LOAD 253 1.0DS+1.0DO+1.0AF(+VE)+0.33FF(+VE)+1.0T(+VE)+1.0SL(+VE)
943. REPEAT LOAD
944. 11 1.0 12 1.0 31 1.0 33 0.33 35 1.0 51 1.0
945. LOAD 254 1.0DS+1.0DO+1.0AF(-VE)+0.33FF(-VE)+1.0T(-VE)+1.0SL(-VE)
946. REPEAT LOAD
947. 11 1.0 12 1.0 32 1.0 34 0.33 35 1.0 52 1.0
948. *******************************************************************************
949. PERFORM ANALYSIS PRINT STATICS CHECK
950. *PDELTA 3 ANALYSIS
STAAD SPACE
-- PAGE NO. 20
++ Adjusting Displacements
++ Adjusting Displacements
++ Adjusting Displacements

18:46:37
18:46:37
18:46:38

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

22
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

951. *******************************************************************************
952. *DESIGN
953. PARAMETER
954. CODE LRFD
955. FYLD 355000 ALL
956. BEAM 1 ALL
957. RATIO 1 ALL
958. MAIN 0 ALL
959. *TRACK 2 ALL
960. ****************
961. *LZ 7.1 MEMB 1 2 14 15 27 28 40 41 65 TO 68 364 TO 367
962. LZ 6.95 MEMB 314 316 378 379
963. LZ 13.9 MEMB 311 312
964. LZ 4.6 MEMB 366 367 406 407 496 497
965. LY 4.6 MEMB 366 367 406 407 496 497
966. LY 1.9 MEMB 3 4 419 420
967. LZ 1.9 MEMB 3 4 419 420
968. LZ 4.6 MEMB 432 433 528 TO 531 537 538 541 543
969. LY 2.1 MEMB 432 433 528 537
970. LZ 8.55 MEMB 385 553 555 556
971. LZ 4.68 MEMB 40 41 566 567
972. LY 2.5 MEMB 61 64 278 285 487 490 526 527
973. *LY 7.1 MEMB 1 2 14 15 364 TO 367 406 407 437 438 441 453
974. LY 7.1 MEMB 1 2 14 15 364 TO 367 406 407 496 497
975. LZ 4.5 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
976. LY 4.5 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
977. LZ 7 MEMB 310 333 335 384 564
978. LY 2 MEMB 261 265 277 281 331 480 481 486 493
979. LY 7 MEMB 303 356 532 TO 535 539 540 544 545 554 557 TO 559
980. LY 3.5 MEMB 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 981. 162 TO 164 181 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 982. 290 TO 296 412 TO 415 425 TO 428
983. LY 1.6 MEMB 434 435
984. LZ 7 MEMB 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 985. 163 TO 164 181 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 986. 290 TO 296 412 TO 415 425 TO 428
987. LZ 10.5 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315
988. 322 TO 325 327 329
989. LZ 3.5 MEMB 55 58 261 262 265 269 317 331 332 480 481 486
990. LZ 3.5 MEMB 277 278 487
991. LZ 3.5 MEMB 281 285 493 526
992. LZ 1.6 MEMB 434 435
993. LZ 8.42 MEMB 477 479 570 571
994. *LZ 7.1 MEMB 1 2 14 15 27 28 40 41 65 TO 68 364 TO 367 406 407 432 433 496 497
995. ***************
996. KZ 2.77 MEMB 1 2
997. KZ 2.54 MEMB 366 367 406 407 496 497
998. KZ 2.37 MEMB 3 4 419 420
999. KZ 2.77 MEMB 14 15
1000. KZ 3.09 MEMB 364 365
1001. KZ 3.31 MEMB 16 17
1002. KZ 2.89 MEMB 27 28
1003. KZ 2.84 MEMB 529 530 538 543
1004. KZ 2.8 MEMB 29 30

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

23
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

1005. KZ 2.31 MEMB 299 314 379 553 556


1006. KZ 2.71 MEMB 40 41 566 567
1007. KZ 2.66 MEMB 432 433 528 531 537 541
1008. KZ 2.8 MEMB 42 43
1009. KZ 2.31 MEMB 300 316 378 385 555
1010. ****************
1011. UNT 2.25 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
1012. UNB 2.25 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
1013. UNT 2.75 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315 1014. 322 TO 325 327 329
1015. UNB 2.75 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315
1016. 322 TO 325 327 329
1017. UNT 2.5 MEMB 55 58 61 64 261 262 265 269 277 278 281 285 310 317 331 TO 333 1018. 335 480 481 486 487 490 493 526 527
1019. UNB 2.5 MEMB 55 58 61 64 261 262 265 269 277 278 281 285 310 317 331 TO 333 1020. 335 480 481 486 487 490 493 526 527
1021. UNT 7 MEMB 532 TO 535 539 540 544 545
1022. UNB 7 MEMB 532 TO 535 539 540 544 545
1023. UNT 3.5 MEMB 413 414 425 428
1024. UNB 3.5 MEMB 413 414 425 428
1025. UNT 1.6 MEMB 434 435
1026. UNB 1.6 MEMB 434 435
1027. NSF 0.85 MEMB 192 TO 195 201 TO 204 340 TO 343 353 TO 355 357 358 382 383 1028. 410 411 417 418 430 431 477 479 482 TO 485 488 489 491 492 500 TO 511 518 1029. 519 TO 521 536 546 551 552 560 TO 563 568 TO 575
1030. LOAD LIST 101 TO 133
1031. *FOR COLUMNS
1032. CHECK CODE MEMB 1 TO 4 14 TO 17 27 TO 30 40 TO 43 297 TO 300 304 TO 307 311 1033. 312 314 316 364 TO 367 378 379 385 406 407 419 420 432 433 496 497 512 513 1034. 528 TO 531 537 538 541 543 553 555 556 566 567

STAAD.PRO CODE CHECKING - (LRFD 3RD EDITION)


********************************************
ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)
MEMBER

TABLE
RESULT/ CRITICAL COND/ RATIO/ LOADING/
FX
MY
MZ
LOCATION
=======================================================================

1 ST HE400A
PASS
248.37 C
2 ST HE400A
PASS
287.70 C
3 ST HE400A
PASS
33.41 C
4 ST HE400A
PASS
70.46 C

(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.303
110
40.49
85.13
2.35
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.306
109
39.07
-85.08
2.35
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.144
109
30.78
-22.73
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.123
110
26.80
13.96
0.00

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

14 ST HE400A
PASS
394.79 C
15 ST HE400A
PASS
429.28 C
16 ST HE400A
PASS
154.08 C
17 ST HE400A
PASS
177.51 C
27 ST HE400A
PASS
936.29 C
28 ST HE400A
PASS
867.48 C
29 ST HE400A
PASS
188.46 C
30 ST HE400A
PASS
191.65 C
40 ST HE400A
PASS
261.30 C
41 ST HE400A
PASS
276.45 C
42 ST HE400A
PASS
105.63 C
43 ST HE400A
PASS
120.62 C
297 ST HE400A
PASS
15.54 C
298 ST HE400A
PASS
55.15 C
299 ST HE400A
PASS
77.96 C
300 ST HE400A

(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.344
110
17.26
163.25
2.35
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.350
109
16.08
-165.89
2.35
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.249
110
0.00
189.44
1.90
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.182
128
-33.40
31.89
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.619
104
37.16
252.09
2.57
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.575
103
26.74
-257.61
2.57
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.189
104
0.76
135.40
1.90
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.201
103
2.00
-141.01
1.90
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.214
109
17.92
-87.80
2.34
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.194
110
13.72
82.07
2.34
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.151
104
-0.74
111.65
1.90
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.144
109
0.74
-104.75
1.90
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.083
110
-2.89
-57.61
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.171
103
8.28
110.28
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.092
109
3.00
59.08
0.00
(EUROPEAN SECTIONS)

Rev
O1

24
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

304 ST

305 ST

306 ST

307 ST

311 ST

312 ST

314 ST

316 ST

364 ST

365 ST

366 ST

367 ST

378 ST

379 ST

385 ST

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

PASS
62.92 C
HE140A
PASS
3.50 T
HE140A
PASS
6.68 T
HE140A
PASS
1.35 T
HE140A
PASS
5.66 T
HE400A
PASS
12.43 C
HE400A
PASS
22.03 C
HE400A
PASS
44.85 C
HE400A
PASS
35.71 C
HE400A
PASS
333.45 C
HE400A
PASS
289.42 C
HE400A
PASS
166.23 C
HE400A
PASS
120.63 C
HE400A
PASS
24.01 C
HE400A
PASS
28.39 C
HE400A
PASS

LRFD-H1-1B-C
0.091
103
-1.16
65.39
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.121
103
0.01
-6.52
1.60
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.309
103
0.00
-16.74
1.60
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.246
109
0.00
-13.43
1.60
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.212
103
0.00
-11.47
1.60
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.073
103
-1.41
44.52
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.138
103
-1.97
86.02
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.071
103
-1.45
45.48
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.053
103
-0.20
-36.19
3.33
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.356
103
-18.47
-168.09
4.60
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.360
104
-21.25
170.12
4.60
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.267
128
-62.64
3.32
2.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.268
128
-64.03
-7.00
2.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.086
103
0.00
-64.95
3.62
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.106
109
0.00
-80.20
3.62
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.096
110

Rev
O1

25
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

40.74 C
406 ST HE400A
PASS
161.22 C
407 ST HE400A
PASS
115.56 C
419 ST HE400A
PASS
116.68 C
420 ST HE400A
PASS
64.63 C
432 ST HE400A
PASS
211.01 C
433 ST HE400A
PASS
210.73 C
496 ST HE400A
PASS
174.27 C
497 ST HE400A
PASS
133.87 C
512 ST HE200A
PASS
28.20 C
513 ST HE200A
PASS
28.20 C
528 ST HE400A
PASS
377.17 C
529 ST HE400A
PASS
596.12 C
530 ST HE400A
PASS
373.49 C

0.94
-60.70
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.266
128
-62.64
3.29
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.266
128
-64.03
-6.97
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.096
125
0.54
-66.62
1.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.130
104
0.00
100.96
1.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.324
110
56.94
68.46
0.15
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.388
109
71.47
-77.51
0.15
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.206
109
16.45
-89.73
1.10
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.207
110
19.51
88.38
1.15
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.015
103
0.00
-0.50
1.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.015
104
0.00
0.50
1.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.284
129
-59.10
-8.50
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.382
103
26.77
153.18
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.383
103
1.21
-260.43
2.50

Rev
O1

26
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

27
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

531 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.303
110
71.94 C
56.94
68.49
0.00
537 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.361
129
405.22 C
-80.58
3.51
0.00
538 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C
0.491
104
625.96 C
37.23
-153.71
0.00
541 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.363
109
48.10 C
71.47
-77.53
0.00
543 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.395
110
339.41 C
-6.48
259.07
2.50
553 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.109
104
45.02 C
0.76
-70.23
0.00
555 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.091
110
22.37 C
0.00
67.45
3.62
556 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.110
104
26.44 C
0.00
81.60
3.62
566 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.506
109
256.77 C
-72.07
-165.14
2.34
567 ST HE400A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.439
110
271.93 C
-56.99
153.86
2.34
1035. *FOR LONGITUDIONAL BEAMS
1036. CHECK CODE MEMB 53 TO 64 89 TO 92 94 96 102 TO 105 107 109 132 150 152 154 1037. 156 158 180 182 184 186 187 189 255 256 258 261 TO 263 265 267 269 272 273 1038. 275 277 TO 279 281 283 285 301 303 308 TO 310 313 315 317 322 TO 325 327 1039. 329 331 TO 333 335 337 338 356 368 369 374 380 381 408 409 416 421 422 429 1040. 434 435 480 481 486 487 490 493 526 527 532 TO 535 539 540 544 545 554 557 1041. 558 TO 559
53 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.240
110
45.64 T
2.26
-30.57
2.25
54 ST IPE450
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.266
129
16.25 T
-0.14
-128.64
2.25
55 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.103
104
78.12 T
-0.94
-9.76
2.50
56 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.239
109
47.10 T
-2.19
-30.58
2.25
57 ST IPE450
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.270
102
37.24 C
-0.32
-126.98
2.25
58 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.126
104
168.23 T
-1.08
-8.49
2.50
59 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.249
110
18.16 C
2.30
-30.79
2.25
60 ST IPE450
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.356
125
3.55 C
-0.17
-173.36
2.25

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

61 ST IPE360
PASS
11.40 T
62 ST IPE300
PASS
15.76 C
63 ST IPE450
PASS
49.12 C
64 ST IPE360
PASS
81.71 C
89 ST IPE450
PASS
15.39 T
90 ST IPE450
PASS
14.60 T
91 ST IPE450
PASS
14.06 T
92 ST IPE450
PASS
3.54 C
94 ST IPE450
PASS
3.54 C
96 ST IPE450
PASS
3.53 C
102 ST IPE450
PASS
38.03 C
103 ST IPE450
PASS
54.46 C
104 ST IPE450
PASS
55.15 C
105 ST IPE450
PASS
50.05 C
107 ST IPE450
PASS
79.76 C
109 ST IPE450
PASS
80.48 C
132 ST HE100A
PASS
1.95 C
150 ST HE100A
PASS
144.77 C
152 ST HE100A
PASS
148.82 C
154 ST HE100A
PASS
150.00 C
156 ST HE100A

(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.062
125
-0.03
17.58
1.90
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.249
109
-2.40
-30.78
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.285
129
-0.49
-132.12
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.084
129
0.11
16.79
1.75
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.392
129
1.06
-185.16
2.75
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.392
129
1.06
-185.16
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.299
129
-0.18
-144.75
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.595
125
0.07
-291.23
2.75
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.595
125
0.07
-291.23
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.395
125
-0.13
-193.10
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.396
102
1.03
-184.33
2.75
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.400
102
1.03
-184.33
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.305
102
-0.32
-141.87
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.430
129
1.62
-195.99
2.75
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.437
129
1.62
-195.99
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.324
129
-0.50
-147.26
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.008
108
0.00
-0.14
1.12
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.413
102
0.00
-0.16
1.12
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.569
129
0.00
-0.24
1.38
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.574
129
0.00
-0.24
1.37
(EUROPEAN SECTIONS)

Rev
O1

28
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

158 ST

180 ST

182 ST

184 ST

186 ST

187 ST

189 ST

255 ST

256 ST

258 ST

261 ST

262 ST

263 ST

265 ST

267 ST

269 ST

272 ST

273 ST

275 ST

277 ST

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

PASS
157.23 C
HE100A
PASS
64.99 C
HE100A
PASS
2.36 C
HE100A
PASS
234.62 C
HE100A
PASS
208.53 C
HE100A
PASS
209.20 C
HE100A
PASS
182.52 C
HE100A
PASS
92.94 C
IPE300
PASS
45.26 T
HE100A
PASS
3.39 C
IPE300
PASS
46.90 T
IPE300
PASS
145.70 T
IPE300
PASS
121.85 T
HE100A
PASS
44.11 T
IPE300
PASS
216.55 T
HE100A
PASS
1.60 C
IPE300
PASS
115.77 T
IPE300
PASS
18.43 C
HE100A
PASS
3.88 C
IPE300
PASS
15.88 C
IPE360
PASS

LRFD-H1-1A-C
0.601
129
0.00
-0.24
1.37
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.217
129
0.00
-0.20
1.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.009
108
0.00
-0.14
1.12
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.666
129
0.00
-0.16
1.12
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.794
129
0.00
-0.24
1.38
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.796
129
0.00
-0.24
1.37
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.696
129
0.00
-0.24
1.37
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.308
129
0.00
-0.20
1.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.240
110
2.26
-30.57
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.010
108
0.00
-0.14
1.13
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.239
109
-2.19
-30.58
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.169
103
-1.31
16.15
1.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.112
110
-0.87
-9.28
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.039
128
0.00
-0.13
1.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.192
104
1.35
16.18
1.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.011
101
0.00
-0.20
1.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.110
109
0.90
-9.15
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.250
110
2.30
-30.79
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.011
108
0.00
-0.14
1.13
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.249
109
-2.40
-30.78
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.086
125

Rev
O1

29
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

35.52 C
278 ST IPE360
PASS
35.86 C
279 ST HE100A
PASS
51.64 C
281 ST IPE360
PASS
88.68 C
283 ST HE100A
PASS
1.60 C
285 ST IPE360
PASS
104.07 C
301 ST IPE300
PASS
0.20 C
303 ST IPE360
PASS
0.10 T
308 ST IPE300
PASS
0.07 T
309 ST IPE300
PASS
0.15 T
310 ST IPE300
PASS
66.33 C
313 ST IPE300
PASS
2.34 C
315 ST IPE300
PASS
13.95 C
317 ST IPE300
PASS
32.08 C
322 ST IPE300
PASS
8.65 C
323 ST IPE300
PASS
36.31 C
324 ST IPE300
PASS
40.40 C
325 ST IPE300
PASS
31.50 C
327 ST IPE300
PASS
31.50 C
329 ST IPE300
PASS
66.37 C
331 ST IPE300
PASS
32.08 C

-0.04
-22.29
0.00
(EUROPEAN SECTIONS)
SHEAR-Y
0.083
125
-0.01
13.44
0.60
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.069
129
0.00
-0.13
1.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.076
129
0.07
-14.68
1.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.011
101
0.00
-0.20
1.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.090
129
-0.02
-16.82
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.069
110
2.19
-1.38
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.180
109
-10.09
2.16
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.076
103
-2.20
-3.43
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.098
128
0.01
-16.70
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.094
128
-0.03
-10.94
2.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.083
103
-2.18
-4.24
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.112
110
-0.53
-15.59
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.041
110
-0.56
-2.05
2.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.168
129
0.02
-27.74
2.75
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.182
129
0.02
-27.74
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.140
110
-0.62
-17.61
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.154
128
-0.03
-23.31
2.75
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.154
128
-0.03
-23.31
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.147
128
-0.04
-18.97
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.039
110
-0.56
-2.05
0.00

Rev
O1

30
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

332 ST IPE300
PASS
2.15 T
333 ST IPE300
PASS
23.26 C
335 ST IPE300
PASS
23.26 C
337 ST IPE300
PASS
2.34 C
338 ST IPE300
PASS
0.07 T
356 ST IPE360
PASS
0.01 C
368 ST IPE300
PASS
11.93 C
369 ST IPE300
PASS
12.11 C
374 ST HE280A
PASS
0.40 C
380 ST IPE360
PASS
3.13 T
381 ST IPE360
PASS
3.94 T
408 ST HE200A
PASS
58.96 T
409 ST HE200A
PASS
58.98 T
416 ST HE100A
PASS
0.05 C
421 ST HE200A
PASS
0.02 C
422 ST HE200A
PASS
0.01 C
429 ST HE100A
PASS
0.02 C
434 ST HE200A
PASS
0.00 C
435 ST HE200A
PASS
0.00 C
480 ST IPE300
PASS
149.98 T
481 ST IPE300

(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.031
110
-0.55
-2.79
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.073
103
0.42
-9.37
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.070
103
0.41
-8.62
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.083
103
-2.18
-4.24
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.076
103
-2.20
-3.43
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.180
109
-10.09
2.16
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.086
104
2.35
-1.38
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.086
103
-2.35
-1.38
2.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.194
110
15.64
-19.93
5.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.172
110
9.79
1.38
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.173
110
9.79
1.38
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.039
104
-0.77
-1.25
1.52
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.039
103
0.77
-1.25
1.52
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.008
101
0.00
-0.20
1.25
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.016
109
0.78
-0.46
1.30
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.016
104
-0.78
-0.46
1.30
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.009
125
0.00
-0.21
1.30
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.074
129
-0.07
9.83
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.074
129
0.07
9.82
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.161
109
-1.13
15.34
0.00
(EUROPEAN SECTIONS)

Rev
O1

31
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

486 ST

487 ST

490 ST

493 ST

526 ST

527 ST

532 ST

533 ST

534 ST

535 ST

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

PASS
164.67 T
IPE300
PASS
33.82 C
IPE360
PASS
36.05 C
IPE360
PASS
25.88 C
IPE360
PASS
77.30 C
IPE360
PASS
76.82 C
IPE360
PASS
17.95 T
HE280A
PASS
82.46 T
HE280A
PASS
51.89 T
HE280A
PASS
256.84 C
HE280A
PASS

LRFD-H1-1B-T
0.164
110
1.11
15.14
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.044
110
-0.55
-2.80
1.00
(EUROPEAN SECTIONS)
SHEAR-Y
0.121
125
-0.02
17.58
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.058
128
-0.07
14.48
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.085
109
0.74
-14.90
1.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.088
109
-0.82
14.67
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.070
104
0.83
15.42
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.331
110
-5.58
-81.86
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.484
125
-0.02
-138.29
2.33
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.362
128
0.86
77.10
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.331
110

Rev
O1

32
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

33
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

82.29 T
-5.57
-81.86
0.00
539 ST HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.403
129
80.27 T
1.12
-111.43
2.33
540 ST HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C
0.560
128
336.85 C
-1.00
103.36
0.00
544 ST HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.414
129
109.69 T
0.04
-115.06
3.50
545 ST HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.414
129
109.35 T
0.04
-115.06
0.00
554 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.175
110
0.07 C
-10.05
1.04
3.50
557 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.192
109
2.35 T
10.94
1.54
3.50
558 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.192
109
1.71 T
10.94
1.54
0.00
559 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.175
104
0.05 T
-10.04
1.05
0.00
1042. *VERTICAL BRACINGS
1043. CHECK CODE MEMB 357 358 382 383 410 411 477 479 482 TO 485 488 489 491 492 1044. 518 TO 521 536 546 551 552 560 TO 563 568 TO 575
357 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.101
103
5.71 C
-1.68
-0.94
2.52
358 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.100
110
5.52 C
-1.68
-0.94
2.52
382 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.092
103
4.25 C
-1.54
-0.90
2.41
383 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.092
110
4.50 C
-1.54
-0.90
2.41
410 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.115
104
81.75 C
-0.73
-0.50
1.80
411 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.115
103
81.75 C
0.73
-0.50
1.80
477 ST IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C
0.353
129
361.85 C
2.04
-0.01
0.00
479 ST IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C
0.254
110
230.14 C
1.45
9.86
4.21
482 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C
0.559
128
254.36 C
0.00
-0.94
2.15
483 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C
0.468
129
211.53 C
0.00
-0.94
2.15
484 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C
0.681
128
311.70 C
0.00
-0.94
2.15

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

485 T

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

IPE400
PASS
266.93 C
488 T IPE400
PASS
114.40 C
489 T IPE400
PASS
6.61 C
491 T IPE400
PASS
109.61 C
492 T IPE400
PASS
12.64 C
518 T IPE400
PASS
130.66 C
519 T IPE400
PASS
56.94 C
520 T IPE400
PASS
91.57 C
521 T IPE400
PASS
114.66 C
536 T IPE400
PASS
233.15 T
546 T IPE400
PASS
133.10 C
551 T IPE400
PASS
29.36 C
552 T IPE400
PASS
70.02 C
560 T IPE400
PASS
3.53 C
561 T IPE400
PASS
4.26 C
562 T IPE400
PASS
3.84 C
563 T IPE400
PASS
3.70 C
568 T IPE400
PASS
15.57 C
569 T IPE400
PASS
27.13 T
570 ST IPE400
PASS
387.49 C
571 ST IPE400

(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.585
129
0.00
-0.94
2.15
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.091
128
0.00
-0.32
1.34
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.021
110
0.29
-0.19
1.13
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.087
129
0.00
-0.32
1.34
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.025
103
0.29
-0.19
1.13
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.100
128
0.00
-0.28
1.29
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.047
129
0.00
-0.28
1.29
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.072
128
0.00
-0.28
1.29
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.089
129
0.00
-0.28
1.29
(EUROPEAN SECTIONS)
LRFD-H1-1A-T
0.227
128
0.00
-0.89
2.04
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.316
109
0.93
-0.77
2.04
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.040
109
0.35
-0.21
1.24
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.055
128
0.00
-0.25
1.24
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.135
103
-2.41
-1.13
3.02
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.137
109
2.41
-1.13
3.02
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.098
110
1.68
-0.94
2.52
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.098
104
-1.68
-0.94
2.52
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.076
104
-0.99
-0.79
2.10
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.072
110
-0.99
-0.79
2.10
(EUROPEAN SECTIONS)
LRFD-H1-1A-C
0.372
129
1.71
-0.01
0.00
(EUROPEAN SECTIONS)

Rev
O1

34
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

PASS LRFD-H1-1A-C
0.271
110
249.42 C
1.45
9.86
0.00
572 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.116
109
46.91 C
1.42
-0.66
1.75
573 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.107
110
36.79 C
-1.42
-0.66
1.75
574 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.035
128
52.61 C
0.00
0.00
0.00
575 T IPE400
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.028
110
43.47 T
0.00
0.25
1.05
1045. *FOR PLAN BRACINGS
1046. CHECK CODE MEMB 192 TO 195 201 TO 204 500 TO 511
192 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.210
104
37.30 C
0.00
0.00
0.00
193 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.253
109
38.84 C
0.00
0.00
0.00
194 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.147
131
22.62 C
0.00
0.00
0.00
195 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.184
132
28.21 C
0.00
0.00
0.00
201 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.197
128
34.96 C
0.00
0.00
0.00
202 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.164
129
25.24 C
0.00
0.00
0.00
203 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.231
128
35.40 C
0.00
0.00
0.00
204 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.161
131
24.72 C
0.00
0.00
0.00
500 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.761
110
125.62 C
0.00
0.00
0.00
501 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.542
109
89.43 C
0.00
0.00
0.00
502 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.454
110
86.19 C
0.00
0.00
0.00
503 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.363
109
68.88 C
0.00
0.00
0.00
504 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.408
110
67.39 C
0.00
0.00
0.00
505 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.324
109
53.44 C
0.00
0.00
0.00
506 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.555
129
91.63 C
0.00
0.00
0.00

Rev
O1

35
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

36
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

507 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.392
129
64.67 C
0.00
0.00
0.00
508 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.296
129
56.10 C
0.00
0.00
0.00
509 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.176
110
33.44 C
0.00
0.00
0.00
510 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.367
129
60.63 C
0.00
0.00
0.00
511 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.258
110
42.67 C
0.00
0.00
0.00
1047. *FOR PLAN BRACINGS
1048. CHECK CODE MEMB 201 TO 204 340 TO 343 353 TO 355 417 418 430 431
201 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.197
128
34.96 C
0.00
0.00
0.00
202 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.164
129
25.24 C
0.00
0.00
0.00
203 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.231
128
35.40 C
0.00
0.00
0.00
204 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.161
131
24.72 C
0.00
0.00
0.00
340 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.098
103
26.82 C
0.00
0.00
0.00
341 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.095
110
21.28 C
0.00
0.00
0.00
342 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.105
128
23.53 C
0.00
0.00
0.00
343 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.084
129
18.76 C
0.00
0.00
0.00
353 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.108
129
26.64 C
0.00
0.00
0.00
354 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.101
128
30.34 C
0.00
0.00
0.00
355 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.126
110
31.27 C
0.00
0.00
0.00
417 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.021
104
3.39 C
0.00
0.00
0.00
418 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.021
109
3.40 C
0.00
0.00
0.00
430 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.015
110
2.40 C
0.00
0.00
0.00
431 ST L130X130X12
(EUROPEAN SECTIONS)
PASS COMPRESSION
0.015
103

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

37
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

2.44 C
0.00
0.00
0.00
1050. LOAD LIST 101 TO 133 151 TO 154
1051. *TRANSVERSE BEAMS
1052. CHECK CODE MEMB 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 1053. 159 162 TO 164 181 183 185 257 259 264 266 268 270 274 276 280 282 284 286 1054. 289 TO 296 318 TO 321 326 328 330 334 336 339 384 412 TO 415 425 TO 428 436 1055. 522 TO 525 564
5 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.392
109
11.03 T
0.10
102.17
0.00
6 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.341
103
9.69 C
-0.10
99.27
0.00
18 ST HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.558
103
9.47 C
-0.18
190.43
0.00
19 ST HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.505
103
3.12 T
0.07
173.02
0.00
31 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.850
109
19.37 C
0.05
221.29
0.00
32 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.611
109
5.52 C
0.04
179.85
0.00
44 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.691
109
23.52 T
0.06
180.20
0.00
45 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.527
103
27.44 C
-0.01
152.57
0.00
128 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.408
110
26.19 T
0.11
105.30
3.50
131 ST HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.598
110
71.73 T
-23.83
148.82
2.92
133 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.414
129
0.49 C
-0.62
-60.99
3.50
135 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.416
154
0.55 C
0.34
-62.39
3.50
139 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.380
152
0.85 T
0.44
-56.44
3.50
149 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.414
129
0.69 T
-0.62
-60.99
0.00
151 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.380
152
0.79 T
0.44
-56.44
0.00
153 ST IPE300
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.416
154
0.67 T
0.34
-62.39
0.00
155 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.864
104
27.66 C
0.04
223.95
3.50
159 ST IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.680
104
7.48 T
0.05
178.28
3.50

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

162 ST IPE300
PASS
1.16 C
163 ST IPE300
PASS
0.16 T
164 ST IPE300
PASS
1.00 C
181 ST IPE300
PASS
0.98 T
183 ST IPE300
PASS
0.16 T
185 ST IPE300
PASS
0.98 T
257 ST IPE300
PASS
0.05 T
259 ST IPE300
PASS
0.05 T
264 ST IPE300
PASS
65.65 C
266 ST IPE300
PASS
62.98 C
268 ST IPE300
PASS
42.11 C
270 ST IPE300
PASS
39.45 C
274 ST IPE300
PASS
0.04 C
276 ST IPE300
PASS
0.04 C
280 ST IPE300
PASS
0.77 C
282 ST IPE300
PASS
3.84 C
284 ST IPE300
PASS
51.75 C
286 ST IPE300
PASS
29.47 C
289 ST IPE360
PASS
65.03 C
290 ST HE280A
PASS
81.68 C
291 ST IPE360

(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.417
129
-0.86
-60.44
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.571
125
0.01
-87.62
2.62
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.405
154
0.51
-59.99
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.416
129
-0.86
-60.44
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.546
125
0.02
-83.78
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.404
154
0.51
-59.99
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.373
129
-0.88
-53.78
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.373
129
-0.88
-53.78
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.440
153
-1.00
-56.54
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.438
153
-1.00
-56.54
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.424
153
-1.03
-56.56
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.422
153
-1.03
-56.56
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.390
128
1.52
-53.78
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.390
128
1.52
-53.78
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.506
125
0.02
-77.48
2.92
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.500
125
0.02
-76.24
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.471
153
-0.62
-64.42
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.456
153
-0.62
-64.42
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.412
110
-0.03
100.96
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.570
110
-0.13
189.43
3.50
(EUROPEAN SECTIONS)

Rev
O1

38
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

292 ST

293 ST

294 ST

295 ST

296 ST

318 ST

319 ST

320 ST

321 ST

326 ST

328 ST

330 ST

334 ST

336 ST

339 ST

384 ST

412 ST

413 ST

414 ST

415 ST

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

PASS LRFD-H1-1B-C
0.793
104
27.27 C
-0.01
205.63
3.50
IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.651
104
37.24 C
0.00
167.17
3.50
IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.198
110
65.02 C
-1.18
-48.95
0.00
HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.335
128
20.14 C
-37.10
-31.93
1.00
IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.261
104
56.67 C
0.10
-76.72
0.00
IPE360
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.212
104
37.24 C
0.06
-63.67
0.00
HE140A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.382
103
17.39 C
0.01
18.89
0.00
HE140A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.431
109
6.12 T
-0.05
21.90
0.00
HE140A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.539
103
7.41 T
0.06
27.36
0.00
HE140A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.243
103
1.71 T
0.13
12.16
0.00
L130X130X12
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.105
101
0.01 T
0.00
-1.93
1.46
L130X130X12
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.105
101
0.01 T
0.00
-1.93
1.46
L130X130X12
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.105
128
0.02 C
0.00
-1.93
1.46
L130X130X12
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.105
101
0.00 T
0.00
-1.93
1.46
L130X130X12
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.105
101
0.00 T
0.00
-1.93
1.46
L130X130X12
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.105
101
0.00 T
0.00
-1.93
1.46
HE280A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C
0.233
110
2.58 C
0.00
67.46
7.00
HE200A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.044
101
28.68 T
-0.08
-4.36
3.50
HE200A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.447
101
0.00 T
-0.19
-56.03
3.50
HE200A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.447
101
0.02 T
-0.19
-56.03
0.00
HE200A
(EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T
0.045
101

Rev
O1

39
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

28.68 T
425 ST HE200A
PASS
0.00 C
426 ST HE200A
PASS
12.04 T
427 ST HE200A
PASS
12.04 T
428 ST HE200A
PASS
0.00 T
436 ST HE200A
PASS
0.08 T
522 ST HE300B
PASS
4.71 T
523 ST HE300B
PASS
5.66 T
524 ST HE300B
PASS
4.60 T
525 ST HE300B
PASS
0.51 C
564 ST HE280A
PASS
5.30 C

Rev
O1

40
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

-0.08
-4.36
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.445
101
-0.02
-56.05
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.039
125
-0.03
-4.43
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.039
125
-0.03
-4.43
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.445
152
-0.02
-56.05
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.336
102
-21.05
0.00
3.50
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.529
104
144.59
0.15
7.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.790
110
-0.06
410.85
7.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-T
0.601
103
0.05
312.51
0.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.275
110
-0.09
143.13
7.00
(EUROPEAN SECTIONS)
LRFD-H1-1B-C
0.282
104
0.00
81.60
7.00

************** END OF TABULATED RESULT OF DESIGN **************

1056. *********************
1057. STEEL TAKE OFF LIST 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 STEEL TAKE-OFF
-------------PROFILE

LENGTH(METE)

WEIGHT(KN )

1058. 96 102 TO 105 107 109 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 1059. 180 TO 187 189 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 1060. 290 TO 301 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 1061. 426 TO 436 477 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 1062. 551 TO 564 566 TO 573
ST HE400A
127.20
155.366
ST IPE360
84.00
46.912
ST HE280A
66.50
49.706
ST IPE300
173.50
71.706
ST IPE450
42.00
31.877
ST HE100A
49.10
7.996
ST L130X130X12
142.67
32.880
ST HE140A
16.40
3.956
T IPE400
115.09
37.355
ST HE200A
53.00
21.905

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Rev
O1

41
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

ST IPE400
16.84
10.928
ST HE300B
28.00
32.049
PRISMATIC STEEL
0.00
0.000
---------------TOTAL =
502.636
1063. LOAD LIST 101 TO 133 151 TO 154
1064. PRINT SUPPORT REACTION
SUPPORT REACTIONS -UNIT KN METE
-----------------

STRUCTURE TYPE = SPACE

JOINT LOAD FORCE-X FORCE-Y FORCE-Z

1 101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
151
152
153
154
2 101
102
103
104
105
106
107
108
109

22.39
21.24
-34.60
36.24
-4.85
7.09
1.14
1.11
-34.60
36.24
-4.85
7.09
1.15
1.12
-34.72
35.88
-5.08
6.82
0.89
0.86
-3.29
5.05
0.90
0.87
1.32
-5.27
7.52
22.40
21.24
1.13
1.12
1.14
1.13
23.00
20.63
23.00
20.63
-21.25
-22.40
-36.08
34.43
-7.06
4.81
-1.15
-1.12
-36.08

205.12
202.21
96.97
252.14
160.73
188.39
174.56
174.56
97.04
252.16
160.77
188.43
174.60
174.60
16.33
169.85
85.69
113.11
99.40
99.40
83.51
102.68
93.09
93.09
150.65
115.15
143.10
205.14
202.21
174.57
174.55
174.61
174.60
206.67
200.66
206.68
200.65
248.15
251.08
291.56
136.39
227.80
200.14
213.97
213.97
291.49

14.79
16.95
15.86
15.08
15.48
15.40
15.17
15.71
17.70
16.72
17.25
17.12
16.92
17.45
8.67
7.65
8.87
8.76
8.53
9.10
8.17
8.09
7.93
8.33
3.42
3.04
2.85
14.70
17.00
15.36
15.51
17.12
17.25
14.68
17.06
14.63
17.11
15.30
16.41
15.45
16.14
15.73
15.80
15.49
16.04
16.24

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM-X

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM-Y

MOM Z

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
151
152
153
154
3 101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

34.44
-7.06
4.82
-1.15
-1.12
-35.79
34.62
-6.80
5.07
-0.89
-0.86
-5.03
3.27
-0.90
-0.87
-1.33
-7.49
5.23
-21.24
-22.40
-1.13
-1.14
-1.13
-1.14
-20.65
-23.00
-20.64
-23.00
18.19
17.14
-70.41
67.78
-9.66
10.08
0.64
-0.16
-70.42
66.98
-10.03
9.61
0.23
-0.58
-69.71
67.49
-9.51
10.11
0.74
-0.08
-6.49
7.24
0.68
0.11
-3.06
-15.21
9.84
18.92
16.57
0.77
-0.30
0.38
-0.74

136.37
227.76
200.10
213.92
213.93
192.83
39.31
137.18
109.76
123.47
123.47
125.66
106.48
116.07
116.07
212.12
195.80
167.85
248.14
251.09
213.97
213.98
213.92
213.93
246.59
252.65
246.58
252.66
256.44
261.33
44.54
394.40
194.33
244.65
220.28
218.70
50.17
398.58
199.34
249.46
225.20
223.60
-55.06
288.82
100.39
149.93
125.96
124.36
99.58
134.22
117.46
116.34
281.64
209.65
273.17
261.12
257.90
222.85
216.11
227.80
220.98

17.06
0.00
0.00
0.00
16.58
0.00
0.00
0.00
16.67
0.00
0.00
0.00
16.35
0.00
0.00
0.00
16.90
0.00
0.00
0.00
7.64
0.00
0.00
0.00
8.55
0.00
0.00
0.00
8.70
0.00
0.00
0.00
8.80
0.00
0.00
0.00
8.45
0.00
0.00
0.00
9.05
0.00
0.00
0.00
8.04
0.00
0.00
0.00
8.11
0.00
0.00
0.00
7.86
0.00
0.00
0.00
8.29
0.00
0.00
0.00
3.60
0.00
0.00
0.00
3.03
0.00
0.00
0.00
3.20
0.00
0.00
0.00
14.96
0.00
0.00
0.00
16.65
0.00
0.00
0.00
15.50
0.00
0.00
0.00
16.03
0.00
0.00
0.00
16.36
0.00
0.00
0.00
16.88
0.00
0.00
0.00
15.21
0.00
0.00
0.00
16.50
0.00
0.00
0.00
14.96
0.00
0.00
0.00
16.74
0.00
0.00
0.00
7.17
0.00
0.00
0.00
9.06
0.00
0.00
0.00
5.38
0.00
0.00
0.00
5.43
0.00
0.00
0.00
5.25
0.00
0.00
0.00
5.32
0.00
0.00
0.00
4.88
0.00
0.00
0.00
5.69
0.00
0.00
0.00
7.33
0.00
0.00
0.00
6.55
0.00
0.00
0.00
6.85
0.00
0.00
0.00
6.81
0.00
0.00
0.00
6.42
0.00
0.00
0.00
7.23
0.00
0.00
0.00
3.36
0.00
0.00
0.00
2.95
0.00
0.00
0.00
3.29
0.00
0.00
0.00
3.31
0.00
0.00
0.00
2.87
0.00
0.00
0.00
3.73
0.00
0.00
0.00
3.04
0.00
0.00
0.00
3.05
0.00
0.00
0.00
2.74
0.00
0.00
0.00
3.35
0.00
0.00
0.00
1.37
0.00
0.00
0.00
1.23
0.00
0.00
0.00
1.17
0.00
0.00
0.00
7.15
0.00
0.00
0.00
9.08
0.00
0.00
0.00
5.24
0.00
0.00
0.00
5.32
0.00
0.00
0.00
6.79
0.00
0.00
0.00
6.87
0.00
0.00
0.00

Rev
O1

42
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

151
152
153
154
4 101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
151
152
153
154
5 101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

18.50
16.83
19.01
16.26
-17.08
-18.57
-67.35
70.68
-9.70
10.02
0.52
-0.28
-67.81
69.63
-10.41
9.24
-0.21
-1.02
-67.71
69.68
-10.24
9.41
-0.04
-0.85
-7.36
6.39
-0.22
-0.79
-3.41
-15.39
9.63
-16.70
-18.88
0.40
-0.17
-0.31
-0.93
-16.77
-18.88
-16.50
-19.20
12.29
16.20
-98.93
87.58
-13.49
11.02
-1.41
-0.91
-101.06
95.24
-11.44
14.41
1.31
1.82
-99.49
91.71
-12.26
12.90
0.14
0.65

256.89
7.07
260.88
9.16
260.23
7.06
257.45
9.18
307.27
7.73
302.49
8.64
438.71
5.82
88.80
5.76
288.88
5.72
238.56
5.64
262.90
5.27
264.54
6.08
433.07
6.28
84.67
6.73
283.90
6.40
233.77
6.40
258.00
6.00
259.67
6.80
314.32
3.01
-29.56
3.27
176.05
3.31
126.51
3.27
150.46
2.85
152.10
3.73
159.66
3.05
125.03
3.02
141.77
2.73
142.92
3.34
320.25
1.52
306.26
1.32
242.74
1.38
302.57
7.46
305.96
8.82
260.35
5.46
267.12
5.88
255.41
6.19
262.29
6.60
306.79
7.66
302.98
8.71
303.44
7.46
306.46
8.90
706.63
4.93
78.40 -29.67
209.57
0.08
940.44 15.39
529.06
6.70
619.84
8.38
630.13 10.25
518.77
4.84
-263.14 -24.19
466.04 -10.32
55.67 -18.20
146.13 -16.69
156.54 -14.89
45.26 -19.99
-173.07 -9.52
544.32
4.62
151.93 -3.60
241.01 -2.06
252.03 -0.23
140.91 -5.43

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

43
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

121 -8.40 153.95 -3.17


122
9.21 216.23 -2.10
123
0.26 223.98 -0.81
124
0.62 146.20 -4.45
125
1.64 397.43 -9.59
126 -16.16 274.31 -9.53
127 18.68 407.02 -6.89
128 10.98 900.02 14.65
129 17.18 -59.60 -35.99
130 -1.99 712.30 14.10
131 -0.31 436.66
1.09
132
0.72 238.74 -11.26
133
2.43 -36.87 -23.53
151 12.13 745.57
7.19
152 16.36 39.49 -31.77
153 11.19 883.71 14.14
154 17.34 -98.50 -38.07
6 101 -15.23 624.45 -0.35
102 -12.47 198.05 -23.57
103 -90.42 871.63 11.10
104 97.37 141.06 -4.03
105 -13.33 551.46
4.19
106 11.38 460.73
2.53
107 -1.29 574.19
6.38
108 -0.80 437.98
0.35
109 -90.89 565.84 -5.23
110 102.88 -164.17 -19.51
111 -11.17 245.88 -11.78
112 14.34 155.31 -13.33
113
1.26 268.66 -9.64
114
1.76 132.51 -15.44
115 -91.23 555.18
4.86
116 99.49 -162.41 -9.37
117 -12.62 252.17 -1.83
118 12.48 163.06 -3.39
119 -0.39 275.52
0.32
120
0.10 139.70 -5.52
121 -8.96 227.29 -1.89
122
8.61 165.00 -2.97
123 -0.38 243.67 -0.38
124 -0.04 148.61 -4.47
125
1.75 459.62 -18.83
126 -15.64 460.56 -14.79
127 18.94 327.87 -17.44
128 -15.73 773.05
7.49
129 -12.10 91.98 -28.83
130 -1.52 612.00
8.66
131 -0.57 400.14 -1.89
132
1.05 306.39 -7.44
133
1.98 94.74 -17.61
151 -15.32 660.62
1.70
152 -12.38 161.91 -25.53
153 -15.67 766.77
7.31
154 -12.01 55.84 -30.76
238 101
4.24 -64.57 -243.72
102
1.63 555.49 220.54
103 -39.20 -30.61 -89.45
104 40.30 -19.39 -298.69
105 -3.48 -28.45 -182.17
106
5.46 -20.49 -205.16
107
0.84 -81.07 -232.58

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

44
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

108
1.15 32.13 -154.77
109 -37.17 437.33 263.22
110 33.84 447.11 54.17
111 -5.13 438.82 170.55
112
2.66 446.67 147.64
113 -1.38 386.17 120.33
114 -1.07 499.33 197.85
115 -38.19 113.17 93.52
116 37.51 125.64 -111.30
117 -4.16 122.00
1.98
118
4.26 130.11 -20.46
119 -0.09 69.56 -48.02
120
0.22 182.55 29.52
121 -2.85 117.08 -0.66
122
3.04 122.76 -16.34
123 -0.01 80.38 -35.64
124
0.21 159.46 18.63
125
1.58 285.58 17.59
126 -5.44 243.83 34.10
127
8.14 245.66 -3.94
128
4.69 -262.48 -368.19
129
1.34 696.81 308.86
130
1.25 -165.57 -282.15
131
0.74 116.59 -105.31
132 -1.00 301.61 70.92
133 -1.45 583.84 247.15
151
4.13 -103.12 -270.53
152
1.76 594.04 247.22
153
4.45 -244.49 -359.44
154
1.47 735.34 335.50
239 101 -2.35 86.26 -167.27
102 -4.00 520.71 143.06
103 -37.25 108.85 -234.23
104 39.88 97.38 -25.07
105 -3.45 107.41 -140.88
106
5.17 99.40 -117.90
107
0.70 36.27 -173.16
108
1.00 170.55 -85.63
109 -36.21 419.41 -11.36
110 35.00 410.46 198.60
111 -4.95 419.08 82.34
112
2.87 411.34 105.38
113 -1.22 348.14 50.22
114 -0.90 482.31 137.50
115 -37.40 149.92 -111.55
116 37.86 137.67 93.62
117 -4.36 156.52 -20.72
118
3.99 148.44
1.77
119 -0.36 85.53 -53.08
120 -0.04 219.45 34.12
121 -3.14 146.90 -16.58
122
2.72 141.24 -0.87
123 -0.33 97.21 -39.24
124 -0.11 190.93 21.79
125
1.50 363.03
0.90
126 -5.35 311.87 -18.40
127
7.98 310.02 19.68
128 -2.11 -57.81 -269.66
129 -4.16 623.41 215.83
130
1.07
0.75 -202.18
131
0.62 206.08 -56.62

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

45
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

132
133
151
152
153
154

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

-0.84
-1.27
-2.53
-3.81
-2.36
-3.97

312.74 21.33
517.71 166.38
49.75 -192.85
557.15 168.52
-53.15 -265.99
659.86 241.27

0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00

46
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

0.00
0.00
0.00
0.00
0.00
0.00

1065. LOAD LIST 201 TO 233 251 TO 254


1066. PRINT SUPPORT REACTION
SUPPORT REACTIONS -UNIT KN METE
-----------------

STRUCTURE TYPE = SPACE

JOINT LOAD FORCE-X FORCE-Y FORCE-Z

1 201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
251
252
253
254
2 201
202
203
204
205
206
207
208

16.05
15.20
-21.29
22.93
-3.24
5.11
0.95
0.93
-21.29
22.93
-3.23
5.11
0.95
0.93
-21.21
22.94
-3.29
5.04
0.89
0.87
-2.09
3.86
0.89
0.88
0.95
-5.46
7.33
16.06
15.20
0.94
0.94
0.95
0.94
16.45
14.79
16.46
14.79
-15.20
-16.05
-22.85
21.20
-5.10
3.22
-0.96
-0.93

146.55
144.39
97.15
193.77
135.82
155.11
145.46
145.47
97.20
193.79
135.85
155.14
145.50
145.49
55.40
151.48
89.80
108.99
99.40
99.40
86.25
99.94
93.09
93.09
107.60
93.66
121.54
146.56
144.39
145.47
145.46
145.50
145.49
147.58
143.36
147.59
143.36
177.22
179.39
226.62
130.00
187.96
168.66
178.31
178.31

10.37
12.06
13.11
12.58
12.86
12.80
12.64
13.03
14.68
14.05
14.39
14.31
14.16
14.54
9.36
8.73
8.85
8.78
8.61
9.02
8.16
8.10
7.99
8.28
2.46
2.55
2.36
10.28
12.15
12.74
12.92
14.27
14.43
10.29
12.14
10.20
12.23
10.73
11.63
12.89
13.36
13.09
13.14
12.91
13.31

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM-X

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM-Y

MOM Z

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
251
252
253
254
3 201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

-22.85
21.20
-5.09
3.22
-0.95
-0.93
-22.87
21.14
-5.03
3.28
-0.89
-0.87
-3.85
2.08
-0.89
-0.88
-0.95
-7.30
5.42
-15.20
-16.06
-0.94
-0.95
-0.94
-0.95
-14.80
-16.46
-14.80
-16.46
13.07
12.27
-43.47
42.69
-6.70
7.09
0.49
-0.07
-43.63
42.13
-7.04
6.70
0.13
-0.44
-43.06
42.75
-6.55
7.18
0.62
0.05
-4.52
5.29
0.60
0.19
-2.20
-14.75
10.24
13.60
11.70
0.74
-0.34
0.40

226.58
129.98
187.93
168.63
178.27
178.28
177.00
80.93
133.07
113.87
123.47
123.47
122.92
109.22
116.07
116.07
151.53
165.47
137.59
177.21
179.39
178.31
178.32
178.28
178.28
176.19
180.43
176.18
180.43
183.19
186.63
74.23
291.58
165.41
200.42
183.47
182.36
78.68
295.28
169.54
204.44
187.55
186.43
22.21
237.56
107.82
142.50
125.72
124.60
104.53
129.27
117.30
116.50
201.18
169.62
232.74
186.56
183.21
186.28
179.52
190.39

13.62
14.15
13.84
13.91
13.67
14.07
8.70
9.26
8.72
8.79
8.54
8.96
8.05
8.10
7.92
8.22
2.61
2.53
2.70
10.45
11.91
12.83
13.39
13.60
14.15
10.65
11.70
10.38
11.98
4.98
6.51
4.44
4.41
4.36
4.40
4.09
4.67
6.02
5.56
5.76
5.73
5.45
6.03
3.55
3.30
3.30
3.31
3.00
3.60
3.04
3.05
2.83
3.26
1.02
1.05
0.99
4.93
6.57
4.32
4.44
5.68

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

47
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

233
251
252
253
254
4 201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
251
252
253
254
5 201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

-0.72
13.27
12.06
13.80
11.49
-12.26
-13.30
-42.39
43.77
-6.78
7.01
0.38
-0.18
-42.84
43.01
-7.36
6.38
-0.22
-0.79
-42.92
42.97
-7.31
6.44
-0.16
-0.73
-5.40
4.42
-0.30
-0.70
-2.45
-14.89
10.09
-11.97
-13.63
0.38
-0.20
-0.19
-0.83
-12.05
-13.52
-11.76
-13.84
8.90
11.60
-61.22
55.82
-9.62
7.61
-1.14
-0.79
-61.47
60.63
-7.73
10.27
1.12
1.49
-60.98
58.56
-8.44
9.16
0.22

183.57
5.81
183.49
4.91
186.33
6.59
186.85
4.85
182.90
6.65
219.46
5.39
216.09
6.17
328.47
4.76
111.09
4.76
237.27
4.74
202.26
4.69
219.19
4.42
220.34
5.01
324.02
5.28
107.41
5.55
233.16
5.38
198.25
5.37
215.12
5.08
216.29
5.67
265.86
3.33
50.49
3.49
168.62
3.30
133.94
3.28
150.71
2.98
151.85
3.60
154.71
3.05
129.97
3.03
141.94
2.82
142.75
3.26
228.74
1.16
260.31
1.13
197.18
1.19
216.10
5.15
219.54
6.40
216.39
4.49
223.17
4.95
212.28
5.15
219.16
5.60
219.15
5.33
216.41
6.24
215.79
5.09
219.87
6.46
504.79
3.10
55.28 -21.25
251.90
1.60
705.58 10.98
446.99
5.64
510.07
6.79
517.47
8.09
439.58
4.34
-141.87 -18.77
310.94 -10.13
52.87 -15.04
115.77 -14.00
123.25 -12.73
45.40 -16.30
-18.88 -7.29
430.59
1.58
165.29 -3.37
227.64 -2.30
235.36 -1.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

220
0.57 157.57 -4.65
221 -5.86 162.85 -3.02
222
6.71 207.33 -2.25
223
0.31 212.87 -1.33
224
0.57 157.31 -3.93
225
1.17 283.86 -6.84
226 -16.38 217.99 -8.14
227 18.42 349.76 -5.53
228
7.99 642.66
9.82
229 12.55 -82.49 -27.52
230 -1.79 616.28 12.71
231 -0.12 340.84 -0.18
232
0.46 222.07 -8.33
233
2.17 -53.35 -20.61
251
8.80 530.69
4.56
252 11.70 29.39 -22.64
253
7.90 668.57 11.31
254 12.65 -108.36 -28.89
6 201 -11.02 446.16 -0.59
202 -8.90 140.44 -16.95
203 -57.99 648.53
7.47
204 59.70 194.99 -1.82
205 -9.52 453.19
3.32
206
7.82 390.14
2.19
207 -1.06 469.28
4.85
208 -0.71 374.04
0.66
209 -57.38 393.98 -5.95
210 63.39 -59.28 -14.80
211 -7.60 198.74 -9.91
212 10.21 135.77 -10.98
213
1.10 214.86 -8.41
214
1.45 119.65 -12.47
215 -58.13 442.82
1.83
216 61.07 -6.78 -7.10
217 -8.89 238.80 -2.07
218
8.68 176.43 -3.15
219 -0.32 255.15 -0.56
220
0.03 160.07 -4.65
221 -6.47 218.39 -2.05
222
6.08 173.90 -2.82
223 -0.34 230.09 -0.97
224 -0.09 162.19 -3.89
225
1.24 328.71 -13.42
226 -15.90 394.59 -12.11
227 18.68 262.84 -14.72
228 -11.42 552.05
4.85
229 -8.49 34.60 -22.13
230 -1.36 527.46
8.02
231 -0.40 315.82 -2.45
232
0.80 272.96 -5.34
233
1.75 61.50 -15.49
251 -11.08 470.21
0.75
252 -8.83 116.41 -18.24
253 -11.48 576.10
6.20
254 -8.42 10.56 -23.41
238 201
3.03 -46.22 -173.93
202
1.21 397.53 158.14
203 -24.01 -24.15 -96.56
204 25.33 -16.73 -226.28
205 -2.27 -23.05 -153.29
206
3.93 -17.42 -169.23

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

49
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

207
0.73 -59.83 -188.47
208
0.94 19.35 -134.06
209 -23.68 365.19 197.12
210 21.28 371.86 67.49
211 -3.80 365.95 140.40
212
1.73 371.51 124.50
213 -1.14 329.15 105.33
214 -0.92 408.31 159.57
215 -23.69 129.25 54.60
216 23.57 136.86 -73.79
217 -2.89 123.22 -1.38
218
3.01 128.89 -17.09
219 -0.04 86.51 -36.38
220
0.17 165.60 17.90
221 -2.01 117.89 -2.90
222
2.20 121.95 -14.10
223
0.02 91.68 -27.88
224
0.18 148.16 10.88
225
1.14 203.95 12.59
226 -5.69 202.94 31.43
227
7.94 204.93 -6.28
228
3.32 -187.35 -262.55
229
0.93 538.62 246.34
230
1.09 -161.25 -249.67
231
0.58 120.72 -72.99
232 -0.80 227.69 44.30
233 -1.26 509.72 220.48
251
2.94 -71.87 -191.75
252
1.30 423.18 175.90
253
3.24 -213.01 -280.40
254
1.02 564.26 264.07
239 201 -1.68 61.52 -119.37
202 -2.93 372.94 102.99
203 -23.18 89.94 -172.70
204 24.96 82.40 -42.99
205 -2.29 89.10 -115.72
206
3.73 83.45 -99.78
207
0.60 39.33 -138.35
208
0.82 133.23 -77.15
209 -23.26 348.92 13.01
210 21.83 342.68 143.13
211 -3.66 348.65 70.18
212
1.90 343.16 86.15
213 -1.00 298.99 47.64
214 -0.78 392.83 108.69
215 -23.54 163.71 -74.10
216 23.41 156.24 54.53
217 -3.11 155.31 -17.35
218
2.73 149.66 -1.60
219 -0.31 105.62 -39.99
220 -0.09 199.36 21.04
221 -2.31 146.09 -14.34
222
1.88 142.05 -3.11
223 -0.30 110.60 -30.52
224 -0.14 177.54 13.07
225
1.10 258.95
0.43
226 -5.60 259.95 -18.45
227
7.82 257.94 19.30
228 -1.49 -41.11 -192.24
229 -3.10 475.43 175.60
230
0.93 -16.26 -180.45

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

50
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

231
232
233
251
252
253
254

0.49
-0.68
-1.10
-1.80
-2.80
-1.61
-2.98

PIPE RACK AREA, WA15 - DESIGN CALCULATIONS


PETRORabigh, UOU PROJECT
1-14-2410/59
YES
2411-8320-CA-WA15-0001

188.83 -35.08
243.52
5.68
448.31 150.63
37.25 -136.36
397.18 119.92
-65.38 -209.24
499.68 192.52

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
O1

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

************** END OF LATEST ANALYSIS RESULT **************


1067. FINISH

51
Sheet No :
Originator Checker
Date
TPR
Ashokan
17-Nov-06

of 51
Approver

FOSTER WHEELER
SUBJECT :

WA15 PIPERACK- DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

APPENDIX H

Sheet No :
Rev

Date

O1

16-Nov-06

BASE PLATE DESIGN (BP1)

H11 OF H13

Originator Checker Approver


TPR

Ashokan

FOSTER WHEELER
SUBJECT :

WA15 PIPERACK- DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

H12 OF H13

Originator Checker Approver

Rev

Date

O1

16-Nov-06

TPR

Ashokan

BASE PLATE DESIGN (FOR WA15)


BASE PLATE -BP1
E) For WA15- For Column base of HE400A Section
GRID:
0
From Staad output, the following combination is considered as critical for Base Plate design.
Fz (kN) Mx (kNm) My (kNm) Mz (kNm)
Node Load comb Fx (kN) Fy (kN)
104
5
88
941
16
0
0
0
MEMBER PROPERTIES
HE400A
Column Size:
0.24645 in
159 mm
Area
15.35 in
390.00 mm
Depth
d
300.00 mm
Flange Width
bf 11.81 in
11.00 mm
Web Thickness
tw
0.43 in
19.00 mm
Flange Thickness
tf
0.75 in
Clear Web Depth

d'

13.86

in

MATERIAL PROPERTIES
Yield Stress

Fy

39.89

ksi

275.0 N/mm

Comp. Strgth

f'c

5.08

ksi

35.0 N/mm

PIER DIMENSIONS
Pier Dim
23.62 x
Area of concrete support A2 =

23.62 in
558 in

BASE PLATE DIMENSIONS


Distance between bolts

LOADING CONDITION
Compression
Tension
Shear parallel to Flange
Shear parallel to Web

Pu
T
VF
VW

No of Anchor Bolt Rows

600

7.87

211.5
-59.6
19.8
3.6

600 mm
360000 mm

in

200

mm

kip
kip
kip
kip

941.00
-265.00
88.00
16.00

kN
kN
kN
kN

A1 Req.
A1 Req.

= Pu /(1.7f'c*)
= bf x d

Maximum of the above

0.80bf
B

2.0

and
(A2/A1)
The design bearing strength
cxPp

A1 Req.

Base PL

d5
9.
0

352.00 mm

BASE PLATE DESIGN


Base Plate Dimensions
The allowable bearing capacity on the concrete
Pp
= 0.85 x f'c xA1x (A2/A1)
2
where
A1
= Area of base plate , in
2
A2
= Area of pedestal , in

1
Pu
= xA 0.85f'c
2

yb

<
=
>
=

2
cxPp
Pu
0.6

7.18 in

4632 mm

=
=

40.9 in
181.4 in

117000 mm

181 in

117000 mm

26359 mm

< 1.7 x f'c xA1

(Specification Sec. J9 AISC-LRFD )

FOSTER WHEELER
SUBJECT :

WA15 PIPERACK- DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

= 0.5 x (0.95 x d - 0.8 x bf)


N Req. = A1 +
B Req. = A1 / N
A1 Req.

=
=
=
=

2.57
16.0
11.3
181.35

65.25
407.303
287.256
1E+05

in
in
in
in

Rev

Date

O1

16-Nov-06

mm
mm Provide
mm Provide
mm A1 Provided

H13 OF H13

Originator Checker Approver

------> N =
------> B =
=

TPR

17.7 in
13.8 in
244 in

Ashokan

450 mm
350 mm
2E+05 mm

Act. capacity = Pu
=
211.5 kip
941.0 kN
Allowable Bearing capacity
Pp = Minimum of ( x 1.7 x f'c x A1, x 0.85 x f'c x A1 x (A2 / A1))
x 1.7 x f'c x A1
= 1264.0 kip
5622.47 kN
4250.19 kN
x 0.85 x f'c x A1 x (A2 / A1) = 955.528 kip
Pp =

956 kip

4250.19 kN

Pp > Pu --> ok

Thickness

Base pate projection from the column face


m = (N-0.95xd)/2
=
n = (B-0.8xbf)/2
=
b =
Resistance factor for bending
Actual base pressure at edge, fc"

The design bearing pressure,fcm

1.56 in
2.17 in
0.90

39.8 mm
55.0 mm
M

=
=
=
=

Pu/A
5.97 N/mm2
0.87 ksi
x 0.85 x f'c x (A2 / A1)

=
=

3.91
26.98

=
=
=
=
=

0.5*(N-0.95*d)
39.8 mm
55.0
mm
fc"*(lb)2/2
0.203 kip in

=
=
=

(4*Mu / Fy)
0.15 in
1.18 in

=
=

352.00 mm
169.50 mm

ksi
N/mm2

Safe

a) Cantilever projection
Baseplate projection from
column face, lb

So Mu
Thk.of base Plate Req.

tp
tp

Use Plate Thickness

or
or
=

0.5*(B-0.8*bf)
55
mm
21.65
inch.

0.023 kNm

3.8211 mm
30 mm

Safe

b) Middle part

b
a
b

a*0.5/b =
=
So Mu
Allowable bending stress
Thk.of base Plate Req.
Use Plate Thickness

=
=
Fb =
=
tp

=
=
=

1.04
0.270 From Moody's chart
*fc"*(b)2
46346.0 Nmm
Fy
N/mm
247.50
(4*Mu / Fy)
27.37 mm
1.18 in

30 mm

Safe

(Maximum)

FOSTER WHEELER
SUBJECT :

WA15 PIPERACK- DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Rev

Date

O1

16-Nov-06

Check for Tension


L
T
yb' =

Dist b/n bolts


Tension per bolt row

7.9
-29.8 Kips
76.0 mm

200 mm
-132 kN

T'

T'

yb'

yb'

= T*yb'*(a-yb')/A
= 7895402.1 Nmm

0.5
Thk.of base Pl Req. tp = (6M/(Fy*N)

t
Use Plate Thickness =

1.18 in

= 0.9

in
30 mm

22.59 mm

H14 OF H13

Originator Checker Approver


TPR

Ashokan

FOSTER WHEELER
SUBJECT :

WA15 PIPERACK- DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

APPENDIX H

Sheet No :
Rev

Date

O1

16-Nov-06

BASE PLATE DESIGN(BP2)

H11 OF H13

Originator Checker Approver


TPR

Ashokan

FOSTER WHEELER
SUBJECT :

WA15 PIPERACK- DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

H12 OF H13

Originator Checker Approver

Rev

Date

O1

16-Nov-06

TPR

Ashokan

BASE PLATE DESIGN (FOR WA15)


BASE PLATE -BP2
E) For WA15- For Column base of HE400A Section
GRID:
0
From Staad output, the following combination is considered as critical for Base Plate design.
Fz (kN) Mx (kNm) My (kNm) Mz (kNm)
Node Load comb Fx (kN) Fy (kN)
129
238
1.5
697
309
0
0
0
MEMBER PROPERTIES
HE400A
Column Size:
0.24645 in
159 mm
Area
15.35 in
390.00 mm
Depth
d
300.00 mm
Flange Width
bf 11.81 in
11.00 mm
Web Thickness
tw
0.43 in
19.00 mm
Flange Thickness
tf
0.75 in
Clear Web Depth

d'

13.86

in

MATERIAL PROPERTIES
Yield Stress

Fy

39.89

ksi

275.0 N/mm

Comp. Strgth

f'c

5.08

ksi

35.0 N/mm

PIER DIMENSIONS
Pier Dim
23.62 x
Area of concrete support A2 =

23.62 in
558 in

BASE PLATE DIMENSIONS


Distance between bolts

LOADING CONDITION
Compression
Tension
Shear parallel to Flange
Shear parallel to Web

Pu
T
VF
VW

No of Anchor Bolt Rows

600

7.87

156.7
-58.9
0.3
69.5

600 mm
360000 mm

in

200

mm

kip
kip
kip
kip

697.00
-262.00
1.50
309.00

kN
kN
kN
kN

A1 Req.
A1 Req.

= Pu /(1.7f'c*)
= bf x d

Maximum of the above

0.80bf
B

2.0

and
(A2/A1)
The design bearing strength
cxPp

A1 Req.

Base PL

d5
9.
0

352.00 mm

BASE PLATE DESIGN


Base Plate Dimensions
The allowable bearing capacity on the concrete
Pp
= 0.85 x f'c xA1x (A2/A1)
2
where
A1
= Area of base plate , in
2
A2
= Area of pedestal , in

1
Pu
= xA 0.85f'c
2

yb

<
=
>
=

2
cxPp
Pu
0.6

3.94 in

2541 mm

=
=

30.3 in
181.4 in

117000 mm

181 in

117000 mm

19524 mm

< 1.7 x f'c xA1

(Specification Sec. J9 AISC-LRFD )

FOSTER WHEELER
SUBJECT :

WA15 PIPERACK- DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

= 0.5 x (0.95 x d - 0.8 x bf)


N Req. = A1 +
B Req. = A1 / N
A1 Req.

=
=
=
=

2.57
16.0
11.3
181.35

65.25
407.303
287.256
1E+05

in
in
in
in

Rev

Date

O1

16-Nov-06

mm
mm Provide
mm Provide
mm A1 Provided

H13 OF H13

Originator Checker Approver

------> N =
------> B =
=

TPR

17.7 in
13.8 in
244 in

Ashokan

450 mm
350 mm
2E+05 mm

Act. capacity = Pu
=
156.7 kip
697.0 kN
Allowable Bearing capacity
Pp = Minimum of ( x 1.7 x f'c x A1, x 0.85 x f'c x A1 x (A2 / A1))
x 1.7 x f'c x A1
= 1264.0 kip
5622.47 kN
4250.19 kN
x 0.85 x f'c x A1 x (A2 / A1) = 955.528 kip
Pp =

956 kip

4250.19 kN

Pp > Pu --> ok

Thickness

Base pate projection from the column face


m = (N-0.95xd)/2
=
n = (B-0.8xbf)/2
=
b =
Resistance factor for bending
Actual base pressure at edge, fc"

The design bearing pressure,fcm

1.56 in
2.17 in
0.90

39.8 mm
55.0 mm
M

=
=
=
=

Pu/A
4.43 N/mm2
0.64 ksi
x 0.85 x f'c x (A2 / A1)

=
=

3.91
26.98

=
=
=
=
=

0.5*(N-0.95*d)
39.8 mm
55.0
mm
fc"*(lb)2/2
0.150 kip in

=
=
=

(4*Mu / Fy)
0.13 in
3.28859 mm
30 mm
1.18 in

ksi
N/mm2

Safe

a) Cantilever projection
Baseplate projection from
column face, lb

So Mu
Thk.of base Plate Req.

tp
tp

Use Plate Thickness

or
or
=

0.5*(B-0.8*bf)
55
mm
21.65
inch.

0.017 kNm

Safe

b) Middle part

b
a
b

=
=

a*0.5/b =
=
So Mu
Allowable bending stress
Thk.of base Plate Req.
Use Plate Thickness

=
=
Fb =
=
tp

=
=
=

352.00 mm
169.50 mm
1.04
0.267 From Moody's chart
*fc"*(b)2
33947.1 Nmm
Fy
N/mm
247.50
(4*Mu / Fy)
23.42 mm
1.18 in

30 mm

Safe

(Maximum)

FOSTER WHEELER
SUBJECT :

WA15 PIPERACK- DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Rev

Date

O1

16-Nov-06

Check for Tension


L
T
yb' =

Dist b/n bolts


Tension per bolt row

7.9
-29.4 Kips
76.0 mm

200 mm
-131 kN

T'

T'

yb'

yb'

= T*yb'*(a-yb')/A
= 7806020.2 Nmm

0.5
Thk.of base Pl Req. tp = (6M/(Fy*N)

t
Use Plate Thickness =

1.18 in

= 0.9

in
30 mm

22.46 mm

H14 OF H13

Originator Checker Approver


TPR

Ashokan

FOSTER WHEELER
SUBJECT :

ANCHOR BOLT DESIGN-WA15

PROJECT:

PETRORabigh UOU

CONTRACT NO : 1-14-2410/59

Sheet No :
Rev

Date

Originator

Checker

O1

24-Nov-06

TPR

Ashokan

SAFETY CALC. YES


CALC. NO

1 of 3

2411-8320-CA-WA15-0001

APPENDIX J
ANCHOR BOLT DESIGN FOR BP1

Approver

Company

Foster Wheeler

Project

PETRORabigh UOU

Subject

PIPERACK WA15

Name

TPR

Date

Checked by

Ashokan

Check Date

Project # 1-14-2410/59

11/24/2006

Total Sheets

LOADING CONDITIONS

DESIGN CONSIDERATIONS

Note: Calculations are per ACI 318-02 Appendix D.

Ductility required?

Factored tensile load (kips) = N u =


perpendicular to edge

59.18

Specified concrete strength (psi) = f' c =

5000

23.40

Cracking
modification
factor, 7

ANCHOR DATA, EMBEDMENT, AND THICKNESS OF MEMBER


A36, Fu = 58

Nominal anchor diameter (in.) =

Effective anchor embedment depth (in.) = hef


Thickness of member in which anchor is anchored, (in.) = h
Number of anchors in tension = n (tension) =
Number of anchors in shear = n (shear) =
CONCRETE FAILURE AREAS
An =

No
no

Av =

515.361

Av=

280.845

1.5c1

35o

Breakout cone for tension


SUMMARY OF RESULTS
DUCTILITY

1.5c1

hef

35

VU (perpendicular)
VU (parallel)

Breakout cone for shear

TENSION
Edge Distance, in.

(0=single anchor)

c1 =
c2 =

7.9

c3 =

7.9

c4 =

SHEAR
Spacing, in.

7.9

s1 =

7.9

s2 =

Edge Distance, in.

7.9

c1 =

7.9

7.9

c2 =

7.9

c4 =

7.9

c1 = minimum edge distance


c2 = least edge distance perpendicular to c 1

INTERACTION OF TENSILE AND SHEAR FORCES

Nn = 112.5 kips <


Nu = 59.18
Vn = 50.6 kips
<
Vu = 23.40
Nu/(Nn) + Vu/(Vn) =
0.53 + 0.46 = 0.99 <=1.2
Applied Tension > than Steel Capacity of Anchor, NG
Applied Shear > than Steel Capacity of Anchor, NG

Spacing, in.
s2 =

7.9

c1 = edge distance in direction of V n (perp.)


c2 = least edge distance perpendicular to c 1
c1

c1 s1 c 3
c2 s2 c4

NU

Yes

EDGE DISTANCES AND SPACING

418.4283

An= 388.012276

Do you want to manually input the value of A v?

1.5hef

Adequate reinforcement provided to resist shear loads in anchors?


3.94 = hef ECCENTRICITY
74.80 = h
Eccentricity of tensile force on group of tensile anchors (in.)
4.9213
4
eN' =
4
Eccentricity of shear force on group of anchors (in.)
(Note ev' must be less than s perpendicular to shear)
eV'=
4.9213

no
No

Do you want to manually input the value of A n?

c1

Yes

Adequate supplementary reinf. provided to resist tension loads in anchors?


1

Note: Units for A n and Av are sq. in.

1.4 - Located in region where there isn't cracking at service loads (ft < fr)

VU

h or 1.5c1

Anchor material type =

No

Shear
No

Yes

Is there a built-up grout pad?

No

c2 s2 c4

Factored shear load (kips) = V u =

Tension

Intermediate or high seismic risk?

Appendix C

Nu and Vu were factored using factors from ACI 318-02?

1.5hef

2 of 3

Sheet Number

VU

c1
c4

s2

RESULTS
Using supplemental reinf to carry Tension
Using supplemental reinf to carry Shear

ANCHOR OK !
0.99

c2

Company

Foster Wheeler

Project

PETRORabigh UOU

Subject

PIPERACK WA15

Name

TPR

Checked by

Ashokan

BOLT PARAMETERS
Grade
Size
do

LOAD CONDITIONS
LOAD FACTORS
TENSILE LOAD, Nu
SHEAR LOAD, Vu

3 of 3

Sheet

Project 1-14-2410/59

Date 11/24/2006
Check Date

A36, Fu = 58
1 in.
1.000 in.

36 ksi hef
58 ksi n(tension)
0.606 sq. in. n(shear)
1.501 sq. in.

fy
fut
Ase
Ab

3.94 in.
4
4

REINFORCEMENT
Appendix C ADEQUATE SUPPL REINF PROVIDED TO RESIST TENSION
59.18
ADEQUATE REINF PROVIDED TO RESIST SHEAR
23.40

DESIGN CONSIDERATIONS
DUCTILITY NOT REQD IN TENSION
DUCTILITY NOT REQD FOR SHEAR
LOW SEISMIC RISK
eN' = 4.92 in.
ECCENTRICITIES
DESIGN FOR TENSION
Ns

140.6 kips

Ncb or Ncbg

25.1 kips

nNpn

336.3 kips

Nsb or Nsbg
(governing)

NA

PULLOUT STRENGTH
OF ANCHOR(S)
CONCRETE SIDE-FACE
BLOWOUT STRENGTH
OF HEADED
ANCHOR(S)

5000 psi

CRACKING MOD FACTOR, 7


GROUT PAD
eV' = 4.92 in.

1.4

DESIGN FOR SHEAR

STEEL STRENGTH
CONCRETE BREAKOUT
STRENGTH OF
ANCHOR(S)

CONCRETE STRENGTH, f'c

EDGE DISTANCES, SPACINGS,


FAILURE AREAS

c1

TENSION
7.90 in.

SHEAR
7.90 in.

c2

7.90 in.

7.90 in.

c3

7.90 in.

c4

7.90 in.

s1

7.87 in.

s2

7.90 in.

7.90 in.

388.0 sq. in.

280.8 sq. in.

Calculated

CONCRETE BREAKOUT
STRENGTH OF ANCHOR,
Perpendicular to edge

Calculated

67.5 kips

Vcb or Vcbg

12.9 kips

Vcp

92.2 kips

CONCRETE PRYOUT
STRENGTH OF ANCHOR

SUMMARY OF RESULTS
TENSION
Steel Capacity
Concrete Capacity

112.5 kips
21.4 kips

SHEAR

7.90 in.

An or Av

Vs

STEEL STRENGTH

Steel Capacity

50.6 kips

Concrete Capacity

10.9 kips

INTERACTION OF TENSILE AND SHEAR FORCES


112.5 kips

= Nn*

<

Nu

59.18

50.6 kips

Vn*

<

Vu

23.40

Nu/(Nn*)

=
+

Vu/(Vn*)

0.53 + 0.46 <= 1.2


OK
*Multiplied by 0.75 if intermediate or high seismic area
Page

FOSTER WHEELER
SUBJECT :

ANCHOR BOLT DESIGN-WA15

PROJECT:

PETRORabigh UOU

CONTRACT NO : 1-14-2410/59

Sheet No :
Rev

Date

Originator

Checker

O1

24-Nov-06

TPR

Ashokan

SAFETY CALC. YES


CALC. NO

1 of 3

2411-8320-CA-WA15-0001

APPENDIX J
ANCHOR BOLT DESIGN FOR BP2

Approver

Foster Wheeler
Project # 1-14-2410/59

Project

PETRORabigh UOU

Subject

PIPERACK WA15

Name

TPR

Date

Checked by

Ashokan

Check Date

11/24/2006

Total Sheets

LOADING CONDITIONS

DESIGN CONSIDERATIONS

Note: Calculations are per ACI 318-02 Appendix D.

Ductility required?

Factored tensile load (kips) = N u =


perpendicular to edge

59.18

Specified concrete strength (psi) = f' c =

5000

0.00

Cracking
modification
factor, 7

ANCHOR DATA, EMBEDMENT, AND THICKNESS OF MEMBER


A36, Fu = 58

Anchor material type =


Nominal anchor diameter (in.) =

Effective anchor embedment depth (in.) = hef


Thickness of member in which anchor is anchored, (in.) = h
Number of anchors in tension = n (tension) =
Number of anchors in shear = n (shear) =
CONCRETE FAILURE AREAS
An =

No
no

515.361

Av=

Breakout cone for tension


SUMMARY OF RESULTS
DUCTILITY

VU (perpendicular)
VU (parallel)

Breakout cone for shear

TENSION
Edge Distance, in.

Yes

(0=single anchor)

c1 =
c2 =

7.9

c3 =

7.9

c4 =

SHEAR
Spacing, in.

7.9

s1 =

7.9

s2 =

Edge Distance, in.

7.9

c1 =

7.9

7.9

c2 =

7.9

c4 =

7.9

c1 = minimum edge distance


c2 = least edge distance perpendicular to c 1

INTERACTION OF TENSILE AND SHEAR FORCES

Nn = 112.5 kips <


Nu = 59.18
Vn = 0.0 kips
<
Vu = 0.00
Nu/(Nn) + Vu/(Vn) =
0.53 + 0.00 = 0.53 <=1.2
Applied Tension > than Steel Capacity of Anchor, NG
Applied Shear > than Steel Capacity of Anchor, NG

Spacing, in.
s2 =

7.9

c1 = edge distance in direction of V n (perp.)


c2 = least edge distance perpendicular to c 1
c1

c1 s1 c 3
c2 s2 c4

1.5c1

35o

1.5c1

hef

418.4283

Av =

NU
35

Yes

EDGE DISTANCES AND SPACING

An= 388.012276

Do you want to manually input the value of A v?

1.5hef

Adequate reinforcement provided to resist shear loads in anchors?


3.94 = hef ECCENTRICITY
71.85 = h
Eccentricity of tensile force on group of tensile anchors (in.)
4.9213
4
eN' =
0
Eccentricity of shear force on group of anchors (in.)
(Note ev' must be less than s perpendicular to shear)
eV'=
4.9213

no
No

Do you want to manually input the value of A n?

c1

1.4 - Located in region where there isn't cracking at service loads (ft < fr)

Adequate supplementary reinf. provided to resist tension loads in anchors?


1

Note: Units for A n and Av are sq. in.

No

Shear
No

Yes

Is there a built-up grout pad?

No

VU

h or 1.5c1

Factored shear load (kips) = V u =

Tension

Intermediate or high seismic risk?

Appendix C

Nu and Vu were factored using factors from ACI 318-02?

1.5hef

2 of 3

Sheet Number

c2 s2 c4

Company

VU

c1
c4

s2

RESULTS
Using supplemental reinf to carry Tension
Using supplemental reinf to carry Shear

ANCHOR OK !
0.53

c2

Company

Foster Wheeler

Project

PETRORabigh UOU

Subject

PIPERACK WA15

Name

TPR

Checked by

Ashokan

BOLT PARAMETERS
Grade
Size
do

LOAD CONDITIONS
LOAD FACTORS
TENSILE LOAD, Nu
SHEAR LOAD, Vu

3 of 3

Sheet

Project 1-14-2410/59

Date 11/24/2006
Check Date

A36, Fu = 58
1 in.
1.000 in.

36 ksi hef
58 ksi n(tension)
0.606 sq. in. n(shear)
1.501 sq. in.

fy
fut
Ase
Ab

3.94 in.
4
0

REINFORCEMENT
Appendix C ADEQUATE SUPPL REINF PROVIDED TO RESIST TENSION
59.18
ADEQUATE REINF PROVIDED TO RESIST SHEAR
0.00

DESIGN CONSIDERATIONS
DUCTILITY NOT REQD IN TENSION
DUCTILITY NOT REQD FOR SHEAR
LOW SEISMIC RISK
eN' = 4.92 in.
ECCENTRICITIES
DESIGN FOR TENSION
Ns

140.6 kips

Ncb or Ncbg

25.1 kips

nNpn

336.3 kips

Nsb or Nsbg
(governing)

NA

PULLOUT STRENGTH
OF ANCHOR(S)
CONCRETE SIDE-FACE
BLOWOUT STRENGTH
OF HEADED
ANCHOR(S)

5000 psi

CRACKING MOD FACTOR, 7


GROUT PAD
eV' = 4.92 in.

1.4

DESIGN FOR SHEAR

STEEL STRENGTH
CONCRETE BREAKOUT
STRENGTH OF
ANCHOR(S)

CONCRETE STRENGTH, f'c

EDGE DISTANCES, SPACINGS,


FAILURE AREAS

c1

TENSION
7.90 in.

SHEAR
7.90 in.

c2

7.90 in.

7.90 in.

c3

7.90 in.

c4

7.90 in.

s1

7.87 in.

s2

7.90 in.

7.90 in.

388.0 sq. in.

280.8 sq. in.

Calculated

CONCRETE BREAKOUT
STRENGTH OF ANCHOR,
Perpendicular to edge

Calculated

0.0 kips

Vcb or Vcbg

0.0 kips

Vcp

92.2 kips

CONCRETE PRYOUT
STRENGTH OF ANCHOR

SUMMARY OF RESULTS
TENSION
Steel Capacity
Concrete Capacity

112.5 kips
21.4 kips

SHEAR

7.90 in.

An or Av

Vs

STEEL STRENGTH

Steel Capacity

0.0 kips

Concrete Capacity

0.0 kips

INTERACTION OF TENSILE AND SHEAR FORCES


112.5 kips

= Nn*

<

Nu

59.18

0.0 kips

Vn*

<

Vu

0.00

Nu/(Nn*)

=
+

Vu/(Vn*)

0.53 + 0.00 <= 1.2


OK
*Multiplied by 0.75 if intermediate or high seismic area
Page

FOSTER WHEELER
SUBJECT :

SHEAR KEY DESIGN-WA15

PROJECT:

PETRORabigh UOU

CONTRACT NO : 1-14-2410/59

Sheet No :
Rev

Date

Originator

Checker

O1

24-Nov-06

TPR

Ashokan

SAFETY CALC. YES


CALC. NO

2411-8320-CA-WA15-0001

APPENDIX K
SHEAR KEY DESIGN FOR BP2

Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

FOOTING DESIGN FOR WA15-F1


PETRORabigh UOU
1 - 14 - 2410/59

Sheet No :
Date

Originator

Checker

O1

17-Nov-06

TPR

Ashokan

YES
2411-8320-CA-WA15-0001

APPENDIX G
FOUNDATION DESIGN - TYPE F1 & CF1
PIPERACK-WA15

Rev

OF

5
Approver

FOSTER WHEELER
SUBJECT :

FOOTING DESIGN FOR WA15-F1

PROJECT:

PETRORabigh UOU

Rev

Date

Originator

Checker

CONTRACT NO :
SAFETY CALC.
CALC. NO

1 - 14 - 2410/59
YES
2411-8320-CA-WA15-0001

O1

17-Nov-06

TPR

Ashokan

Sheet No :

Fy
I) NOTES
1) Sign convention of forces as per Right Hand Thumb Rule.
2) Cells with italic font and/or marked with
are inputs.
3) In check for sliding, passive pressure along sides of the Footing is NOT considered.
4) Overturning check is valid only for footings with pedestal is located at CG of footing in both directions.
5) Forces are reactions of STAAD output. Program internally calculates support loads.

Mz
Fx

Mx

1234
2
150 kN/m
2
0 kN/m

Net safe bearing capacity


Surcharge pressure
Factor of safety for sliding
Factor of safety for overturning
Minimum allowable % of contact area

150
0.925
1.50
18
25

Friction coefficient
Coordinates of the column

x1

x1

0.60
Fz

1.50

1.2

0.60

0.6

3.75

1.5
1.5
70 %

Final net safe bearing capacity


Height of the pedestal above G.L
Bottom of footing below G.L
Density of soil above the footing s
Density of footing concrete

5
Approver

0.9 z1

II) FOOTING DATA


STAAD support No's:

OF

kN/m2 Col. size


m
Footing size
m
soil
kN/m3
kN/m3

0.4
= 1.88 m

X Dir
(m)

Z Dir
(m)

Depth
(m)

0.60
3.75
3.75

0.60
1.20
1.20

1.83
0.6
0.9

Weight
(kN)

16
68
67 < = [1.2*3.75-0.6*0.6]*0.9*18
151.0 kN

Height of steel support

0.000

z1
= 0.60 m
from point "A"
III) CHECK FOR BEARING PRESSURE FOR UNFACTORED LOADS
Sl. No

1
2
3
4

Critical case
(LC,node)
Critical sliding (215,3)
Critical Overturning (209,1)
Critical Overturning (215,3)
Max. Pressure(209,4)

Bearing
capacity
Inc. Factor

Load factor
for Dead
Load

Fx
(kN)

Fy
(kN)

Fz
(kN)

Mx
(kN-m)

My
(kN-m)

Mz
(kN-m)

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

43.1
21.3
43.1
42.8

22.2
97.2
22.2
324.0

-3.6
-14.7
-3.6
-5.3

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

Resultant

Horiz.
Load(kN)

43
26
43
43

Total
Fy
(kN)

173
248
173
475

Horiz
FOS for
Resistant
Slide
(kN)

69
99
69
190

Check
For
Slide

1.60 Okay
3.84 Okay
1.60 Okay
4.40 Okay

Total
Mx
(kN-m)

8.6
35.6
8.6
12.8

Total
Mz
(kN-m)

104.4
51.6
104.4
103.9

FOSTER WHEELER
SUBJECT :

FOOTING DESIGN FOR WA15-F1

PROJECT:

PETRORabigh UOU

Rev

Date

Originator

Checker

Approver

CONTRACT NO :
SAFETY CALC.
CALC. NO

1 - 14 - 2410/59
YES
2411-8320-CA-WA15-0001

O1

17-Nov-06

TPR

Ashokan

Total Pressure (kN/m 2)


PA PB
PC
PD

Sl. No

1
2
3

66
34
66

85
113
85

Sheet No :

Loss of % of Loss of
Contact contact area
area (m2)

-8
-3
-8

11 0.10
76 0.04
11 0.10

Max.Pr.(kN/m ) [For
cases ex/lx+ez/lz >1/6,
Roark's Tables are
used]

2.2
0.9
2.2

% of
Contact
Area
97.8
99.1
97.8

Check for
Gross safe
bearing capacity Bearing
pressure
2
(kN/m )

85.8
113.4
85.8

Check for
Loss of
contact
Area

177 Okay
177 Okay
177 Okay

Okay
Okay
Okay

Sl. No

Load case
(node)
109(4)

Total

Load factor
for Dead
Load

Fx
(kN)

Fy
(kN)

Fz
(kN)

Mx
(kN-m)

My
(kN-m)

Mz
(kN-m)

1.2

67.8

433.1

-6.3

0.0

0.0

0.0

Total Pressure (kN/m2)


Pa Pb
Pc
178

212

Pd
61

(kN)
614
0

Design Pressure(kN/m 2)
Pb
Pc
Pd

Pa
95

Fy

Overturning
FOS
X Dir
Z Dir
X Dir
Z Dir
325
104
3.1
12.1
465
149
9.0
4.2
325
104
3.1
12.1

141

174

24

Total
Total
Total
Mx
My
Mz
(kN-m)
(kN-m) (kN-m)
15
0.0
164
0
0.0
0

Design Pr. at Face of Pedestal side (kN/m 2)

AB
58

CD
108

AC
90

BD
91

Restoring Moment

IV) DESIGN OF FOOTING FOR FACTORED LOADS


Sl. No

OF

108

Check
Okay
Okay
Okay

FOSTER WHEELER
SUBJECT :

FOOTING DESIGN FOR WA15-F1

PROJECT:

PETRORabigh UOU

Rev

Date

Originator

Checker

Approver

CONTRACT NO :
SAFETY CALC.
CALC. NO

1 - 14 - 2410/59
YES
2411-8320-CA-WA15-0001

O1

17-Nov-06

TPR

Ashokan

Clear cover for bottom reinf.- X Dir


Clear cover for bottom reinf. - Z Dir
Clear cover to top reinf.- X Dir
Clear cover to top reinf.- Z Dir

mm
mm
mm
mm
2
34.4 N/mm =
2
412.6 N/mm =

Sheet No :

75
95
75
85

f1c-Specified compressive strength of concrete

fy-Specified yield strength of steel


Min. ratio of reinforcement for footings

Eff. depth for bot. reinf. -X Dir (d) =


Eff. depth for bot reinf. -Z Dir =
Eff. depth for top reinf. -X Dir =
Eff. depth for top reinf. - Z Dir =

OF

m
m
m
m

4989.3 PSI
59842.8 PSI

As per Cl. No:10.5.4 & 7.12.2.1 of ACI-318

0.0018

Hence Ast min =0.0018*600*1000 =


Bottom X Dir reinf. diameter(Prov)

0.515
0.495
0.517
0.507

1080.0
20 mm @

mm2/m

Bottom Z Dir reinf. diameter(Prov)

20 mm @

150 mm c/c @ bot =>

Top X Dir reinf. diameter (Prov)

16 mm @

150 mm c/c @ Top =>

2
2094 mm /m
2
2094 mm /m
2
1340 mm /m

Top Z Dir reinf. diameter (Prov)

16 mm @

150 mm c/c @ Top =>

2
1340 mm /m

150 mm c/c @ bot =>

> 1080 Hence okay


> 1080 Hence okay
> 1080 Hence okay
> 1080 Hence okay

IV-A- FLEXURE CHECK


Sl. No Bending moment at face of pedestal(kN-m)
AB
CD
1
175

AC
71

BD
4

Ultimate moments (kN-m)


AB
CD
AC
5
175
71

REINFORCEMENT ARRANGEMENT (Bottom)

20 Dia @ 150 C/C


20Dia @150 C/C

Reqd. reinf. in X dir(mm2)

BD
4

Bottom
5

Top
1233

Reqd. reinf. In Z dir(mm 2)

Bottom Top
0
28

Reinforcement check
X dir Bot Top
Z dir Bot. Top

0 Okay

Okay

Okay

Okay

FOSTER WHEELER
SUBJECT :

FOOTING DESIGN FOR WA15-F1

PROJECT:

PETRORabigh UOU

Rev

Date

Originator

Checker

Approver

CONTRACT NO :
SAFETY CALC.
CALC. NO

1 - 14 - 2410/59
YES
2411-8320-CA-WA15-0001

O1

17-Nov-06

TPR

Ashokan

Sheet No :

OF

IV-B- ONE WAY SHEAR CHECK


One way shear check at "d" from Face of Pedestal
2 f1c0.5
Allowable shear stress
=
As per Cl No: 11.1.1 and Cl. No: 11.3.1 of ACI-318-2002
N/mm2
=
0.75* 2 * 4989^0.5 * 0.00689 =
0.731
2
Shear stress( N/mm 2)
Pressure at "d" distance from face of pedestal (kN/m )
Sl.No
Shear force ( kN)
AB
CD
AC
BD
AB
CD
AC
BD
AB
CD
AC
149
61 No shea No shear
0.29
0.12
0.00
1
124.48
73.65 section osection outs

IV-C-TWO WAY SHEAR CHECK


Punching shear check at 0.5 d from face of pedestal
Permissible shear stress is minimum of following
1)
0.75* 4* f 1c0.5

Shear check
BD
X Dir
Z Dir
0.00 Okay
Okay

PUNCHING SHEAR PATTERN


=

As per Cl:11.12.2.1 of ACI-318-2002


1.461 N/sq.mm

Xc
Xa

2) 0.75*[2+ 4/c] *f1c0.5


Hence Permissible shear stress

=
2.192 N/sq.mm
=
1.461 N/sq.mm
Punching Perimeter =
4.46 m
2
Area of Fdn. under punching
=
1.24 m
< = (Xc - Xa) * ( Zb- Za)
Co-ordinates of punching rectangular corner
Xa
=
1.3175 M
Xc =
2.4325 M
Za
=
0.0425 M
Zb =
1.1575 M
Punching load = Col. load (i.e Fy+Load Fac* Ped. Wt) - Avg. press. of points a,b,c & d * Area of fdn. under punching
Punching shear stress = Punching Load / [ Punching perimeter * Effective depth of footing ]
Punching
Punching shear
Shear
Sl. NO
Pressure at punching corners (kN/sq.m)
Shear (kN) stress (N/mm2)
check
a
b
c
d
1
101
132
66
97
330 0.14
Okay

Za
Zb

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

FOOTING DESIGN FOR PIPERACK WA15 : CF1


PETRORabigh UOU
1-14-2410/59
YES

Sheet No :
Rev
O1

Date

Originator

Checker

16-Nov-06

TPR

Ashokan

of

7
Approver

2411-8320-CA-WA15-0001

COMBINED FOOTING FOR COLUMNS AT BRACED BAY LOCATIONS


I) NOTES
1) Sign convention of forces as per Right Hand Thumb Rule.
2) Cells with italic font and/or marked with
are inputs.
3) In check for sliding, passive pressure along sides of the Footing is NOT considered.
4) Forces are reactions of STAAD output. Program internally calculates support loads.
5) On a conservative side, the overturning checks are made.

Left/Top
238 239
18
25
0.40
1.5
1.5
3.35
0.90
0.60
0.60
0.60
-0.50
-1.00
7.50
1.00
7.00
0.00
8
2.0
0
240.00
247.54
220

FOSTER WHEELER

Fx

Right/Bot.
56
kN/m3
kN/m3

Fz
H1

H3
d
m
m
m
m
m
m
m
m
m
m
m
m
m
m
kN
kN
kN/m2

STAAD X AXIS

Longitudinal axis of footing parallel to

Mz

Mx

STAAD Z AXIS

L3
Elevation Along X-Dir.
x0

x1

X
z0
z1

lz
Z

lx

Elevation Along Z-Dir.

II) FOOTING DATA


STAAD Support Joint Numbers
Density of soil
Density of concrete
Friction coefficient between soil & foundation
Factor of safety for sliding
Factor of safety for overturning
Height of pedestal(H1)
Height of soil above footing (H3)
Length of pedestal (lx)
Width of pedestal (lz)
Depth of footing (d)
Co-ordinates from Left/Top Pedestal CG.
Left-Top of Footing
x0
z0
Right-Bot. of Footing
x1
z1
2nd Pedestal
x2
z2
Length of footing (Lx)
Length of footing (Lz)
Height of steel column
Wt. of footing
Wt. of soil over footing
Net allowable bearing pressure

Fy

SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

FOOTING DESIGN FOR PIPERACK WA15 : CF1


PETRORabigh UOU
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Sheet No :
Rev
O1

of

Date

Originator

Checker

16-Nov-06

TPR

Ashokan

Approver

III) CHECK FOR BEARING PRESSURE & SLIDING


At Left Pedestal
Sl. No.
1
2
3
4
5
6
7
8
9
10

Sl. No.

1
2
3
4
5
6
7
8
9
10

Load Case/Node nos.


209 / 238-5
228 / 238-5
215 / 238-5
204 / 238-5

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Tot. Fy1 (kN) Tot. Mx1 (kN)

395.3
-157.2
159.4
13.4
27.1
27.1
30.2
30.2
30.2
30.2

Bearing capacity Dead Load


inc. factor
Factor

-93.5
13.1
-93.6
100.1
0.0
0.0
0.0
0.0
0.0
0.0

Tot. Mz1
(kN)

-778.6
1037.1
-215.7
893.8
0.0
0.0
0.0
0.0
0.0
0.0

1.00
1.00
1.00
1.00
0.90
0.90
1.00
1.00
1.00
1.00

Tot. Fy2
(kN)

-111.7
672.8
11.3
735.7
27.1
27.1
30.2
30.2
30.2
30.2

Fx1
-197.1
262.6
-54.6
226.3
0.0
0.0
0.0
0.0
0
0

Tot. Mx2
(kN)

-242.8
31.6
-240.9
220.5
0.0
0.0
0.0
0.0
0.0
0.0

Fy1
365.2
-187.3
129.2
-16.7
0.0
0.0
0.0
0.0
0.0
0.0

Tot. Mz2
(kN)

74.1
-38.8
28.8
-43.4
0.0
0.0
0.0
0.0
0.0
0.0

At Right Pedestal
Fz1
23.7
-3.3
23.7
-25.3
0.0
0.0
0.0
0.0
0.0
0.0

Resultant
Horiz. (kN)

197.6
253.0
97.0
230.1
0.0
0.0
0.0
0.0
0.0
0.0

Mx1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total vertical
(kN)

771.2
1003.2
658.2
1236.7
493.1
493.1
547.8
547.8
547.8
547.8

Mz1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Hor. Resist.
(kN)

308.5
401.3
263.3
494.7
197.2
197.2
219.1
219.1
219.1
219.1

Fx2

Fy2

Fz2

18.8
-9.8
7.3
-11.0
0.0
0.0
0.0
0.0
0.0
0.0

-141.9
642.7
-18.9
705.6
0.0
0.0
0.0
0.0
0.0
0.0

61.5
-8.0
61.0
-55.8
0.0
0.0
0.0
0.0
0.0
0.0

FOS

1.56
1.59
2.71
2.15
No Slide
No Slide
No Slide
No Slide
No Slide
No Slide

Check for
Slide

Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

Mx2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Mz2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Eccentricity in
Z Dir (m) X Dir (m) Z Dir (m)

CG of Loads from Ped-1

X Dir (m)

-2.76
9.13
0
7
3.50
3.50
4
4
3.50
3.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-6.26
5.63
-3
3
0.00
0.00
0
0
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

Sl. No.
1
2
3
4
5
6
7
8
9
10
Sl. No.

FOOTING DESIGN FOR PIPERACK WA15 : CF1


PETRORabigh UOU
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Total-Mz TotalAdd. Moment in (kN-m) (kN-m)


Mx (kN- ex (m)
(Mz)
(Mx)
m)
1775
0.0
1070
-336
1.39
-2905
0.0
-1907
45
1.90
518
0.0
332
-334
0.50
-2528
0.0
-1678
321
1.36
0
0.0
0
0
0.00
0
0.0
0
0
0.00
0
0.0
0
0
0.00
0
0.0
0
0
0.00
0
0.0
0
0
0.00
0
0.0
0
0
0.00
Overturning Moment (kN-m)

Right
1
2
3
4
6
7
8
9
10

Left
760
1907
187
1678
0
0
0
0
0
0

N.O.T - No Overturning.

1070
1077
332
850
0
0
0
0
0
0

ez (m)
0.44
0.04
0.51
0.26
0.00
0.00
0.00
0.00
0.00
0.00

FOS
Right
Left
Right
Left
4915
3085
6.5
2.9
4013
6996
2.1
6.5
3151
2633
16.9
7.9
4947
7475
2.9
8.8
1972
1972
N.O.T
N.O.T
1972
1972
N.O.T
N.O.T
2191
2191
N.O.T
N.O.T
2191
2191
N.O.T
N.O.T
2191
2191
N.O.T
N.O.T
2191
2191
N.O.T
N.O.T

Restoring moment (kN-m)

Sheet No :
Rev
O1

ex/Lx +
ez/Lz
0.392
0.260
0.317
0.299
0.000
0.000
0.000
0.000
0.000
0.000
Check
Right
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

Originator

Checker

16-Nov-06

TPR

Ashokan

Pressure at corners(in kN/m 2)


Bottom
Top
Bottom
Top Left
Left
Right
Right
161.4
35.3
61.1
-65.0
-35.1
-18.3
143.7
160.5
119.4
-6.0
88.3
-37.1
-61.5
58.8
95.8
216.0
30.8
30.8
30.8
30.8
30.8
30.8
30.8
30.8
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2
34.2

Top

Bot.
448
157
334
0
0
0
0
0
0
0

Top
112
202
0
321
0
0
0
0
0
0

883
1205
658
1557
493
493
548
548
548
548

Approver

Total gross Net


All. Bearing Check
Roark's
coefficient pr. (kN/m 2) pr.(kN/m2) pr. (kN
bearing
pr.

4.04
2.73
3.28
2.98
1.00
1.00
1.00
1.00
1.00
1.00

194.9
171.1
134.9
230.4
30.8
30.8
34.2
34.2
34.2
34.2

167.9
144.1
107.9
203.4
3.8
3.8
7.2
7.2
7.2
7.2

Overturning moment (kRestoring moment (kN- FOS

Left
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

of

Date

Bot.
1219
1160
993
1237
493
493
548
548
548
548

Top

Bot.
2.0
10.9
7.7
5.7
2.0 N.O.T
N.O.T
3.9
N.O.T
N.O.T
N.O.T
N.O.T
N.O.T
N.O.T
N.O.T
N.O.T
N.O.T
N.O.T
N.O.T
N.O.T

220
220
220
220
220
220
220
220
220
220
Check
Top
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

Bot.
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

FOOTING DESIGN FOR PIPERACK WA15 : CF1


PETRORabigh UOU
1-14-2410/59
YES
2411-8320-CA-WA15-0001

IV) STRENGTH DESIGN OF FOOTING


IV-A) INPUTS
Clear cover for reinforcement
Grade of concrete
Grade of steel
Eff. depth of footing X Dir -Bot.
Eff. depth of footing Z Dir -Bot.
Eff. depth of footing X Dir -Top
Eff. depth of footing Z Dir -Top
Min. ratio of reinf. for footings

=
=
=
=
=
=
=

75
5000
60000
0.513
0.488
0.517
0.501

0.0018

mm
PSI
PSI
m
m
m
m

Checker

16-Nov-06

TPR

Ashokan

As per Cl. No:10.5.4 & 7.12.2.1 of ACI-318

25 mm @

150 mm c/c @ bot =>

Bottom Z Dir reinf. diameter(Prov)

25 mm @

150 mm c/c @ bot =>

Top X Dir reinf. diameter (Prov)

16 mm @

150 mm c/c @ Top =>

Top Z Dir reinf. diameter (Prov)

16 mm @

150 mm c/c @ Top =>

Allowable one way shear stress

2 f1c0.5

=
=

Dead
load
0.90
1.20
0.90
1.20
1.20
0.90
1.20
1.40
1.20
0.90

2
3272 mm /m
2
3272 mm /m
2
1340 mm /m
2
1340 mm /m

> 1080 Hence okay


> 1080 Hence okay
> 1080 Hence okay
> 1080 Hence okay

Cl No: 11.1.1 and Cl. No: 11.3.1

(0.75*2*5000^0.5)*0.006877
0.729 N/mm2

1
2
3
4
5
6
7
8
9
10

Originator

34.4 N/mm2
412.6 N/mm2

=
=

Bottom X Dir reinf. diameter(Prov)

Load case/node nos


115 (238-5)
109 (238-5)
115 (238-5)
109(238-5)

Date

2
1080.0 mm /m

Hence Ast min =0.0018*600*1000 =

Sl. No.

Sheet No :
Rev
O1

Fx1
-93.5
-263.2
-93.5
-263.2
0.0
0.0
0.0
0.0
0.0
0.0

Fy1
113.2
437.3
113.2
437.3
0.0
0.0
0.0
0.0
0.0
0.0

Fz1
38.2
37.2
38.2
37.2
0.0
0.0
0.0
0.0
0.0
0.0

Mx1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Mz1

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Fx2

Fy2

Fz2

9.5
24.2
9.5
24.2
0.0
0.0
0.0
0.0
0.0
0.0

-173.1
-263.1
-173.1
-263.1
0.0
0.0
0.0
0.0
0.0
0.0

99.5
101.1
99.5
101.1
0.0
0.0
0.0
0.0
0.0
0.0

Mx2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Mz2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

of

7
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

FOOTING DESIGN FOR PIPERACK WA15 : CF1


PETRORabigh UOU
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Sheet No :
Rev
O1

Originator

Checker

16-Nov-06

TPR

Ashokan

IV-B) DESIGN ALONG LONGITUDINAL DIRECTION FOR BM & ONE WAY SHEAR

Sl. No.
1
2
3
4
5
6
7
8
9
10

Tot. Fy1 Tot Mx1


Tot Mz1 Tot. Fy2 Tot. Mx2 Tot Mz2
(kN)
(kN-m)
(kN-m)
(kN)
(kN-m)
(kN-m)
140.3
-150.9
-369.4 -145.9 -393.0
37.6
473.5
-146.8 -1039.7 -227.0 -399.2
95.6
140.3
-150.9
-369.4 -145.9 -393.0
37.6
473.5
-146.8 -1039.73 -227.0 -399.2
95.6
36.2
0.0
0.00
36.2
0.0
0.0
27.1
0.0
0.0
27.1
0.0
0.0
36.2
0.0
0.00
36.2
0.0
0.0
42.2
0.0
0.00
42.2
0.0
0.0
36.2
0.0
0.00
36.2
0.0
0.0
27.1
0.0
0.00
27.1
0.0
0.0

Sl. No. Pr. At Ped. (kN/m2)


Left Ped.

1
2
3
4
5
6
7
8
9
10

27.1
77.2
27.1
77.2
4.5
3.4
4.5
5.3
4.5
3.4

Right Ped.

-27.8
-46.4
-27.8
-46.4
4.5
3.4
4.5
5.3
4.5
3.4

Shear Force (kN)


At Left Ped.

At Bot. Ped.

Just Left

Just Left

29.1
81.7
29.1
81.7
4.5
3.4
4.5
5.3
4.5
3.4

At centre

-111.2
-391.9
-111.2
-391.9
-31.7
-23.7
-31.7
-36.9
-31.7
-23.7

-116.1
-176.1
-116.1
-176.1
31.7
23.7
31.7
36.9
31.7
23.7

CG of loads
from Left ped.
(m)

181.526
-6.443
181.526
-6.443
3.500
3.500
3.500
3.500
3.500
3.500

Eccentric Add. Moment Total Moment Pressure at(kN/m2)


Right
Mz (kN-m) Mz (kN-m) Left
ity (m)
178.026
1002
670
31.1
-31.8
-9.943
2452
1507
86.1
-55.3
178.026
1002
670
31.1
-31.8
-9.943
2452
1507
86.1
-55.3
0.000
0.0
0.0
4.5
4.5
0.000
0
0
3.4
3.4
0.000
0.0
0.0
4.5
4.5
0.000
0.0
0.0
5.3
5.3
0.000
0.0
0.0
4.5
4.5
0.000
0.0
0.0
3.4
3.4

Bending Moment (kN-m)


At Left pedestal
At Right Pedestal

Just Right

29.8
50.8
29.8
50.8
-4.5
-3.4
-4.5
-5.3
-4.5
-3.4

Just Left

7.4
20.8
7.4
20.8
1.1
0.8
1.1
1.3
1.1
0.8

At centre

376.8
1060.5
376.8
1060.5
1.1
0.8
1.1
1.3
1.1
0.8

Date

Just Left

30
82
30
82
1
1
1
1
1
1

Just Right

-7.6
-13.1
-7.6
-13.1
1.1
0.8
1.1
1.3
1.1
0.8

of

7
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

FOOTING DESIGN FOR PIPERACK WA15 : CF1


PETRORabigh UOU
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Sl. No. Bot Moment Ast reqd (mm 2) Ast


(kN-m)
pro.(mm2)

1
2
3
4
5
6
7
8
9
10

376.8
1060.5
376.8
1060.5
1.1
0.8
1.1
1.3
1.1
0.8

2007.8
5804.2
2007.8
5804.2
5.9
4.5
5.9
6.9
5.9
4.5

6545
6545
6545
6545
6545
6545
6545
6545
6545
6545

Check

Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

Sheet No :
Rev
O1

Top
Moment
(kN)

-7.6
-13.1
-7.6
-13.1
0.0
0.0
0.0
0.0
0.0
0.0

Ast reqd
(mm2)

Ast
pro.(mm2)

39.7
68.1
39.7
68.1
0.0
0.0
0.0
0.0
0.0
0.0

2681
2681
2681
2681
2681
2681
2681
2681
2681
2681

Check

Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

IV-C) DESIGN ALONG TRANSVERSE DIRECTION FOR BM & ONE WAY SHEAR
Cantilever Projection of footing
0.7 m
Max. Pr due to Pr. Due to
Total
Ver. Load +
Trans.Moment
pressure
Sl. No. Long. Moment
2
(kN/m )
(kN/m 2)
(kN/m2)

Mx

1
2
3
4
5
6
7
8
9
10

31.1
86.1
31.1
86.1
4.5
3.4
4.5
5.3
4.5
3.4

101.97
102.38
101.97
102.38
0.00
0.00
0.00
0.00
0.00
0.00

133.03
188.45
133.03
188.45
4.52
3.39
4.52
5.28
4.52
3.39

BM at
face of
Ast reqd
ped. (kN- (mm2)
m)

32.59
46.17
32.59
46.17
1.11
0.83
1.11
1.29
1.11
0.83

180.50
255.98
180.50
255.98
6.12
4.59
6.12
7.14
6.12
4.59

Shear
Shear (kN) Stress
(N/mm2)

93.12
131.92
93.12
131.92
3.17
2.37
3.17
3.69
3.17
2.37

0.19
0.27
0.19
0.27
0.01
0.00
0.01
0.01
0.01
0.00

Check

Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

Date

Originator

Checker

16-Nov-06

TPR

Ashokan

Max.
shear
(kN)

116.1
391.9
116.1
391.9
31.7
23.7
31.7
36.9
31.7
23.7

Shear
stress
(N/mm2)

0.113
0.382
0.113
0.382
0.031
0.023
0.031
0.036
0.031
0.023

Check

Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

of

7
Approver

FOSTER WHEELER
SUBJECT :
PROJECT:
CONTRACT NO :
SAFETY CALC.
CALC. NO

FOOTING DESIGN FOR PIPERACK WA15 : CF1


PETRORabigh UOU
1-14-2410/59
YES
2411-8320-CA-WA15-0001

Sheet No :
Rev
O1

of

Date

Originator

Checker

16-Nov-06

TPR

Ashokan

7
Approver

III-C) TWO WAY SHEAR CHECK


Punching shear check at 0.5 d from face of pedestal
Permissible shear stress is minimum of following
1)

0.75* 4* f1c0.5

2) 0.75*[2+ 4/c] *f1c0.5


Where - Ratio of long side to short side of the column =

=
=

Hence allowable shear stress


Length of punching periphery

Sl. No. Max. col.


Load (kN)
1
140.3
2
473.5
3
140.3
4
473.5
5
36.2
6
27.1
7
36.2
8
42.2
9
36.2
10
27.1

Pun. Shear
stress (N/mm 2)

= (0.75*4*5000^0.5)*0.006877 =
= (0.75*(2+4/1.000)*5000^0.5)*0.006877 =
1.000
1.459 N/mm2
3.425 m

2
1.459 N/mm
2
2.195 N/mm

Check

0.08
0.27
0.08
0.27
0.02
0.02
0.02
0.02
0.02
0.02

Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Diagrams of 1st Load Case of Table.

Left Ped.
30

-116.1
140.3

29.1

29.8

-31.8

7.4
-7.6

31.1
-111.2
376.8

DESIGN PRESSURE DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT DIAGRAM


[BM diagram is drawn as line, instead of curve, on an approximate]

FOSTER WHEELER
SUBJECT :

PIPE RACK WA15 - DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Sheet No :

K1 OF K1

Rev

Date

Originator

Checker

O1

16-Nov-06

TPR

ASHOKAN

APPENDIX J
DESIGN OF PEDESTAL-PD1

Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK WA15 - DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :
Rev

Date

Originator

Checker

O1

16-Nov-06

TPR

ASHOKAN

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

STRENGTH DESIGN OF PEDESTAL


(Ref. ACI 318-2005)
Critical STAAD file : WA15
3
Critical Node :
Critical Load Case :
115
Fx
Fy
Fz
mx
(kN)
(kN)
(kN)
(kNm)
0
69.00
-55.00
4.00

mz
(kNm)
0

Axial Force (Fy) at Pedestal level, Pu


Width of Pedestal, b
Depth of Pedestal, h
Effective depth, d
Area of cross section of Pedestal, Ag

=
=
=
=
=

-55.0 kN
600.0 mm
600.0 mm
540.0 mm
360000 mm

(From support reactions, Section 3)

Grade beam is designed as short column with axial force(tension/compression) with bending.
Yield Strength of Steel, fy
Characteristic strength of Concrete, f'c

=
=

Height of pedestal from centre of


Grade Beam, H

420 N/mm
35 N/mm

=
=

61073 psi
5089 psi

1.825 m

a) Tension with bending


Resultant Shear Force (Fx) at Pedestal level
Mu = Fx*H
Moment co-efficient,

=
=
=

69.1 kN
126.14 kNm
0.90

Mn'
Pn

= (Mu-Pu(d-h/2))/
= Pu/

=
=

61.88 kNm
61.11 kN

K
z/d

= Mn'/(bdf'c)
= 0.5+(0.25-K/1.7)^0.5

=
=
=

0.01
0.99
0.95

z/d
Area of steel required
Ast = Mn'/(fy*d(z/d)) + (Pn/fy)

:
=

Shall not exceed 0.95

433 mm

So longitudinal bars required,


Providing reinforcement of
Area of steel required, Ast
Provide on sides the same reinforcement
Total no of bars required
Minimum reinforcement, 0.5% Ag

5 nos of
20 mm dia.
1570.8 mm2
Safe

So Ast provided

:
16 nos of
2
= 1800
mm
2
= 5027
mm

Ties reqired,
10.0 mm dia. bars
Providing
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars
48*Tie dia.
Least lateral dimension

= 320
= 480
= 600

Provide

10.0 mm dia. Bars @

150 mm c/c.

(From support reactions, Section 3)

mm
mm
mm

20
Safe

mm dia.

Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK WA15 - DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Rev

Date

Originator

Checker

O1

16-Nov-06

TPR

ASHOKAN

b) Compression with bending


Fx
(kN)
70.00

Fy
(kN)
440.00

Fz
(kN)
6.00

mx
(kNm)
0

mz
(kNm)
0

Axial Force (Fy) at Pedestal level, Pu


Width of Pedestal, b
Depth of Pedestal, h
Effective depth, d
Area of cross section of Pedestal, Ag

=
=
=
=
=

440.0
600.0
600.0
540.0
360000

kN
mm
mm
mm
mm

(From support reactions, Section 3)

Resultant Shear Force (Fx) at Pedestal level


Mu = Fx*H
Moment co-efficient, = 0.9-(0.2Pu/0.1f'cAg)

=
=
=

70.3 kN
128.22 kNm
0.83

(From support reactions, Section 3)

Mn'
Pn

= (Mu+Pu(d-h/2))/
= Pu/

=
=

174.8 kNm
530.02 kN

K
z/d

= Mn'/(bdf'c)
= 0.5+(0.25-K/1.7)^0.5

=
=
=

z/d
Area of steel required
Ast = Mn'/(fy*d(z/d)) - (Pn/fy)

0.03
0.98
0.95

Shall not exceed 0.95

451 mm

So longitudinal bars required,


Providing reinforcement of
Area of steel required, Ast
Provide on sides the same reinforcement
Total no of bars required
Minimum reinforcement, 0.5% Ag
So Ast provided

16 nos of
:
2
= 1800
mm
=
5027 mm2

Ties reqired,
10.0 mm dia. bars
Providing
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars
48*Tie dia.
Least lateral dimension

= 320
= 480
= 600

Provide

10.0 mm dia. Bars @

:
=

150 mm c/c.

5 nos of
20 mm dia.
1570.8 mm2
Safe

mm
mm
mm

20
Safe

mm dia.

Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK WA15 - DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Sheet No :

K1 OF K1

Rev

Date

Originator

Checker

O1

16-Nov-06

TPR

Ashokan

APPENDIX J
DESIGN OF PEDESTAL-PD2

Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK WA15 - DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :
Rev

Date

Originator

Checker

O1

16-Nov-06

TPR

ASHOKAN

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

STRENGTH DESIGN OF PEDESTAL


(Ref. ACI 318-2005)
Critical STAAD file : WA15
5
Critical Node :
Critical Load Case :
109
Fx
Fy
Fz
mx
(kN)
(kN)
(kN)
(kNm)
0
101.00 -263.00 24.00

mz
(kNm)
0

Axial Force (Fy) at Pedestal level, Pu


Width of Pedestal, b
Depth of Pedestal, h
Effective depth, d
Area of cross section of Pedestal, Ag

=
=
=
=
=

-263.0
600.0
600.0
537.5
360000

kN
mm
mm
mm
mm

(From support reactions, Section 3)

Grade beam is designed as short column with axial force(tension/compression) with bending.
Yield Strength of Steel, fy
Characteristic strength of Concrete, f'c

=
=

420 N/mm
35 N/mm

Height of pedestal from centre of


Grade Beam, H

3.35 m

Resultant Shear Force (Fx) at Pedestal level


Mu = Fx*H
Moment co-efficient,

=
=
=

103.8 kN
347.77 kNm
0.90

Mn'
Pn

= (Mu-Pu(d-h/2))/
= Pu/

=
=

85.17 kNm
292.22 kN

K
z/d

= Mn'/(bdf'c)
= 0.5+(0.25-K/1.7)^0.5

=
=
=

0.01
0.99
0.95

1093 mm

=
=

61073 psi
5089 psi

a) Tension with bending

z/d
Area of steel required
Ast = Mn'/(fy*d(z/d)) + (Pn/fy)
So longitudinal bars required,
Providing reinforcement of
Area of steel required, Ast
Provide on sides the same reinforcement
Total no of bars required
Minimum reinforcement, 0.5% Ag

:
=

Shall not exceed 0.95

5 nos of
25 mm dia.
2454.4 mm2
Safe

So Ast provided

16 nos of
:
2
= 1800
mm
2
= 7854
mm

Ties reqired,
10.0 mm dia. bars
Providing
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars
48*Tie dia.
Least lateral dimension

= 400
= 480
= 600

Provide

10.0 mm dia. Bars @

150 mm c/c.

(From support reactions, Section 3)

mm
mm
mm

25
Safe

mm dia.

Approver

FOSTER WHEELER
SUBJECT :

PIPE RACK WA15 - DESIGN CALCULATIONS

PROJECT:

PETRORabigh, UOU PROJECT

Sheet No :

CONTRACT NO : 1-14-2410/59
SAFETY CALC.

YES

CALC. NO

2411-8320-CA-WA15-0001

Rev

Date

Originator

Checker

O1

16-Nov-06

TPR

ASHOKAN

b) Compression with bending


Fx
(kN)
88.00

Fy
(kN)
940.00

Fz
(kN)
16.00

mx
(kNm)
0

mz
(kNm)
0

Axial Force (Fy) at Pedestal level, Pu


Width of Pedestal, b
Depth of Pedestal, h
Effective depth, d
Area of cross section of Pedestal, Ag

=
=
=
=
=

940.0
600.0
600.0
537.5
360000

kN
mm
mm
mm
mm

(From support reactions, Section 3)

Resultant Shear Force (Fx) at Pedestal level


Mu = Fx*H
Moment co-efficient, = 0.9-(0.2Pu/0.1f'cAg)

=
=
=

89.4 kN
299.63 kNm
0.75

(From support reactions, Section 3)

Mn'
Pn

= (Mu+Pu(d-h/2))/
= Pu/

=
=

427.4 kNm
1252.01 kN

K
z/d

= Mn'/(bdf'c)
= 0.5+(0.25-K/1.7)^0.5

=
=
=

z/d
Area of steel required
Ast = Mn'/(fy*d(z/d)) - (Pn/fy)

0.07
0.96
0.95

Shall not exceed 0.95

988 mm

So longitudinal bars required,


Providing reinforcement of
Area of steel required, Ast
Provide on sides the same reinforcement
Total no of bars required
Minimum reinforcement, 0.5% Ag
So Ast provided

16 nos of
:
2
= 1800
mm
=
7854 mm2

Ties reqired,
10.0 mm dia. bars
Providing
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars
48*Tie dia.
Least lateral dimension

= 400
= 480
= 600

Provide

10.0 mm dia. Bars @

:
=

150 mm c/c.

25 mm dia.
5 nos of
2454.4 mm2
Safe

mm
mm
mm

25
Safe

mm dia.

Approver

Das könnte Ihnen auch gefallen