Beruflich Dokumente
Kultur Dokumente
3
13 m
20 minutes
10%
42.9 m3/hr.
45 m3/hr.
B) Capacity selection of LDO unloading Pumps for 5x180 TPH Process Boiler Plant:
We have considered that the required LDO will be brought to the fuel oil unloading
area dedicated for Process Boiler Plant in road tankers. The unloading system will be designed
to unload LDO from two (2) nos. road tankers sequentially one after another.
The capacity for each tanker is considered
3
13 m
20 minutes
10%
42.9 m3/hr.
45 m3/hr.
ATTACHMENT-1A
ATTACHMENT-1B
LDO UNLOADING PUMP (FOR CPP) TDH CALCULATION
CONSIDERATION
1. Kinematic viscosity of LDO =7 Cst
2.LDO Storage Tank inlet nozzle elevation =
3. Flow through suction header =
10.5 M
45 m3/hr.
SUCTION
DISCHARGE
PIPE SIZE
(mm NB)
Pipe outer
Diameter
Pipe Thickness
(mm)
150
168.3
7.11
114.3
6.02
Pipe Inner
Diameter (mm)
154.08
Suction Piping
Length (m)
70
Discharge
Piping Length
(m)
Flow, Q (m3/hr)
45
Flow, Q (m3/hr)
45
Density (kg/m3)
810
Density (kg/m3)
810
Viscosity (CS)
Pipe Inner
Diameter (mm)
100
Reynolds No.
Viscosity (CS)
14756.24
Darcy Friction
Factor
Velocity
(m/sec)
Pressure Drop
(m) in st pipe
Reynolds No.
100
7
22233.93
Darcy Friction
Factor
Velocity (m/sec)
0.025
0.239351
Pressure Drop
(m) in st pipe
2.8864
Adding
10%
MARGIN ON
PRESSURE
DROP = (M)
0.26329
Adding
10%
MARGIN
ON
PRESSURE
DROP = (M)
3.1750
Pr.loss due to
strainer(MLC)
TOTAL
SUCTION
HEAD
LOSS
(ABSOLUTE)
(MLC)
1
TOTAL
DISCHARGE
HEAD
LOSS
(ABSOLUTE)
(MLC)
3.1750
0.023
102.26
0.670
1.2633
10.5
14.938 MLC
1.522
of total
developed
5% head
15.685 MLC
5%
16.47 MLC
20 MLC
NOTE: Minimum wall thickness for steel piping shall be (i) Sch. 80 for pipe sizes up to 50 NB; (ii) Sch. 40
for pipe sizes above 50 NB but below 300 NB; and (iii) Sch. STD for pipe sizes 300 NB and above.