1. Accident, Quick Review
2. Ex-NPS Contamination
3. Environment Remediation
4. Post accident Safety grade-up for
the safest
2
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
5
Copyright 2014 Tokyo Institute of Technology All Rights Reserved.
No.1 NPP
14 hrs of no water supply
No.3 NPP
95hrs
Completed
H2 explosion
Site boundary
radiation level
Sv/h
vent
1.E+05
1.E+04
1.E+03
1.E+02
1.E+01
1.E+00
1.E-01
1.E-02
3/11
2030km,
Ordered to stay in house
3/12
3/13
3/14
Water
injection
by fire
engines
3/15
3/16
3/17
Contents
1. Accident, Quick Review
2. Ex-NPS Contamination
3. Environment Remediation
4. Post accident Safety grade-up for
the safest
8
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
Land contamination-1
Cs-134 & Cs-137
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
Land contamination-2
Historical large
release accidents
Fkshm
1.E+04
Chernobyl
1.E+03
1.E+02
Fukushima
1.E+01
1.E+00
1.E-01
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
10
Fukushima vs Chernobyl
Time of
large FP
release
Fkshm
Chrnbyl
<4 days.
CV partly
functioned
>10 days by
graphite fire.
No CV
Core covered
Core opened
3 days
weather
Snow
Clear
Environ.
Radiation
monitoring
Systematically
conducted
unknown
Food
limitation
Immediately
Continued
drinking milk
for >3 days
Executive summary, assessment of radiological and health impact, 2002 update of Chernobyl, OECD/NEA. Health impact,
Chernobyl accident, Appendix, World Nuclear Assoc. Environmental consequences of the Chernobyl Accident and their remediation,
20 yrs of experience, UN Chernobyl Expert Group, Aug. 2005.
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
11
Chernobyl
1Infant thyroid (0-7 years old) : About 4,000
thyroid cancers. 15 death.
2External exposure: 3,000 people exposed
10,000 mSv.
3External exposure of people for 20 years in
the specially controlled areas.
4: External exposure of people for 20 years in
the contaminated areas.
Due to unaware of the accident for 3 days,
children stayed outside and infants
continued to drink contaminated milk.
Fukushima
A: External exposure <25mSv.
B: Internal exposure: 3mSv including infants
and children.
No health effect due to radiation.
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
12
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
13
Through root
Transfer and distribution of radioactive materials in agricultural products, in Japanese, H. Tsukuba, Institute for
Environmental Sciences Japan, April 4, 2012
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
14
15
1.0E+05
1.0E+04
Fukushima
Chernobyl
1.0E+03
1.0E+02
1.0E+01
rice ,
mBq/kg
1.0E+00
1955
1975
1995
Fukushimas
highly
contaminated
area: rice, 5401540 Bq/kg .
TsukubaFukushima:
2015
200 km
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
16
17
nuclear tests in
atmosphere
between 1945-1996
is 528:
US:215, USSR:
219, UK: 21,
France:50,
China:23.
Tsukuba,
forest,
in 1999
Aomori,
Uncultivated land,
in 2003
Cs137 : 1Bq =
3x10-13 g,
From Atomica.
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
18
Particle size of
soil
200
20200m
220m
2m
0
100
200
Absorbed Cs in soilkBq/kg
Decontamination of firming land, Ministry of Agriculture, Forestry
and Fisheries of Japan, Nov. 2011., K. Ishii, Regular Mtg of Atomic
Energy Commission, Japan, Sept. 6, 2011., Cs behavior in Soil,
Japan Society of Soil Science and Plant Nutrition, 2011.
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
19
to our health, in
Japanese, Food Safety Commission of Japan, Jan. 2012.
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
20
After 2
years ,
Cs-137 in
all
agricultural
products
came down
within the
regulatory
limit.
prepared from Radioactive materials contained in foods, in Japanese, Ministry of Agriculture, Forestry and Fisheries, Feb.2012.
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
21
Contents
1. Accident, Quick Review
2. Ex-NPS Contamination
3. Environment Remediation
4. Post accident Safety grade-up for
the safest
22
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
23
1 mSv/y
24
Children first
top priority was decontamination of school
The most of Cs: within
5cm from the land surface
Cs reduction rate:
8095
From Results of model demonstration test of decontamination,
in Japanese, Cabinet Office, Ministry of Environment and JAEA,
March 26, 2012. Totani, JAEA, October 16, 2011
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
25
Decontamination of
road & farming land
(Total area of contaminated
firming land in Fukushima) =
22 (area within Tokyo
Yamanote Line)
Farming land
26
Decontamination of forest
Could
be long
term
source
leaves
Evergreen:
Cs137
continued
stay on
leaves
litter
Decontamination:
remove leaves and litter,
prevention of surface soil
loss.
27
28
Decontamination:
current status as of October 2014
<20 mSV/y
Evacuation orders
soon be lifted.
329,000 persons
11/2011
6/2012 11/2012
20-50 mSv/y
not permitted to live.
233,000 persons
<20 mSV/y
Evacuation
orders lifted on
April 1, 2014
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
>50 mSv/y
For long years,
prohibited to
return to live.
247,000 persons
Evacuation
orders lifted on
Oct. 1, 2014
29
Contents
1. Accident, Quick Review
2. Ex-NPS Contamination
3. Environment Remediation
4. Post accident Safety grade-up for
the safest
30
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
anti-Tsunami measures
protected off-site & on-site power as well as
core cooling system to avoid core damage
System to prevent CV over-pressure in
order to prevent CV failure
System to reduce FPs releases into air
Nuclear Regulatory Authority of Japan, 2013
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
31
mitigation
Abnormal
transient
Accident
core
Shut down
systems
Severe
Accident
Reactor safety
systems
Engineered
safety
features
DBA
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
Accident
management
Off-site
emergency
response.
BDBA
Copyright 2014 Tokyo Institute of Technology All Rights Reserved.
32
33
Water proof
Raise
embankment
Protect pump
against flooding
Alternative
onsite AC
power (power
vehicle)
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
34
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
35
Water injection
system to prevent
thermal failure of
CV by molten core
Tokyo Tech and Hitachi Nuclear Engineering Course in Malaysia (4th Term)
36
M9 earthquake of 3.11
validated seismic design
Onagawa NPS, i.e., closest to the epicenter, experienced
the strongest ground shaking of any plants affected by the
M9 earthquake of 3.11and some flooding from the tsunami.
Onagawa- :130km,
Fukushima-200km,
Tokai-
240km.
(IAEA,Aug.10,2012)
37
NRA,2014
Higashidori #2
Application accepted Dec. 2013.
Kashiwazaki-Kariwa #6, #7
Application accepted Sept. 2013
Onagawa #2
Application accepted Dec. 2013.
Hamaoka #4
Application accepted Feb. 2014
Tokai #2
Application accepted May 2014.
Ohi #3, #4
Application accepted July 2013.
Takahama #3, #4
Application accepted July 2013.
Shimane #2
Application accepted Dec. 2013.
Ikata #3
Application accepted July 2013.
Genkai #3, #4
Application accepted July 2013.
Sendai #1, #2
Application accepted July 2013.
Preliminary approval: July 2014
38
39
Glossary
ATWS: anticipated transient without
scrum
BDBD: beyond design basis accident
CD: control rod
CV: containment vessel
DBA: design basis accident
DBEQ: design basis earthquake
DBT: design basis tsunami
ECCS: Emergency Core Cooling
System
FA: fuel assembly
FPs: fission products
LOCA: loss of coolant accident
LOHS: loss of heat sink accident
NPP: nuclear power plant
NPS: nuclear power station
40