G+7 Storeyed+3Basements
Plinth area:32,000 sq.m
Solar PV System

930KWp Capacity

PROJECT TEAM
User organisation
Execution Agency
Architectural and
Structural Planning
Consultants
Green Building
MEP Services
Interior Design
Construction agencies
1.Main Composite Contract
2. Solar Power
3.Automated Parking

MoEF
CPWD

CPWD

M/s DPAP
M/s Spectral Services
M/s Kothari
M/s Swadeshi Civil Infra structure
M/s Swadeshi Civil Infra structure
M/s Simplex Projects

INDIRA PARYAVARAN BHAWAN


Area

details

Plot area
Plinth Area

Project

Completion Cost

9565 sqm
31400 sqm

Rs 195 Cr
(Tentative)
4

BUILDING UTILITY DETAILS


Basements
1. Fully automated Robotic parking for 330 cars
2. All bulk MEP Services i/c
a)AC plant room 500 TR
b) Electrical Substation and Transformers
c)Fire fighting pump house
d) Sewage treatment plant (30KL/day)
e) DG set 500KVA and UPS

BUILDING UTILITY DETAILS


Superstructure
1. Office space for 600 employees i/c 3 Ministers
2. Auditorium 125 seating capacity
3. Committee rooms and conference rooms(7 Nos)
4. Roof garden ,Gymnasium and Yoga room for
recreation
5. Cafeteria, Kitchen and executive dining hall

Additional Scope beyond conventional


Roof Top Solar Power plant

Fully Automated Robotic


Car Parking

930 KW Capacity
6000 sqm

330 cars

UNIQUE FEATURES
FIRST

NET ZERO ENERGY


Multistoreyed Building
with 100% ON-SITE Power Generation

FIRST
in GOVERNMENT SECTOR
targeted for both ratings
of Green

building

5STAR GRIHA
LEED India PLATINUM
LARGEST Roof top
Solar Power system
8
in any multistoreyed Building
(930KWp)

ACHIEVEMENTS

a)40% Savings in ENERGY


b)ZERO Electricity Billing
a)55% Savings in Water
b)Zero Net Disharge

Overall Environmental
Protection

GREEN
BUILDING

COMPOSITE CONTRACT
Services Included (All inclusive)
1.Main structure and finishing works
2.Central Air Conditioning
3.Sub station
4.Lifts
5.Fire Fighting & Fire Alarm
6.IBMS
7.DG Sets
8.UPS
9.CCTV system
10.Internal EI

CHRONOLOGY OF EVENTS

Start of the Project


Completion of the Project
Completion Certificate by NDMC
Total Construction time

12

Foundation stone laying


19.11.2009
Sanction of PE(A/A& ES)
23.06.2010
Conceptual Approval by DUAC
06.01.2011
Total Planning time
< 1 Y 2M

28.01.2011
31.10.2013
31.12.2013
2Y 11M

Sl No

STATUTORY APPROVALS
Approval

Concept
stage

Completion
Stage

Forest (Tree cutting )

04.01.2011

----------

Environmental Impact 05.01.2011


Assessment

----------

Delhi Fire Services

21.12.2010

28.10.2013

AAI

24.05.2010

----------

Land Use Change

DUAC

06.01.2011

11.12.2013

ASI

19.04.2010

----------

NDMC

13.01.2011

31.01.2014
(expected)

Completion of Project : 31.10.2013

----------

Ready for Occupation: 31.12.2013

STATUTORY APPROVALS
Sl No Approval

Concept
stage

Completion
Stage

Electric Load
Sanction

------------

Oct 2013

10

Energisation of HT
panels

-----------

Nov2013

11

Substation by CEA

-----------

Oct 2013

12

Labour safety (Delhi ----------Govt)


Electric Power
----------Supply
Water Supply &
----------Sewerage Connection

Nov 2013

13
14

Completion of Project : 31.10.2013

31.12.2013
24.01.2014

Ready for Occupation: 31.12.2013

ARCHITECTURAL PLANNING AND LANDSCAPING


Effective Ventilation by orientating the building E-W and by
optimum integration with nature by separating out different blocks
with connecting corridors and a huge central court yard.

W
N

ARCHITECTURAL PLANNING AND LANDSCAPING


The Building Envelope has been designed

i) to receive 75% of natural daylight to reduce energy


consumption.
ii) Access Friendly to differently-abled persons.
Out of total 79 trees
existing on the site ,
only 19 were cut, and
11 transplanted

ARCHITECTURAL PLANNING AND LANDSCAPING


More than 50% area outside
the building is soft
with plantation and grassing.
circulation roads and pathways
soft with grass paver blocks
to enable ground water recharge

E&M Services
REGULAR
1.Central Air Conditioning(HVAC)
2.Lifts
3.Fire Fighting & Fire Alarm
4.IBMS
5.DG Sets
6.UPS
7.CCTV system
8.Audio Visual System
9.Internal EI
SPECIAL
1.Fully Automated robotic Parking for 330 cars

ENERGY SCENARIO
(Average Annual)
Power Requirement (Base
Case)

22.0

lakh KWh

Power Requirement(Design
Case)

13.6

lakh KWh

Percentage savings

40% (approx)
14.3 lakh KWh

Targeted Solar Power


Generation
Net Power generation

0.7

lakh KWh

(Surplus)

22

ENERGY EFFICIENCY
ECBC 2007

ACTUAL

Lighting Power 11.8 W/sqm


Density (LPD)

5 W/sqm

HVAC load

20 sqm/Tr

40 sqm/Tr

Total

100W/sqm

40 W/sqm
23

OPTIMIZED BUILDING
ENVELOPE

1)PROPER ORIENTATION
2)INSULATED WALLS AND
ROOF
3)GLASS TRANMITTING
LIGHT BUT NOT HEAT

OPTIMIZED DAY
LIGHTING

1)ENERGY EFFICIENT
LED LIGHTS

2)SENSORS

CENTRAL PUBLIC WORKS DEPARTMENT

OPTIMIZED ENERGY
SYSTEMS I/C HVAC

1)CHILLED BEAM SYSTEM


OF AIR CONDITIONING
WITH <50%
CONVENTIONAL
ENERGY CONSUMPTION

2)GEOTHERMAL HEAT
EXCHANGE SYSTEM
3)REGENRATIVE LIFTS
4)ENERGY EFFICIENT
EQUIPMENT

CENTRAL PUBLIC WORKS DEPARTMENT

CHILLED BEAM WORK AT SITE


In the IPB project Chilled Beams are being installed in
second floor to sixth floor.
Chilled Beam Water in Temperature is 16 C and
water out temperature is 20 C.
Room temperature maintained is 26 1 C.
Chilled Beams with Drain pan are used to drain out
water droplets due to condensation during monsoon.
160 TR of air conditioning load of the Building is met
through Chilled Beam system.

CHILLED BEAMS INDUCTION UNITS OVERVIEW

Primary air ventilation


from Dedicated Outdoor
Air Source
Chilled Water
Hot Water

Total room mixing


is achieved
through
Convection
currents
within the space

A CHILLED BEAM INSTALLED AT SITE


Chilled Water Return Pipe ( dia.)
Chilled Beam

Chilled Water Supply Pipe ( dia.)

28

Drain Pipe ( dia.)

Flexible Duct (6 Inch dia.)

Suppl
y Air
Induc
ed Air

A GEOTHERMAL HEAT EXCHANGE WORK AT SITE

There are 180 vertical bores at the Depth of 80 meter all along the
Building Premises. Minimum 3 meter distance is maintained between
any two bores.
Each bore is lowered with HDPE pipe U-loop (32mm outer Dia.) and
grouted with Bentonite Slurry.
Each U-Loop is connected to MS Header Pipe(100mm Dia.)which
finally joins the Condenser Water Line in Plant Room.
Condenser hot water is sent at 100F (37.8 C) & back at 900 F (32.2
C).

One U-Loop has 0.9 TR Heat Rejection capacity, so all together 160
TR of Heat rejection is obtained without using a cooling tower.

GEO THERMAL HEAT EXCHANGE


VERTICAL CLOSED LOOPS

NET ZERO ENERGY


A MAJOR CHALLENGE
Renewable Energy to be Generated

: 14 lakh KWh
Per Year
Area required for locating Solar panels : 6000 m2
Area available over terraces
: 2200 m2
Creation of this additional space(6000 minus 2200 m2)
in a multistoreyed building with restricted plot & roof areas
where no structure including surface parking is provided around
the building, was a big Constraint
,32

ACTUAL SOLAR POWER


GENERATION
(as on 25.01.2014)

Power Evacuation to grid

started on 19.11.2013

Power generation achieved

3000 KWh(per day)

Total generation so far

2.0 lakh KWh


33

Highest efficiency (20%) Solar PV panels


Grid Interactive System

SOLAR PV SYSTEM
TOTAL AREA
TOTAL AREA OF PANELS
ANNUAL ENERGY Generation

930KWp CAPACITY
6000 M2
4650 M2
14.3 lakh units

34

36

37

UTILISATION OF FLY ASH

Cement used is PPC


(Portland Pozzolona
Cement)(29% Fly Ash)

Flyash (Reuse) :

In all RCC, PCC, Plaster,


Masonry Work.
FALG Bricks and AAC
blocks used instead of
clay bricks.

AAC BLOCKS

INDIRA PARYAVARAN BHAWAN,NEW D

FALG BRICKS

FLYASH LIME GYPSUM BRICKS

FLYASH

40%

LOW ENERGY MATERIALS


REGIONALLY AVAILABLE
Use of material available within a radius of 800 km
.
Dholpur stone, Kota stone, North Indian Granites, AAC Blocks, FaLG
bricks etc.

Granite
(Lakha Red)

Dholpur Stone

LOW ENERGY MATERIALS


RECYCLED / RECYCLABLE
Use of material available having Recycled content
FaLG Bricks, Terrazo Tiles, Vitrified Tiles, Calcium Silicate Tiles, crazy
marble etc.

Calcium Silicate
Tiles

Terrazo Tiles

Crazy Marble

LOW ENERGY MATERIALS


RAPIDLY RENEWABLE
BAMBOO JUTE COMPOSITE DOORS

Polymer
Thermosetti
ng Resin
(Phenol
Formal
Dehyde)

BAMBOO
MAT

Woven sheet
using
Bam0.boo
slivers 0.6 to
0.8mm thick
& 5mm wide

JUTE / COIR
MAT

Jute / Coir
Thread
woven into
coarse cloth

Satisfies all the quality parameters


that a normal flush door does

Use of Eco friendly Materials


Fly Ash Brick
Aerated Autoclaved Cement (AAC) Block
Portland Puzzolona Cement
Terrazzo tile flooring with salvaged stone pieces
Grass Paver Blocks Pavements
Local Stone with Marble Strips
Calcium Silicate Tiles
Bamboo Jute Composite for Frames & Doors
Low Volatile Organic Compound Paints

45

55% Reduction in overall use of water

Low discharge water fixtures

Low demand plants in landscaping

Use of Geothermal Cooling

Recycling of waste water for ZERO


Discharge

Rain water harvesting

Recharge wells, supply to NDMC


Tankers

AUTOMATIC CAR PARKING SYSTEM


INTRODUCTION

All the three(3) basements will be used for


Automatic
Car Parking system.

Total Capacity : 330 nos. of cars.


The following type of system is adopted in this
project:1. Shuttle Dolly System( 2nd & 3rd Basement).
2. Puzzle Parking System(1st Basement).

SALIENT FEATURE

The followings are the stringent targets of the


project:1. Maximum waiting time : 180 sec(i.e. 3minutes)
2. Total evacuation time : 40 minutes.
(Emergency)

LIFT ENTRY LOBBY

LIFT WELL

SHUTTLE BAY

SHUTTLE BAY

55