Statement showing the details of the road proposed for NABARD RIDF XIX Additional
Name of District: Dindigul
Sl.
No.
Name of the
Block
Name of road
Vedasandur
Vedasandur
257964622.xls
Existing
condition of
the road
Name and
1.Earthen / designation of the
Length
Gravel
inspecting officer
(in KM)
2.WBM,
along with date of
3.Worn out
inspection *
BT (Indicate
1,2 or 3)
1.000
1.000
Whether
Whether
detailed
Photographs
Whether Block
Name and
estimates have
covering
maps showing
designation of the
been prepared every 200m Village Panchayats
Super Checking
and enclosed
stretch of
and the roads
officer along with
as per actual
road taken
proposed are
date of Super
site conditions?
and
enclosed?
Check
(Yes or
enclosed?
(Yes or No)
No)
(Yes or No)
10
R.PRAGADEESWARA
N, ASSISTANT
ENGINEER (09-072014)
Yes
Yes
Yes
R.PRAGADEESWARA
N, ASSISTANT
ENGINEER (09-072014)
Yes
Yes
Yes
RURAL ROAD PROJECT - FINANCIAL DETAILS - NABARD RIDF XIX ADDITIONAL PROPOSAL
Annexure I
(Rs. lakhs)
Name of work
Reach
Lenth in
KM / MT
Updated
cost in
Lakhs
Vedasandur
Kallukottai to
Rajapuram..Km: 0/0-1/0.
0/0 - 1/000
1.000
28.80
0.00
10
Year I
Year II
Year III
TOTAL
11
12
13
14
28.800 11.52
11.52
5.76
Further
Cost of
Cost / KM. Cost/Km/
G.O . TN retaining
(Excl. CD MT (incl. Remarks.
contributi wall & CD
works) CD works)
on
works
15
28.80
16
6.880
17
21.92
18
19
CD Details
(Type)
20
21
22
28.80
RCC Slab
culvert 2m
span - 1 No
, Retaining
wall - 160m
length
RCC Slab
culvert 2m
span - 2
Nos,RCC
Slab culvert
3m span - 1
No.
Dindigul
In
Expendi Balance
Eligible
ture
Cost
cost
ERR%
Name of the
Block
BCR
Sl.
No.
District
RIDF LOAN
Vedasandur
Total
257964622.xls
0/0 - 1/000
1.000
30.00
2.000
58.800
0.00
0.000 0.000
30.000 12.00
###
###
12.00
6.00
30.00
###
###
###
0.000
7.470
22.53
30.00
14.350
44.450
58.800
0.000
ANNEXURE - II
EXISTING
S.
No.
District
TECHNICAL DETAILS
Name of work
Category
PROPOSED
INCREASE
Carria Pavem
Pave No. of
Road
Road Carriag Paveme
Road Carriag
ge
ent
ment
CD
way
way
e way
nt
STAT way e way
way thickn STATUS
thickn works.
width
width width thicknes US width width
width
ess
ess
(m)
(m)
(m)
s (mm)
(m)
(m)
(m)
(mm)
(mm)
6
10
11
12
13
14
15
16
17
6.50
3.00
Earthern
9.00
3.75
320
BT
2.50
0.75
320
6.50
3.00
Earthern
9.00
3.75
320
BT
2.50
0.75
320
257964622.xls
Panchayat
Union Road
ANNEXURE -- III
RURAL ROAD PROJECTS - COST DETAILS
Base
Earth
WBM
Cour
work
Gr II
se
Name of work
Length
Grave No
l
of
Cost
solin CD of CD
g for wor works
berm ks
No
of
Prot
ectiv
e
work
s
Cost of
Retaining wall
and Protective
works
Sl
District Block
No
(Rs. in Lakh)
WBM
Gr III
BT
Other
Total
s
10
11
12
13
14
15
16
17
Kallukottai to Rajapuram..Km:
0/0-1/0.
1.000
0.76
0.97
3.43
4.12
9.23
0.41
1.00
1.89
2.00
4.99
3.00
28.80
1.000
0.76
0.98
3.53
4.23
9.38
0.42
3.00
7.47
0.00
0.00
3.23
30.00
2.00
1.52
1.95
6.96
8.35
18.61
0.83 4.00
9.36
2.00
4.99
6.23
###
Total
257964622.xls
257964622.xls
S.
No
1
District
ANNEXURE IV
Name of
Block
Length
No.of
Populatio
No. of
in KM / Villages
n
marketin
MT
benefitted Benefited g centres
No. of
No. of
Hospital
Pilgrim
NonTourist
s/
centres
rec.emp
spots
schools
connecte
Generation
connected
etc.,
d
10
11
12
Kallukottai to Rajapuram..Km:
0/0-1/0.
1.000
1600
21300
1.000
1540
32000
2.00
4.00
3140.00
2.00
0.00
0.00
5.00
53300.00
Total
257964622.xls
3
4
Total
257964622.xls
5
6
7
8
9
10
11
12
13
#REF! ###
14
15
16
17
18
19
20
21
22
1
Kallukottai to
Rajapuram..Km: 0/0-1/0.
1.000
28.80
0.29
2
1600
515
50470 ###
###
15141 ### 2120 5.20 6.27 0.02 2.56
5.4
14.25
2
Valluvar nagar to Maalai
kannimar kovil..Km: 0/0-1/0.
1.000
30.00
0.30
2
1540
640
62720 ###
###
18816 ### 2634 5.20 6.27 0.02 2.56
5.4
14.25
ERR(%)
A. Basic data
PC ratio at 15%
discount
Per Ha averagemarket
surplus(30% of
Gross Income)
Incremental non
farm income per
village
Passengere car unit per day
Reference -Price
for convering-PCU
in value
Agricultural
Benefits
Savings wastage of
market surplus 2%
of marketted
surplus
Non farm income
Savings in vehicle
operating cost
perday PCU*Road
length*Price*365da
Total benefits
of
ys
the projects(Rs.in
lakhs)
Population
benefited
Total Investment
(Rs.in lakhs)
Operation&
Maintenance
Cost/KM at 1% of
Project
No. of villages
connected
Per ha average
-net income
Per ha average
-cost of cultivation
Name of Block
per Ha average
Gross Income
District
Name of work
Lengt
h of
road
cover
ed in
KM /
MT
Crop cultivation
area
covered (Ha)
Sl. No.
RIDF IV - NABARD
B- Benefits due to project
23
24
S.
No
.
Name of
District
Name of Block
ANNEXURE -V
TRAFFIC DETAILS - 2013-14
Name of Project
Cycl
e
Han Horse
Lengt Cycle Rick
d
driven Bulloc
h in (Nos. sha Cart vehicl k cart
KM
)
w (Nos
e
(No.)
(Nos .)
(Nos.)
.)
Passeng
Distanc
Truck
Motor er cars/ Agricult
e
Trailor
cycle/
pickup
ural
Truck/
reductio
AgriculScoote
van/
Tractor
Bus
n incase
tural
r
Auto
LCV
(No.)
of
Tractor/
(Nos.) rickshaw (No.)
bridge
Trailor
(No.)
(in Km.)
10
11
12
13
14
15
16
1.000
210
50
271
105
160
10
180
1.000
340
64
310
129
205
15
210