Sie sind auf Seite 1von 8

Abstract

Statement showing the details of the road proposed for NABARD RIDF XIX Additional
Name of District: Dindigul

Sl.
No.

Name of the
Block

Name of road

Vedasandur

Kallukottai to Rajapuram..Km: 0/01/0.

Vedasandur

Valluvar nagar to Maalai kannimar


kovil..Km: 0/0-1/0.

257964622.xls

Existing
condition of
the road
Name and
1.Earthen / designation of the
Length
Gravel
inspecting officer
(in KM)
2.WBM,
along with date of
3.Worn out
inspection *
BT (Indicate
1,2 or 3)

1.000

1.000

Whether
Whether
detailed
Photographs
Whether Block
Name and
estimates have
covering
maps showing
designation of the
been prepared every 200m Village Panchayats
Super Checking
and enclosed
stretch of
and the roads
officer along with
as per actual
road taken
proposed are
date of Super
site conditions?
and
enclosed?
Check
(Yes or
enclosed?
(Yes or No)
No)
(Yes or No)

10

R.PRAGADEESWARA
N, ASSISTANT
ENGINEER (09-072014)

Yes

Yes

Yes

R.PRAGADEESWARA
N, ASSISTANT
ENGINEER (09-072014)

Yes

Yes

Yes

RURAL ROAD PROJECT - FINANCIAL DETAILS - NABARD RIDF XIX ADDITIONAL PROPOSAL
Annexure I
(Rs. lakhs)

Name of work

Reach

Lenth in
KM / MT

Updated
cost in
Lakhs

Vedasandur

Kallukottai to
Rajapuram..Km: 0/0-1/0.

0/0 - 1/000

1.000

28.80

0.00

10

Year I

Year II

Year III

TOTAL

11

12

13

14

28.800 11.52

11.52

5.76

Further
Cost of
Cost / KM. Cost/Km/
G.O . TN retaining
(Excl. CD MT (incl. Remarks.
contributi wall & CD
works) CD works)
on
works
15

28.80

16

6.880

17

21.92

18

19

CD Details
(Type)

20

21

22

28.80

RCC Slab
culvert 2m
span - 1 No
, Retaining
wall - 160m
length

RCC Slab
culvert 2m
span - 2
Nos,RCC
Slab culvert
3m span - 1
No.

Dindigul

In
Expendi Balance
Eligible
ture
Cost
cost

ERR%

Name of the
Block

BCR

Sl.
No.

District

RIDF LOAN

Vedasandur

Valluvar nagar to Maalai


kannimar kovil..Km: 0/0-1/0.

Total

257964622.xls

0/0 - 1/000

1.000

30.00

2.000

58.800

0.00

0.000 0.000

30.000 12.00

###

###

12.00

6.00

30.00

###

###

###

0.000

7.470

22.53

30.00

14.350

44.450

58.800

0.000 0.000 0.000

0.000

ANNEXURE - II

EXISTING

Name of the Block

S.
No.

District

TECHNICAL DETAILS

Name of work

Category

PROPOSED

INCREASE

Carria Pavem
Pave No. of
Road
Road Carriag Paveme
Road Carriag
ge
ent
ment
CD
way
way
e way
nt
STAT way e way
way thickn STATUS
thickn works.
width
width width thicknes US width width
width
ess
ess
(m)
(m)
(m)
s (mm)
(m)
(m)
(m)
(mm)
(mm)
6

10

11

12

13

14

15

16

17

Kallukottai to Rajapuram..Km: Panchayat


Union Road
0/0-1/0.

6.50

3.00

Earthern

9.00

3.75

320

BT

2.50

0.75

320

Valluvar nagar to Maalai


kannimar kovil..Km: 0/0-1/0.

6.50

3.00

Earthern

9.00

3.75

320

BT

2.50

0.75

320

257964622.xls

Panchayat
Union Road

ANNEXURE -- III
RURAL ROAD PROJECTS - COST DETAILS

Base
Earth
WBM
Cour
work
Gr II
se

Name of work

Length

Grave No
l
of
Cost
solin CD of CD
g for wor works
berm ks

No
of
Prot
ectiv
e
work
s

Cost of
Retaining wall
and Protective
works

Sl
District Block
No

(Rs. in Lakh)

WBM
Gr III

BT

Other
Total
s

10

11

12

13

14

15

16

17

Kallukottai to Rajapuram..Km:
0/0-1/0.

1.000

0.76

0.97

3.43

4.12

9.23

0.41

1.00

1.89

2.00

4.99

3.00

28.80

Valluvar nagar to Maalai


kannimar kovil..Km: 0/0-1/0.

1.000

0.76

0.98

3.53

4.23

9.38

0.42

3.00

7.47

0.00

0.00

3.23

30.00

2.00

1.52

1.95

6.96

8.35

18.61

0.83 4.00

9.36

2.00

4.99

6.23

###

Total

257964622.xls

257964622.xls

RIDF IV - NABARD PROPOSALS

S.
No
1

District

ANNEXURE IV

Name of
Block

Name of the work

Length
No.of
Populatio
No. of
in KM / Villages
n
marketin
MT
benefitted Benefited g centres

No. of
No. of
Hospital
Pilgrim
NonTourist
s/
centres
rec.emp
spots
schools
connecte
Generation
connected
etc.,
d

10

11

12

Kallukottai to Rajapuram..Km:
0/0-1/0.

1.000

1600

21300

Valluvar nagar to Maalai


kannimar kovil..Km: 0/0-1/0.

1.000

1540

32000

2.00

4.00

3140.00

2.00

0.00

0.00

5.00

53300.00

Total

257964622.xls

3
4

Total

257964622.xls
5
6
7
8
9
10
11
12
13

#REF! ###

14
15
16
17
18
19
20
21
22

1
Kallukottai to
Rajapuram..Km: 0/0-1/0.

1.000
28.80

0.29
2
1600
515

50470 ###
###
15141 ### 2120 5.20 6.27 0.02 2.56
5.4

14.25

2
Valluvar nagar to Maalai
kannimar kovil..Km: 0/0-1/0.

1.000
30.00

0.30
2
1540
640

62720 ###
###
18816 ### 2634 5.20 6.27 0.02 2.56
5.4

14.25

ERR(%)

A. Basic data
PC ratio at 15%
discount

Per Ha averagemarket
surplus(30% of
Gross Income)
Incremental non
farm income per
village
Passengere car unit per day
Reference -Price
for convering-PCU
in value
Agricultural
Benefits
Savings wastage of
market surplus 2%
of marketted
surplus
Non farm income
Savings in vehicle
operating cost
perday PCU*Road
length*Price*365da
Total benefits
of
ys
the projects(Rs.in
lakhs)

Population
benefited

Total Investment
(Rs.in lakhs)
Operation&
Maintenance
Cost/KM at 1% of
Project
No. of villages
connected

Per ha average
-net income

Per ha average
-cost of cultivation

Name of Block

per Ha average
Gross Income

District

Name of work
Lengt
h of
road
cover
ed in
KM /
MT
Crop cultivation
area
covered (Ha)

Sl. No.

ANNEXURE - IV -A (INFRASTRUCTURE DETAILS)

RIDF IV - NABARD
B- Benefits due to project

23
24

S.
No
.

Name of
District

Name of Block

ANNEXURE -V
TRAFFIC DETAILS - 2013-14

Name of Project

Cycl
e
Han Horse
Lengt Cycle Rick
d
driven Bulloc
h in (Nos. sha Cart vehicl k cart
KM
)
w (Nos
e
(No.)
(Nos .)
(Nos.)
.)

Passeng
Distanc
Truck
Motor er cars/ Agricult
e
Trailor
cycle/
pickup
ural
Truck/
reductio
AgriculScoote
van/
Tractor
Bus
n incase
tural
r
Auto
LCV
(No.)
of
Tractor/
(Nos.) rickshaw (No.)
bridge
Trailor
(No.)
(in Km.)

10

11

12

13

14

15

16

Kallukottai to Rajapuram..Km: 0/01/0.

1.000

210

50

271

105

160

10

180

Valluvar nagar to Maalai kannimar


kovil..Km: 0/0-1/0.

1.000

340

64

310

129

205

15

210

257964622.xls

Das könnte Ihnen auch gefallen