Beruflich Dokumente
Kultur Dokumente
Unit = sqm
Taking output = 500 sqm (10 cum)
a)
1.08
Labour
Mate
Mazdoor (Semi-Skilled)
178.00
day
192.24
155.00
day
3255.00
173.00
day
1038.00
Machinery
4485.24
1526.05
hour
6104.20
160.00
hour
640.00
371.00
hour
742.00
7486.20
Km : 0 / 0 - 1 / 0
0.73
745.28 cum
30514.00
10061.28
Km : 1 / 0 - 2 / 0
Km : 2 / 0 - 2 / 1
754.38 10184.13
1.00
Labour
4485.24
4485.24 4485.24
4485.24
4485.24
4485.24
1.00
Machinery
7486.20
7486.20 7486.20
7486.20
7486.20
7486.20
6568.34
6576.02
6583.70
59115.06
59184.17
59253.27
118.23
118.37
118.51
Page 1 of 167
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid
to the specified levels, grade and cross fall using Type A, Type B and Type C
as per Technical Specification Clause 510
Unit = sqm
Taking output = 1100 sqm
a)
Labour
1.15
Mate
178.00
day
204.70
1.00
Bitumen Sprayer
107.00
day
107.00
155.00
day
3410.00
173.00
day
1038.00
Mazdoor (Semi-Skilled)
Machinery
4759.70
2.20
160.00
hour
352.00
2.20
371.00
hour
816.20
1168.20
Km : 0 / 0 - 1 / 0
1.078
9.90
1.00
Labour
1.00
Machinery
458.95 cum
45060.40
Km : 2 / 0 - 2 / 1
463.50
4588.65
468.05
4633.70
4759.70
4759.70 4759.70
4759.70
4759.70
4759.70
1168.20
1168.20 1168.20
1168.20
1168.20
1168.20
6941.49
6947.12
6952.75
62473.40
62524.07
62574.75
56.79
56.84
56.89
Page 2 of 167
4543.61
Km : 1 / 0 - 2 / 0
5.1
508.2
a)
0.80
Labour
Mate
Mazdoor (Skilled)
266.00
day
212.80
231.00
day
4158.00
258.00
day
516.00
Machinery
4886.80
6.00
188.00
hour
1128.00
3.60
371.00
hour
1335.60
2463.60
c)
1.94
Material
Bitumen
Emulsion
21.50 kg per 10 sqm
Km : 0 / 0 - 1 / 0
@
43700.00
745.28 cum
84778.00
18110.30
1.00
Labour
4886.80
4886.80
1.00
Machinery
2463.60
2463.60
13779.84
###
Page 3 of 167
137.80
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid
to the specified levels, grade and cross fall using Type C as per Technical
Specification Clause 510
Unit = sqm
Taking output = 2700 sqm (24.3 cum)
a)
0.80
Labour
Mate
Mazdoor (Skilled)
178.00
day
142.40
155.00
day
2790.00
173.00
day
346.00
Machinery
3278.40
6.00
188.00
hour
1128.00
3.60
371.00
hour
1335.60
2463.60
c)
2.70
Material
Km : 0 / 0 - 1 / 0
Bitumen Emulsion @ 10 kg
43700.00
per 10 sqm
458.95 cum
###
11152.49
1.00
Labour
3278.40
3278.40
1.00
Machinery
2463.60
2463.60
16860.56
###
Page 4 of 167
56.20
DINDIGUL DISTRICT
NABARD - XX
Estimate Amount :-
ABSTRACT ESTIMATE
Name of Work: Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.
Estimate Amount: Rs. 28.80 Lakhs
Sl.
No
QTY
DESCRIPTION OF WORK
RATE
UNIT AMOUNT
1800.00
2.15
Sqm
3870
1620.00
44.60
CUM
72252
175.62
CUM
137708
1248.36
CUM
343061
784.12
KM: 0/0-1/0
274.81
KM: 0/0-1/0
Sl.
No
QTY
RATE
UNIT AMOUNT
DESCRIPTION OF WORK
274.81
KM: 0/0-1/0
3664.13
1497.47
CUM
411519
37.78
Sqm
138431
Sl.
No
QTY
DESCRIPTION OF WORK
RATE
UNIT AMOUNT
KM: 0/0-1/0
214.22
Sqm
784941
3664.13
9
170.00
Nos
680
10
328.00
Nos
328
189038
Nos
189038
10
186999
Nos
186999
10
311666
Nos
311666
14
L.S
L.S
258049
11
L.S
L.S
3000
12
L.S
L.S
500
13
L.S
L.S
28385
14
L.S
L.S
6000
15
L.S
Contigencies
L.S
3572
TOTAL
2880000
Sl.
No
QTY
DESCRIPTION OF WORK
RATE
UNIT AMOUNT
DETAILED ESTIMATE
Name of Work: Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.
Name of Block : Vedasandur
Scheme
: NABARD XX
Year
: 2014-15
A.S.Ref :
Description of work
Nos.
Quantity
Clearing scrub jungle by uprooting including all cutting charges and depositing of the
1 products and clearing as directed by the departmental officers including all incidental
charges etc. complete.Sl.No. 17(3)
K.M 0/0 - 1/0
1000.00
3000.00
1.50
Total Quantity
3000.00
1200.00
Net Quantity
1800.00
Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of
2m in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth
2 and earth mixed with small size boulders SS 20 A including laying and spreading in layers
of 250mm loose thick each, sectioning, watering and compacting etc.., complete as per
MORT & H 301-305
K.M 0/0 - 1/0
1000.00
0.90
0.90
1620.00
1620.00
Supply & Laying of U S Gravel including cost and conveyance of gravel from approved
sources to work site including labour for spreading, watering and compacting by power
3 roller to achieve the required proctor density at 100% compaction at optimum moisture
content and hire and fuel charges for power roller, water sprinkler and all other incidental
charges such as traffic barricading and providing danger lights etc.., complete
KM: 0/0-1/0 (Side berms)
1000.00
1.20
0.10
240.00
-1
20.00
1.20
0.10
-4.80
-1
2.90
1.20
0.10
-0.70
Sub Base
1000.00
3.75
0.15
562.50
-1
20.00
3.75
0.15
-11.25
-1
2.90
3.75
0.15
-1.63
784.12
Sl.
No.
Description of work
Nos.
Quantity
Providing 75mm consolidated thickness WBM for Bottom LAYER using 1 cum of Grade
III metal of size 90 -22.4MM IRCsize HBG metal (1M3 Grade III HBG = 0.025Cum of
63mm + 0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of
11.2mm) with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials
from approved quarries to roadside and stacking of materials to departmental gauge for
premeasurements including labour for laying, spreading new metal, hand packing to
4
camber, watering with all leads for good water even if the season is worst drought
condition forming edge bunds and consolidation by 8 to 10 tonne power roller and
finishing to the total thickness with lines grades and cross sections as specified in the
departmental specifications including hire charges for all T&P fuel cost and other running
charges for power roller and other tools and plants employed and all other incidental
charges etc., complete.
K.M 0/0 - 1/0
1000.00
3.75
0.075
281.25
-1
20.00
3.75
0.075
-5.63
-1
2.90
3.75
0.075
-0.82
274.81
Providing 75mm consolidated thickness WBM for Top LAYER using 1 cum of Grade III
metal of size 63 -11.2MM IRCsize HBG metal (1M3 Grade II HBG = 0.025Cum of 63mm +
0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of 11.2mm)
with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials from
approved quarries to roadside and stacking of materials to departmental gauge for
premeasurements including labour for laying, spreading new metal, hand packing to
5
camber, watering with all leads for good water even if the season is worst drought
condition forming edge bunds and consolidation by 8 to 10 tonne power roller and
finishing to the total thickness with lines grades and cross sections as specified in the
departmental specifications including hire charges for all T&P fuel cost and other running
charges for power roller and other tools and plants employed and all other incidental
charges etc., complete.
K.M 0/0 - 1/0
1000.00
3.75
0.075
281.25
-1
20.00
3.75
0.075
-5.63
-1
2.90
3.75
0.075
-0.82
274.81
Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of
bituminous emulsion which will be supplied departmentally at section stores cost of which
will be recovered herewith including conveyance of bitumen emulsion to actual work spot
handling charges for brushing cleaning and including labour charges for preparing the
6 surface for laying to actual work spot handling charges for brushing cleaning and to tack
coat and labour for applying the required quantity of bitumen emulsion including the hire
charges and fuel charges for tools and plants employed for the work including all other
incidental charges such as barricading and providing danger lights flags etc. complete as
per standard specification no 503 MOST.
K.M 0/0 - 1/0
1000.00
3.75
3750.00
Sl.
No.
Description of work
Nos.
Quantity
-1
20.00
3.75
-75.00
-1
2.90
3.75
-10.88
3664.13
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness
using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine
crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm
of premix carpet and 0.09cum 0.09cum of 6.70mm IRC size machine broken HBG metal
with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from
approved quarry including the cost of bitumen which will be supplied departmentally and
cost will be recovered at the rates specified in the special condition appended herewith
and including conveyance bitumen to workspot handling charges for the same at both
7
ends including labour charges for heating the bitumen to required temperature and mixing
the required quantity of metal and bitumen using mini hot mix plant conveying the mix by
wheel borrow including labour charges for spreading the mix to grades,lines and profile
and consolidation with power roller rolling etc.,including hire,fuelcharges and running
charges for mini hot mix plant,power roller and all other tools and plants employed &all
incidental charges such as barricading, providing danger lights etc.,complete complying
with standard specification(Payment shall be made for the finished item of work after
compaction)No.509&513 of MOST.
K.M 0/0 - 1/0
1000.00
3.75
3750.00
-1
20.00
3.75
-75.00
-1
2.90
3.75
-10.88
3664.13
Sub
estimate
Sub
estimate
4Nos
1No
LS
LS
LS
LS
ABSTRACT ESTIMATE
Name of Work: Construction of Retaining wall at ch 900m - 1000m in Kallukottai to Rajapuram
road.
Sl.No.
QTY
DESCRIPTION OF WORK
RATE
UNIT
92.00
83.70
Cum
7700
15.75
2381.98
Cum
37516
114.69
2246.68
Sqm
257672
195.05
Cum
8777
45.00
AMOUNT
311666
DETAILED ESTIMATE
Name of Work: Construction of Retaining wall at ch 900m - 1000m in Kallukottai to Rajapuram road.
Sl.No.
Description of work
Nos.
Quantity
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of
2m in hard gravelly soil as per SS 20B for foundation
1
Retaining wall
1 x 1
100.00
1.15
0.80
92.00
92.00
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of
all materials to site and all labour charges for mixing laying and curing etc.,
completed for foundation.
Retaining wall
1 x 1
100.00
1.05
0.15
15.75
15.75
Random Rubble masonry in CM 1:5mix using rough stones and bond stones with
simultaneous pointing including cost and conveyance of all matials to site and all
labour charges etc., complete.
3
1 x 1
100.00
0.93
0.23
21.39
1 x 1
100.00
0.84
0.45
37.80
1 x 1
100.00
(0.66+0.45)/2
1.00
55.50
114.69
Total Quantity
Plastering 1:5 mix 20mm thickness including cost & conveyance of all materials to
site and all labour charges etc., complete.
4
1 x 1
100.00
0.45
45.00
45.00
ABSTRACT ESTIMATE
Name of Work: Construction of Retaining wall at ch 550m - 610m in Kallukottai to Rajapuram road.
Sl.No.
QTY
DESCRIPTION OF WORK
RATE
UNIT
55.20
83.70
Cum
4620
9.45
2381.98
Cum
22510
68.81
2246.68
Sqm
154603
27.00
195.05
Cum
5266
TOTAL
AMOUNT
186999
DETAILED ESTIMATE
Name of Work: Construction of Retaining wall at ch 550m - 610m in Kallukottai to Rajapuram road.
Sl.No.
Description of work
Nos.
Quantity
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of
2m in hard gravelly soil as per SS 20B for foundation
1
Retaining wall
1 x 1
60.00
1.15
0.80
55.20
55.20
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of
all materials to site and all labour charges for mixing laying and curing etc.,
completed for foundation.
Retaining wall
1 x 1
60.00
1.05
0.15
9.45
9.45
Random Rubble masonry in CM 1:5mix using rough stones and bond stones with
simultaneous pointing including cost and conveyance of all matials to site and all
labour charges etc., complete.
3
1 x 1
60.00
0.93
0.23
12.83
1 x 1
60.00
0.84
0.45
22.68
1 x 1
60.00
(0.66+0.45)/2
1.00
33.30
68.81
Total Quantity
Plastering 1:5 mix 20mm thickness including cost & conveyance of all materials to
site and all labour charges etc., complete.
4
1 x 1
60.00
0.45
27.00
27.00
Description of
Work
No.
Contents
Amount
25.74
11.88
37.62
83.70
3149
7.02
3.24
10.26
2381.98
24439
2
4
7.80
2.00
1.50
1.35
1.10
1.10
m3 @
Rs.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal
2 including cost and conveyance of all matials to site and
all labour charges etc., complete
37.62
body wall
wing wall
Total
2
4
7.80
2.00
1.50
1.35
0.30
0.30
m3 @
Rs.
RR masonry CM 1:5 mix including all cost and
3 conveyance of all matirials and all labour charges etc.,
complete
10.26
7.65
1.35
0.23
4.75
2.00
1.20
0.23
2.21
Body wall II nd
footing
7.50
1.20
0.45
8.10
wing wall II nd
footing
2.00
1.05
0.45
3.78
7.50
1.05+0.
60/2
1.20
14.85
2.00
0.90+0.
45/2
1.20
6.48
parapet
2.90
0.45
0.45
1.17
41.34
m3 @
Rs.
41.34
2246.68
92885
16.20
7.50
20.80
0.15
2.00
4.86
15.00
0.25
5.20
25.06
25.06
m2 @
Rs.
395.00
9899
7.50
0.60
0.15
28607
1.35
1.35
1.35
m3 @
Rs.
3395.51
4584
5.44
5.44
4462.39
24264
2.61
3.60
6.21
195.05
1211
7.50
2.90
0.25
5.44
m2 @
Rs.
2
4
2.90
2.00
0.45
0.45
6.21
189038
0.050 M3
90
mm IRC Me
322.00
16.10
0.025 M3
63
mm IRC Metal
465.00
11.63
0.450 M
63
mm IRC Me
465.00
209.25
0.200 M
53
mm IRC Metal
565.00
113.00
0.425 M3
53
mm IRC Me
565.00
240.13
0.725 M3
45
mm IRC Metal
757.00
548.83
0.050 M3
45
mm IRC Me
757.00
37.85
0.025 M3
1061.00
26.53
0.025 M
1061.00
26.53
0.025 M
668.00
16.70
716.69
529.86
Total
REACH
KM
Name of quarry
1.00
-
Kind of metal
0.00
Distance in KM
Total
1.00
Nature of
route for
conveyance
metalled or
unmetalled
Cost at
Quarry
Convey
ance (Plain)
Convey
ance
(Hills)
Stacking
Charges
20%
Extra
(Labour)
Total
Plains
Hills
WBM Gr II metal
529.86
62.40
0.00
3.15
0.00
595.41
--do--
716.69
62.40
0.00
3.15
0.00
782.24
--do--
757.00
62.40
0.00
3.15
0.00
822.55
--do--
983.00
62.40
0.00
3.15
0.00
1048.55
--do--
668.00
62.40
0.00
3.15
0.00
733.55
--do--
496.00
62.40
0.00
3.15
0.00
561.55
Average Lead
Gravel
130.00
7.80
0.00
3.05
0.00
140.85
Thadikombu
110.00
7.80
0.00
3.05
0.00
120.85
At P.U.Store,Vedasandur
Packed bitumen
55500.00
0.00
0.00
0.00
0.00
55500.00
Emulsion
54700.00
0.00
0.00
0.00
0.00
54700.00
Vellampatty
0.00
--do--
519.20
62.40
0.00
3.05
0.00
584.65
Name of work Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.
DATA SHEET 2013-14
Clearingthe Scrub jungle including all labour charges for burryingng and burning etc.,
Rs
2.15 /Sq.m
0.00
2.15 /Sq.m
2
Earth work excavation and depositing on bank within initial lead and lift in
hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B
Rs
41.85 /Cu.m
0.00
41.85 /Cu.m
2a
Earth work excavation and depositing on bank within initial lead and lift in
hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Rs
44.60 /Cu.m
0.00
44.60 /Cu.m
3
0.00
1.00
-for Km
0.00
0.00
DATA
1.00 cum
595.41 /cum
595.41
0.00
0.00
0.24 cum
gravel
140.85 /cum
33.80
0.00
0.00
10.00 sqm
101.92 /10sqm
101.92
0.00
0.00
10.00 sqm
Labour charges
205.14 /10sqm
205.14
0.00
0.00
0.00
0.00
936.27
0.00
936.27 /0.75
Rate per CUM:
0.00 /0.75
Rs
1248.36
Rs
0.00
WBM Grade III Top layer using 53-22.40mm IRC graded metal
-for Km
0.00
1.00
-for Km
0.00
0.00
DATA
1.00 cum
782.24 /cum
782.24
0.00
0.00
0.24 cum
gravel
140.85 /cum
33.80
0.00
0.00
10.00 sqm
101.92 /10sqm
101.92
0.00
0.00
10.00 sqm
Labour charges
205.14 /10sqm
205.14
0.00
0.00
0.00
0.00
1123.10
0.00
1123.10 /0.75
Rate per CUM:
0.00 /0.75
Rs
1497.47
Rs
0.00
0.004 Mt
Emulsion bitumen
10.00 sqm
Labour charges
0.00
54700.00 /mt
144.00 /10 sqm
Rs
1.00
0.00
0.00
218.80
0.00
0.00
144.00
144.00
144.00
0.00
0.00
15.00
0.00
377.80
144.00
37.78
Rs
14.40
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance
of gravel from approved sources to work site including labour for spreading, watering
and compacting by Power roller to achieve the required Proctor density at 100%
compaction
KM
Rate
Proctor Density
2.05
Field Density
1.77
Extra
required
Gravel
1.16
Cost of Gravel
1.00
0.00 1.00
Per
Amount
0.00 0.00
Rate
Amount
Amount
m3
163.39
0.00
0.00
0.00
0.00
12.23
m3
12.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
road
PREMIX CARPET WITH SEAL COAT TYPE ' A Plastic
'
-for Km 0.00
-for Km
1.00
0.09 Cum
22.448 Kgs
Rate
140.85
0.18 Cum
0.09 Cum
0.00 0.00
0.16
-for Km
0.00
0.00
1048.55 /cum
733.55 /cum
188.74
66.02
0.00
0.00
0
0.00
561.55 /cum
55500.00 /Mt
50.54
1245.86
0.00
55500.00
0
1245.86
58.56
30.00
241.17
58.56
1.952 Kgs
10.00 Sqm
Plastic wastage
Hire & fuel charges for P.
30.00 Kg
241.17 /10sqm
10.00 Sqm
10.00 Sqm
33.34 /10sqm
193.50 /10sqm
10.00 Sqm
532.51
33.34
193.50
532.51
64.50
0.00
0.00
2142.23
214.2234
1836.93
183.693
PAGE23
Name of work :
total
4634.20
343.50
343.50
394.40
517.40
804.40
1096.40
893.90
45674.20
653.90
642.40
1020.40
540.40
137.80
4448.83
343.50
4792.33
4634.20 /MT
343.50 /cum
3336.62
343.50
3680.12
4634.20 /MT
343.50 /cum
1668.31
343.50
2011.81
43.35
2055.16
1.00 cum
Mixing charges
43.35 /cum
4634.20 /MT
343.50 /cum
1.00 cum
Qty
9.00
4.50
1.80
17.70
14.10
Mixing charges
43.35 /cum
1334.65
343.50
1678.15
43.35
1721.50
DATA
Earth work excavation and depositing on bank with in initial lead of 10 m
and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Rate / cum
41.85
Add 100% extra for narrow foundati
41.85
83.70 /cum
Items
Rate
Per
Amount
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
cum
Cost of 40mm ISS metal
804.40 /cum
7239.60
cum
Cost of cement mortar 1:4
2011.81 /cum
9053.15
nos
Mason II class
326.00 /each
586.80
nos
Mazdoor I class
228.00 /each
4035.60
nos
Mazdoor II class
206.00 /each
2904.60
PAGE24
0.00
23819.75
RATE @ RS
2381.98 /cum
PAGE25
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
10.00
1.00
3.40
7.10
10.60
14.10
14.10
RATE @RS
1096.40
3680.12
326.00
228.00
206.00
/cum
/cum
/each
/each
/each
9867.60
16560.54
586.80
4035.60
2904.60
0.00
33955.14
3395.51 /cum
3944.00
517.40
5853.10
2577.30
3455.60
3214.80
2904.60
0.00
22466.80
RATE @RS
2246.68 /cum
Supplying and fabrication of steel including cost and conveyance of
steel to site and all labour charges for straightening, cutting to length,
bending to shape and tying in position and forming grills for all R.C.C works
1.00 MT
0.01 mt
35.00 nos
Cost of steel
Cost of binding wire
Fitter I class
45674.20 /mt
48000.00 /mt
316.00 /each
45674.20
480.00
11060.00
57214.20
9.00
4.50
4308.00
3.50
21.20
35.30
9867.60
1545.75
19964.13
1141.00
4833.60
7271.80
44623.88
0.22
2.20
0.50
3.20
RATE @RS
4462.39 /cum
Plastering with cement mortar 1:5 mix to 20 mm thick including
cost and conveyance of all materials to site and all labour
charges etc complete for 10 Sqm
cum
Cement mortar 1:5
1721.50 /cum
nos
Mason I class
363.00 /each
nos
Mazdoor I class
228.00 /each
nos
Mazdoor II class
206.00 /each
378.73
798.60
114.00
659.20
1950.53
RATE @RS
195.05 /Sqm
Steel=
I
S.No
Ending Chainage
Diesel
Length of Road
Starting Chainage
55500
Emulsion
Bitumen
Rates
0.000
1.000
Hill Percentage
50 %
ROADS
Description of work
0.00
1.00 0.00
0.00
2.15
44.60
41.85
175.62
97.34
0.00
5 WBM Grade II
1248.36
0.00
1497.47
0.00
3454.74
0.00
3680.74
0.00
37.78
22.80
219.20
214.2234
0.00
183.693
612.29
13 GSB
II CD WORKS
S.No
Materials
Plain
Hills
16
Sand
35
Metal
Gravel
Description of work
1 Earth work SS 20 B
Rates
83.70
2 C.C.1:4:8
2381.98
3 C : C 1: 5: 10
2231.90
4 R . R. MASONARY 1 : 5
2246.68
5 R . R. MASONARY 1 : 4
2360.12
6 C : C 1: 3: 6
using 40 mm metal
2632.22
7 C : C 1: 2: 4
using 20 mm metal
3395.51
8 R.C. C 1: 1 1/2: 3
4467.95
9 R.C. C 1: 2: 4
3963.29
10 R.C.C. 1: 2: 4
3967.45
11 Fabrication of STEEL
57214.20
12 Steel Centring
404.00
13 Steel Shuttering
202.00
195.05
202.39
102.76
98.09
113.78
17 Gravel Filling
155.55
18 Sand Filling
356.50
19 Wearing Coat
347.96
20
1012.97
7.50
7.50
0.50
0.00
Hills
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00
Sand
Plain
Gravel
Metal 63 - 22.4 mm
Lead
0.00
12.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2442.00
2442.00
0.00
0.00
2442.00
0.00
0.00
0.00
59.11
135.42
59.107
135.42
0.00
Highways Department
SCHEDULE OF RATE 2013-14
S.No.
Description
Unit
Rates in
Rupees
FUEL RATES
Diesel (Local Rate) Litre
Day
300.00
Furnace Oil
Litre
Day
312.00
Kerosene
Litre
Day
312.00
Day
312.00
BITUMEN
Day
261.00
Bitumen packed
MT
Day
285.00
Emulsion
MT
Day
258.00
Day
231.00
Day
231.00
10
Head Mazdoor
Day
266.00
11
Mazdoor (Skilled)
228.00
12
Mazdoor (Unskilled)
206.00
II
Day
828.00
Water sprinkler
Day
1159.00
Day
1674.00
Day
10 Sq.m
15.00
Bitumen Sprayer
Day
202.00
Day
9696.00
Vibratory Roller
Day
5428.00
Paver Finisher
Day
2447.00
10
Tipper Trucks
Day
1094.00
11
Water
12
Hydraulic Broom
hour
357.00
13
hour
319.00
14
Loader
Day
1205.00
15
Water Tanker
Day
855.00
16
Motor Grader
Day
13533.00
17
Day
6679.00
18
Day
5179.00
19
Tractor Rotovator
Day
2824.00
Kl
60.00
hour
353.00
20
Tractor
21
Tipper Trucks/Tonne Km
22
Day
25.00
23
Rotovator
hour
17.00
24
Day
8933.00
25
26
1243.00
27
Day
2005.00
28
Tonne
10 Sq.m
2.00
15.00
460.00
Litre
54.15
Furnace Oil
Litre
50.00
Kerosene
Litre
50.00
IV
Rates of works
Scrub jungle
Sqm
2.15
Jungle clearance
Sqm
2.35
Earth work SS 20 A
Cum
44.60
Cum
41.85
Cum
62.30
Cum
109.80
Cum
297.00
Cum
5.25
Cum
4.20
10
Cum
14.70
11
Cum
13.00
12
Cum
5.16
13
Stacking metal
Cum
3.15
14
Stacking gravel
Cum
3.05
15
Stacking sand
Cum
3.05
16
Kilometre stone
each
328.00
17
Hectametre stone
each
170.00
RATES OF MATERIALS
Sl.No. Description
2013-14
Unit
Coimbatore
Circle
90mm size
one cum
322.00
ii
75mm size
one cum
360.00
iii
63mm size
one cum
465.00
iv
53mm size
one cum
565.00
46.5mm size
one cum
757.00
vi
45mm size
one cum
757.00
vii
37.5mm size
one cum
773.00
viii
26.5mm size
one cum
731.00
ix
25mm size
one cum
731.00
22.4mm size
xi
13.2mm size
one cum
983.00
xii
11.2mm size
one cum
668.00
xiii
6.7mm size
one cum
496.00
xiv
6mm size
one cum
496.00
xv
5.6mm size
one cum
496.00
xvi
one cum
440.00
xvii
Gravel
130.00
xviii Wellgravel
107.80
xix
110.00
Mt
Emulsion
Mt
VI
Other Materials
Mt
4700.00
Sand
one cum
110.00
one cum
110.00
Rough stone
one cum
332.00
Bond stone
one cum
455.00
one cum
742.00
Country bricks
Cement
2 3/4"
Incidental charges
0 - 10 Kms.
4.9 5.40
7.80
6.60
8.80
11.00
10 - 20 Kms.
4.2 4.65
6.70
5.65
7.60
9.25
20 - 40 Kms.
3.7 4.10
5.90
5.00
6.70
8.35
40 - 80 Kms.
3.1 3.45
4.95
4.20
5.60
7.00
Above 80 Kms.
2.85 3.10
4.50
3.75
5.05
6.30
Loading Charges
73.1 34.90
23.90
34.35
34.35
34.35
Unloading Charges
An Adhoc extra
for inter state
works
L & UL Charges
73.1 34.90
23.90
34.35
34.35
34.35
14.55 16.00
23.25
19.60
26.15
26.15
0.00
0.00
0.00
0.00
6
7
0 0.00
Sl.No.
Distance in
Kilometre
2
Br.
Jelly,
Cement/Stee Wood
l
work
(one
m3)
3
0.00
Broken
Stone
Sand
Gravel
(one m3)
0.00
0.00
0.00
0.00
Co- efficient
Incidental charges
0 - 10 Kms.
9.8 10.80
15.60
13.20
17.60
22.00
10 - 20 Kms.
8.4 9.30
13.40
11.30
15.20
18.50
20 - 40 Kms.
7.4 8.20
11.80
10.00
13.40
16.70
40 - 80 Kms.
6.2 6.90
9.90
8.40
11.20
14.00
Above 80 Kms.
5.7 6.20
9.00
7.50
10.10
12.60
IX.
Lumpsum Rates
L.S.
L.S.
L.S.
L.S.
L.S.
L.S
L.S
L.S
Levelling and tamping the Premix in the patches and pot holes rolling etc
L.S
L.S
Regulation of traffic
L.S
L.S
L.S
L.S
L.S
Regulation of traffic
L.S
L.S
80/100 KN
Sl.no
Type of Consolidation/Compaction
Out Turn
425 Cum
2 Gravel soling
425 Cum
600 Cum
150mm Thick
650 Cum
450 Cum
6 Sand-Gravel mix
150mm Thick
950 Cum
740 Sqm
550 Sqm
75mm Thick
450 Sqm
100mm Thick
350 Sqm
11 Bituminuous macadam
50mm Thick
300 Sqm
12 Bituminuous macadam
75mm Thick
225 Sqm
75mm Thick
225 Sqm
14 Asphaltic concrete
40mm Thick
300 Sqm
15 Premix Carpet
20mm Thick
500 Sqm
16 Seal Coat
1000 Sqm
800 Sqm
550 Sqm
600 Sqm
400 Sqm
1100 Sqm
54.15
50.00
50.00
55500.00
54700.00
1.46
1.46
1.46
1.46
1.52
4.55
3.54
17.68
6.06
2.53
2.53
0.71
2.20
5.50
2.20
2.20
0.55
Highways Department
SCHEDULE OF RATE 2013-14
S.No.
Description
Unit
Rates in
Rupees
FUEL RATES
Diesel (Local Rate)
Litre
Day
300.00
Furnace Oil
Litre
Day
312.00
Kerosene
Litre
Day
312.00
Day
312.00
BITUMEN
Day
261.00
Bitumen packed
MT
Day
285.00
Emulsion
MT
Day
258.00
Day
231.00
Day
231.00
10
Head Mazdoor
Day
266.00
11
Mazdoor (Skilled)
228.00
12
Mazdoor (Unskilled)
206.00
II
Day
Water sprinkler
Day
hour
1159.00 Water tanker 6 kl - 1 trip per h
Day
Day
10 Sq.m
Bitumen Sprayer
Day
Day
9696.00
Vibratory Roller
Day
5428.00
Paver Finisher
Day
2447.00
10
Tipper Trucks
Day
1094.00
11
Water
12
Hydraulic Broom
hour
357.00
13
hour
319.00
14
Loader
Day
1205.00
15
Water Tanker
Day
855.00
16
Motor Grader
Day
###
17
Day
6679.00
18
Day
5179.00
19
Tractor Rotovator
Day
2824.00
20
Tractor
hour
363.00
Kl
60.00
Tonne
2.00
21
Tipper Trucks/Tonne Km
22
Day
25.00
23
Rotovator
hour
17.00
24
Day
8933.00
25
26
hour
1243.00
27
Day
2005.00
III
FUEL RATES
Litre
49.40
Furnace Oil
Litre
50.00
Kerosene
Litre
30.00
IV
10 Sq.m
15.00
Rates of works
Scrub jungle
Sqm
2.15
Jungle clearance
Sqm
2.35
Earth work SS 20 A
Cum
44.60
23.2
Cum
41.85
21.1
Cum
62.30
Cum
109.80
Cum
297.00
Cum
5.25
Cum
4.20
10
Cum
14.70
11
Cum
13.00
12
Cum
5.16
13
Stacking metal
Cum
3.15
14
Stacking gravel
Cum
3.05
15
Stacking sand
Cum
3.05
16
Kilometre stone
each
328.00
17
Hectametre stone
each
165.00
26.4
RATES OF MATERIALS
Sl.No. Description
2013-14
Unit
Coimbatore
Circle
90mm size
one cum
322.00
ii
75mm size
one cum
360.00
iii
63mm size
one cum
465.00
iv
53mm size
one cum
565.00
46.5mm size
one cum
757.00
vi
45mm size
one cum
757.00
242.55
vii
37.5mm size
one cum
773.00
242.55
viii
26.5mm size
one cum
731.00
242.55
ix
25mm size
one cum
731.00
22.4mm size
one cum
1061.00
xi
13.2mm size
one cum
983.00
xii
11.2mm size
one cum
668.00
xiii
6.7mm size
one cum
496.00
xiv
6mm size
one cum
496.00
xv
5.6mm size
one cum
496.00
xvi
one cum
440.00
xvii
Gravel
130.00
xviii Wellgravel
107.80
xix
110.00
Mt
Emulsion
Mt
VI
Other Materials
Mt
4700.00
Sand
one cum
110.00
one cum
110.00
Rough stone
one cum
332.00
Bond stone
one cum
455.00
one cum
742.00
one cum
1034.00
Country bricks
1000 nos
3985.00
Cement
2 3/4"
one cum
638.00
519.2
420
VII
2013-14
RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN PLAINS FOR THE YEAR 2013-14
Sl.No.
Distance in Kilometre
Br. Jelly,
Wood work
(one m3)
Broken
Stone
Sand
Gravel
(one m3)
Mangalo Chamber
Country
re Tiles
bricks,
Bricks
(1000No Flooring
(1000
s,)
tiles.
Nos,)
(1000nos)
1.10
1.60
1.35
1.80
2.25
Co- efficient
Incidental charges
0 - 10 Kms.
5.40
7.80
6.60
8.80
11.00
10 - 20 Kms.
4.65
6.70
5.65
7.60
9.25
20 - 40 Kms.
4.10
5.90
5.00
6.70
8.35
40 - 80 Kms.
3.45
4.95
4.20
5.60
7.00
Above 80 Kms.
3.10
4.50
3.75
5.05
6.30
Loading Charges
34.90
23.90
34.35
34.35
34.35
Unloading Charges
34.90
23.90
34.35
34.35
34.35
16.00
23.25
19.60
26.15
32.70
L & UL Charges
0.00
0.00
0.00
0.00
0.00
Sl.No.
Distance in Kilometre
Br. Jelly,
Wood work
(one m3)
Broken
Stone
Sand
Gravel
(one m3)
Mangalo
Country
re Tiles
Bricks
Chamber
(1000No
(1000
bricks
s,)
Nos,)
0.00
0.00
0.00
0.00
0.00
10.80
15.60
13.20
17.60
22.00
Co- efficient
Incidental charges
0 - 10 Kms.
10 - 20 Kms.
9.30
13.40
11.30
15.20
18.50
20 - 40 Kms.
8.20
11.80
10.00
13.40
16.70
40 - 80 Kms.
6.90
9.90
8.40
11.20
14.00
Above 80 Kms.
6.20
9.00
7.50
10.10
12.60
IX.
Lumpsum Rates
L.S.
L.S.
L.S.
L.S.
L.S.
L.S
L.S
L.S
Levelling and tamping the Premix in the patches and pot holes rolling etc.
L.S
L.S
Regulation of traffic
L.S
L.S
L.S
L.S
L.S
Regulation of traffic
L.S
L.S
80/100 KN
Sl.no
Type of Consolidation/Compaction
Out Turn
425 Cum
2 Gravel soling
425 Cum
600 Cum
650 Cum
450 Cum
6 Sand-Gravel mix
150mm Thick
950 Cum
740 Sqm
550 Sqm
75mm Thick
450 Sqm
100mm Thick
350 Sqm
11 Bituminuous macadam
50mm Thick
300 Sqm
12 Bituminuous macadam
75mm Thick
225 Sqm
75mm Thick
225 Sqm
14 Asphaltic concrete
40mm Thick
300 Sqm
15 Premix Carpet
20mm Thick
500 Sqm
16 Seal Coat
1000 Sqm
800 Sqm
550 Sqm
600 Sqm
400 Sqm
1100 Sqm
49.40
50.00
30.00
49486.00
44320.00
645.00
250.00
1526.05
160.00
178.78
107.00
979.95
845.41
642.55
Bitumen
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bitumen
8
0.00
0.00
0.00
0.00
0.00
0.00
1.46
1.46
1.46
1.46
1.52
4.55
3.54
17.68
6.06
2.53
2.53
0.71
2.20
5.50
2.20
2.20
0.55
Name of work Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.
Starting
Ending
0.000
1.000
Scheme :
Year : 2012-13
KM
From
To
Working
milage
0.00
KM
0.00 - 0.00
Hills
Plain
Total
0.00
KM
0.00 - 0.00
Hills
Plain
Total
0.00
KM
0.00 - 0.00
Hills
Plain
Total
0.00
KM
0.00 - 0.00
Hills
Plain
Total
0.00
KM
Bitumen
Gravel
Sand
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
1.50
0.00
0.00
1.00
1.50
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
or
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.50
0.00
0.00
0.00
1.50
0.00
0.00
0.00
1.50
or
0.00
or
0.00
or
0.00
0.00
or
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
8.00
or
0.00
8.00
8.00
8.00
or
0.00
8.00
8.00
0.50
or
0.00
1.00
1.00
1.00
0.00
1.00
1.00
0.50
or
0.00
1.00
1.00
HILLS
0.00
0.00
0.00
0.00
0.00
PLAINS
7.50
7.50
0.00
0.50
0.00
Bitumen
Gravel
Sand
0.00 - 0.00
Hills
Plain
Total
0.50
KM
Metal
63-22.4
13.2-6.7
8.50
8.50
or
or
0.00
0.00
0.00
0.00
0.00
0.00
8.50
8.50
or
or
0.00
0.00
0.00
0.00
0.00
0.00
8.50
8.50
or
or
0.00
0.00
0.00
0.00
0.00
0.00
8.50
8.50
or
or
0.00
0.00
0.00
0.00
0.00
0.00
8.50
8.50
0.00 - 1.00
Hills
Plain
Total
63-22.4 13.2-6.7
Metal
Metal
Name of work Improvements to the road from Kallukottai to Rajapuram. Km: 0/0-1/0.
Name of Quarry
Metal : Vellampatty
Bitumen : At P.U.Store,Vedasandur
Emulsion : At P.U.Store,Vedasandur
Gravel : Average Lead
Sand : Thadikombu
LEAD STATEMENT
Plain
HILLS
( Kms)
Cement /
Steel
Sand
Rough
stone, &
Metal
Country
Bricks
Brickjelly
Lime stone
16
35
10
10
0.00
xxx
PWD Rates
xxx
Rates of Labour
II
1 Carpenter I class
355.00 c
2 Carpenter II class
326.00
III
c
1
3 Fitter I class
316
322.00
1 Cement
4700.00
4 Fitter II class
293
300.00
2 Shell lime
1180.00
5 Floor polisher
281.00
3 Lime stone
869.00
363.00
4 Grinding mortor
105.90
326.00
5 Mixing mortor
8 Mazdoor I class
228.00
9 Mazdoor II class
206.00
1 PCC
26.20
10 Painter I Class
293.00
2 RCC
35.25
11 Painter II Class
271.00 d
12 Plumber I class
316.00
1 CW scantling
< 4m
28790.00
13 Plumber II class
293.00
2 CW scantling
(raft)
30250.00
280.00
3 CW planks
258.00
4 CW reepers-50x25
29.00
16 Wodder
236.00
5 CW reepers-50x12
21.10
207.00
6 Palmyrah rafter
41.65
18 Mason I class(stone wo
363.00
7 Casu. poles
13-15
27.80
19 Mason II class(stone w
326.00
8 Casu. poles
10-13
21.10
9 Casu. poles
8-10
16.25
5-8
13.85
13060
II
Rates of Material
43.35
Concrete Vibrators
10 Casu. poles
3985.00
33030.00 d
2 Brick Jelly- 40 mm
495.00
3 --do--
550.00
10
20mm
4 Pressed Tiles.(20x20)
5 --do-6 Mang. Tiles
(23x23)
8710.00 e
12340.00
class AA
8.30
7 Mosaic (Grey)25x25
10980.00
8 Mosaic (Grey)20x20
6995.00
1/4" )
5.00
3140.00
f
11
47700.00
2 MS plate
kg
48.00
3 MS Angle
kg
48.00
4 Binding wire Mt
48.00
12
13
5 GI sheet 300x1.6mm/1Sqm
335.00
/m2
/kg
19.25
&
###
###
coller n
200.00
1
2
###
700.00
170.00
V
1
332.00 III
Rates of works
2 Roughstone ( revet )
288.00 a
3 Bond stones
455.00
1 Roughstone
4 Stoneslab
(masonry)
3115.00
5 Km stone1.65 x 0.45 x
328.00
170.00 b
130.00
3265.00
ISS Metal
8 40mm metal
742.00
9 20mm metal
1034.00
10 12mm metal
1 Lighjungle
2.35
2 Scrub jungle
2.15
5
6
Dismanling
7
8
1 Brick/stone
in clay
25.65
2 Brick/stone
in lime
78.65
10
3 Brick/stone
in cement
96.40
11
4 Lime concrete
122.10
958.00
5 Cement concrete
165.60
13
11 10mm metal
705.00
6 RCC
2515.00
14
12 6mm metal
478.00
7 Chipping concrete
13.90 /m2
15
13 Gravel
130.00
8 Pres.tiles & WC
16.00 /m2
16
14 Well gravel
107.80
110.00 IV
110.00
19
28.60
20
17
Electrification
18
18 Cuddapah slab
50mm
342.00
19 Cuddapah slab
38/40
330.00
2 Plug point
20 Cuddapah slab
20/30
304.00
1815.00
580
6 Serv.main
SI 62
25.10 /m
SI 124
IRC Metal
456.80 /pt
SI 34 340.05 /pt
21
VI
1 45 mm metal
757.00
7 Arial Fuse
99.90 /pt
2 25 mm metal
731.00
3 11.2 mm metal
668.00
4 6 mm metal
496.00
9 Ceiling.Fan SI 106
### /no
10 BH Fitting
SI 80 307.85 /no
11 40W bulb
SI 77
77.20 /no
Sl.No.
Lime
stone,
Steel 1.00MT brick jelly,
woodwork
(1Cum)
Cement
Distance in
1 M.T
Rough stone,
Metal, sand,
gravel,surki,
earth (1Cum)
Country bricks
Co-efficient
1.00
1.00
1.10
1.60
1.35
Incidental c
0.00
0.00
0.00
0.00
0.00
0 -10 Kms
4.90
4.90
5.40
7.80
6.60
10 - 20 Kms
4.20
4.20
4.65
6.70
5.65
20 - 40 Kms
3.70
3.70
4.10
5.90
5.00
40 - 80 Kms
3.10
3.10
3.45
4.95
4.20
above 80 Km
2.85
2.85
3.10
4.50
3.75
Loading cha
73.10
73.10
34.90
23.90
34.35
Unloading c
73.10
73.10
34.90
23.90
34.35
Add above ex
14.55
14.55
16.00
23.25
19.60
CONVEYANCE TABLE
KM 0-10
KM
I
I.C
KM 10-20
KM
rate
amt KM
10
4.90 ###
KM 20-40
rate
amt
KM
rate
4.20
25.20
3.70
Buildings
1 Cement
16 0.00
2 Rough stone
8 0.00
7.80 ###
6.70
0.00
5.90
3 Bond stone
8 0.00
7.80 ###
6.70
0.00
5.90
4 40mm iss m
8 0.00
7.80 ###
6.70
0.00
5.90
5 20mm iss m
8 0.00
7.80 ###
6.70
0.00
5.90
6 10-12mm me
8 0.00
7.80 ###
6.70
0.00
5.90
7 6-10mm met
8 0.00
7.80 ###
6.70
0.00
5.90
35 0.00
10
7.80 ###
10
6.70
67.00
15
5.90
35 0.00
10
7.80 ###
10
6.70
67.00
15
5.90
10 steel
16 0.00
10
4.90 ###
4.20
25.20
3.70
11 country bric
10 0.00
10
6.60 ###
5.65
0.00
5.00
12 brick jelly
10 0.00
10
5.40 ###
4.65
0.00
4.10
13 shell lime
1 0.00
5.40 5.40
4.65
0.00
4.10
14 Lime stone
1 0.00
5.40 5.40
4.65
0.00
4.10
15 pressed tiles
1 0.00
8.80 8.80
7.60
0.00
4.60
16 CW planks
1 0.00
5.40 5.40
4.65
0.00
4.10
17 CW scantling
1 0.00
5.40 5.40
4.65
0.00
4.10
18 Gravel
1 0.00
7.80 7.80
6.70
0.00
5.90
19 cutstone rou
8 0.00
7.80 ###
6.70
0.00
5.90
20 25mm IRC m
8 0.00
7.80 ###
6.70
0.00
5.90
21 11.2mm IRC
8 0.00
7.80 ###
6.70
0.00
5.90
22 6mm IRC me
8 0.00
7.80 ###
6.70
0.00
5.90
23 45mm IRC m
8 0.00
7.80 ###
6.70
0.00
5.90
Sl.No.
Distance in
Cement
M.T
Lime
stone,
brick jelly,
1
woodwork
(1Cum)
Steel 1.00MT
Rough stone,
Metal, sand,
gravel,surki,
earth (1Cum)
Country bricks
Co-efficient
1.00
1.00
1.10
1.60
1.35
Incidental c
0.00
0.00
0.00
0.00
0.00
0 -10 Kms
9.80
9.80
10.80
15.60
13.20
10 - 20 Kms
8.40
8.40
9.30
13.40
11.30
20 - 40 Kms
7.40
7.40
8.20
11.80
10.00
40 - 80 Kms
6.20
6.20
6.90
9.90
8.40
above 80 Km
5.70
5.70
6.20
9.00
7.50
Shell lime
M.Tiles &
Pressed
Tiles
Wood
xxx
xxx
Local Rates
297.00
594.00
152.00
133.95
Drilling holes 40 mm
96.30
Lift Gharges
Gr.
Floor
Addl.
Floor
Concrete
###
89.00
Brk/stone masny
59.40
Below GL
###
1.5m
4.5m
Concrete
###
88.35
Brk/stone masny
###
59.40
20b
30.75
4.5m9.00m
Earth work
Ordinary soil
Gravelly soil SS 20 A
44.60
Gravelly soil SS 20 b
41.85
SDR
62.30
MR & DMR
109.80
5.25
4.20
Refilling ( Sand )
13.00
Refilling ( Earth )
14.70
Spreading gravel
/sqm
4.14
Stacking metal
/m3
3.15
Stacking gravel
/m3
3.05
Stacking sand
/m3
3.05
45.35
28.75
up to 300 mm dia
17.75
5117.00
577.30
160.00
1089.00
1510.00
lit
242.55
156.75
145.50
Cement paint
53.10
Plastic emulsion
Distember
kg
sqm
Crude oil
kg
315.15
78.50
23.00
175.50
15.00
11.40
24.00
22.35
--do-- 0.305x0.305
50.80
--do-- 0.400x0.400
64.00
10.00
14.00
17.00
42.35
1454.00
Steel Gate
1398.00
1.20x1.80
953.00
1457.00
648.00
Ventilator 0.90x0.45m
1000.00
TV Shutter 0.90x0.75
1398.00
1759.00
M.Tiles(1000),
pressed tiles(2000)
Brick I & II
class,
Chamber
bricks
1.80
2.25
0.00
0.00
8.80
11.00
7.60
9.25
6.70
8.35
5.60
7.00
5.05
6.30
34.35
34.35
34.35
34.35
26.15
32.70
2013-2014
KM 20-40
KM 40-80
KM above 80
amt
KM
rate
amt
KM
0.00
3.10
0.00
0.00
4.95
0.00
0.00
4.95
0.00
0.00
4.95
0.00
0.00
4.95
0.00
0.00
4.95
0.00
0.00
4.95
0.00
88.50
4.95
0.00
88.50
4.95
0.00
0.00
3.10
0.00
0.00
4.20
0.00
0.00
3.45
0.00
0.00
3.45
0.00
0.00
3.45
0.00
0.00
5.60
0.00
0.00
3.45
0.00
0.00
3.45
0.00
0.00
4.95
0.00
0.00
4.95
0.00
0.00
4.95
0.00
0.00
4.95
0.00
0.00
4.95
0.00
0.00
4.95
0.00
M.Tiles(1000),
pressed tiles(2000)
Brick I & II
class,
Chamber
bricks
1.80
2.25
0.00
0.00
17.60
22.00
15.20
18.50
13.40
16.70
11.20
14.00
10.10
12.60
Grave
l
colour cement(Kg)
/Sqm
/Sqm
/Sqm
/Sqm
/Sqm
/Sqm
26.65
/Sqm
/Sqm
/Sqm
KM above 80
rate
amt
TOTAL L &UL
2.85
0.00
74.20
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
4.50
0.00
233.50
0.00
4.50
0.00
233.50
0.00
2.85
0.00
74.20
0.00
3.75
0.00
66.00
0.00
3.10
0.00
54.00
0.00
3.10
0.00
5.40
0.00
3.10
0.00
5.40
0.00
5.05
0.00
8.80
0.00
3.10
0.00
5.40
0.00
3.10
0.00
5.40
0.00
4.50
0.00
7.80
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
4.50
0.00
62.40
0.00
2011-12
PAGE86
NAME OF WORK:
Name of materials
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Cement
sand for mortar
sand for filling
Rough stone
Bond stone
40mm iss metal
20mm iss metal
10-12mm metal
6-10mm metal
Rough stone for revet
Cutstone roughly dres
steel
country bricks ( 23/4")
country bricks ( 21/4")
brick jelly 20 mm
shell lime
Lime stone
pressed tiles
Country wood planks
--do-- scantlings
Gravel
lead in KM
Plains
Hills
16
0
35
0
35
0
8
0.00
8
0
8
0
8
0
8
0
8
0
8
0
8
0
16
0
10
0
10
0
10
0
1
0
1
0
1
0
1
0
1
0
1
0
6mm metal
10
CEMENT MORTAR 1:2
0.720 MT
Cost of cement
1.00 cum
Cost of sand
Mixing charges
Add for 20% on labour
Cost
Conveyan Conveyan
c ( Plains ) c ( Hills )
Total
4700.00
110.00
110.00
332.00
455.00
742.00
1034.00
831.50
538.00
288.00
3265.00
48783.00
3985.00
3140.00
550.00
1180.00
869.00
8710.00
33030.00
13060.00
130.00
61.60
209.90
209.90
31.20
31.20
31.20
31.20
31.20
31.20
31.20
31.20
61.60
39.60
39.60
32.40
0.00
0.00
55.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4761.60
319.90
319.90
363.20
486.20
773.20
1065.20
862.70
569.20
319.20
3296.20
48844.60
4024.60
3179.60
582.40
1180.00
869.00
8765.40
33030.00
13060.00
130.00
638.00
62.40
0.00
700.40
705.00
62.40
0.00
767.40
334.60
4571.14
319.90
4891.04
863.60
4761.60 /MT
319.90 /cum
27
451.00
78.00
4761.60 /MT
319.90 /cum
3428.35
319.90
3748.25
4761.60 /MT
319.90 /cum
2285.57
319.90
2605.47
43.35
17.34
2666.16
43.35 /cum
17.34 /cum
PAGE87
Mixing charges
Add for 20% on labour
Mixing charges
Add for 20% on labour
Mixing charges
Add for 20% on labour
4761.60 /MT
319.90 /cum
43.35 /cum
17.34 /cum
4761.60 /MT
319.90 /cum
43.35 /cum
17.34 /cum
4761.60 /MT
319.90 /cum
43.35 /cum
17.34 /cum
4761.60
319.90
105.90
42.36
/cum
/cum
/cum
/cum
1714.18
319.90
2034.08
43.35
17.34
2094.77
1371.34
319.90
1691.24
43.35
17.34
1751.93
1142.78
319.90
1462.68
43.35
17.34
1523.37
2380.80
319.90
105.90
42.36
2848.96
DATA
Earth work excavation and depositing on bank with in initial lead of 10 m
and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Rate / cum
36.40
Add 100% extra for narrow foundation
36.40
72.80
Add for 20% on labour
29.12
101.92 /cum
Cement concrete 1:6:12 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
cum
cum
nos
nos
773.20
1462.68
261.00
183.00
/cum
/cum
/each
/each
6958.80
6582.06
469.80
3239.10
PAGE88
14.10 nos
Mazdoor II class
Add for 20% on labour
RATE @ RS
165.00 /each
2326.50
2414.16
0.00
21990.42
2199.04 /cum
Cement concrete 1:5:10 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @ RS
773.20
1691.24
261.00
183.00
165.00
/cum
/cum
/each
/each
/each
6958.80
7610.58
469.80
3239.10
2326.50
2414.16
0.00
23018.94
2301.89 /cum
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @ RS
773.20
2034.08
261.00
183.00
165.00
/cum
/cum
/each
/each
/each
6958.80
9153.36
469.80
3239.10
2326.50
2414.16
0.00
24561.72
2456.17 /cum
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @ RS
773.20
2605.47
261.00
183.00
165.00
/cum
/cum
/each
/each
/each
2713.30 /cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
6958.80
11724.62
469.80
3239.10
2326.50
2414.16
0.00
27132.98
PAGE89
laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
1065.20
3748.25
261.00
183.00
165.00
/cum
/cum
/each
/each
/each
9586.80
16867.13
469.80
3239.10
2326.50
2414.16
0.00
34903.49
3490.35 /cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
1065.20
2605.47
261.00
183.00
165.00
/cum
/cum
/each
/each
/each
9586.80
11724.62
469.80
3239.10
2326.50
2414.16
0.00
29760.98
2976.10 /cum
cum
cum
cum
nos
nos
nos
nos
Rough stone
Bond stone
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
363.20
486.20
1751.93
291.00
261.00
183.00
165.00
/cum
/cum
/cum
/each
/each
/each
/each
3632.00
486.20
5956.56
2066.10
2766.60
2580.30
2326.50
3895.80
0.00
23710.06
2371.01 /cum
Rough stone
Bond stone
Cement mortar 1:4
363.20 /cum
486.20 /cum
2094.77 /cum
3632.00
486.20
7122.22
PAGE90
7.10
10.60
14.10
14.10
nos
nos
nos
nos
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
291.00
261.00
183.00
165.00
RATE @RS
/each
/each
/each
/each
2066.10
2766.60
2580.30
2326.50
3895.80
0.00
24875.72
2487.57 /cum
cum
cum
cum
nos
nos
nos
nos
Rough stone
Bond stone
clay
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
363.20
486.20
26.00
291.00
261.00
183.00
165.00
RATE @RS
/cum
/cum
/cum
/each
/each
/each
/each
3632.00
486.20
104.00
1018.50
2766.60
1939.80
1749.00
2989.56
0.00
14685.66
1468.57 /cum
Dry stone masonry for Retainingwall -10cum including cost and conveyance
of all materials and all labour charges etc complete for 10 cum
12.00
3.50
7.10
7.10
3.50
cum
nos
nos
nos
nos
RATE @RS
319.20
291.00
261.00
183.00
165.00
/cum
/each
/each
/each
/each
3830.40
1018.50
1853.10
1299.30
577.50
1899.36
0.00
10478.16
1047.82 /cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"
and conveyance of all materials to site and all labour charges etc complete -10 cum
4590
2.50
3.50
10.60
7.10
21.20
nos
cum
nos
nos
nos
nos
Country bricks
8
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
3/4"
x4
3/8"
RATE @RS
x2
3/4"
4024.60
1751.93
291.00
261.00
183.00
165.00
3315.16 /cum
/1000nos
/cum
/each
/each
/each
/each
18472.91
4379.83
1018.50
2766.60
1299.30
3498.00
1716.48
0.00
33151.62
PAGE91
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"
and conveyance of all materials to site and all labour charges etc complete
6010
2.80
3.50
7.10
7.10
14.10
nos
cum
nos
nos
nos
nos
Country bricks
8
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
3/4"
x4
1/4"
RATE @RS
x2
1/4"
3179.60
1751.93
291.00
261.00
183.00
165.00
/1000nos
/cum
/each
/each
/each
/each
19109.40
4905.40
1018.50
1853.10
1299.30
2326.50
1299.48
0.00
31811.68
3181.17 /cum
Collection and supply of sand and filling in to the basement including cost and
conveyance to the siteand all labour charges for filling
as per standard speecifications
1.00 cum
1.00 cum
319.90 /cum
11.30 /cum
319.90
11.30
4.52
335.72
335.72 /cum
Collection and supply of gritty gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete,
1.00 cum
1.00 cum
1.00 cum
130.00 /cum
3.05 /cum
12.80 /cum
130.00
3.05
12.80
6.34
152.19
152.19 /cum
Collection and supply of Well gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete,
1.00 cum
1.00 cum
1.00 cum
Wellgravel
Stacking charges
Labour charges for filling
Add for 20% on labour
RATE @RS
98.00 /cum
3.05 /cum
12.80 /cum
120.19 /cum
Refilling the basement with excavated earth other than sand complying the
Standard specification
RATE @RS
12.80 /cum
98.00
3.05
12.80
6.34
120.19
PAGE92
5.12
17.92 /cum
Supplying and erecting centering shuttering including necessary supports for plane
surface in foundation and basement and in all floors for R C C column footing
column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild
steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country
wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and
supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre
complete complying with standard specifications and as directed by departmental
officers including conveyance of all materials to site and proper centering etc complete.
Sub Data I
Cost of MS sheets & angles for each set
Weight of MS sheet B.G 10 Gauge size 90x60cm x 3.175 mm
3.175 x 7850/1000 = 24.924 kg/m 2
24.924 Kg/m2 x 0.54 m2 = 13.46 Kg.
Weight of MS angle size 25 x 25 x 3 mm
3.6 x 1.1 Kg/m = 4.00 Kg
13.46 kgs
Cost of MS sheet
4 kgs
Cost of MS angle
L.S
Cutting,bending,welding,etc
48.00 /kg
48.00 /kg
646.08
192.00
21.63
859.71
Sub Data 2
Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm
19 Nos
Cost of strutting
0.12 cum
98.5 Rm
859.71 /each
16334.49
10340.00 /cum
19.20 /Rm
1240.80
1891.20
3132.00
16334.49 /40
3132.00 /5
408.36
626.40
3.80 nos
5.40 nos
1 nos
L.S
L.S
408.36
626.40
284.00
183.00
160.00
/each
/each
/each
/each
/each
417.41 /Sqm
408.36
626.40
1079.20
988.20
160.00
890.96
10.00
10.94
4174.06
PAGE93
417.41
41.74
459.15 /Sqm
19.20
1891.20 /5
284.00 /each
183.00 /each
4174.06 -574.38
RATE @RS
iv] Centering below Ground level
50% of the above rate
359.97 /Sqm
417.41 /2
RATE @RS
378.24
85.20
54.90
56.04
574.38
3599.68
208.70
208.70 /Sqm
Cost of steel
Cost of binding wire
Fitter I class
Add for 20% on labour
48844.60 /mt
48.00 /mt
253.00 /each
48844.60
0.48
8855.00
3542.00
0.00
61242.08
9.00
4.50
3.50
21.20
35.30
RATE @RS
9586.80
16867.13
913.50
3879.60
5824.50
4247.04
0.00
41318.57
4131.86 /cum
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal 1445.85
including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
9.00 cum
20mm ISSmetal
1065.20 /cum
4.50 cum
sand
319.90 /cum
9586.80
1439.55
PAGE94
###
3.50
21.20
35.30
Kg
nos
nos
nos
cement
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
9.00
4.50
3.50
21.20
35.30
/kg
/each
/each
/each
15384.73
913.50
3879.60
5824.50
4247.04
0.00
41275.72
4127.57 /cum
RATE @RS
9.00
4.50
###
1.80
17.70
14.10
4.76
261.00
183.00
165.00
9586.80
22009.68
913.50
3879.60
5824.50
4247.04
0.00
46461.12
4646.11 /cum
9586.80
1439.55
20512.97
469.80
3239.10
2326.50
2414.16
0.00
39988.88
0.10
1.10
1.10
1.10
RATE @RS
111.01 /Sqm
266.62
320.10
201.30
181.50
140.58
0.00
1110.10
PAGE95
0.22
2.20
0.50
3.20
RATE @RS
0.22
2.20
0.50
3.20
/cum
/each
/each
/each
460.85
640.20
91.50
528.00
503.88
0.00
2224.43
222.44 /Sqm
RATE @RS
586.56
640.20
91.50
528.00
251.94
0.00
2098.20
209.82 /Sqm
RATE @RS
0.22
2.20
0.50
3.20
2666.16
291.00
183.00
165.00
385.42
640.20
91.50
528.00
503.88
0.00
2149.00
214.90 /Sqm
cum
nos
nos
nos
RATE @RS
2666.16
291.00
183.00
165.00
/cum
/each
/each
/each
373.26
320.10
91.50
181.50
118.62
0.00
1084.98
108.50 /Sqm
2094.77 /cum
293.27
PAGE96
1.10 nos
0.50 nos
1.10 nos
Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
291.00 /each
183.00 /each
165.00 /each
320.10
91.50
181.50
237.24
0.00
1123.61
112.36 /Sqm
cum
nos
nos
nos
RATE @RS
1751.93
291.00
183.00
165.00
/cum
/each
/each
/each
245.27
320.10
91.50
181.50
237.24
0.00
1075.61
107.56 /Sqm
Damp proof course in cement mortor CM1:3 - 20mm thick with water proofing
compound at 5% by wt of cement
0.21
1.10
1.10
2.20
1.10
cum
nos
nos
nos
nos
5.00 kg
RATE @RS
2666.16
291.00
261.00
183.00
165.00
/cum
/each
/each
/each
/each
15.00 / kg
559.89
320.10
287.10
402.60
181.50
238.26
75.00
0.00
2064.45
206.45 /Sqm
Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing
compound at 2 % by wt of cement
0.14
1.10
0.50
1.10
cum
nos
nos
nos
1.00 kg
RATE @RS
2666.16
291.00
183.00
165.00
/cum
/each
/each
/each
38.50 / kg
373.26
320.10
91.50
181.50
118.62
38.50
0.00
1123.48
112.35 /Sqm
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm
ISS metal to 25mm thick including cost and conveyance of all materials to site
and all labour charges for mixing, laying, curing etc complete for 10 cum
PAGE97
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
25mm Tk
3187.39
862.70
3748.25
261.00
183.00
165.00
RATE @RS
3187.39 /cum
x 0.025 =
79.68 /Sqm
/cum
/cum
/each
/each
/each
7764.30
16867.13
469.80
3239.10
2326.50
1207.08
0.00
31873.91
Ellispattern Ist sort -20mm thick including cost and conveyance of all
materials to site and all labour charges etc complete
0.24
0.117
0.50
1.10
4.30
nos
mt
nos
nos
nos
6 to 10mm chips
Cost of cement
Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
569.20
4761.60
291.00
183.00
165.00
/cum
/mt
/each
/each
/each
136.61
557.11
145.50
201.30
709.50
211.26
0.00
1961.28
196.13 /Sqm
Flooring with red cement plaster polished surface and thread lined -10 Sqm
10.00 Sqm
0.80 kg
1.10 Nos
214.90 Sqm
20.00 kg
291.00 cum
2149.00
16.00
320.10
64.02
0.00
2549.12
254.91 /Sqm
Gravel
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
sundries
RATE @RS
130.00 cum
183.00 E
165.00 E
221.00
201.30
82.50
56.76
0.00
561.56
56.16 /Sqm
4500.00
PAGE98
0.10
4.00
1.10
4.10
2.70
3.30
cum
kg
nos
nos
nos
nos
RATE @RS
3748.25
20.95
291.00
261.00
183.00
165.00
/cum
/kg
/each
/each
/each
/each
374.83
83.80
320.10
1070.10
494.10
544.50
485.76
0.00
7873.19
787.32 /Sqm
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality
including cost and conveyance of all materials to site and all labour charges etc
complete.
167
0.10
4.00
1.10
4.10
2.70
3.30
Nos
cum
kg
nos
nos
nos
nos
Glazed tiles
cement mortar 1:2 mix
Colour cement
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
24.00
3748.25
20.95
291.00
261.00
183.00
165.00
/each
/cum
/kg
/each
/each
/each
/each
4008.00
374.83
83.80
320.10
1070.10
494.10
544.50
485.76
0.00
7381.19
738.12 /Sqm
Nos
cum
nos
nos
nos
nos
Ceromic tiles
cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
20.35
2666.16
291.00
261.00
183.00
165.00
/each
/cum
/each
/each
/each
/each
5087.50
559.89
320.10
287.10
402.60
363.00
274.56
0.00
7294.75
729.48 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
cost and conveyance of all materials to site and all labour charges etc complete
112
0.21
1.20
1.00
1.00
Nos
cum
nos
no
no
305x305x6
46.20
2666.16
291.00
261.00
183.00
/each
/cum
/each
/each
/each
5174.40
559.89
349.20
261.00
183.00
PAGE99
1.00 no
0.50 no
0.50 Kg
3.0 Kg
Mazdoor II class
Stone cutter I class
Add for 20% on labour
Cotton waste
Colour cement
Sundries
165.00 /each
224.00 /each
10.00 /Kg
20.95 /Kg
LS
RATE @RS
165.00
112.00
214.04
5.00
62.85
0.00
7086.38
708.64 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 400x400x7mm including
cost and conveyance of all materials to site and all labour charges etc complete
63
0.21
1.20
1.00
1.00
1.00
0.50
Nos
cum
nos
no
no
no
no
0.50 Kg
3.0 Kg
400x400x7
RATE @RS
64.00
2666.16
291.00
261.00
183.00
165.00
224.00
/each
/cum
/each
/each
/each
/each
/each
10.00 /Kg
20.95 /Kg
LS
4032.00
559.89
349.20
261.00
183.00
165.00
112.00
214.04
5.00
62.85
0.00
5943.98
594.40 /Sqm
Supplying & fixing of Granite slab of 20mm thick with nosing, cutting and bedding
laidover in CM 1 : 2 20mm thick - 10 Sqm
10
0.21
1.10
2.00
2.20
1.10
Sqm
cum
nos
no
no
no
4.0
1.60
0.50
1.10
Kg
no
no
no
1800.00
3748.25
291.00
261.00
183.00
165.00
20.95
261.00
183.00
165.00
/each
/cum
/each
/each
/each
/each
18000.00
787.13
320.10
522.00
402.60
181.50
285.24
/Kg
/each
/each
/each
83.80
417.60
91.50
181.50
138.12
0.00
21411.09
LS
2141.11 /Sqm
Pointing with cement mortor 1:3 cuddapah slab & paving stone to full depth - 10 Sqm
0.01 cum
1.60 nos
2666.16 /cum
261.00 /each
26.66
417.60
PAGE100
0.50 nos
1.10 nos
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
10.50
0.12
1.00
10.00
1.10
2.10
2.20
1.10
183.00 /each
165.00 /each
85.54 /Sqm
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
thick and pointed with cement mortar 1:3 -10 Sqm
Sqm
Cuddapah slabs (50mm thick)
311.00 Sqm
cum
cement mortar1:3
2666.16 cum
cum
Cement Concrete 1:6:12
2199.04 cum
Sqm
Pointing with CM 1:3
85.54 cum
No
Mason I class
291.00 cum
No
Mason IIclass
261.00 /each
No
Mazdoor I Class
183.00 /each
No
Mazdoor II class
165.00 /each
Add for 20% on labour
sundries
RATE @RS
91.50
181.50
138.12
0.00
855.38
3265.50
319.94
2199.04
855.38
320.10
548.10
402.60
181.50
290.46
0.00
8382.62
838.26 /Sqm
White washing two coats using shell lime including cost and conveyance of
all materials to site and all labour charges etc comoplete for 100 Sqm
0.07
1.60
0.50
2.70
cum
nos
nos
nos
RATE @RS
1180.00
261.00
183.00
165.00
/cum
/each
/each
/each
82.60
417.60
91.50
445.50
190.92
0.00
1228.12
12.28 /Sqm
Colour washing two coats using approved colour pigments including cost
and conveyance of all materials to site and all labour charges etc complete
1 Sqm
12.28
6.14
18.42
18.42 /Sqm
Kg
No
No
No
Distember
Painter I Class
Mazdoor I Class
Mazdoor II Class
Add for 20% on labour
71.40
235.00
183.00
165.00
/Kg
/each
/each
/each
95.68
117.50
91.50
132.00
136.40
PAGE101
Ls
LS
0.00
573.08
57.31 /Sqm
Priming coat for new iron with ready mixed primer of approved quality 10Sqm
1.33 kg
Red Oxide
132.50 kg
176.23
0.70 No
Painter-I class
235.00 /each
164.50
Add for 20% on labour
32.90
sundries
including brushes, soaps.putty etc
0.37
374.00
RATE @RS
37.40 /Sqm
Priming coat on new wood work with ready mixed primer of approved quality-10 Sqm
1.44 kg
0.70 No
205.20
164.50
32.90
0.00
402.60
40.26 /Sqm
Painting two coats over new iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.10 nos
Cost of paint
220.50 /lit
Painter I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs
489.51
258.50
103.40
0.59
852.00
85.20 /Sqm
Painting two coats over new wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.55 Lit
1.20 nos
Cost of paint
220.50 /lit
Painter I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs
562.28
282.00
56.40
0.32
901.00
90.10 /Sqm
Painting two coats over old iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
1.89 Lit
1.10 nos
Cost of paint
220.50 /lit
Painter I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs
72.70 /Sqm
416.75
258.50
51.70
0.05
727.00
PAGE102
Painting two coats over old wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.20 nos
Cost of paint
220.50 /lit
Painter I class
235.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs
489.51
282.00
56.40
2.09
830.00
83.00 /Sqm
cum
nos
nos
nos
RATE @RS
2666.16
261.00
183.00
165.00
/cum
/each
/each
/each
239.95
417.60
91.50
181.50
138.12
0.00
1068.67
106.87 /Sqm
Pointing with cement mortar 1:3 flush pointing for brickwork including cost
and conveyance of all materialsand all labour charges etc complete for 10 Sqm
0.06
1.60
0.50
1.10
cum
nos
nos
nos
RATE @RS
2666.16
261.00
183.00
165.00
/cum
/each
/each
/each
159.97
417.60
91.50
181.50
138.12
0.00
988.69
98.87 /Sqm
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by
weight of cement including cost and conveyance of all materials to site
and all labour charges etc complete for 10 Sqm
0.04
2.20
0.50
1.10
cum
nos
nos
nos
RATE @RS
2666.16
261.00
183.00
165.00
/cum
/each
/each
/each
112.33 /cum
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio
106.65
574.20
91.50
181.50
169.44
0.00
1123.29
PAGE103
of 32:12.5 including cost and conveyance of all materials to site and all labour
charges for mixing , laying ,and finishing etc complete for 10 cum
12.80
5.00
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
582.40
869.00
261.00
183.00
165.00
/cum
/cum
/each
/each
/each
7454.72
4345.00
469.80
3239.10
2326.50
1207.08
0.00
19042.20
1904.22 /cum
Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with one course of pressed tiles of size 23x23x2cm with cement
mortar 1:3 mix and pointed with the same oiled mortar including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
0.80
189
0.12
5.80
10.00
1.10
2.10
2.20
1.10
cum
nos
cum
kg
Sqm
nos
nos
nos
nos
RATE @RS
1904.22
8765.40
2666.16
15.00
112.33
291.00
261.00
183.00
165.00
/cum
/1000 nos
/cum
/kg
/Sqm
/each
/each
/each
/each
1523.38
1656.66
319.94
87.00
1123.29
320.10
548.10
402.60
181.50
290.46
0.00
6453.03
645.30 /Sqm
Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with Cement mortor 1:4 -20mm thick plastering including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
0.80
5.80
0.22
2.20
0.50
3.20
cum
kg
cum
nos
nos
nos
RATE @RS
1904.22
15.00
2094.77
291.00
183.00
165.00
/cum
/kg
/cum
/each
/each
/each
1523.38
87.00
460.85
640.20
91.50
528.00
251.94
0.00
3582.87
358.29 /Sqm
Honey comb brick work with class III country bricks including cost and conveyance
PAGE104
cum
nos
nos
nos
nos
RATE @RS
4024.60
2666.16
291.00
261.00
183.00
165.00
/1000Nos
/cum
/each
/each
/each
/each
2575.74
1866.31
931.20
1696.50
402.60
891.00
784.26
0.00
9147.61
914.76 /Sqm
Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and
conveyance of all materials to site and all labour charges etc complete
4.59
3.50
7.20
7.10
14.10
x1000nos
nos
nos
nos
nos
Country bricks
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
4024.60
291.00
261.00
183.00
165.00
/1000nos
/each
/each
/each
/each
18472.91
1018.50
1879.20
1299.30
2326.50
1304.70
0.00
26301.11
2630.11 /cum
Dry Brick work using country bricks 83/4"x41/4"x21/4" including cost and
conveyance of all materials to site and all labour charges etc complete
6.01
3.50
7.20
7.10
14.10
nos
nos
nos
nos
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
4024.60
291.00
261.00
183.00
165.00
/1000nos
/each
/each
/each
/each
24187.85
1018.50
1879.20
1299.30
2326.50
1304.70
0.00
32016.05
3201.61 /cum
Gravel
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
sundries
RATE @RS
130.00 cum
183.00 /each
165.00 /each
376.02 /Sqm
1508.00
1299.30
577.50
375.36
0.00
3760.16
PAGE105
Rough stone dry packing for aprons and revetments including cost and
conveyance and all labour charges etc complete
11.00
3.50
10.60
7.10
cum
nos
nos
nos
Rough stone
Wodders
Mazdoor I class
Mazdoor II class
Add for 20% on labour
319.20
189.00
183.00
165.00
RATE @RS
/cum
/each
/each
/each
3511.20
661.50
1939.80
1171.50
754.56
0.00
8038.56
803.86 /Sqm
cum
nos
nos
nos
nos
Rough stone
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
319.20
291.00
261.00
183.00
165.00
RATE @RS
/cum
/each
/each
/each
/each
3830.40
1018.50
1853.10
1299.30
577.50
1899.36
0.00
10478.16
1047.82 /Sqm
Wodders
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
Labour Charges for removing &
clearing the old stones
RATE @RS
302
0.21
2.00
1.00
1.00
189.00 /each
183.00 /each
165.00 /each
Ls
661.50
1939.80
1171.50
754.56
2.64
4530.00
453.00 /cum
Precast Hollow Block Masonry with C.m.1:5 mix using hollow in size
of 0,40x0.10mx0.20m
for 2.56 Cum
nos
Hollow Block
10.00
cum
CM 1:5
1751.93
nos
Mason ii class
261.00
nos
mazdoor I class
183.00
nos
mazdoor ii class
165.00
Add for 20% on labour
each
each
each
each
each
4431.91 /2.56
RATE @RS
1731.21 /cum
3020.00
367.91
522.00
183.00
165.00
174.00
0.00
4431.91
PAGE106
151
0.21
2.00
1.00
1.00
Precast Hollow Block Masonry with C.m.1:5 mix using hollow in size
of 0,40x0.20mx0.20m
for 2.56 Cum
nos
Hollow Block
17.00
cum
CM 1:5
1751.93
nos
Mason ii class
261.00
nos
mazdoor I class
183.00
nos
mazdoor ii class
165.00
Add for 20% on labour
each
each
each
each
each
3978.91 /2.56
RATE @RS
1554.26 /cum
2567.00
367.91
522.00
183.00
165.00
174.00
0.00
3978.91
Roofing with AC corrugated sheet 6mm thick including cost of " J " bolts
and bitumen washer etc.complete. -10 Sqm
11.00
2.20
1.10
3.20
Sqm
Nos
Nos
Nos
20.00 Nos
20.00 Nos
LS
159.60
235.00
284.00
183.00
/Sqm
/each
/each
/each
2.50 /each
0.50 /each
LS
352.00 /Sqm
Nos
m
kg
cum
No
No
No
No
-10Sqm
Mangalore tiles
7.55 /each
CW,reepers 50x25mm
26.40 /mtr
Reeper nails 50mm long
48.00 /kg
Lime mortar
2848.96 /cum
Carpenter I class
284.00 /each
Mason IIclass
261.00 /each
Mazdoor I Class
183.00 /each
Mazdoor II class
165.00 /each
Add for 20% on labour
Sundries
including wind-ties,screws,washers etc
RATE @RS
1755.60
517.00
312.40
585.60
283.00
50.00
10.00
6.40
3520.00
1207.20
950.40
23.52
256.41
142.00
130.50
201.30
363.00
167.36
8.31
3450.00
345.00 /Sqm
Best tiled roofing with Mangalore tiles,over ceiling tiles of best quality
including CW reepers -10Sqm
160.00 Nos
250.00 Nos
36.00 m
Mangalore tiles
Ceiling tiles 20x20x2 cm
CW,reepers 50x25mm
7.55 /each
4.55 /each
26.40 /mtr
1207.20
1136.25
950.40
PAGE107
0.49
0.09
0.50
1.00
1.10
3.30
kg
cum
No
No
Nos
Nos
23.52
256.41
142.00
261.00
201.30
544.50
229.76
0.00
4952.34
495.23 /Sqm
Mason IIclass
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
Sundries
RATE @RS
261.00 /each
183.00 /each
165.00 /each
104.40
91.50
49.50
49.08
0.00
294.48
29.45 /Sqm
no
m
m3
m3
no
no
no
no
1.00 kg
0.006 mt
0.40 kg
RATE @RS
750.00
125.00
319.90
1904.22
253.00
235.00
291.00
183.00
/1 no
/1m
/cum
/cum
/each
/each
/each
/each
20.95 /kg
4761.60 /mt
6.00 /kg
750.00
75.00
143.96
209.46
253.00
58.75
291.00
183.00
157.15
20.95
28.57
2.40
0.76
2174.00
2174.00 /each
Supplying and Fixing inposition of best quality make White glazed wash
basin of size 550x 400mm - 1 No.
1.00
1.00
0.10
0.50
1.00
No
No
No
No
No
1375.00
253.00
235.00
291.00
165.00
/each
/each
/each
/each
/each
1375.00
253.00
23.50
145.50
165.00
117.40
PAGE108
6.00 Set
10.00 g
0.25 No
RATE @RS
5.00
Set
8.00
100g
1.50 /each
30.00
0.80
0.38
0.00
2110.58
2110.58 /each
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia
with necessary shoes, bends,& clamps etc.,
3.00
1.00
1.00
1.00
1.00
L.S
m
No
No
No
No
125.00
30.00
30.00
9.00
253.00
/Rm
/each
/each
/each
/each
L.S
For 3 Rm
249.20 /Rm
375.00
30.00
30.00
9.00
253.00
50.60
0.00
747.60
PAGE109
cum
cum
cum
cum
kg
nos
nos
nos
nos
nos
Sq.m
700.40
767.40
863.60
319.90
4.7616
112.00
101.00
101.00
284.00
179.00
/cum
/cum
/cum
/cum
/kg
/each
/each
/each
/each
/each
LS
LS
LS
LS
311.68
130.46
60.45
108.77
1577.04
210.56
109.08
8.08
122.12
64.44
25.00
25.00
10.00
10.00
0.00
LS
0.00
2772.68
PAGE110
PAGE111
PAGE112
PAGE113
PAGE114
PAGE115
Name of work :
Estimate Amount : Rs:
COST OF MATERIALS AT SITE
Sl.No
Name of materials
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Cement
sand for mortar
sand for filling
Rough stone
Bond stone
40mm iss metal
20mm iss metal
10-12mm metal
6-10mm metal
Rough stone for revet
Cutstone roughly dres
steel
country bricks ( 23/4")
country bricks ( 21/4")
brick jelly 20 mm
shell lime
Lime stone
pressed tiles
Country wood planks
--do-- scantlings
Gravel
lead in KM
Plains
Hills
16
0
35
0
35
0
8
0
8
0
8
0
8
0
8
0
8
0
8
0
8
0
16
0
10
0
10
0
10
0
10
0
10
0
1
0
1
0
1
0
1
0
6mm metal
8
CEMENT MORTAR 1:2
0.720 MT
Cost of cement
1.00 cum
Cost of sand
Mixing charges
Add for 20% on labour
Cost
Conveyan Conveyan
c ( Plains ) c ( Hills )
Total
4700.00
110.00
110.00
332.00
455.00
742.00
1034.00
831.50
591.50
288.00
3265.00
33500.00
3985.00
3140.00
550.00
0.00
0.00
12340.00
33030.00
28790.00
130.00
74.20
233.50
233.50
62.40
62.40
62.40
62.40
62.40
62.40
62.40
62.40
74.20
66.00
66.00
54.00
54.00
54.00
5.40
5.40
5.40
7.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4774.20
343.50
343.50
394.40
517.40
804.40
1096.40
893.90
653.90
350.40
3327.40
33574.20
4051.00
3206.00
604.00
54.00
54.00
12345.40
33035.40
28795.40
137.80
731.00
62.40
0.00
793.40
553.00
62.40
0.00
615.40
0.00
4583.23
343.50
4926.73
558.40
4774.20 /MT
343.50 /cum
0
496.00
62.40
4774.20 /MT
343.50 /cum
3437.42
343.50
3780.92
4774.20 /MT
343.50 /cum
2291.62
343.50
2635.12
43.35
0.00
2678.47
43.35 /cum
0.00 /cum
PAGE116
Mixing charges
Add for 20% on labour
Mixing charges
Add for 20% on labour
Mixing charges
Add for 20% on labour
4774.20 /MT
343.50 /cum
43.35 /cum
0.00 /cum
4774.20 /MT
343.50 /cum
43.35 /cum
0.00 /cum
4774.20 /MT
343.50 /cum
43.35 /cum
0.00 /cum
4774.20
343.50
105.90
0.00
/cum
/cum
/cum
/cum
1718.71
343.50
2062.21
43.35
0.00
2105.56
1374.97
343.50
1718.47
43.35
0.00
1761.82
1145.81
343.50
1489.31
43.35
0.00
1532.66
2387.10
343.50
105.90
0.00
2836.50
DATA
Earth work excavation and depositing on bank with in initial lead of 10 m
and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Rate / cum
41.85
Add 100% extra for narrow foundation
41.85
83.70
Add for 20% on labour
0.00
83.70 /cum
Cement concrete 1:6:12 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
cum
cum
nos
nos
804.40
1489.31
326.00
228.00
/cum
/cum
/each
/each
7239.60
6701.90
586.80
4035.60
PAGE117
14.10 nos
Mazdoor II class
Add for 20% on labour
206.00 /each
2904.60
0.00
21468.50
RATE @ RS
2146.85 /cum
Cement concrete 1:5:10 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
804.40
1718.47
326.00
228.00
206.00
/cum
/cum
/each
/each
/each
7239.60
7733.12
586.80
4035.60
2904.60
0.00
22499.72
RATE @ RS
2249.97 /cum
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @ RS
804.40
2062.21
326.00
228.00
206.00
/cum
/cum
/each
/each
/each
7239.60
9279.95
586.80
4035.60
2904.60
0.00
0.00
24046.55
2404.66 /cum
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @ RS
804.40
2635.12
326.00
228.00
206.00
/cum
/cum
/each
/each
/each
2662.46 /cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
7239.60
11858.04
586.80
4035.60
2904.60
0.00
0.00
26624.64
PAGE118
laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
1096.40
3780.92
326.00
228.00
206.00
/cum
/cum
/each
/each
/each
9867.60
17014.14
586.80
4035.60
2904.60
0.00
0.00
34408.74
3440.87 /cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
1096.40
2635.12
326.00
228.00
206.00
/cum
/cum
/each
/each
/each
9867.60
11858.04
586.80
4035.60
2904.60
0.00
0.00
29252.64
2925.26 /cum
cum
cum
cum
nos
nos
nos
nos
Rough stone
Bond stone
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
394.40
517.40
1761.82
363.00
326.00
228.00
206.00
/cum
/cum
/cum
/each
/each
/each
/each
3944.00
517.40
5990.19
2577.30
3455.60
3214.80
2904.60
0.00
0.00
22603.89
2260.39 /cum
Rough stone
Bond stone
Cement mortar 1:4
394.40 /cum
517.40 /cum
2105.56 /cum
3944.00
517.40
7158.90
PAGE119
7.10
10.60
14.10
14.10
nos
nos
nos
nos
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
363.00
326.00
228.00
206.00
RATE @RS
/each
/each
/each
/each
2577.30
3455.60
3214.80
2904.60
0.00
0.00
23772.60
2377.26 /cum
cum
cum
cum
nos
nos
nos
nos
Rough stone
Bond stone
clay
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
394.40
517.40
28.60
363.00
326.00
228.00
206.00
RATE @RS
/cum
/cum
/cum
/each
/each
/each
/each
3944.00
517.40
114.40
1270.50
3455.60
2416.80
2183.60
0.00
0.00
13902.30
1390.23 /cum
Dry stone masonry for Retainingwall -10cum including cost and conveyance
of all materials and all labour charges etc complete for 10 cum
12.00
3.50
7.10
7.10
3.50
cum
nos
nos
nos
nos
RATE @RS
350.40
363.00
326.00
228.00
206.00
/cum
/each
/each
/each
/each
4204.80
1270.50
2314.60
1618.80
721.00
0.00
0.00
10129.70
1012.97 /cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"
and conveyance of all materials to site and all labour charges etc complete -10 cum
4590
2.50
3.50
10.60
7.10
21.20
nos
cum
nos
nos
nos
nos
Country bricks
8
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
3/4"
x4
3/8"
RATE @RS
x2
3/4"
4051.00
1761.82
363.00
326.00
228.00
206.00
3371.07 /cum
/1000nos
/cum
/each
/each
/each
/each
18594.09
4404.55
1270.50
3455.60
1618.80
4367.20
0.00
0.00
33710.74
PAGE120
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"
and conveyance of all materials to site and all labour charges etc complete
6010
2.80
3.50
7.10
7.10
14.10
nos
cum
nos
nos
nos
nos
Country bricks
8
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
3/4"
x4
1/4"
RATE @RS
x2
1/4"
3206.00
1761.82
363.00
326.00
228.00
206.00
/1000nos
/cum
/each
/each
/each
/each
19268.06
4933.10
1270.50
2314.60
1618.80
2904.60
0.00
0.00
32309.66
3230.97 /cum
Collection and supply of sand and filling in to the basement including cost and
conveyance to the siteand all labour charges for filling
as per standard speecifications
1.00 cum
1.00 cum
343.50 /cum
13.00 /cum
343.50
13.00
0.00
356.50
356.50 /cum
Collection and supply of gritty gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete,
1.00 cum
1.00 cum
1.00 cum
137.80 /cum
3.05 /cum
14.70 /cum
137.80
3.05
14.70
0.00
155.55
155.55 /cum
Collection and supply of Well gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete,
1.00 cum
1.00 cum
1.00 cum
Wellgravel
Stacking charges
Labour charges for filling
Add for 20% on labour
RATE @RS
107.80 /cum
3.05 /cum
14.70 /cum
125.55 /cum
Refilling the basement with excavated earth other than sand complying the
Standard specification
RATE @RS
14.70 /cum
107.80
3.05
14.70
0.00
125.55
PAGE121
0.00
14.70 /cum
Supplying and erecting centering shuttering including necessary supports for plane
surface in foundation and basement and in all floors for R C C column footing
column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild
steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country
wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and
supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre
complete complying with standard specifications and as directed by departmental
officers including conveyance of all materials to site and proper centering etc complete.
Sub Data I
Cost of MS sheets & angles for each set
Weight of MS sheet B.G 10 Gauge size 90x60cm x 3.175 mm
3.175 x 7850/1000 = 24.924 kg/m 2
24.924 Kg/m2 x 0.54 m2 = 13.46 Kg.
Weight of MS angle size 25 x 25 x 3 mm
3.6 x 1.1 Kg/m = 4.00 Kg
13.46 kgs
Cost of MS sheet
4 kgs
Cost of MS angle
L.S
Cutting,bending,welding,etc
48.00 /kg
48.00 /kg
646.08
192.00
21.63
859.71
Sub Data 2
Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm
19 Nos
Cost of strutting
0.12 cum
98.5 Rm
859.71 /each
16334.49
10340.00 /cum
21.10 /Rm
1240.80
2078.35
3319.15
16334.49 /40
3319.15 /5
408.36
663.83
3.80 nos
5.40 nos
1 nos
L.S
L.S
408.36
663.83
355.00
228.00
293.00
/each
/each
/each
/each
/each
396.64 /Sqm
408.36
663.83
1349.00
1231.20
293.00
0.00
10.46
10.55
3966.40
PAGE122
396.64
39.66
436.30 /Sqm
21.10
2078.35 /5
355.00 /each
228.00 /each
3966.40 -590.57
RATE @RS
iv] Centering below Ground level
50% of the above rate
337.58 /Sqm
396.64 /2
RATE @RS
415.67
106.50
68.40
0.00
590.57
3375.83
198.32
198.32 /Sqm
Cost of steel
Cost of binding wire
Fitter I class
Add for 20% on labour
33574.20 /mt
48.00 /mt
322.00 /each
33574.20
0.48
11270.00
0.00
0.00
44844.68
9.00
4.50
3.50
21.20
35.30
RATE @RS
9867.60
17014.14
1141.00
4833.60
7271.80
0.00
0.00
40128.14
4012.81 /cum
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal 1445.85
including cost and conveyance of all materials to site and all
labour charges for mixing, laying, and curing etc complete for 10 cum
9.00 cum
20mm ISSmetal
1096.40 /cum
4.50 cum
sand
343.50 /cum
9867.60
1545.75
PAGE123
###
3.50
21.20
35.30
Kg
nos
nos
nos
cement
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
9.00
4.50
3.50
21.20
35.30
/kg
/each
/each
/each
15425.44
1141.00
4833.60
7271.80
0.00
0.00
40085.19
4008.52 /cum
RATE @RS
9.00
4.50
###
3.50
21.20
35.30
4.77
326.00
228.00
206.00
9867.60
22170.29
1141.00
4833.60
7271.80
0.00
0.00
45284.29
4528.43 /cum
9867.60
1545.75
20567.25
1141.00
4833.60
7271.80
0.00
0.00
45227.00
0.10
1.10
1.10
1.10
RATE @RS
114.46 /Sqm
267.85
399.30
250.80
226.60
0.00
0.00
1144.55
PAGE124
0.22
2.20
0.50
3.20
RATE @RS
0.22
2.20
0.50
3.20
/cum
/each
/each
/each
463.22
798.60
114.00
659.20
0.00
0.00
2035.02
203.50 /Sqm
RATE @RS
589.26
798.60
114.00
659.20
0.00
0.00
2161.06
216.11 /Sqm
RATE @RS
0.22
2.20
0.50
3.20
2678.47
363.00
228.00
206.00
387.60
798.60
114.00
659.20
0.00
0.00
1959.40
195.94 /Sqm
cum
nos
nos
nos
RATE @RS
2678.47
363.00
228.00
206.00
/cum
/each
/each
/each
374.99
399.30
114.00
226.60
0.00
0.00
1114.89
111.49 /Sqm
2105.56 /cum
294.78
PAGE125
1.10 nos
0.50 nos
1.10 nos
Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
363.00 /each
228.00 /each
206.00 /each
399.30
114.00
226.60
0.00
0.00
1034.68
103.47 /Sqm
cum
nos
nos
nos
RATE @RS
1761.82
363.00
228.00
206.00
/cum
/each
/each
/each
246.65
399.30
114.00
226.60
0.00
0.00
986.55
98.66 /Sqm
Damp proof course in cement mortor CM1:3 - 20mm thick with water proofing
compound at 5% by wt of cement
0.21
1.10
1.10
2.20
1.10
cum
nos
nos
nos
nos
5.00 kg
RATE @RS
2678.47
363.00
326.00
228.00
206.00
/cum
/each
/each
/each
/each
15.00 / kg
562.48
399.30
358.60
501.60
226.60
0.00
75.00
0.00
2123.58
212.36 /Sqm
Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing
compound at 2 % by wt of cement
0.14
1.10
0.50
1.10
cum
nos
nos
nos
1.00 kg
RATE @RS
2678.47
363.00
228.00
206.00
/cum
/each
/each
/each
42.35 / kg
374.99
399.30
114.00
226.60
0.00
42.35
0.00
1157.24
115.72 /Sqm
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm
ISS metal to 25mm thick including cost and conveyance of all materials to site
and all labour charges for mixing, laying, curing etc complete for 10 cum
PAGE126
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
25mm Tk
3258.62
893.90
3780.92
326.00
228.00
206.00
RATE @RS
3258.62 /cum
x 0.025 =
81.47 /Sqm
/cum
/cum
/each
/each
/each
8045.10
17014.14
586.80
4035.60
2904.60
0.00
0.00
32586.24
Ellispattern Ist sort -20mm thick including cost and conveyance of all
materials to site and all labour charges etc complete
0.24
0.117
0.50
1.10
4.30
nos
mt
nos
nos
nos
6 to 10mm chips
Cost of cement
Mason I class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
653.90
4774.20
363.00
228.00
206.00
/cum
/mt
/each
/each
/each
156.94
558.58
181.50
250.80
885.80
0.00
0.00
2033.62
203.36 /Sqm
Flooring with red cement plaster polished surface and thread lined -10 Sqm
10.00 Sqm
0.80 kg
1.10 Nos
195.94 Sqm
20.00 kg
363.00 cum
1959.40
16.00
399.30
0.00
0.00
2374.70
237.47 /Sqm
Gravel
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
sundries
RATE @RS
137.80 cum
228.00 E
206.00 E
234.26
250.80
103.00
0.00
0.00
588.06
58.81 /Sqm
5130.00
PAGE127
0.10
4.00
1.10
4.10
2.70
3.30
cum
kg
nos
nos
nos
nos
RATE @RS
3780.92
23.00
363.00
326.00
228.00
206.00
/cum
/kg
/each
/each
/each
/each
378.09
92.00
399.30
1336.60
615.60
679.80
0.00
0.00
8631.39
863.14 /Sqm
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality
including cost and conveyance of all materials to site and all labour charges etc
complete.
167
0.10
4.00
1.10
4.10
2.70
3.30
Nos
cum
kg
nos
nos
nos
nos
Glazed tiles
cement mortar 1:2 mix
Colour cement
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
24.00
3780.92
26.65
363.00
326.00
228.00
206.00
/each
/cum
/kg
/each
/each
/each
/each
4008.00
378.09
106.60
399.30
1336.60
615.60
679.80
0.00
0.00
7523.99
752.40 /Sqm
Nos
cum
nos
nos
nos
nos
Ceromic tiles
cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
22.35
2678.47
363.00
326.00
228.00
206.00
/each
/cum
/each
/each
/each
/each
5587.50
562.48
399.30
358.60
501.60
453.20
0.00
0.00
7862.68
786.27 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
cost and conveyance of all materials to site and all labour charges etc complete
112
0.21
1.20
1.00
1.00
Nos
cum
nos
no
no
305x305x6
50.80
2678.47
363.00
326.00
228.00
/each
/cum
/each
/each
/each
5689.60
562.48
435.60
326.00
228.00
PAGE128
1.00 no
0.50 no
0.50 Kg
3.0 Kg
Mazdoor II class
Stone cutter I class
Add for 20% on labour
Cotton waste
Colour cement
Sundries
206.00 /each
280.00 /each
9.20 /Kg
26.65 /Kg
LS
RATE @RS
206.00
140.00
0.00
4.60
79.95
0.00
7672.23
767.22 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 400x400x7mm including
cost and conveyance of all materials to site and all labour charges etc complete
63
0.21
1.20
1.00
1.00
1.00
0.50
Nos
cum
nos
no
no
no
no
0.50 Kg
3.0 Kg
400x400x7
RATE @RS
64.00
2678.47
363.00
326.00
228.00
206.00
280.00
/each
/cum
/each
/each
/each
/each
/each
9.20 /Kg
26.65 /Kg
LS
4032.00
562.48
435.60
326.00
228.00
206.00
140.00
0.00
4.60
79.95
0.00
6014.63
601.46 /Sqm
Supplying & fixing of Granite slab of 20mm thick with nosing, cutting and bedding
laidover in CM 1 : 2 20mm thick - 10 Sqm
10
0.21
1.10
2.00
2.20
1.10
Sqm
cum
nos
no
no
no
4.0
1.60
0.50
1.10
Kg
no
no
no
1815.00
3780.92
363.00
326.00
228.00
206.00
23.00
326.00
228.00
206.00
/each
/cum
/each
/each
/each
/each
18150.00
793.99
399.30
652.00
501.60
226.60
0.00
/Kg
/each
/each
/each
92.00
521.60
114.00
226.60
0.00
0.00
21677.69
LS
2167.77 /Sqm
Pointing with cement mortor 1:3 cuddapah slab & paving stone to full depth - 10 Sqm
0.01 cum
1.60 nos
2678.47 /cum
326.00 /each
26.78
521.60
PAGE129
0.50 nos
1.10 nos
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
10.50
0.12
1.00
10.00
1.10
2.10
2.20
1.10
228.00 /each
206.00 /each
88.90 /Sqm
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
thick and pointed with cement mortar 1:3 -10 Sqm
Sqm
Cuddapah slabs (50mm thick)
342.00 Sqm
cum
cement mortar1:3
2678.47 cum
cum
Cement Concrete 1:6:12
2146.85 cum
Sqm
Pointing with CM 1:3
88.90 cum
No
Mason I class
363.00 cum
No
Mason IIclass
326.00 /each
No
Mazdoor I Class
228.00 /each
No
Mazdoor II class
206.00 /each
Add for 20% on labour
sundries
RATE @RS
114.00
226.60
0.00
0.00
888.98
3591.00
321.42
2146.85
888.98
399.30
684.60
501.60
226.60
0.00
0.00
8760.35
876.04 /Sqm
White washing two coats using shell lime including cost and conveyance of
all materials to site and all labour charges etc comoplete for 100 Sqm
0.07
1.60
0.50
2.70
cum
nos
nos
nos
RATE @RS
54.00
326.00
228.00
206.00
/cum
/each
/each
/each
3.78
521.60
114.00
556.20
0.00
0.00
1195.58
11.96 /Sqm
Colour washing two coats using approved colour pigments including cost
and conveyance of all materials to site and all labour charges etc complete
1 Sqm
11.96
5.98
17.93
17.93 /Sqm
Kg
No
No
No
Distember
Painter I Class
Mazdoor I Class
Mazdoor II Class
Add for 20% on labour
78.50
293.00
228.00
206.00
/Kg
/each
/each
/each
105.19
146.50
114.00
164.80
0.00
PAGE130
Ls
LS
0.00
530.49
53.05 /Sqm
Priming coat for new iron with ready mixed primer of approved quality 10Sqm
1.33 kg
Red Oxide
145.50 kg
193.52
0.70 No
Painter-I class
293.00 /each
205.10
Add for 20% on labour
0.00
sundries
including brushes, soaps.putty etc
0.38
399.00
RATE @RS
39.90 /Sqm
Priming coat on new wood work with ready mixed primer of approved quality-10 Sqm
1.44 kg
0.70 No
225.72
205.10
0.00
0.18
431.00
43.10 /Sqm
Painting two coats over new iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.10 nos
Cost of paint
242.55 /lit
Painter I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs
538.46
322.30
0.00
0.24
861.00
86.10 /Sqm
Painting two coats over new wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.55 Lit
1.20 nos
Cost of paint
242.55 /lit
Painter I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs
618.50
351.60
0.00
0.90
971.00
97.10 /Sqm
Painting two coats over old iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
1.89 Lit
1.10 nos
Cost of paint
242.55 /lit
Painter I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs
78.10 /Sqm
458.42
322.30
0.00
0.28
781.00
PAGE131
Painting two coats over old wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.20 nos
Cost of paint
242.55 /lit
Painter I class
293.00 /each
Add for 20% on labour
sundries
including brushes, soaps.putty etc
RATE @Rs
538.46
351.60
0.00
9.94
900.00
90.00 /Sqm
cum
nos
nos
nos
RATE @RS
2678.47
326.00
228.00
206.00
/cum
/each
/each
/each
241.06
521.60
114.00
226.60
0.00
0.00
1103.26
110.33 /Sqm
Pointing with cement mortar 1:3 flush pointing for brickwork including cost
and conveyance of all materialsand all labour charges etc complete for 10 Sqm
0.06
1.60
0.50
1.10
cum
nos
nos
nos
RATE @RS
2678.47
326.00
228.00
206.00
/cum
/each
/each
/each
160.71
521.60
114.00
226.60
0.00
0.00
1022.91
102.29 /Sqm
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by
weight of cement including cost and conveyance of all materials to site
and all labour charges etc complete for 10 Sqm
0.04
2.20
0.50
1.10
cum
nos
nos
nos
RATE @RS
2678.47
326.00
228.00
206.00
/cum
/each
/each
/each
116.49 /cum
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio
107.14
717.20
114.00
226.60
0.00
0.00
1164.94
PAGE132
of 32:12.5 including cost and conveyance of all materials to site and all labour
charges for mixing , laying ,and finishing etc complete for 10 cum
12.80
5.00
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
604.00
54.00
326.00
228.00
206.00
/cum
/cum
/each
/each
/each
7731.20
270.00
586.80
4035.60
2904.60
0.00
0.00
15528.20
1552.82 /cum
Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with one course of pressed tiles of size 23x23x2cm with cement
mortar 1:3 mix and pointed with the same oiled mortar including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
0.80
189
0.12
5.80
10.00
1.10
2.10
2.20
1.10
cum
nos
cum
kg
Sqm
nos
nos
nos
nos
RATE @RS
1552.82
12345.40
2678.47
15.00
116.49
363.00
326.00
228.00
206.00
/cum
/1000 nos
/cum
/kg
/Sqm
/each
/each
/each
/each
1242.26
2333.28
321.42
87.00
1164.94
399.30
684.60
501.60
226.60
0.00
0.00
6961.00
696.10 /Sqm
Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with Cement mortor 1:4 -20mm thick plastering including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
0.80
5.80
0.22
2.20
0.50
3.20
cum
kg
cum
nos
nos
nos
RATE @RS
1552.82
15.00
2105.56
363.00
228.00
206.00
/cum
/kg
/cum
/each
/each
/each
1242.26
87.00
463.22
798.60
114.00
659.20
0.00
0.00
3364.28
336.43 /Sqm
Honey comb brick work with class III country bricks including cost and conveyance
PAGE133
cum
nos
nos
nos
nos
RATE @RS
4051.00
2678.47
363.00
326.00
228.00
206.00
/1000Nos
/cum
/each
/each
/each
/each
2592.64
1874.93
1161.60
2119.00
501.60
1112.40
0.00
0.00
9362.17
936.22 /Sqm
Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and
conveyance of all materials to site and all labour charges etc complete
4.59
3.50
7.20
7.10
14.10
x1000nos
nos
nos
nos
nos
Country bricks
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
4051.00
363.00
326.00
228.00
206.00
/1000nos
/each
/each
/each
/each
18594.09
1270.50
2347.20
1618.80
2904.60
0.00
0.00
26735.19
2673.52 /cum
Dry Brick work using country bricks 83/4"x41/4"x21/4" including cost and
conveyance of all materials to site and all labour charges etc complete
6.01
3.50
7.20
7.10
14.10
nos
nos
nos
nos
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
4051.00
363.00
326.00
228.00
206.00
/1000nos
/each
/each
/each
/each
24346.51
1270.50
2347.20
1618.80
2904.60
0.00
0.00
32487.61
3248.76 /cum
Gravel
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
sundries
RATE @RS
137.80 cum
228.00 /each
206.00 /each
393.83 /Sqm
1598.48
1618.80
721.00
0.00
0.00
3938.28
PAGE134
Rough stone dry packing for aprons and revetments including cost and
conveyance and all labour charges etc complete
11.00
3.50
10.60
7.10
cum
nos
nos
nos
Rough stone
Wodders
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
350.40
236.00
228.00
206.00
/cum
/each
/each
/each
3854.40
826.00
2416.80
1462.60
0.00
0.00
8559.80
855.98 /Sqm
cum
nos
nos
nos
nos
Rough stone
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
Add for 20% on labour
RATE @RS
350.40
363.00
326.00
228.00
206.00
/cum
/each
/each
/each
/each
4204.80
1270.50
2314.60
1618.80
721.00
0.00
0.00
10129.70
1012.97 /Sqm
Wodders
Mazdoor I Class
Mazdoor II class
Add for 20% on labour
Labour Charges for removing &
clearing the old stones
RATE @RS
236.00 /each
228.00 /each
206.00 /each
Ls
4.60
4710.00
471.00 /cum
cum
cum
cum
cum
kg
nos
nos
nos
nos
nos
Sq.m
793.40
615.40
558.40
343.50
4.7742
228.00
206.00
206.00
355.00
363.00
/cum
/cum
/cum
/cum
/kg
/each
/each
/each
/each
/each
LS
LS
LS
826.00
2416.80
1462.60
0.00
353.06
104.62
39.09
116.79
1581.22
428.64
222.48
16.48
152.65
130.68
25.00
25.00
10.00
258.00
Rate / Sq.m
69.66
6.97
1/6 No
231.00
38.50
1 No
231.00
231.00
3 No
258.00
774.00
1/6 No
231.00
38.50
1082.00
Rate per 1Sq.m
108.20
(ii)Hire Charges
600 Sq.m
2.5 litres
828.00
8 Hours
54.15
1083.00
1911.00
1911.00 /600x10 =
(i)+(ii)
31.85
140.05
Spreading Gravel and consolidation with power roller rolling excluding cost of Gravel
(i) Hire charges for Machineries
3.25 litres
1159.00
R 54.15
/ litre
8 lit
1407.90
2566.90
1000 cum
2.57
828.00
20 litres
R 54.15
per litre
1083.00
1911.00
425 cum
4.50
2 Nos.
258.00
516.00
5.16
(i)+(ii)+(iii)
12.23
Mazdoor I class
2 Nos.
258.00
516.00
5.16
2 Nos.
258.00
516.00
5.16
Maz I
1.08x1/6
258.00
46.44
1.08x1/8
258.00
34.83
L.S
2.20
L.S
5.50
L.S
2.20
Regulation of traffic
L.S
2.20
L.S
0.55
93.92
Forming embankment with earth work excavation from borrow pits and
compaction by power roller
100 % Compaction
3.25 litres
1159.00
54.15 / litre
1407.90
2566.90
1000 cum
2.57
2.5 litres
828.00
54.15 / litre
1083.00
1911.00
425 cum
4.50
1911.00 /425
2.57
4.50
7.07
Mazdoor I class
2 Nos
258.00
516.00
5.16
7.07
12.23
5.16
Forming embankment with earth work excavation from borrow pits and
compaction by power roller
97% Compaction
3.25 litres
1159.00
54.15 / litre
1407.90
2566.90
1000 cum
2.57
2.5 litres
828.00
54.15 / litre
1083.00
1911.00
500 cum
3.82
2.57
3.82
6.39
2 Nos
258.00
516.00
5.16
6.39
11.55
5.16
3.25 litres
1159.00
54.15 / litre
1407.90
2566.90
1000 cum
2.57
2566.90 /1000
Power roller
Hire charges excluding fuel charges/day
Fuel charges / day
2.5 litres
828.00
54.15 / litre
1083.00
1911.00
950 Sq.m of 100mm thick
20.12
1911.00 /950x10
2.57
20.12
22.69
6 Nos
258.00
1548.00
Mazdoor II class
24 Nos
231.00
5544.00
7092.00
7092.00
74.65
/950x10
4 Nos
258.00
1032.00
10.32
74.65
10.32
84.97
22.69
84.97
107.66
(i)+(ii)
3.50 litres
1159.00
54.15
1516.20
2675.20
59.45
2675.20 /450x10
Power roller
Hire charges excluding fuel charges/day
Fuel charges / day
2.5 litres
828.00
54.15 / litre
1083.00
1911.00
42.47
1911.00 /450x10
59.45
101.92
42.47
Mazdoor I class
258.00
52.25
1.08x1/4 Nos
Mazdoor II class
231.00
62.37
1.08x1/3 Nos
231.00
83.16
L.S.
1.46
L.S.
1.46
L.S.
1.46
L.S.
1.46
L.S.
1.52
205.14
(i)+(ii)
101.92
205.14
307.06
Mazdoor I class
258.00
2580.00
16 Nos
Mazdoor II class
231.00
3696.00
231.00
924.00
Mazdoor II class
7200.00
40% for labour
(i) Labour charges per 10 Sq.m
(ii) Hire charges for Bitumen Sprayer per 10 sqm
144.00
7200.00 /500x10
L.S.
15.00
15.90
(i)+(ii)/10=
Mazdoor I class
258.00
2580.00
16 Nos
Mazdoor II class
231.00
3696.00
Mazdoor II class
231.00
1617.00
7893.00
(i) Labour charges per 10 Sq.m
(ii) Hire charges for Bitumen Sprayer
157.86
7893.00 /500x10
L.S.
15.00
17.29
(i)+(ii)/10=
Mazdoor Iclass
258.00
12.90
645.00 /500x10
L.S.
(i)+(ii)/10=
645.00
15.00
2.79
Mazdoor I class
258.00
1290.00
Mazdoor II class
231.00
1155.00
2445.00
(i) Labour charges per 10 Sq.m
48.90
2445.00 /500x10
L.S.
15.00
6.39
(i)+(ii)/10=
1674.00 / 8
209.25
15 lit / Hour
1.00
54.15
812.25
45 lit / Hour
1.00
50.00
2250.00
Outturn/hour -
180sqm
3271.50
181.75
3271.50 / 180x10
828.00
8.00
54.15
1083.00
1911.00
38.22
1911.00 x10/500
1452.00 / 8
1452
181.50
181.50
125 kg
14.60 Kg x
1.452
1.452
21.20
Total Hire & fuel charges for PC 20mm thick -10 sqm (i)+(ii)+(iii)
(i) Mini Hot mix plant
(ii) Roller
241.17
Mazdoor I class
258.00
193.50
241.17
193.50
434.67
828.00
8.00
54.15
1083.00
1911.00
19.11
1911.00 x10/1000
1452.00 / 8
1452
181.50
181.50 / 125kg
1.452
9.80 Kg / 10 Sq.m
14.23
Total Hire & fuel charges for Sealcoat type "A" -10 sqm (i)+(ii)
(i) Roller
33.34
Mazdoor I class
258.00
64.50
33.34
64.50
97.84
1452.00 / 8
1452
181.50
181.50 / 125kg
1.450
6.80 Kg / 10 Sq.m
9.86
1674.00 / 8
209.25
15 lit / Hour
1.00
54.15
812.25
45 lit / Hour
1.00
50.00
2250.00
Outturn/hour -
664 sqm
3271.50
3271.50 / 664x10
49.27
828.00
8.00
54.15
1083.00
1911.00
19.11
1911.00 x10/1000
Total Hire & fuel charges for Sealcoat type "B" -10 sqm (i)+(ii)+(iii)
(i) Bitumen Boiler
(iii) Roller
78.24
Mazdoor I class
258.00
64.50
78.24
64.50
142.74
Labour charges for Patch work with Bituminous Premix materials for 0.625
cum of Bituminous material.
Picking the road surface 2" to 3" deep
In patches and cutting
Mazd I
1.08 x 1/6
258.00
46.44
1.08 x 1/8
258.00
34.83
L.S
4.55
L.S
3.54
L.S
17.68
Levelling and tamping the Premix in the patches and pot holes rolling etc.,
6.06
L.S
2.53
Regulation of traffic
L.S
2.53
L.S
0.71
118.87
118.87
Rate
/ 0.625
190.19
Unit
6.97 / Sq.m
5.16 / cum
5.16 / cum
140.05 / Sq.m
12.23 /cum
93.92 / cum
7a.
100 %
7b.
97 %
Compaction
Compaction
12.23 /cum
11.55 /cum
107.66
307.06 / 10 Sq.m
/ 10 Sq.m
15.90 / Sq.m.
10
11
12
532.51 / 10 Sq.m
12b
577.41 / 10 Sq.m
13
Premix Carpet
434.67 / 10 Sq.m
14
97.84 / 10 Sq.m
15
17.29 / 10 Sq.m
16
14b
15
6.39 / Sq.m.
2.79 / 10 Sq.m
142.74 / 10 Sq.m
190.19 / cum
258.00
Rate / Sq.m
69.66
6.97
1/6 No
231.00
38.50
1 No
231.00
231.00
3 No
258.00
774.00
1/6 No
231.00
38.50
1082.00
Rate per 10Sq.m
108.20
(ii)Hire Charges
600 Sq.m
2.5 litres
828.00
8 Hours
54.15
1083.00
1911.00
1911.00
/600x10 =
(i)+(ii)
31.85
140.05
Spreading Gravel and consolidation with power roller rolling excluding cost of Gravel
(i) Hire charges for Machineries
3.25 litres
1159.00
54.15
/ litre
8 lit
1407.90
2566.90
1000 cum
2.57
828.00
20 litres
54.15
per litre
1083.00
1911.00
425 cum
4.50
2 Nos.
258.00
516.00
5.16
(i)+(ii)+(iii)
12.23
Mazdoor I class
2 Nos.
258.00
516.00
5.16
2 Nos.
258.00
516.00
5.16
Maz I
1.08x1/6
258.00
46.44
1.08x1/8
258.00
34.83
L.S
2.20
L.S
5.50
L.S
2.20
Regulation of traffic
L.S
2.20
L.S
0.55
93.92
Forming embankment with earth work excavation from borrow pits and
compaction by power roller
100 % Compaction
3.25 litres
1159.00
54.15 / litre
1407.90
2566.90
1000 cum
2.57
2.5 litres
828.00
54.15 / litre
1083.00
1911.00
425 cum
4.50
1911.00 /425
2.57
4.50
7.07
Mazdoor I class
2 Nos
258.00
516.00
5.16
7.07
12.23
5.16
Forming embankment with earth work excavation from borrow pits and
compaction by power roller
97% Compaction
3.25 litres
1159.00
54.15 / litre
1407.90
2566.90
1000 cum
2.57
2.5 litres
828.00
54.15 / litre
1083.00
1911.00
500 cum
3.82
2.57
3.82
6.39
2 Nos
258.00
516.00
5.16
6.39
11.55
5.16
3.25 litres
1159.00
54.15 / litre
1407.90
2566.90
1000 cum
2.57
2566.90 /1000
Power roller
Hire charges excluding fuel charges/day
Fuel charges / day
2.5 litres
828.00
54.15 / litre
1083.00
1911.00
950 Sq.m of 100mm thick
20.12
1911.00 /950x10
2.57
20.12
22.69
6 Nos
258.00
1548.00
Mazdoor II class
24 Nos
231.00
5544.00
7092.00
7092.00
74.65
/950x10
4 Nos
258.00
1032.00
10.32
74.65
10.32
84.97
22.69
84.97
107.66
(i)+(ii)
1159.00
3.50 litres
54.15
1516.20
2675.20
59.45
2675.20 /450x10
Power roller
Hire charges excluding fuel charges/day
Fuel charges / day
828.00
2.5 litres
54.15 / litre
1083.00
1911.00
42.47
1911.00 /450x10
59.45
101.92
42.47
Mazdoor I class
258.00
52.25
1.08x1/4 Nos
Mazdoor II class
231.00
62.37
1.08x1/3 Nos
231.00
83.16
L.S.
1.46
L.S.
1.46
L.S.
1.46
L.S.
1.46
L.S.
1.52
205.14
(i)+(ii)
101.92
205.14
307.06
Mazdoor I class
258.00
2580.00
16 Nos
Mazdoor II class
231.00
3696.00
231.00
924.00
Mazdoor II class
7200.00
40% for labour
(i) Labour charges per 10 Sq.m
(ii) Hire charges for Bitumen Sprayer per 10 sqm
144.00
7200.00 /500x10
L.S.
15.00
15.90
(i)+(ii)/10=
Mazdoor I class
258.00
2580.00
16 Nos
Mazdoor II class
231.00
3696.00
Mazdoor II class
231.00
1617.00
7893.00
(i) Labour charges per 10 Sq.m
(ii) Hire charges for Bitumen Sprayer
157.86
7893.00 /500x10
L.S.
15.00
17.29
(i)+(ii)/10=
Mazdoor Iclass
258.00
12.90
645.00 /500x10
L.S.
(i)+(ii)/10=
645.00
15.00
2.79
Mazdoor I class
258.00
1290.00
Mazdoor II class
231.00
1155.00
2445.00
(i) Labour charges per 10 Sq.m
48.90
2445.00 /500x10
L.S.
15.00
6.39
(i)+(ii)/10=
1674.00 / 8
209.25
15 lit / Hour
1.00
54.15
812.25
45 lit / Hour
1.00
50.00
2250.00
Outturn/hour -
180sqm
3271.50
181.75
3271.50 / 180x10
828.00
8.00
54.15
1083.00
1911.00
38.22
1911.00 x10/500
+ 25 lit x 50.00
Hire charges for bitumen boiler including fuel (Kerosene) / 202.00
day
Hire charges / hour
1452.00 / 8
1452
181.50
181.50
125 kg
14.60 Kg x
1.452
1.452
21.20
Total Hire & fuel charges for PC 20mm thick -10 sqm (i)+(ii)+(iii)
(i) Mini Hot mix plant
(ii) Roller
241.17
Mazdoor I class
258.00
193.50
241.17
193.50
434.67
828.00
8.00
54.15
1083.00
1911.00
19.11
1911.00 x10/1000
+ 25 lit x 50.00
Hire charges for bitumen boiler including fuel (Kerosene) / 202.00
day
Hire charges / hour
1452.00 / 8
1452
181.50
181.50 / 125kg
1.452
9.80 Kg / 10 Sq.m
14.23
Total Hire & fuel charges for Sealcoat type "A" -10 sqm (i)+(ii)
(i) Roller
33.34
Mazdoor I class
258.00
64.50
33.34
64.50
97.84
Labour charges for Patch work with Bituminous Premix materials for 0.625
cum of Bituminous material.
Picking the road surface 2" to 3" deep
In patches and cutting
Mazd I
1.08 x 1/6
258.00
46.44
1.08 x 1/8
258.00
34.83
L.S
4.55
L.S
3.54
L.S
17.68
Levelling and tamping the Premix in the patches and pot holes rolling etc.,
6.06
L.S
2.53
Regulation of traffic
L.S
2.53
L.S
0.71
118.87
118.87
/ 0.625
Rate
190.19
Unit
6.97 / Sq.m
5.16 / cum
5.16 / cum
140.05 / Sq.m
12.23 /cum
93.92 / cum
7a.
100 %
7b.
97 %
Compaction
Compaction
12.23 /cum
11.55 /cum
107.66
307.06 / 10 Sq.m
/ 10 Sq.m
15.90 / Sq.m.
10
11
12
532.51 / 10 Sq.m
12b
575.71 / 10 Sq.m
13
Premix Carpet
434.67 / 10 Sq.m
14
97.84 / 10 Sq.m
15
17.29 / 10 Sq.m
16
6.39 / Sq.m.
2.79 / 10 Sq.m
141.04 / 10 Sq.m
15
190.19 / cum
16
606.10 / cum
14b
10
0.00
-for Km
0.18 Cum
0.09 Cum
0.09 Cum
1.00
1048.55 /cum
188.74
733.55 /cum
66.02
561.55 /cum
50.54
24.40 Kgs
Bitumen 60/70
55500.00 /Mt
10.00 Sqm
10.00 Sqm
10.00 Sqm
10.00 Sqm
1354.20
/10sqm
606.10
/10sqm
/10sqm
606.10
/10sqm
0.00
2265.60
10
Rs
226.56
2.00
3.00
0.18 Cum
0.00 /cum
0.09 Cum
0.00 /cum
0.09 Cum
0.00 /cum
24.40
10.00
10.00
10.00
10.00
Kgs
Sqm
Sqm
Sqm
Sqm
Bitumen 60/70
55500.00 /Mt
Hire & fuel charges for P.C
/10sqm
Hire & fuel charges for SC
/10sqm
606.10
Labour charges for P.C
/10sqm
Labour charges for S.C
/10sqm
Add 20% Extra for Labour in hilly areas
Rate per sqm
10
0.18
0.09
0.09
24.40
10.00
10.00
10.00
10.00
Cum
Cum
Cum
Kgs
Sqm
Sqm
Sqm
Sqm
10
1354.20
606.10
0.00
1960.30
196.03
5.00
0
0
0
1354.20
606.10
0.00
1960.30
196.03
PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
0.00
1.00
0.18 Cum
1048.55 /cum
188.74
0.09 Cum
733.55 /cum
66.02
0.09 Cum
561.55 /cum
50.54
21.96 Kgs
2.44 Kgs
Bitumen 60/70
Plastic waste
10.00 Sqm
10.00 Sqm
10.00 Sqm
10.00 Sqm
55500.00 /Mt
1218.78
30.00 /Kg
73.20
/10sqm
606.10
/10sqm
/10sqm
606.10
/10sqm
0.00
2203.38
Rs
220.34
10
PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
2.00 3.00
0.18
0.09
0.09
21.96
2.44
10.00
10.00
10.00
10.00
Cum
Cum
Cum
Kgs
Kgs
Sqm
Sqm
Sqm
Sqm
Rs
0
0
0
1218.78
73.20
606.10
0.00
1898.08
189.81
10
PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
4.00 5.00
0.18
0.09
0.09
21.96
2.44
10.00
10.00
10.00
10.00
Cum
Cum
Cum
Kgs
Kgs
Sqm
Sqm
Sqm
Sqm
0
0
0
1218.78
73.20
606.10
0.00
1898.08
Rs
189.81
10
1.00
-for Km
2.00
0.18 Cum
0.00 /cum
0.09 Cum
0.00 /cum
0.09 Cum
0.00 /cum
24.40 Kgs
Bitumen 60/70
### /Mt
10.00 Sqm
10.00 Sqm
10.00 Sqm
10.00 Sqm
1354.20
/10sqm
606.10
/10sqm
606.10
/10sqm
/10sqm
0.00
1960.30
10
Rs
196.03
3.00
4.00
0.18 Cum
0.00 /cum
0.09 Cum
0.00 /cum
0.09 Cum
0.00 /cum
24.40
10.00
10.00
10.00
10.00
Kgs
Sqm
Sqm
Sqm
Sqm
Bitumen 60/70
### /Mt
Hire & fuel charges f
/10sqm
Hire & fuel charges
/10sqm
606.10
Labour charges for
/10sqm
Labour charges for
/10sqm
Add 20% Extra for Labour in hilly areas
Rate per sqm
1354.20
606.10
0.00
1960.30
196.03
10
0.18
0.09
0.09
24.40
10.00
10.00
10.00
10.00
Cum
Cum
Cum
Kgs
Sqm
Sqm
Sqm
Sqm
10
0
0
0
1354.20
606.10
0.00
###
196.03
PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
1.00 2.00
0.18 Cum
0.00 /cum
0.09 Cum
0.00 /cum
0.09 Cum
0.00 /cum
Bitumen 60/70
### /Mt
1218.78
30.00 /Kg
73.20
21.96 Kgs
2.44 Kgs
Plastic waste
10.00 Sqm
10.00 Sqm
10.00 Sqm
10.00 Sqm
/10sqm
606.10
/10sqm
/10sqm
606.10
/10sqm
0.00
1898.08
Rs
189.81
10
PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
3.00 4.00
0.18
0.09
0.09
21.96
2.44
10.00
10.00
10.00
10.00
Cum
Cum
Cum
Kgs
Kgs
Sqm
Sqm
Sqm
Sqm
Rs
0
0
0
1218.78
73.20
606.10
0.00
1898.08
189.81
10
PREMIX CARPET WITH SEAL COAT TYPE ' A ' plastic road
-for Km
5.00 6.00
0.18
0.09
0.09
21.96
2.44
10.00
10.00
10.00
10.00
Cum
Cum
Cum
Kgs
Sqm
Sqm
Sqm
Sqm
0
0
0
1218.78
73.20
606.10
0.00
1898.08
Rs
189.81
9696
9696.00/8
1212
1624.5
25 lit x 50
170 lit x 50
1250
8500
Total:
12587
325.00 Sq.m
387.2769
387.28
2 Bitumen Boiler :
Since Bitumen Boiler is attached with CMP site, hire charges for separate bitumen boiler is not necessary.
3 Power Roller 80-100 KN :
Hire charges excluding fuel charges per
day
828.00
Fuel charges ( Diesel ) per day = 54.15 x
2.50 lit x 8 Hours
1083
54.15
50
1212
1624.5
1250
8500
12586.5
387.2769
387.28
necessary.
828
1083
10
0.18 Cum
1025.00 /cum
184.5
0.09 Cum
739.00 /cum
66.51
0.09 Cum
582.00 /cum
52.38
24.40 Kgs
Bitumen 60/70
50000.00 /Mt
10.00 Sqm
10.00 Sqm
10.00 Sqm
10.00 Sqm
1220.00
/10sqm
492.70
/10sqm
/10sqm
492.70
/10sqm
2016.09
Rs
201.61
45.00 mm Metal
689.00
689.00
1.00
37.50 mm Metal
703.00
703.00
1.00
26.50 mm Metal
665.00
665.00
1.00
25.00 mm Metal
665.00
665.00
1.00
22.40 mm Metal
965.00
965.00
3687.00
737.40
Basic cost
737.40
Conveyance
131.00
Total
868.40
22.40 mm Metal
965.00
965.00
1.00
13.20 mm Metal
894.00
894.00
1.00
11.20 mm Metal
608.00
608.00
1.00
6.70 mm Metal
451.00
451.00
1.00
6.00 mm Metal
451.00
451.00
1.00
5.60 mm Metal
451.00
451.00
400.00
400.00
4220.00
602.86
Basic cost
602.86
Conveyance to plant
131.00
Total
733.86
400.00
Conveyance to plant
131.00
531.00
Qty
Main data
Main Data
Rate
Amount
Rate
###
0.396 45 to 22.4
868.40
343.89
0.528 22.4--2.36
733.86
387.48
531.00
210.28
313.45
313.45
1255.10