Book1
Section A: Overall Design Basis
1
2
3
4

Introduction Purpose and scope


Overall Facilities Process Design Basis
Overall Heat and Material Balance
Overall Heat and Material Balance (SPL)

Process Flow diagram unit 98 IBL interconnecting pipe work utilities and core units block flow
diagram

Process Flow diagram unit 98 IBL interconnecting pipe work offsite and core units block flow
diagram

Process Flow diagram unit 98 IBL interconnecting pipe work water block flow diagram

8
Utility Philosophies
9
Utility Philosophies (SPL)
10
Utility Design Basis
11
Utility Design Basis (SPL)
12
Offsite Philosophies
13
Offsite Design Basis
14
Overall Control Strategy
15
Overall Utility balance
16
Overall Water Balance
17
Utility Specification
18
Interface Management Procedure (SPL)
19
Safety Review Procedure
20
Value engineering Analysis procedure
21
PFDs review procedure
22
Topographical survey report
23
Soil Investigation Report
Section B: Unit Design Basis
Subsection B1: Process Units Design Basis
1
Unit 10 Air Separation
2
Unit 20 Synthesis Gas (SPL)
3
Unit 30 FT Synthesis (SPL)
4
Unit 35 Heavy Ends Recovery (SPL)
5
Unit 40 Water Treatment (SPL)
6
Unit 45 Wax Treatment (SPL)
7
Unit 50 Product Work Up (SPL)
8
Unit 55 LPG Treatment (SPL)
9
Unit 60 Hydrogen Production
Subsection B2: Utility Units Design Basis
1
Unit 71 Raw Water Treatment
2
Unit 72 Steam & Condensate System (SPL)
3
Unit 73 Power Generation System
4
Unit 74 Cooling Water System
5
Unit 75 Air & Nitrogen System
6
Unit 76 Effluent Treatment
7
Unit 77 Process Effluent Biotreatment (SPL)
8
Unit 78 Fuel System (SPL)
Subsection B3: Offsite Units Design Basis
1
Unit 81 Flare System
2
Unit 82 Fire System
3
Unit 83 Intermediate Tankage
4
Unit 84 Product Storage and Export

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No
Unit 85 Raw Water Intake & Outfall
Unit 86 LPG Storage
7
Unit 87 Chemicals Storage
Subsection B4: Infrastructure Units Design Basis
1
Unit 91 Buildings
5
6

Unit 92 Electrical Distribution

3
Unit 93 Civil Works
4
Unit 94 Instrument & Control System
5
Unit 98 IBL Interconnecting Pipework
6
Unit 97 Outer Site Interfaces Outside Plan Battery Limit
Section C: Project Philosophy and Standards
Subsection C1: Overall Project Philosophies and Basis
1
Design Input Questionnaire
2
Process Design Basis
3
Operation and Maintenance Philosophy
4
Risk Management Philosophy
5
Noise Control Philosophy
6
Relief and Venting Philosophy
7
Plant Layout Basis
8
Offsite and Utilities Stream Specification
9
Winterization Philosophy
10
Feed and Back Up Gas Supply Philosophy
11
Water Drainage Philosophy
12
Battery Limits & Isolation Philosophy
13
Laboratory & Analysis Philosophy
14
Sparing Philosophy
15
Start-up & Shut-down Philosophy
16
Plant Layout Standard
17
Classification of Hazardous Chemicals
18
Equipment Noise Specification
Subsection C2: Overall Project Specification and Standard
1
Index of Engineering Standards
2
Administration of Engineering Standards
3
Preparation of Project Record and Mechanical Catalogue
4
Site Conditions
5
SH&E Design Basis
6
Units of Measurement
7
Equipment, Flow Line and Instrument Numbering
8
Document and Drawing Numbering Requirements
9
Drawing General Practice
10
Preparation of PFDs, MSDs, P&IDs and DPTDs
11
Introduction
4
Trays for Vessels
5
API Storage Tanks
6
Non Pressure Vessels and Small Tanks
Subsection C4: UZGTL-2 Series Heat Transfer Equipment
1
General Requirements for Shell and Tube Heat Exchangers
2
General requirements for Air Cooled Heat Exchangers
3
Plate and Frame Heat Exchangers
4
General requirements for Fired Heaters (API 560)
5
General requirements for Steam Generators and Boilers
6
Cooling Towers
Subsection C5: UZGTL-3 Series Mechanical Rotating Equipment
1
General Requirements for all Pumps Drivers and Auxiliary Equipment
2
Centrifugal Pumps for Heavy Duty Service (API 610)
3
Centrifugal Pumps for General Service
4
PD Controlled Volume (Metering) Pumps
5
PD Rotary Screw Pumps
6
PD Reciprocating Pumps

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Centrifugal compressors (API 617)


Reciprocating Compressors (API 618)
9
Rotary Positive Displacement Compressors (API 619)
4
Trays for Vessels
5
API Storage Tanks
6
Non Pressure Vessels and Small Tanks
Subsection C4: UZGTL-2 Series Heat Transfer Equipment
1
General Requirements for Shell and Tube Heat Exchangers
2
General requirements for Air Cooled Heat Exchangers
3
Plate and Frame Heat Exchangers
4
General requirements for Fired Heaters (API 560)
5
General requirements for Steam Generators and Boilers
6
Cooling Towers
Subsection C5: UZGTL-3 Series Mechanical Rotating Equipment
1
General Requirements for all Pumps Drivers and Auxiliary Equipment
2
Centrifugal Pumps for Heavy Duty Service (API 610)
3
Centrifugal Pumps for General Service
4
PD Controlled Volume (Metering) Pumps
5
PD Rotary Screw Pumps
6
PD Reciprocating Pumps
7
Centrifugal compressors (API 617)
8
Reciprocating Compressors (API 618)
9
Rotary Positive Displacement Compressors (API 619)
10
Special Purpose Steam Turbines (API 612)
11
Lubrication, Hydraulic & Heat Transfer Fluid Requirements
7
8

12

Lubrication, Shaft Sealing and Control Oil Systems for Special Purpose Applications

13
Top Entry Rotating Agitators
14
Special Purpose Gear Units (API 613)
15
Dynamic Analysis of Rotating Equipment
16
Safeguarding of Machinery
Subsection C6: UZGTL-4 Series Civil Engineering
1
Basic Civil Engineering Design Data
2
Wind and Earthquake Loading
3
Design Loading for Building, Equipment, Structures and Foundations.
4
Specification for Ground Investigation (Geotechnical)
5
Specification for Earth Works
6
General Piling Specification
7
Design of Concrete Foundations, Structures and Paving
8
Foundations and Structures Supporting machinery
9
Specification for Concrete Works
10
Concrete Fire Protection
11
Specification for Grouting Materials and Workmanship
12
Anchor Bolts and Fixing Standard
13
Design of Storage Tank Foundations
14
Specification for Roads and Fencing
15
Drainage Basic Design Specification
16
Specification for Drainage Material and Workmanship
17
Structural Steel Design
18
Structural Steel Fabrication
19
Specification for Buildings
20
ACMV Systems Specification
Subsection C7: UZGTL-5 Series Piping
1
General Piping Requirements
2
Piping Material Specifications
3
Requirements for Steam Tracing Wax Lines
4
Fire and Gas Detection and Protection Systems
Subsection C8: UZGTL-6 Series Control & Instrumentation
1
Control Design Philosophy
2
Assessment for Safety Instrumented Systems

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

General Instrumentation Specification


Machinery Monitoring System (MMS) Technical Specification
5
Custody Transfer (Tank Gauging) Technical Specification
6
Safety Integrity Level Implementation (Design Stage)
7
Custody Transfer (Flow Metering) Technical Specification
8
Distributed Control System (DCS) Technical Specification
9
Safety Instrument System (SIS) Technical Specification
10
Fire and Gas System (FGS) Technical Specification
11
Instrument Piping Material Specification
12
Instrument Cable Specification
13
Instrument Installation Specification
14
Protection of Instruments
15
Inspection and Testing of Electronic Systems
16
Analyzer Shelters & Analyzer Local Panels Specification
17
Analyzer Sample Systems
18
Control/Marshalling Cabinet Specification
19
Installation of Instruments in Piping Systems
20
C & I /Electrical Interface Specification
Subsection C9: UZGTL-7 Series Electrical
1
General Electrical Design Specification
2
Electrical Equipment for Package Equipment
3
Electrical Power Management
4
Electrical Design Philosophy
5
HV Switchgear and Control gear
6
Factory Built Assemblies of LV Switchgear and Control gear
7
Power Transformers
8
Induction Motors (LV)
9
Induction Motors (HV)
10
Synchronous Motors and Generators
11
Variable Speed Drives
12
AC Uninterruptible Power System (UPS) Supplies
13
LV/DC Supplies for Battery Charging and Distribution Equipment
14
Neutral Earthing Resistors
15
Electrical Services for Buildings
16
Power and Control Cable
17
Telephone Systems
18
UHF Trunked Mobile Radio Systems
19
Data Transmission Systems
20
Public Address & Control Systems
21
Closed Circuit Television System (CCTV)
22
Telecommunications Cable
23
Standard Electrical Installation Details
24
General Requirements for Electrical Construction
25
Pre-commissioning of Electrical Installations
26
Site Testing of Electrical Equipment and Installations
3
4

27

Protective Finishes for Electrical Equipment and Materials for Outdoor Use

Subsection C10: UZGTL-8 Series Protective Cover, Material Selection, Fabrication and QA
1
Protective Coatings
2
Coating and Wrapping of Buried Piping
3
External Fireproofing of Equipment Supports and Structures.
4
Hot Service Insulation
5
Cold Service Insulation
6
Welding Pressure Vessels, Tanks & Heat Exchangers
7
Welding Shop & Field Fabricated Piping & Fired Heaters
8
Submission of Fabrication Procedures for Review
9
Welding of Structural Steelwork
10
Positive Material Identification (PMI)
11
Material Requirements
12
Heat Treatment
13
Impact Testing of Materials

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Subsection C11: UZGTL-9 Series Miscellaneous and Inspection


1

Classification, Design, Fabrication, Inspection and Certification of Boilers and Pressure Vessels

2
Cathodic Protection
3
Material Selection & Corrosion Control
Section D: Studies and Technical Notes
1
Feed Gas Availability Studies
2
Products handling, transport, logistic and storage studies
3
LPG Product handling, storage and blending studies
4
Overall water and effluent balance studies
5
The allocation of raw water and its transport facilities
6
Temporary Construction facilities and accommodation facilities
7

Evaluation of the potential to export power to Shurtan grid (subject to Owner instruction)

Studies on all the offsite, infrastructure and supporting facilities during operating phase

Evaluation of the waste water and effluent treatment facilities study conducted by SPL

10

Evaluation criteria of cost estimate for evaluation of technical alternatives

11

Evaluation of plant trip cases (at least for: auxiliary boiler trip / power trip / synthesis gas trip /
HPU trip / ASU trip / FT Synthesis trip / Product Work Up Unit trip / CW trip)

12
13
14
15

Oxygen storage philosophy for plant availability


Evaluation of Feed gas & fuel gas requirement
Diesel CFPP Pre-Study Report (SPL)
Water & Effluent Option Study (SPL)

Section A: Overall Facility


1
2
3
4
5
6
7
8
9
10
11
12

Project execution phase - introduction


Process Description
Process Design Basis
Facility Operating Scenarios
Overall Block Flow Diagram
Overall Heat and Material Balance
GTL Plant Overall heat & Material balance (SPL)
Water Block Flow Diagram
Utility & Offsite Design Basis
Project Philosophies
Tie In List
Overall Utility Balance

Book2

13

Process Flow Diagram Unit 00 Legend and Symbols Instrumentation and piping

14

Process Flow Diagram Unit 00 Legend and Symbols Heat Transfer and Mechanical Equipment

15

Process Flow Diagram Unit 00 Legend and Symbols Vessel -Column and Tank

16
Material selection diagram general notes
17
Notes for feed 2 (SPL)
Section B: Design Engineering Package
Subsection B1: Process Units Engineering Package Unit 10
1
Inquiry scope for unit 10 ASU
2
Feed 2 engineering package for air separation unit scope of work
3
Meeting with ASU Vendor Air Liquid
4
Meeting with ASU Vendor Air Products
5
Meeting with ASU Vendor Linde
6
Air separation unit 10 Technical Tabulation
7
Linde Budgetary proposal
Subsection B1: Process Units Engineering Package Unit 20
1
Process Description

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Process Description
Product Specifications and Consumption Figures
4
Basis of Design
5
Process Flow Diagrams (PFD)
6
Process Flow Diagrams (PFD)
7
Process Flow Diagrams (PFD)
8
Process Flow Diagrams (PFD)
9
Process Flow Diagrams (PFD)
10
Process Flow Diagrams (PFD)
11
Process Flow Diagrams (PFD)
12
Process Flow Diagrams (PFD)
13
Process Flow Diagrams (PFD)
14
Process Flow Diagrams (PFD)
15
Process Flow Diagrams (PFD)
16
Process Flow Diagrams (PFD)
17
Process Flow Diagrams (PFD)
18
Process Flow Diagrams (PFD)
19
Process Flow Diagrams (PFD)
20
Process Flow Diagrams (PFD)
21
Process Flow Diagrams (PFD)
22
Process Flow Diagrams (PFD)
23
Process Flow Diagrams (PFD)
24
Material Selection Diagram (MSD)
25
Material Selection Diagram (MSD)
26
Material Selection Diagram (MSD)
27
Material Selection Diagram (MSD)
28
Material Selection Diagram (MSD)
29
Material Selection Diagram (MSD)
30
Process Control Design Basis
31
Commissioning, Start-up and Shut-down Basis
32
Sized Equipment List
33
Equipment Process Data Sheets
34
Equipment Process Data Sheets
35
Equipment Process Data Sheets
36
Equipment Process Data Sheets
37
Equipment Process Data Sheets
38
Equipment Process Data Sheets
39
Catalyst & Chemicals Data and Consumption
40
Utility Consumption List
41
Plant Effluent and Emissions Data
42
Relief Requirements
43
Battery Limit Schedule
44
Hazardous Material List
45
Requirements for Plant Layout
46
Proposed Plot Plan
47
ATR and Waste Heat Boiler Section Layout Proposal
48
Cost Estimate (SPL)
Subsection B1: Process Units Engineering Package Unit 30
1
Introduction
2
Block Flow Diagram Process Description
3
Process Description
4
Feedstock and Product Specification
5
Basis of Design
6
Material Balance
7
Process Flow Diagrams Symbology Instrumentation & Piping
2
3

Process Flow Diagrams Symbology Heat Transfer & Mechanical Equipment

9
10
11

Process Flow Diagrams Symbology Vessels & Tanks


Process Flow Diagrams Unit 30 Fresh Catalyst System
Process Flow Diagrams Unit 30 Common Catalyst Slurry Handling

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

14
15
16
17
18
19

Process Flow Diagrams Unit 30 Wax Surge Drum


Process Flow Diagrams Unit 30 Wax Cleanup System & KO Drum
Process Flow Diagrams Unit 30 Condensate & Blowdown Systems
Process Flow Diagrams Unit 30 Train 1 Process Steam System
Process Flow Diagrams Unit 30 Train 1 Sasol LTFT Reactor
Process Flow Diagrams Unit 30 Train 1 Raw Wax System
Process Flow Diagrams Unit 30 Train 1 Separator Drum
Process Flow Diagrams Unit 30 Train 1 Compressor System

20

Process Flow Diagrams Unit 30 Solid Waste Discharge Package (130-XP-020)

12
13

21
Process Control Design Basis
22
Commissioning, Start-up and Shutdown Basis
23
Sized Equipment List
24
Equipment Process Data Sheets Slurry Hopper
25
Equipment Process Data Sheets Separator Drum
26
Equipment Process Data Sheets Reactor Steam Drum
27
Equipment Process Data Sheets Reactor BFW Circulation Pump
28
Equipment Process Data Sheets Heat Exchanger
29
Catalyst and Chemicals Data and Consumption
30
Utility Consumption List
31
Plant Effluent and Emissions Data
32
Relief Requirements
33
Battery Limit Schedule
34
Hazardous Material Lists
35
Licensor Requirements for Plant Layout
36
Special Design Requirements
37
Assumptions and Opportunities
Subsection B1: Process Units Engineering Package Unit 35
1
Introduction
2
Block Flow Diagram Process Description
3
Process Description
4
Feedstock and Product Specification
5
Basis of Design
6
Material Balance
7
Process Flow Diagrams Symbology Instrumentation & Piping
8

Process Flow Diagrams Symbology Heat Transfer & Mechanical Equipment

Process Flow Diagram Symbology Vessels & Tanks

10

Process Flow Diagrams Unit 35 Heavy Ends Recovery Tailgas Wash Tower

11

Process Flow Diagrams Unit 35 Heavy Ends Recovery Condensate Recovery

12

Process Flow Diagrams Unit 35Heavy Ends Recovery(135-XP-003) Refrigeration Package

13

Process Flow Diagrams Unit 35 Heavy Ends Recovery Condensate Holdup Drum

14
15
16
17
18
19
20
21
22
23
24
25
26
27

Process Flow Diagrams Unit 35 Heavy Ends Recovery CO2Stripper


Process Control Design Basis
Commissioning, Start-up and Shutdown Basis
Sized Equipment List
Catalyst and Chemicals Data and Consumption
Utility Summary
Plant Effluent and Emissions Data
Relief Requirements
Battery Limit Schedule
Hazardous Material List Silica Gel
Hazardous Material List Molecular Sieve
Licensor Requirements for Plant Layout
Special Design Requirements
Assumptions and Opportunities

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Subsection B1: Process Units Engineering Package Unit 40


1
Introduction
2
3
4
5
6
7

Block Flow Diagram Process Description


Process Description
Feedstock and Product Specification
Basis of Design
Material Balance
Process Flow Diagrams Symbology Instrumentation & Piping

Process Flow Diagrams Symbology Heat Transfer & Mechanical Equipment

9
10

Process Flow Diagram Symbology Vessels & Tanks


Process Flow Diagrams Unit 40 Degassing & Coalescing

11

Process Flow Diagrams Unit 40 Feed Surge Tank & Slops Drum/Closed Drain Hdr

12
Process Flow Diagrams Unit 40 Reaction Separation
13
Process Control Design Basis
14
Commissioning, Start-up and Shutdown Basis
15
Sized Equipment List
16
Equipment Process Data Sheets
17
Catalyst & Chemicals Data and Consumption
18
Utility Consumption List
19
Plant Effluent and Emissions Data
20
Relief Requirements
21
Battery Limit Schedule
22
Licensor Requirements for Plant layout
23
Special Design Requirements
24
Assumptions and Opportunities
Subsection B1: Process Units Engineering Package Unit 45
1
Introduction
2
Process Description
3
Feed and Product Specification
4
Basis of Design
5
Material Balance
6
Process Flow Diagrams Symbology Instrumentation & Piping
7

Process Flow Diagrams Symbology Heat Transfer & Mechanical Equipment

8
9

Process Flow Diagram Symbology Vessels & Tanks


Process Flow Diagrams Unit 45 Wax Treatment Unit

10

Process Flow Diagrams Unit 45 Solid Waste Discharge System (145-XP-030)

11

Process Flow Diagrams Unit 45 Unit 45 Solid Waste Stab. (145-XP-031)

12

Process Flow Diagrams Unit 45 Unit 30 Solid Waste Stab. (145-XP-032)

13
Process Control Design Basis
14
Commissioning, Start-up and Shutdown Basis
15
Sized Equipment List
16
Catalyst and Chemicals Data and Consumption
17
Utility Consumption List
18
Plant Effluent and Emissions Data
19
Relief Requirements
20
Battery Limit Schedule
21
Hazardous Material Lists
22
Licensor Requirements for Plant Layout
23
Special Design Requirements
24
Assumptions and Opportunities
Subsection B1: Process Units Engineering Package Unit 50
1
Introduction
2
Reaction section
3
Recycle gas section

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Fractionation section
Light ends recovery section
6
Isodewaxing section
7
Make-up hydrogen section
8
Equipment Specifications
9
Utility summary
10
Commissioning startup and shutdown guidelines
11
Environment health and safety
12
Conceptual plot plan
13
CLG reference list
Unit 50 Supplementary Scope
14
Process Definition
15
Heat & Material Balance
16
Equipment List
17
Utility Consumption
18
SPL Unit 50 Process Flow Diagram Fuel Gas System
19
SPL Unit 50 Process Flow Diagram Waxy Relief System
Subsection B1: Process Units Engineering Package Unit 55
1
Process Definition
2
Heat & Material Balance
3
PFDs
4
PFDs
5
Equipment List
6
Utility Summary
Subsection B1: Process Units Engineering Package Unit 60
1
Inquiry scope for unit 60
4
5

Feed 2 engineering package for hydrogen production unit scope of work

3
Meeting with HPU Vendor TP BENELUX
4
Meeting with HPU Vendor LINDE
5
Hydrogen Production unit 60 T echnical Tabulation
6
Technip Benelux Technical proposal
Subsection B2: Utility Units Engineering Package Unit 71
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
6
Process Flow Diagrams (PFD)
7
Material Selection Diagram (MSD)
8
Process Control Design Basis
9
Commissioning, Start-up and Shut-down Basis
10
Sized Equipment List
11
Catalyst & Chemicals Data and Consumption
12
Utility Consumption List
13
Plant Effluent and Emissions Data
14
Relief Requirements
15
Battery Limit Schedule
16
Hazardous Material List
17
Requirements for Plant Layout
18
Special Design Requirements
19
Assumptions and Opportunities
Subsection B2: Utility Units Engineering Package Unit 72
1
Process Definition
2
Heat & Material Balance
3
Equipment List
4
Utility Consumption
5
SPL Unit 72 Process Flow Diagrams
6
SPL Unit 72 Process Flow Diagrams
7
SPL Unit 72 Process Flow Diagrams

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

10
11
12
13
14
15
16
17

SPL Unit 72 Process Flow Diagrams


SPL Unit 72 Process Flow Diagrams
SPL Unit 72 Process Flow Diagrams
SPL Unit 72 Process Flow Diagrams
SPL Unit 72 Process Flow Diagrams
SPL Unit 72 Process Flow Diagrams
SPL Unit 72 Process Flow Diagrams
SPL Unit 72 Process Flow Diagrams
SPL Unit 72 Process Flow Diagrams
SPL Unit 72 Process Flow Diagrams

18

Steam and condensate systems process condensate polisher package

8
9

19
Steam and condensate unit Hot condensate polisher package
Subsection B2: Utility Units Engineering Package Unit 73
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
6
Process Flow Diagrams (PFD)
7
Material Selection Diagram (MSD)
8
Process Control Design Basis
9
Commissioning, Start-up and Shut-down Basis
10
Sized Equipment List
11
Utility Consumption List
12
Relief Requirements
13
Battery Limit Schedule
14
Hazardous Material List
15
Requirements for Plant Layout
16
Special Design Requirements
17
Assumptions and Opportunities
Subsection B2: Utility Units Engineering Package Unit 74
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
6

Process Flow Diagram Unit 74 Cooling Water Systems Cooling Water System

Process Flow Diagram Unit 74 Cooling Water Systems Cooling Water Distribution

Material Selection Diagram Unit 74 Cooling Water Systems Cooling Water System

Material Selection Diagram Unit 74 Cooling Water Systems Cooling Water Distribution

10
Process Control Design Basis
11
Commissioning, Start-up and Shut-down Basis
12
Sized Equipment List
13
Catalyst & Chemicals Data and Consumption
14
Utility Consumption List
15
Plant Effluent and Emissions Data
16
Relief Requirements
17
Battery Limit Schedule
18
Hazardous Material List
19
Requirements for Plant Layout
20
Special Design Requirements
21
Assumptions and Opportunities
Subsection B2: Utility Units Engineering Package Unit 75
1
Process Description
2
Feed Specifications

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Product Specifications
Basis of Design
Heat & Material Balance

Process Flow Diagram Unit 75 Air and Nitrogen System Plant and Instrument Air

Process Flow Diagram Unit 75 Air and Nitrogen System Plant and Instrument Air

Material Selection Diagram Unit 75 Air and Nitrogen System Plant and Instrument Air

Material Selection Diagram Unit 75 Air and Nitrogen System LP and HP Nitrogen

3
4

10
Process Control Design Basis
11
Commissioning, Start-up and Shut-down Basis
12
Sized Equipment List
13
Catalyst & Chemicals Data and Consumption
14
Utility Consumption List
15
Relief Requirements
16
Battery Limit Schedule
17
Hazardous Material List
18
Requirements for Plant Layout
19
Special Design Requirements
20
Assumptions and Opportunities
Subsection B2: Utility Units Engineering Package Unit 76
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
6

Process Flow Diagram Unit 76 Effluent Treatment System Oily and Clean Water Collection

Process Flow Diagram Unit 76 Effluent Treatment System Deoling Section

Process Flow Diagram Unit 76 Effluent Treatment System Oily Sludge Thickening and
Dewatering

Process Flow Diagram Unit 76 Effluent Treatment System Bid Sludge Thickening and
Dewatering

10

Process Flow Diagram Unit 76 Effluent Treatment System Chemical Dosing System

11

Process Flow Diagram Unit 76 Effluent Treatment System Sanitary Sewage Treatment Package

12

Process Flow Diagram Unit 76 Effluent Treatment System

13

Material Selection Diagram Unit 76 Effluent Treatment System Oily and Clean Water
Collection

14

Material Selection Diagram Unit 76 Effluent Treatment System Deoling Section

15

Material Selection Diagram Unit 76 Effluent Treatment System Oily Sludge Thickening and
Dewatering

16

Material Selection Diagram Unit 76 Effluent Treatment System Bid Sludge Thickening and
Dewatering

17

Material Selection Diagram Unit 76 Effluent Treatment System Bid Sludge Thickening and
Dewatering

18

Material Selection Diagram Unit 76 Effluent Treatment System Bid Sludge Thickening and
Dewatering

19

Material Selection Diagram Unit 76 Effluent Treatment System Bid Sludge Thickening and
Dewatering

20
21
22
23
24

Process Control Design Basis


Commissioning, Start-up and Shut-down Basis
Sized Equipment List
Catalyst & Chemicals Data and Consumption
Utility Consumption List

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Plant Effluent and Emissions Data


Relief Requirements
27
Battery Limit Schedule
28
Hazardous Material List
29
Requirements for Plant Layout
30
Special Design Requirements
31
Assumptions and Opportunities
Subsection B2: Utility Units Engineering Package Unit 77 Process Effluent Biotreatment
1
Process Definition
2
Heat & Material Balance
3
Equipment List
4
Utility Consumption
5
SPL Unit 77 Process Flow Diagrams
6
SPL Unit 77 Process Flow Diagrams
7
SPL Unit 77 Process Flow Diagrams
8
SPL Unit 77 Process Flow Diagrams
9
Process Effluent bio treatment MBR Package
10
VOC abatement package
Subsection B2: Utility Units Engineering Package Unit 78 Fuel System
1
Process Definition
2
Heat & Material Balance
3
Equipment List
4
Utility Consumption
5
SPL Unit 78 Process Flow Diagrams
6
SPL Unit 78 Process Flow Diagrams
7
SPL Unit 78 Process Flow Diagrams
Subsection B3: Offsite Units Engineering Package Unit 81
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
6
Process Flow Diagram Unit 81 Flare System Flare Headers
7
Process Flow Diagram Unit 81 Flare System Vent Gas System
25
26

Process Flow Diagram Unit 81 Flare System LPG and Cold Flare Headers

9
10
11

Process Flow Diagram Unit 81 Flare System Flare


Material Selection Diagram Unit 81 Flare System Flare Headers
Material Selection Diagram Unit 81 Flare System Vent Gas System

12

Material Selection Diagram Unit 81 Flare System LPG and Cold Flare Headers

13
Material Selection Diagram Unit 81 Flare System - Flare
14
Process Control Design Basis
15
Commissioning, Start-up and Shut-down Basis
16
Sized Equipment List
17
Utility Consumption List
18
Plant Effluent and Emissions Data
19
Battery Limit Schedule
20
Hazardous Material List
21
Requirements for Plant Layout
22
Special Design Requirements
23
Assumptions and Opportunities
Subsection B3: Offsite Units Engineering Package Unit 82
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
6
Process Flow Diagrams (PFD)
7
Material Selection Diagram (MSD)

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Process Control Design Basis


Commissioning, Start-up and Shut-down Basis
10
Sized Equipment List
11
Utility Consumption List
12
Relief Requirements
13
Battery Limit Schedule
14
Hazardous Material List
15
Requirements for Plant Layout
16
Special Design Requirements
17
Assumptions and Opportunities
Subsection B3: Offsite Units Engineering Package Unit 83
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
8
9

Process Flow Diagram for Unit 83 Intermediate Tankage Product, Rework, Condensate
&Aqueous Slops Tanks

Process Flow Diagram for Unit 83 Intermediate Tankage Intermediate Wax and Wax Slops
Tanks

Material Selection Diagram Unit 83 Intermediate Tankage Product Reqork Condensate


and Aqueous Slops Tanks

Material Selection Diagram Unit 83 Intermediate Tankage Intermediate Wax and Wax Slops
Tanks

10
Process Control Design Basis
11
Commissioning, Start-up and Shut-down Basis
12
Sized Equipment List
13
Utility Consumption List
14
Plant Effluent and Emissions Data
15
Relief Requirements
16
Battery Limit Schedule
17
Hazardous Material List
18
Requirements for Plant Layout
19
Special Design Requirements
20
Assumptions and Opportunities
Subsection B3: Offsite Units Engineering Package Unit 84
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
6

Process Flow Diagram for Unit 84 Product Storage and Export Diesel Product Tank

Process Flow Diagram for Unit 84 Product Storage and Export Kerosene Product Tank

Process Flow Diagram for Unit 84 Product Storage and Export Naphtha Product Tank

Material Selection Diagram Unit 84 Product Storage and Export Diesel Product Tank

10

Material Selection Diagram Unit 84 Product Storage and Export Kerosene Product Tank

11

Material Selection Diagram Unit 84 Product Storage and Export Naphtha Product Tank

12
13
14
15
16
17
18

Process Control Design Basis


Commissioning, Start-up and Shut-down Basis
Sized Equipment List
Catalyst & Chemicals Data and Consumption
Utility Consumption List
Plant Effluent and Emissions Data
Relief Requirements

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Battery Limit Schedule


Hazardous Material List
21
Requirements for Plant Layout
22
Special Design Requirements
23
Assumptions and Opportunities
Subsection B3: Offsite Units Engineering Package Unit 85
1
Process Description
2
Basis of Design
3
Heat & Material Balance
4
Process Flow Diagrams (PFD)
5
Material Selection Diagram (MSD)
6
Process Control Design Basis
7
Commissioning, Start-up and Shut-down Basis
8
Sized Equipment List
9
Utility Consumption List
10
Battery Limit Schedule
11
Hazardous Material List
12
Requirements for Plant Layout
13
Assumptions and Opportunities
Subsection B3: Offsite Units Engineering Package Unit 86
1
Process Description
2
Feed Specifications
3
Product Specifications
4
Basis of Design
5
Heat & Material Balance
6
Process Flow Diagrams (PFD)
7
Material Selection Diagram (MSD)
8
Process Control Design Basis
9
Commissioning, Start-up and Shut-down Basis
10
Sized Equipment List
11
Catalyst & Chemicals Data and Consumption
12
Utility Consumption List
13
Relief Requirements
14
Battery Limit Schedule
15
Hazardous Material List
16
Requirements for Plant Layout
17
Special Design Requirements
18
Assumptions and Opportunities
Subsection B3: Offsite Units Engineering Package Unit 87
19
Process Description
20
Basis of Design
21
Heat & Material Balance
22
Process Flow Diagrams (PFD)
23
Material Selection Diagram (MSD)
24
Process Control Design Basis
25
Commissioning, Start-up and Shut-down Basis
26
Sized Equipment List
27
Utility Consumption List
28
Relief Requirements
29
Battery Limit Schedule
30
Hazardous Material List
31
Requirements for Plant Layout
32
Special Design Requirements
33
Assumptions and Opportunities
Subsection B4: Infrastructure Units Engineering Package
1
Unit 91 Buildings
1
1
Buildings philosophy
1
2
Civil Philosophy
19
20

Construction of factory for production of liquid synthetic fuel GTL in republic of Uzbekistan
(STUDIO GEOTECNICO)

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No
2
2

Unit 92 Electrical
Power System Study
Electrical Distribution Philosophy
Electrical Consumer List
Single Line Diagram
Preliminary Electrical Load Analysis & Equipment Sizing
Preliminary Cable Sizing
Unit 93 Civil Works
Preliminary geotechnical report
Site Preparation Work
IBL and OBL Foundations
IBL and OBL Structures
IBL roads and paving
Drainage and Sewerages
IBL and OBL underground services
Unit 94 Instrumentation and Controls
Control & Instrumentation Philosophy
Distributed Control System Philosophy
Safety Instrumented System Philosophy
Fire & Gas System Philosophy
Overall Instrument System Block Diagram

2
2
2
3
2
4
2
5
2
6
3
3
1
3
2
3
3
3
4
3
5
3
6
3
7
4
4
1
4
2
4
3
4
4
4
6
Subsection B5: Others
1
Plot Plan & Equipment Layout
2
Outside Interconnection
3
Material Selection & Corrosion Study
4
Piping Class/Material Selection Philosophy
5
Vendor List for Long Lead Items
6
RAM Study
Section C: Engineering Design Basis
1
Codes and Project Specifications and Standards
2
Electrical
3
Instrumentation and Controls
4
Mechanical
5
Piping
6
Civil
Section D: UDI Local Regulatory Gap Analysis
1
UZGTL Spec. Translated in Russian
1
Preparation of Project Record and Mechanical Catalogue
2
Site Conditions
3
SH&E Design Basis
4
Units of Measurement
5
Equipment, Flow Line and Instrument Numbering
6
Document and Drawing Numbering Requirements
7
Drawing General Practice
8
Preparation of PFDs, MSDs, P&IDs and DPTDs
9
Design Input Questionnaire
10 Process Design Basis
11 Operation and Maintenance Philosophy
12 Risk Management Philosophy
13 Noise Control Philosophy
14 Relief and Venting Philosophy
15 Plant Layout Basis
16 Offsite and Utilities Stream Specification
17 Winterization Philosophy
18 Feed and Back Up Gas Supply Philosophy
19 Water Drainage Philosophy
20 Battery Limits & Isolation Philosophy
21 Laboratory & Analysis Philosophy
22 Sparing Philosophy
23 Start-up & Shut-down Philosophy

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

Engineering Design Guidelines


Introduction
Equipment Data Sheet
Pressure Vessels
Heat Exchangers
Fired Heaters
Boilers
Tanks
Compressors
Pumps
Drivers
Fluid Flow and Piping
Relief System
Flare System
Mechanical Draft Cooling Towers
Refractory
Instrumentation and Control
Electrical
Plant Layout Standard
Classification of Hazardous Chemicals
Equipment Noise Specification
Safeguarding of Machinery
Pressure Vessels (Cat 1, 2, and 3)
Pressure Vessels (Cat 4)
Documentation for pressure equipment
Trays for Vessels
API Storage Tanks
Non Pressure Vessels and Small Tanks
General Requirements for Shell and Tube Heat Exchangers
General requirements for Air Cooled Heat Exchangers
Plate and Frame Heat Exchangers
General requirements for Fired Heaters (API 560)
General requirements for Steam Generators and Boilers
Cooling Towers
General Requirements for all Pumps Drivers and Auxiliary Equipment
Centrifugal Pumps for Heavy Duty Service (API 610)
Centrifugal Pumps for General Service
PD Controlled Volume (Metering) Pumps
PD Rotary Screw Pumps
PD Reciprocating Pumps
Centrifugal compressors (API 617)
Reciprocating Compressors (API 618)
Rotary Positive Displacement Compressors (API 619)
Special Purpose Steam Turbines (API 612)
Lubrication, Hydraulic & Heat Transfer Fluid Requirements

69

Lubrication, Shaft Sealing and Control Oil Systems for Special Purpose Applications

70
71
72
73
74
75
76
77
78
79
80
81
82

Top Entry Rotating Agitators


Special Purpose Gear Units (API 613)
Dynamic Analysis of Rotating Equipment
Basic Civil Engineering Design Data
Wind and Earthquake Loading
Design Loading for Building, Equipment, Structures and Foundations.
Specification for Ground Investigation (Geotechnical)
Specification for Earth Works
General Piling Specification
Design of Concrete Foundations, Structures and Paving
Foundations and Structures Supporting machinery
Specification for Concrete Works
Concrete Fire Protection

24
25

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

Specification for Grouting Materials and Workmanship


Anchor Bolts and Fixing Standard
Design of Storage Tank Foundations
Specification for Roads and Fencing
Drainage Basic Design Specification
Specification for Drainage Material and Workmanship
Structural Steel Design
Structural Steel Fabrication
Specification for Buildings
ACMV Systems Specification
General Piping Requirements
Piping Material Specifications
Requirements for Steam Tracing Wax Lines
Fire and Gas Detection and Protection Systems
Control Design Philosophy
Assessment for Safety Instrumented Systems
General Instrumentation Specification
Machinery Monitoring System (MMS) Technical Specification
Custody Transfer (Tank Gauging) Technical Specification
Safety Integrity Level Implementation (Design Stage)
Distributed Control System (DCS) Technical Specification
Safety Instrument System (SIS) Technical Specification
Fire and Gas System (FGS) Technical Specification
Instrument Cable Specification
Instrument Installation Specification
Protection of Instruments
Inspection and Testing of Electronic Systems
Analyzer Shelters & Analyzer Local Panels Specification
Analyzer Sample Systems
Control/Marshalling Cabinet Specification
Installation of Instruments in Piping Systems
C & I /Electrical Interface Specification
General Electrical Design Specification
Electrical Equipment for Package Equipment
Electrical Power Management
Electrical Design Philosophy
HV Switchgear and Control gear
Factory Built Assemblies of LV Switchgear and Control gear
Power Transformers
Induction Motors (LV)
Induction Motors (HV)
Synchronous Motors and Generators
Variable Speed Drives
AC Uninterruptible Power System (UPS) Supplies
LV/DC Supplies for Battery Charging and Distribution Equipment
Neutral Earthing Resistors
Electrical Services for Buildings
Power and Control Cable
Telephone Systems
UHF Trunked Mobile Radio Systems
Data Transmission Systems
Public Address & Control Systems
Closed Circuit Television System (CCTV)
Telecommunications Cable
Standard Electrical Installation Details
General Requirements for Electrical Construction
Pre-commissioning of Electrical Installations
Site Testing of Electrical Equipment and Installations

141

Protective Finishes for Electrical Equipment and Materials for Outdoor Use

83
84

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

144
145
146
147
148
149
150
151
152

Protective Coatings
Coating and Wrapping of Buried Piping
Hot Service Insulation
Cold Service Insulation
Welding Pressure Vessels, Tanks & Heat Exchangers
Welding Shop & Field Fabricated Piping & Fired Heaters
Submission of Fabrication Procedures for Review
Positive Material Identification (PMI)
Material Requirements
Heat Treatment
Impact Testing of Materials

153

Classification, Design, Fabrication, Inspection and Certification of Boilers and Pressure Vessels

142
143

Gap Analysis reports


1
Gap Analysis Report step 1 (Russian version)
2
Gap Analysis Report step 1 (English version)
3
Gap Analysis Report step 2 (Russian version)
Section E: Management of Change
19
Management of change - catalyst loading system
20
Management of change - over design - sparing philosophies etc.
2

21

Management of change - dedicated treatment systems are provided for oily and bio sludge

22

Management of change - 3 fire water basins of 250 m3 each located at site

23

Management of change - design ambient air temperature

24

Management of change - each section of neutralization basin is provided with an eductor

25

Management of change opportunity of running steam turbines with saturated steam

26

Management of change LPG product take-off

27

Management of change optimization of the steam condensate drums and pumps for the entire
plant

28

Management of change fractionators reflux pumps 150-PC010 A/B

29

Management of change naphtha stabilizer reflux pumps 150PC-012 A/B

30

Unit 74 Design Notes Unit 10 Cooling Water Return Temperature Increase

31

Unit 75 Design Notes Flame Scanner Cooling and Cleaning Operation

32

Unit 71 Design Notes Dedicated Set of Pumps for RO-UF and GAC Backwash Operation

33
34
35
36

Unit 71 Design Notes Deletion of RWRO Feed Pumps


Unit 76 Design Notes Deletion of Oily Water Hold-Up Tank
Unit 76 Design Notes Deletion of Bio-Sludge Holding Tank Blowers
Unit 84 Design Notes Elimination of Vapor Recovery Unit

37

Unit 86 Design Notes Elimination of LPG Storage and Road-Rail Loading Facilities in UZGTL
Plant

38

Unit 86 Design Notes Elimination of LPG Road Tankers Loading and Export Facilities

39

Unit 78 Design Notes Elimination of MRG Methane Rich Gas Knock-Out Drum

40

Unit 84 Design Notes Reduction of Loading Equipment Capacity

41

Unit 81 Design Notes Possibility to Connect 181-VD-003 and 181-VD-002 Outlet to LP Relief
Header Upstream 101-VD-001

42
43
44
45

Unit 71 Design Notes Hot Water System Deletion


Unit 82 Design Notes Elimination of Fire Water Basin 182BA-003
Unit 71 Design Notes Neutralization Basin Configuration
Unit 86 Design Notes Reduction of LPG Storage Inventory

Book3
1

Route Logistics Study

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No
2

Supply Chain report


Oversized and over Weight Equipment Transportation Route Survey for
Uzbekistan

3
4

Addendum n.01 to Oversized and over Weight Equipment Transportation Route Survey for
Uzbekistan

Logistic study review meeting

Book4
TECHNICAL SECTION
1
2
2
1
3
3
4
4
5
6
6
7
7
8
8
9
10
11
11
12
12
13
13
14
14
15
16
16
17
17
18
18

1
1
1

1
1
1

1
1

19
20
21
RISK REGISTER SECTION
21
22
23
24

UDI Scope of Work Review


Integrated Scope Review
Integrated scope review close out report
PFD Review (including VIPs) Units 30/35/40/45
PFD Review (including VIPs) Units 30/35/40/45 CLOSE OUT REPORT
PFD Review (including VIPs) Unit 20
PFD Review (including VIPs) Unit 20 CLOSE OUT REPORT
Review of UDI Bids
PFD Review (including VIPs) Units 50/55
PFD Review (including VIPs) Units 50/55 CLOSE OUT REPORT
Single Line Diagram Review
Overall Single Line diagram report
Single Line Diagram Review 2ndMeeting
Overall Single Line diagram report(See point 7.1)
Stds Committee Review Meeting
Preliminary Plot Plan Review
SPL Non Core Units PFD/VIP Review
PFD/VIP Review for Non Core Units (unit 72/77/78) CLOSE OUT REPORT
TPIT Units PFD/VIP Review
PFD Close out report
Material Selection & Corrosion Review
Material selection and corrosion study
Plot Plan Review
Overall plot plan review Close out report
Plot Plan Safety Review Report
Constructability Review
Constructability work shop close out report
Cost Optimization Session
Value engineering CLOSE OUT REPORT
RAM Study Review and Associated VIP
Plant Ram (Reliability, Availability and Maintainability) Close out Report
Workshop on Plant Wastes
PPHA Review Report
Value improvement practises (VIP) report
Project risk register
Common Assumption register
Workshop on Risk Register
Technical Assumptions Opportunities & risk (SPL)

Attachment 3 (Sypply Chain & Logistics Studies)


Attachment 4 (Permitting Roadmap)
Attachment 5 (Forms of Clarification)
Attachment 6 (Forms of Bid Bond)
Attachment 7 (Financial Status & Capability)

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No

Attachment 8 (Technical Variation Form)


Attachment 9 (Commercial Variation Form)
Attachment 10 (Agreement)
Attachment 11 (Condition of Contract)
i)Exhibit1
ii)Exhibit2
iii)Exhibit3
iv)Exhibit4
v)Exhibit5
vi)Exhibit6
attachment 6
Vii)Exhibit7
Viii)Exhibit8

SECTION 1
1.0
1.1
1.1-A1
SECTION 2
2.1
2.1-A1
2.1-A2
2.1-A3
2.1-A4
2.1-A5
2.2
2.2-A1
2.3
2.3-A1
2.3-A2
2.3-A3
2.4
2.4-A1
2.4-A2
2.4-A3
2.4-A4
2.5
2.5-A1
2.5-A2
2.5-A3
2.5-A4
2.6
2.7
SECTION 3.0
SECTION 4.0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

EPC CONTRACT
Contract Programme
Contract Price & Prices for change in the work
Form of Performance Bond and Advanced Payment Bond
Parent Company Guarantee
Forms of Completion
Form of Third Party Confidentiality Agreement
IP Protocol
Performance Guarantee
Scope of Work
General Information
Scope of Work Document Index
Scope of Work General Information
Project Area Coordinates
Detail Requirements
Scope of Work Engineering Requirements
Document Format
Document Definition
Technical Passports and Manufacturers Data Reports
Engineering Design Requirements
Concession Requests
Scope of Work Procurement Requirements
Vendor List
Scope of Work Construction Requirements
Temporary Facilities
Construction SHERQ Requirements
Controlled Bolt Tightening Guidelines
Scope of Work Pre-commissioning / commissioning
Completeness Definition
Performance Test Requirements
Pre-commissioning Manual Guidelines
Operating Manual Guidelines
Scope of Work Design Safety
Model Review Requirements
HAZOP Study Review Requirements
Electronic 3D Model Requirements
P&ID Review Requirements
Scope of Work Quality Assurance Requirements
Scope of Work Facilities for Owner
Project Procedures
Project Standards
Index of Engineering Standards (this document)
Administration of Engineering Standards
Preparation of Project Record and Mechanical Catalogue
Guidance for Ergonomics
Site Conditions
SH&E Design Basis
Units of Measurement
Equipment, Flow Line and Instrument Numbering
Document and Drawing Numbering Requirements
Drawing General Practice
Preparation of PFDs, MSDs, P&IDs and DPTDs
Design Input Questionnaire
Process Design Basis
Operation and Maintenance Philosophy
Risk Management Philosophy

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

Noise Control Philosophy


Relief and Venting Philosophy

73

Lubrication, Shaft Sealing and Control Oil Systems for Special Purpose Applications

74
75
76
77
78
79
80
81

Top Entry Rotating Agitators


Special Purpose Gear Units (API 613)
Dynamic Analysis of Rotating Equipment
Basic Civil Engineering Design Data
Wind and Earthquake Loading
Design Loading for Building, Equipment, Structures and Foundations
Specification for Ground Investigation (Geotechnical)
General Topographical Survey Specification

Plant Layout Basis


Offsite and Utilities Stream Specification
Winterization Philosophy
Feed and Back Up Gas Supply Philosophy
Water Drainage Philosophy
Battery Limits & Isolation Philosophy
Laboratory & Analysis Philosophy
Sparing Philosophy
Start-up & Shut-down Philosophy
Engineering Design Guidelines -Introduction
Equipment Data Sheets
Pressure Vessels
Heat Exchangers
Fired Heaters
Boilers
Tanks
Compressors
Pumps
Drivers
Fluid Flow and Piping
Relief Systems
Flare System
Mechanical Draft Cooling Towers
Refractory
Instrumentation and Control
Electrical
Plant Layout Standard
Classification of Hazardous Chemicals
Equipment Noise Specification
Safeguarding of Machinery
Spare Parts Requirements
Preparation of Material for Shipment
Pressure Vessels (Cat 1, 2, and 3)
Pressure Vessels (Cat 4)
Documentation for Pressure Equipment
Trays for Vessels
API Storage Tanks
Non Pressure Vessels and Small Tanks
General Requirements for Shell and Tube Heat Exchangers
General requirements for Air Cooled Heat Exchangers
Plate and Frame Heat Exchangers
General requirements for Fired Heaters (API 560)
General requirements for Steam Generators and Boilers
Cooling Towers
General Requirements for all Pumps Drivers and Auxiliary Equipment
Centrifugal Pumps for Heavy Duty Service (API 610)
Centrifugal Pumps for General Service
PD Controlled Volume (Metering) Pumps
PD Rotary Screw Pumps
PD Reciprocating Pumps
Centrifugal compressors (API 617)
Reciprocating Compressors (API 618)
Rotary Positive Displacement Compressors (API 619)
Special Purpose Steam Turbines (API 612)
Lubrication, Hydraulic & Heat Transfer Fluid Requirements

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147

Specification for Earth Works


General Piling Specification
Design of Concrete Foundations, Structures and Paving
Foundations and Structures Supporting Machinery
Specification for Concrete Works
Concrete Fire Protection
Specification for Grouting Materials and Workmanship
Anchor Bolts and Fixing Standard
Design of Storage Tank Foundations
Specification for Roads and Fencing
Drainage Basic Design Specification
Specification for Drainage Material and Workmanship
Structural Steel Design
Structural Steel Fabrication
Specification for Buildings
ACMV Systems Specification
General Piping Requirements
Piping Material Specifications
Requirements for Steam Tracing Wax Lines
Internal Cleaning and Protection of Pipework
Fire and Gas Detection and Protection Systems
Control Design Philosophy
Assessment for Safety Instrumented Systems
Analyzers Maintenance Network
General Instrumentation Specification
Machinery Monitoring System (MMS) Technical Specification
Custody Transfer (Tank Gauging) Technical Specification
Safety Integrity Level Implementation (Design Stage)
Custody Transfer (Flow Metering) Technical Specification
Distributed Control System (DCS) Technical Specification
Safety Instrument System (SIS) Technical Specification
Fire and Gas System (FGS) Technical Specification
Operator Training Simulator Technical Specification
Operator Graphics Display Design
Advanced Process Control
DCS Advanced Regulatory Control
Instrument Piping Material Specification
Instrument Cable Specification
Foundation Fieldbus
Instrument Installation Specification
Protection of Instruments
Inspection and Testing of Electronic Systems
Analyser Shelters & Analyser Local Panels Specification
Analyser Sample Systems
Control/Marshalling Cabinet Specification
Installation of Instruments in Piping Systems
C & I /Electrical Interface Specification
Analyzers
General Electrical Design Specification
Electrical Equipment for Package Equipment
Electrical Power Management
Electrical Design Philosophy
HV Switchgear and Controlgear
Factory Built Assemblies of LV Switchgear and Controlgear
Power Transformers
Induction Motors (LV)
Induction Motors (HV)
Synchronous Motors and Generators
Variable Speed Drives
AC Uninterruptible Power System (UPS) Supplies
LV/DC Supplies for Battery Charging and Distribution Equipment
Neutral Earthing Resistors
Electrical Services for Buildings
Power and Control Cable
Telephone Systems
UHF Trunked Mobile Radio Systems

UzGTL ITB Index


Project: Uzgtl Project

Document Title

Sect. / Subsect. No
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169

Data Transmission Systems


Public Address & Control Systems

170

Classification, Design, Fabrication, Inspection and Certification of Boilers and Pressure Vessels

171
172
SECTION 5.0
5.1
5.2
SECTION 6.0
SECTION 7.0
SECTION 8.0
SECTION 9.0
SECTION 10.0
SECTION 11.0
SECTION 12.0

ix)Exhibit9
x)Exhibit10
xi)Exhibit11
xii)Exhibit12
Xiii)Exhibit13

Closed Circuit Television System (CCTV)


Telecommunications Cable
Standard Electrical Installation Details
General Requirements for Electrical Construction
Pre-commissioning of Electrical Installations
Site Testing of Electrical Equipment and Installations
Protective Finishes for Electrical Equipment and Materials for Outdoor Use
Protective Coatings
Coating and Wrapping of Buried Piping
External Fireproofing of Equipment Supports and Structures
Hot Service Insulation
Cold Service Insulation
Welding - Pressure Vessels, Tanks & Heat Exchangers
Welding Shop & Field Fabricated Piping & Fired Heaters
Submission of Fabrication Procedures for Review
Welding of Structural Steelwork
Positive Material Identification (PMI)
Material Requirements
Heat Treatment
Impact Testing of Materials

Cathodic Protection
Material Selection & Corrosion Control
Engineering Design Package (EDP)
SPL EDP
BOP EDP
HPU Duty Specification and Requirements
ASU Duty Specification and Requirements
Plant Automation System
Sasol Equipment
HTAS Equipment
External Battery Limit Interfaces
Site Preparation

Contractor's Execution plan


FORM OF DIRECT AGREEMENT
DESCRIPTION OF THE PROJECT
The Owner's Permits
Form of Novation Agreement

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

UZGTL Doc. No. / TPIT Doc. No

Vol.

Rev. No.

Receive
date

o
o

9/11/2012

o
o

9/25/2012

9/25/2012

UZGTL-F1-PRO-PD-00054 2381-00-JSD-0000-25
UZGTL-F1-PRO-PD-00053 2381-00-JSD-0000-05
UZGTL-FI-PRO-HM-98051 2381-98-CN-0001-01
UZGTL-F1-PRO-HM-00001

1
1
1
1

o
o
o
o
o

UZGTL-F1-PRO-03-98051 2381-98-PFD-0010-51

9/11/2012

UZGTL-F1-PRO-03-98052 2381-98-PFD-0010-52

9/11/2012

UZGTL-F1-PRO-03-98053 2381-98-PFD-0010-53

9/11/2012

UZGTL-F1-PRO-RP-00056 2381-00-JSD-0000-22
UZGTL-F1-PRO-RP-70001
UZGTL-F1-PRO-PS-00052 2381-00-JSD-0000-04
UZGTL-F1-PRO-PD-70001
UZGTL-F1-PRO-RP-00057 2381-00-JSD-0000.19
UZGTL-F1-PRO-PS-00053 2381-00-JSD-0000.03
UZGTL-FI-PRO-PS-00051 2381-00-JSD-0000-11
UZGTL-F1-PRO-PD-98053 2381-98-CN-0003-01
UZGTL-F1-PRO-HM-98052 2381-98-CN-0001-02
UZGTL-04-7 2381-00-JSD-0000-06
UZGTL-F1-PMC-RP-00001
UZGTL-F1-LOS-PP-00051 2381-00-PP- 202
UZGTL-F1-PRO-PD-00052 2381-00-PP-124
UZGTL-F1-PRO-PD-00051 2381-00-PP-260
28 May 2010 (received by UZGTL-PMT-TPIF1-0125-T)
15 July 2010 (received by UZGTL-PMT-TPIF1-0228-T)

1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
3

1
2
1
2
1
1
1
1
1
1
2
1
1
1
---

UZGTL-F1-PRO-PS-10051 2381-10-SP-4113-01
UZGTL-F1-PRO-PS-20001
UZGTL-F1-PRO-PS-30001
UZGTL-F1-PRO-PS-35001
UZGTL-F1-PRO-PS-40001
UZGTL-F1-PRO-PS-45001
UZGTL-F1-PRO-PS-50001
UZGTL-F1-PRO-PS-55001
UZGTL-FI-PRO-PS-60051 2381-60-SP-4111-01

4
4
4
4
4
4
4
4
4

UZGTL-F1-PRO-PS-71051 2381-71-JSD-0001-01
ref. UZGTL-F1-PRO-PD-70001
UZGTL-FI-PRO-PS-73051 2381-73-JSD-0001-01
UZGTL-FI-PRO-PS-74001 2381-74-JSD-0001-01
UZGTL-FI-PRO-PS-75001 2381-75-JSD-0001-01
UZGTL-F1-PRO-PS-76051 2381-76-JSD-0001-01
UZGTL-F1-PRO-PD-70001
UZGTL-F1-PRO-PD-70001

4
4
4
4
4
4
4
4

UZGTL-F1-PRO-PS-81051 2381-81-JSD-0001-01
UZGTL-FI-PRO-PS-82051 2381-82-JSD-0001-01
UZGTL-FI-PRO-PS-83051 2381-83-JSD-0001-01
UZGTL-F1-PRO-PS-84051 2381-84-JSD-0001-01

4
4
4
4

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

2
1
1
2

9/11/2012
9/11/2012
9/11/2012
9/11/2012

1
2
2
2
2
2
2
2
1
1
2
1
1
1
1
2
2
1
1
1
1

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-F1-PRO-PS-85051 2381-85-JSD-0001-01
UZGTL-F1-PRO-PS-86051 2381-86-JSD-0001-01
UZGTL-F1-PRO-PS-87051 2381-87-JSD-0001.01

4
4

o
o

1
1

9/11/2012
9/11/2012

UZGTL-F1-CIV-RP-91051 2381-91-MS-2000-01

o
o
o

9/11/2012
9/11/2012
9/11/2012

UZGTL-71-4 (see C9-4) 2381-00-JSD-1600-03


UZGTL-F1-ELE-72-92051 2381-00-DW-1652-01

9/11/2012

UZGTL-F1-CIV-RP-93051 2381-93-JSD-1700-01
UZGTL-60-2 (see C8-1) 2381-00-JSD-1510-01
UZGTL-F1-PIP-RP-00052 2381-00-JSD-1300-11
UZGTL-F1-PIP-RP-97051 2381-97-JSD-1300-10

5
5
5
5

2
1
1
1

UZGTL-04-0
UZGTL-04-1 2381-00-JSD-0000-02
UZGTL-04-2 2381-00-JSD-0000-23
UZGTL-04-3 2381-00-JSD-1900-05
UZGTL-04-4 2381-00-JSD-6000-01
UZGTL-04-5 2381-00-JSD-0000-21
UZGTL-04-6 2381-00-JSD-1300-04
UZGTL-04-7 2381-00-JSD-0000-06
UZGTL-04-8 2381-00-JSD-0000-20
UZGTL-04-9
UZGTL-04-10 2381-00-JSD-0000-16
UZGTL-04-11 2381-00-JSD-0000-18
UZGTL-04-14 2381-00-JSD-0000-14
UZGTL-04-15 2381-00-JSD-0000-15
UZGTL-04-16 2381-00-JSD-0000-17
UZGTL-05-2 2381-00-JSD-1300-01
UZGTL-05-3 2381-00-JSD-1900-06
UZGTL-06-1 2381-00-JSD-6000-02

5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6

UZGTL-00-0 2381-00-NM-120
UZGTL-00-1
UZGTL-00-3 2381-00-PP-113
UZGTL-01-1 2381-00-JSD-0000-01
UZGTL-01-2 2381-00-JSD-1900-04
UZGTL-02-1
UZGTL-02-2 2381-00-JSD-0000-31
UZGTL-02-3
UZGTL-03-1
UZGTL-03-2 2381-00-JSD-0000-47
UZGTL-05-1-1 2381-00-JSD-0000.32
UZGTL-11-1 2381-00-JSS-0570-01
UZGTL-13-1 2381-00-JSS-2520-01
UZGTL-13-2 2381-00-JSS-2510-01

6
6
6
6
6
6
6
6
6
6
7
8
8
8

UZGTL-21-1 2381-00-JSS-0610-01
UZGTL-22-1 2381-00-JSS-0710-01
UZGTL-23-1 2381-00-JSS-0660-01
UZGTL-26-1 2381-00-JSD-0110-01
UZGTL-26-2 2381-00-JSD-0150-01
UZGTL-28-1 2381-00-JSD-0310-01

8
8
8
8
8
8

UZGTL-30-2
UZGTL-31-1
UZGTL-31-2
UZGTL-31-3
UZGTL-31-4
UZGTL-31-5

9
9
9
9
9
9

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

2381-00-JSS-0910-03
2381-00-JSS-0910-01
2381-00-JSS-0910-02
2381-00-JSS-0940-01
2381-00-JSS-0930-01
2381-00-JSS-0940-02

2
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-32-1 2381-00-JSS-1010-01
UZGTL-32-2 2381-00-JSS-1020-01
UZGTL-32-3 2381-00-JSS-1030-01
UZGTL-11-1 2381-00-JSS-0570-01
UZGTL-13-1 2381-00-JSS-2520-01
UZGTL-13-2 2381-00-JSS-2510-01

9
9

o
o

1
1

9/11/2012
9/11/2012

9
8
8
8

1
1
1
1

UZGTL-21-1 2381-00-JSS-0610-01
UZGTL-22-1 2381-00-JSS-0710-01
UZGTL-23-1 2381-00-JSS-0660-01
UZGTL-26-1 2381-00-JSD-0110-01
UZGTL-26-2 2381-00-JSD-0150-01
UZGTL-28-1 2381-00-JSD-0310-01

8
8
8
8
8
8

UZGTL-30-2
UZGTL-31-1
UZGTL-31-2
UZGTL-31-3
UZGTL-31-4
UZGTL-31-5
UZGTL-32-1
UZGTL-32-2
UZGTL-32-3
UZGTL-33-1
UZGTL-36-1

2381-00-JSS-0910-03
2381-00-JSS-0910-01
2381-00-JSS-0910-02
2381-00-JSS-0940-01
2381-00-JSS-0930-01
2381-00-JSS-0940-02
2381-00-JSS-1010-01
2381-00-JSS-1020-01
2381-00-JSS-1030-01
2381-00-JSS-1120-01
2381-00-JSS-1061-01

9
9
9
9
9
9
9
9
9
9
9

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
1
1
1
1
1
1
1
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-36-2 2381-00-JSS-1061-02

9/11/2012

UZGTL-37-1
UZGTL-38-2
UZGTL-39-1
UZGTL-06-2

2381-00-JSS-4260-01
2381-00-JSS-1160-01
2381-00-JSS-1010-02
2381-00-JSS-1170-01

9
9
9
9

1
1
1
1

UZGTL-40-1 2381-00-JSD-1700-01
UZGTL-40-2 2381-00-JSD-1700-02
UZGTL-40-3 2381-00-JSD-1700-03
UZGTL-41-1 2381-00-MS-1410-01
UZGTL-41-3 2381-00-JSD-1440-01
UZGTL-42-1 2381-00-MS-1430-01
UZGTL-43-1 2381-00-JSD-1700-04
UZGTL-43-2 2381-00-JSD-1700-05
UZGTL-43-4 2381-00-MS-1700-01
UZGTL-43-5 2381-00-MS-1740-01
UZGTL-43-6 2381-00-MS-1700-02
UZGTL-43-7 2381-00-JSD-1700-06
UZGTL-43-8 2381-00-JSD-1700-07
UZGTL-44-1 2381-00-JSD-1440-02
UZGTL-45-1 2381-00-JSD-1400-01
UZGTL-45-2 2381-00-MS-1470-01
UZGTL-46-1 2381-00-JSD-1800-01
UZGTL-46-2 2381-00-JSS-1800-01
UZGTL-47-1 2381-00-MS-2000-01
UZGTL-47-2 2381-00-JSD-3400-01

9
9
9
9
9
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10

UZGTL-50-1 2381-00-JSD-1300-02
UZGTL-51-2 2381-00-JSD-1300-52
UZGTL-52-1 2381-00-JSD-1300-03
UZGTL-55-1 2381-00-JSD-0000-55

11
11
11
11

UZGTL-60-2 2381-00-JSD-1510-01
UZGTL-60-3 2381-00-JSD-1515-01

11
11

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

UZGTL Doc. No. / TPIT Doc. No

Vol.

Rev. No.

Receive
date

UZGTL-61-1 2381-00-JSD-1540-01
UZGTL-61-3 2381-00-JSS-1515-03
UZGTL-61-4 2381-00-JSS-1516-01
UZGTL-61-5 2381-00-JSD-1515-02
UZGTL-61-6 2381-00-JSD-1584-01
UZGTL-62-1 2381-00-JSS-1511-01
UZGTL-62-2 2381-00-JSS-1515-01
UZGTL-62-4 2381-00-JSS-1515-02
UZGTL-63-1 2381-00-JSS-1572-01
UZGTL-63-2 2381-00-JSS-1574-01
UZGTL-64-1 2381-00-JSD-1570-01
UZGTL-64-2 2381-00-JSS-1573-01
UZGTL-64-3 2381-00-JSD-1590-01
UZGTL-64-4 2381-00-JSS-1585-01
UZGTL-64-5 2381-00-JSS-1568-01
UZGTL-64-6 2381-00-JSS-1521-01
UZGTL-64-7 2381-00-JSS-1570-02
UZGTL-64-8 2381-00-JSS-1521-02

11
11

o
o

1
1

9/11/2012
9/11/2012

11
11
11
11
11
11
12
12
12
12
12
12
12
12
12
12

1
1
1
1
1
2
1
1
1
1
2
1
1
1
1
1

UZGTL-71-1 2381-00-JSD-1600-01
UZGTL-71-2 2381-00-JSD-1600-02
UZGTL-71-3 2381-00-JSD-1661-01
UZGTL-71-4 2381-00-JSD-1600-03
UZGTL-72-2 2381-00-JSD-1652-01
UZGTL-72-3 2381-00-JSD-1654-01
UZGTL-73-1 2381-00-JSD-1641-01
UZGTL-74-1 2381-00-JSD-1691-01
UZGTL-74-2 2381-00-JSD-1692-01
UZGTL-74-3 2381-00-JSD-1696-01
UZGTL-74-4 2381-00-JSD-1693-01
UZGTL-75-1 2381-00-JSD-1671-01
UZGTL-75-2 2381-00-JSD-1672-01
UZGTL-75-4 2381-00-JSD-1642-01
UZGTL-75-5 2381-00-JSD-1600-04
UZGTL-76-1 2381-00-JSD-1621-01
UZGTL-77-1 2381-00-JSS-1533-01
UZGTL-77-2 2381-00-JSS-1532-01
UZGTL-77-3 2381-00-JSD-1530-01
UZGTL-77-4 2381-00-JSS-1535-01
UZGTL-77-5 2381-00-JSS-1531-01
UZGTL-77-6 2381-00-JSS-1574-02
UZGTL-78-1 2381-00-JSD-1690-01
UZGTL-78-2 2381-00-PD-1600-01
UZGTL-78-3 2381-00-PD-1600-02
UZGTL-78-4 2381-00-PD-1600-03

12
12
12
12
12
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-78-5 2381-00-PD-1600-04

13

9/11/2012

14
14
14
14
14
14
14
14
14
14
14
14
14

o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
1
1
1
1
1
1
1
1
1
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-81-1 2381-00-JSD-2300-01
UZGTL-81-2 2381-00-JSD-2300-02
UZGTL-81-3 2381-00-JSD-1980-01
UZGTL-83-1 2381-00-JSD-2200-01
UZGTL-83-2 2381-00-JSD-2200-02
UZGTL-84-1 2381-00-JSS-6300-02
UZGTL-84-2 2381-00-JSD-1300-53
UZGTL-84-6 2381-00-JSD-1300-54
UZGTL-84-7 2381-00-JSD-1300-59
UZGTL-85-1 2381-00-JSD-1300-55
UZGTL-86-1 2381-00-JSD-1300-56
UZGTL-86-2 2381-00-JSD-1300-57
UZGTL-86-3 2381-00-JSD-1300-58

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

UZGTL Doc. No. / TPIT Doc. No

Vol.

Rev. No.

Receive
date
9/11/2012

UZGTL-91-1 2381-00-JSD-0400-04

15

9/11/2012

UZGTL-91-5 2381-00-JSD-1684-01
UZGTL-91-6 281-00-JSD-0000-46

15
15

1
1

UZGTL-FI-PRO-RP-00051 2381-00-ML-903
UZGTL-F1-PRO-RP-84051 2381-84-ML-260
UZGTL-F1-PRO-RP-86051 2381-86-ML-260
UZGTL-FI-PRO-RP-00052 2381-00-ML-262
UZGTL-FI-PRO-RP-85051 2381-85-ML-260
UZGTL-F1-CON-RP-00051 2381-00-ML-810

15
15
15
15
15
15

o
o
o
o
o
o
o
o
o

1
A
1
1
1
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-FI-PRO-RP-00053 2381-00-ML-261

15

9/11/2012

UZGTL-FI-PRO-RP-00080 2381-00-ML-235

15

9/11/2012

UZGTL-FI-PRO-RP-00051 2381-00-ML-260

15

9/11/2012

UZGTL-F1-EST-RP-00051 2381-00-ML-151

15

9/11/2012

UZGTL-FI-PRO-RP-00054 2381-00-ML-263

15

9/11/2012

UZGTL-FI-PRO-RP-10051 2381-10-ML-260
UZGTL-F1-PRO-RP-00055 2381-00-ML-264
UZGTL-F1-PRO-TN-50001
UZGTL-F1-PRO-TN-70001

15
15
15
15

o
o
o
o

1
A
2
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-PD-00055 2381-00-JSD-0000-50
SEE DESIGN PREMISE (A-2)
SEE DESIGN PREMISE (C1-2)
UZGTL-F1-PRO-PD-00060 2381-00-JSD-0000-30
SEE DESIGN PREMISE (A-5)
SEE DESIGN PREMISE (A-3)
UZGTL-F1-PRO-HM-00001
SEE DESIGN PREMISE (A-7)
SEE DESIGN PREMISE (A-10 & A-13)
SEE DESIGN PREMISE (C1)
UZGTL-F1-PRO-PD-97051 2381-97-NM-0012-01
UZGTL-F1-PRO-PD-98053 2381-98-CN-0003-01

16
16
16
16
16
16
16
16
16
16
16
16

o
o
o
o
o
o
o
o
o
o
o
o
o

UZGTL-F1-PRO-03-00051 2381-00-PFD-0010-01

16

UZGTL-F1-PRO-03-00052 2381-00-PFD-0010-02

1
2

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

9/11/2012

16

9/11/2012

UZGTL-F1-PRO-03-00053 2381-00-PFD-0010-03

16

9/11/2012

UZGTL-F1-PRO-05-00051 2381-00-MSD-0011-01
UZGTL-F1-PMC-RP-00007

16
16

o
o

1
2

9/11/2012
9/11/2012

UZGTL-F1-MEC-TS-10051 2381-10-MR-4113-AA
UZGTL-F1-MEC-RP-10051 2381-10-SR-4113-01
UZGTL-TPI-ASU-F1-0001-M
UZGTL-TPI-ASU-F1-0002-M
UZGTL-TPI-ASU-F1-0003-M
UZGTL-F1-PRO-RP-10052 2381-10-TBT-4113-01
06 May 2010

16
16
16
16
16
16
16

UZGTL-F1-PRO-PD-20102

17

o
o
o
o
o
o
o
o
o
o

1
A
0
0
0
1

9/11/2012
10/25/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-F1-PRO-PD-20103
UZGTL-F1-PRO-PD-20104
UZGTL-F1-PRO-PD-20101
UZGTL-F1-PRO-03-20018
UZGTL-F1-PRO-03-20114
UZGTL-F1-PRO-03-20117
UZGTL-F1-PRO-03-20113
UZGTL-F1-PRO-03-20116
UZGTL-F1-PRO-03-20115
UZGTL-F1-PRO-03-20107
UZGTL-F1-PRO-03-20109
UZGTL-F1-PRO-03-20111
UZGTL-F1-PRO-03-20110
UZGTL-F1-PRO-03-20108
UZGTL-F1-PRO-03-20102
UZGTL-F1-PRO-03-20006
UZGTL-F1-PRO-03-20012
UZGTL-F1-PRO-03-20103
UZGTL-F1-PRO-03-20101
UZGTL-F1-PRO-03-20105
UZGTL-F1-PRO-03-20104
UZGTL-F1-PRO-03-20008
UZGTL-F1-PRO-05-20006
UZGTL-F1-PRO-05-20101
UZGTL-F1-PRO-05-20105
UZGTL-F1-PRO-05-20104
UZGTL-F1-PRO-05-20103
UZGTL-F1-PRO-05-20102
UZGTL-F1-PRO-OM-20101
UZGTL-F1-PRO-OM-20102
UZGTL-F1-PRO-EL-20101
UZGTL-F1-PRO-PS-20106
UZGTL-F1-PRO-PS-20102
UZGTL-F1-PRO-PS-20001
UZGTL-F1-PRO-PS-20104
UZGTL-F1-PRO-PS-20105
UZGTL-F1-PRO-PS-20103
UZGTL-F1-PRO-PD-20109
UZGTL-F1-PRO-PD-20105
UZGTL-F1-PRO-PD-20106
UZGTL-F1-PRO-PD-20107
UZGTL-F1-PRO-PD-20110
UZGTL-F1-PRO-PD-20108
UZGTL-F1-PRO-PD-20111
UZGTL-F1-PIP-01-20001
DWG. 0344779
UZGTL-F1-EST-RP-20001

17
17

o
o

1
2

9/11/2012
9/11/2012

17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17

1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
0
1
1
0
0
1
0
4
4
2
1
1
0
1
0
0

UZGTL-F1-PRO-PD-30002
UZGTL-F1-PRO-PD-00001
UZGTL-F1-PRO-PD-30003
UZGTL-F1-PRO-PS-30001
UZGTL-F1-PRO-PD-30004
UZGTL-F1-PRO-HM-30003
UZGTL-F1-PRO-03-0001

18
18
18
18
18
18
18

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
3
2
3
3

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-0002

18

9/11/2012

UZGTL-F1-PRO-03-0003
UZGTL-F1-PRO-03-30001
UZGTL-F1-PRO-03-30002

18
18
18

o
o
o

3
3
3

9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-F1-PRO-03-30003
UZGTL-F1-PRO-03-30004
UZGTL-F1-PRO-03-30005
UZGTL-F1-PRO-03-30106
UZGTL-F1-PRO-03-30107
UZGTL-F1-PRO-03-30108
UZGTL-F1-PRO-03-30109
UZGTL-F1-PRO-03-30110

18
18

o
o

3
3

9/11/2012
9/11/2012

18
18
18
18
18
18

o
o
o
o
o
o

3
3
3
3
3
3

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-30011

18

9/11/2012

UZGTL-F1-PRO-PD-30005
UZGTL-F1-PRO-PD-30006
UZGTL-F1-PRO-EL-30001
UZGTL-F1-PRO-DS-30001
UZGTL-F1-PRO-DS-30102
UZGTL-F1-PRO-DS-30103
UZGTL-F1-PRO-DS-30104
UZGTL-F1-PRO-DS-30105
UZGTL-F1-PRO-PD-30007
UZGTL-F1-PRO-PD-30008
UZGTL-F1-PRO-PD-30009
UZGTL-F1-PRO-PD-30010
UZGTL-F1-PRO-PD-30011
Hazardous Material List MSDS
UZGTL-F1-PRO-PD-30012
UZGTL-F1-PRO-PD-30013
UZGTL-F1-PRO-PD-30014

18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18

1
1
2
2
2
2
2
2
2
2
1
1
1

UZGTL-F1-PRO-PD-35002
UZGTL-F1-PRO-PD-00001
UZGTL-F1-PRO-PD-35003
UZGTL-F1-PRO-PS-35001
UZGTL-F1-PRO-PD-35004
UZGTL-F1-PRO-HM-35003
UZGTL-F1-PRO-03-0001

19
19
19
19
19
19
19

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
2
2
3
2
3

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-0002

19

9/11/2012

UZGTL-F1-PRO-03-0003

19

9/11/2012

UZGTL-F1-PRO-03-35001

19

9/11/2012

UZGTL-F1-PRO-03-35002

19

9/11/2012

UZGTL-F1-PRO-03-35003

19

9/11/2012

UZGTL-F1-PRO-03-35004

19

9/11/2012

UZGTL-F1-PRO-03-35005
UZGTL-F1-PRO-PD-35005
UZGTL-F1-PRO-PD-35006
UZGTL-F1-PRO-EL-35001
UZGTL-F1-PRO-PD-35007
UZGTL-F1-PRO-PD-35008
UZGTL-F1-PRO-PD-35009
UZGTL-F1-PRO-PD-35010
UZGTL-F1-PRO-PD-35011
Hazardous Material List MSDS
Hazardous Material List MSDS
UZGTL-F1-PRO-PD-35012
UZGTL-F1-PRO-PD-35013
UZGTL-F1-PRO-PD-35014

19
19
19
19
19
19
19
19
19
19
19
19
19
19

o
o
o
o
o
o
o
o
o
o
o
o
o
o

3
1
2
2
1
3
1
1
2

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

1
1
1

1
2
2

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Receive
date

Vol.

UZGTL-F1-PRO-PD-40002
UZGTL-F1-PRO-PD-00001
UZGTL-F1-PRO-PD-40003
UZGTL-F1-PRO-PS-40001
UZGTL-F1-PRO-PD-40004
UZGTL-F1-PRO-HM-40002
UZGTL-F1-PRO-03-0001

20

o
o

9/11/2012
9/11/2012

20
20
20
20
20
20

o
o
o
o
o
o

1
2
4
2
2
3

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-0002

20

9/11/2012

UZGTL-F1-PRO-03-0003
UZGTL-F1-PRO-03-40001

20
20

o
o

3
3

9/11/2012
9/11/2012

UZGTL-F1-PRO-03-40002

20

9/11/2012

UZGTL-F1-PRO-03-40003
UZGTL-F1-PRO-PD-40005
UZGTL-F1-PRO-PD-40006
UZGTL-F1-PRO-EL-40001
UZGTL-F1-PRO-DS-40001
UZGTL-F1-PRO-PD-40007
UZGTL-F1-PRO-PD-40008
UZGTL-F1-PRO-PD-40009
UZGTL-F1-PRO-PD-40010
UZGTL-F1-PRO-PD-40011
UZGTL-F1-PRO-PD-40012
UZGTL-F1-PRO-PD-40013
UZGTL-F1-PRO-PD-40014

20
20
20
20
20
20
20
20
20
20
20
20
20

3
2
2
2
2
1
2
2
2
1
1
1
1

UZGTL-F1-PRO-PD-45002
UZGTL-F1-PRO-PD-00001
UZGTL-F1-PRO-PS-45001
UZGTL-F1-PRO-PD-45004
UZGTL-F1-PRO-HM-45003
UZGTL-F1-PRO-03-0001

21
21
21
21
21
21

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
2
2
1
3

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-0002

21

9/11/2012

UZGTL-F1-PRO-03-0003
UZGTL-F1-PRO-03-45001

21
21

o
o

3
3

9/11/2012
9/11/2012

UZGTL-F1-PRO-03-45002

21

9/11/2012

UZGTL-F1-PRO-03-45003

21

9/11/2012

UZGTL-F1-PRO-03-45004

21

9/11/2012

UZGTL-F1-PRO-PD-45005
UZGTL-F1-PRO-PD-45006
UZGTL-F1-PRO-EL-45001
UZGTL-F1-PRO-PD-45007
UZGTL-F1-PRO-PD-45008
UZGTL-F1-PRO-PD-45009
UZGTL-F1-PRO-PD-45010
UZGTL-F1-PRO-PD-45011
Hazardous Material List MSDS
UZGTL-F1-PRO-PD-45012
UZGTL-F1-PRO-PD-45013
UZGTL-F1-PRO-PD-45014

21
21
21
21
21
21
21
21
21
21
21
21

1
1
2
1
3
3
1
2

Process Design Package Chevron Idrocracking Process July 2010


Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010

22
22
22

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

Rev. No.

1
1
1
0
0
0

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

Process Design Package Chevron Idrocracking Process July 2010


Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010
Process Design Package Chevron Idrocracking Process July 2010

22
22

o
o

0
0

9/11/2012
9/11/2012

22
22
22
22
22
22
22
22

0
0
0
0
0
0
0
0

UZGTL-F1-PRO-PD-50020
UZGTL-F1-PRO-HM-50002
UZGTL-F1-PRO-EL-50020
UZGTL-F1-PRO-PD-50021
UZGTL-F1-PRO-03-50020
UZGTL-F1-PRO-03-50021

22
22
22
22
22
22

UZGTL-F1-PRO-PD-55001
UZGTL-F1-PRO-HM-55001
UZGTL-F1-PRO-03-55001
UZGTL-F1-PRO-03-55002
UZGTL-F1-PRO-EL-55001
UZGTL-F1-PRO-PD-55008

22
22
22
22
22
22

UZGTL-F1-MEC-TS-60051 2381-60-MR-4111-AA

23

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-MEC-RP-60051 2381-60-SR-4111-01

23

9/11/2012

UZGTL-TPI-HPU-F1-0001-M
UZGTL-TPI-HPU-F1-0002-M
UZGTL-F1-PRO-RP-60051 2381-60-TBT-4111-01
20 May 2010

23
23
23
23

0
0
1
0

UZGTL-F1-PRO-PD-71051 2381-71-SP-0000-06
UZGTL-F1-PRO-PS-71052 2381-71-SP-0000-07
UZGTL-F1-PRO-PS-71053 2381-71-SP-0000-08
UZGTL-F1-PRO-PS-71051 2381-71-JSD-0001-01
UZGTL-F1-PRO-HM-71051 2381-71-CN-0001-01
UZGTL-F1-PRO-03-7105162 2381-71-PFD-0010-0112
UZGTL-F1-PRO-05-7105162 2381-71-MSD-0011-0112
UZGTL-F1-PRO-PD-71053 2381-71-SP-0000-01
UZGTL-F1-PCC-RP-71051 2381-71-JSD-0000-09
UZGTL-F1-PRO-EL-71051 2381-71-EL-001
UZGTL-F1-PRO-PD-71055 2381-71-CN-0004-01
UZGTL-F1-PRO-PD-71056 2381-71-CN-0003-01
UZGTL-F1-PRO-PD-71057 2381-71-NM-0005-01
UZGTL-F1-PRO-PD-71058 2381-71-NM-0006-01
UZGTL-F1-PRO-PD-71059 2381-71-NM-0050-01
UZGTL-F1-PRO-PS-71051 2381-71-ML-201
UZGTL-F1-PRO-PD-71060 2381-71-JSD-0000-05
UZGTL-F1-PRO-PD-71061 2381-71-SP-0000-10
UZGTL-F1-PRO-PD-71062 2381-71-SP-0000-11

24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24

UZGTL-F1-PRO-PD-72001
UZGTL-F1-PRO-HM-72001
UZGTL-F1-PRO-EL-72001
UZGTL-F1-PRO-PD-72002
UZGTL-F1-PRO-03-72001
UZGTL-F1-PRO-03-72002
UZGTL-F1-PRO-03-72003

25
25
25
25
25
25
25

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

2
2
2
2
2
2
2
2
2
2
2
2

1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
3
3
3

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-F1-PRO-03-72004
UZGTL-F1-PRO-03-72005
UZGTL-F1-PRO-03-72006
UZGTL-F1-PRO-03-72007
UZGTL-F1-PRO-03-72008
UZGTL-F1-PRO-03-72009
UZGTL-F1-PRO-03-72010
UZGTL-F1-PRO-03-72011
UZGTL-F1-PRO-03-72012
UZGTL-F1-PRO-03-72013

25
25

o
o

3
3

9/11/2012
9/11/2012

25
25
25
25
25
25
25
25

o
o
o
o
o
o
o
o

3
3
3
3
3
3
3
3

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-PS-72001

25

9/11/2012

UZGTL-F1-PRO-PS-72002

25

UZGTL-F1-PRO-PD-73051 2381-73-SP-0000-06
UZGTL-F1-PRO-PS-73052 2381-73-SP-0000-07
UZGTL-F1-PRO-PS-73053 2381-73-SP-0000-08
UZGTL-F1-PRO-PS-73051 2381-73-JSD-0001.01
UZGTL-F1-PRO-HM-73051 2381-73-CN-0001-01
UZGTL-F1-PRO-03-73051 2381-73-PFD-0010-01-01
UZGTL-F1-PRO-05-73051 2381-73-MSD-0011-01-01
UZGTL-F1-PRO-PD-73052 2381-73-SP-0000-01
UZGTL-F1-PCC-RP-73051 2381-73-JSD-0000-09
UZGTL-F1-PRO-EL-73051 2381-73-EL-001
UZGTL-F1-PRO-PD-73056 2381-73-CN-0003-01
UZGTL-F1-PRO-PD-73058 23861-73-NM-0006-01
UZGTL-F1-PRO-PD-73059 2381-73-NM-0050-01
UZGTL-F1-LOS-HS-73051 2381-73-ML-201
UZGTL-F1-PRO-PD-73060 2381-73-JSD-0000-05
UZGTL-F1-PRO-PD-73061 2381-73-SP-0000-10
UZGTL-F1-PRO-PD-73062 2381-73-SP-0000-11

26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26
26

UZGTL-F1-PRO-PD-74051 2381-74-SP-0000-06
UZGTL-F1-PRO-PS-74052 2381-74-SP-0000-07
UZGTL-F1-PRO-PS-74053 2381-74-SP-0000-08
UZGTL-F1-PRO-PS-74001 2381-74-JSD-0001-01
UZGTL-F1-PRO-HM-74051 2381-74-CN-0001-01

26
26
26
26
26

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
2
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-74051 2381-74-PFD-0010-01-01

26

9/11/2012

UZGTL-F1-PRO-03-74052 2381-74-PFD-0010-02-01

26

9/11/2012

UZGTL-F1-PRO-05-74051 2381-74-MSD-0011-01-01

26

9/11/2012

UZGTL-F1-PRO-05-74052 2381-74-MSD-0011-02-01

26

9/11/2012

UZGTL-F1-PRO-PD-74052 2381-74-SP-0000-01
UZGTL-F1-PCC-RP-74051 2381-74-JSD-0000-09
UZGTL-F1-PRO-EL-74051 2381-74-EL-001
UZGTL-F1-PRO-PD-74055 2381-74-CN-0004-01
UZGTL-F1-PRO-PD-74056 2381-74-CN-0003-01
UZGTL-F1-PRO-PD-74057 2381-74-NM-0005-01
UZGTL-F1-PRO-PD-74058 2381-74-NM-0006-01
UZGTL-F1-PRO-PD-74059 2381-74-NM-0050-01
UZGTL-F1-LOS-HS-74051 2381-74-ML-201
UZGTL-F1-PRO-PD-74060 2381-74-JSD-0000-05
UZGTL-F1-PRO-PD-74061 2381-74-SP-0000-10
UZGTL-F1-PRO-PD-74062 2381-74-SP-0000-11

26
26
26
26
26
26
26
26
26
26
26
26

1
1
1
1
1
1
1
1
1
1
1
1

UZGTL-F1-PRO-PD-75051 2381-75-SP-0000-06
UZGTL-F1-PRO-PD-75052 2381-75-SP-0000-07

27
27

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-F1-PRO-PS-75053 2381-75-SP-0000-08
UZGTL-F1-PRO-PS-75001 2381-75-JSD-0001-01
UZGTL-F1-PRO-HM-75051 2381-75-CN-0001-01

27
27

o
o

1
2

9/11/2012
9/11/2012

27

9/11/2012

UZGTL-F1-PRO-03-75051 2381-75-PFD-0010-01-01

27

9/11/2012

UZGTL-F1-PRO-03-75052 2381-75-PFD-0010-02-01

27

9/11/2012

UZGTL-F1-PRO-05-75051 2381-75-MSD-0011-01-01

27

9/11/2012

UZGTL-F1-PRO-05-75052 2381-75-MSD-0011-02-01

27

9/11/2012

UZGTL-F1-PRO-PD-75052 2381-75-SP-0000-01
UZGTL-F1-PCC-RP-75051 2381-75-JSD-0000-09
UZGTL-F1-PRO-EL-75051 2381-75-EL-001
UZGTL-F1-PRO-PD-75055 2381-75-CN-0004-01
UZGTL-F1-PRO-PD-75056 2381-75-CN-0003-01
UZGTL-F1-PRO-PD-75058 2381-75-NM-0006-01
UZGTL-F1-PRO-PD-75059 2381-75-NM-0050-01
UZGTL-F1-40S-HS-75051 2381-75-ML-201
UZGTL-F1-PRO-PD-75060 2381-75-JSD-0000-05
UZGTL-F1-PRO-PD-75061 2381-75-SP-0000-10
UZGTL-F1-PRO-PD-75062 2381-75-SP-0000-11

27
27
27
27
27
27
27
27
27
27
27

1
1
1
1
1
1
1
1
1
1
1

UZGTL-F1-PRO-PD-76051 2381-76-SP-0000-06
UZGTL-F1-PRO-PS-76052 2381-76-SP-0000-07
UZGTL-F1-PRO-PS-76053 2381-76-SP-0000-08
UZGTL-F1-PTO-PS-76051 2381-76-JSD-0001-01
UZGTL-F1-PRO-HM-76051 2381-76-CN-0001-01

27
27
27
27
27

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
2
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-76051 2381-76-PFD-0010-01-01

27

9/11/2012

UZGTL-F1-PRO-03-76052 2381-76-PFD-0010-02-01

27

9/11/2012

UZGTL-F1-PRO-03-76053 2381-76-PFD-0010-03-01

27

9/11/2012

UZGTL-F1-PRO-03-76054 2381-76-PFD-0010-04-01

27

9/11/2012

UZGT-F1-PRO-03-76055 2381-76-PFD-0010-05-1

27

9/11/2012

UZGTL-F1-PRO-03-76056 2381-76-PFD-0010-06-01

27

9/11/2012

UZGTL-F1-PRO-03-76057 2381-76-PFD-0010-07-01

27

9/11/2012

UZGTL-F1-PRO-05-76051 2381-76-MSD-0011-01-01

27

9/11/2012

UZGTL-F1-PRO-05-76052 2381-76-MSD-0011-02-01

27

9/11/2012

UZGTL-F1-PRO-05-76053 2381-76-MSD-0011-03-01

27

9/11/2012

UZGTL-F1-PRO-05-76054 2381-76-MSD-0011-04-01

27

9/11/2012

UZGTL-F1-PRO-05-76055 2381-76-MSD-0011-05-01

27

9/11/2012

UZGTL-F1-PRO-05-76056 2381-76-MSD-0011-06-01

27

9/11/2012

UZGTL-F1-PRO-05-76057 2381-76-MSD-0011-07-01

27

9/11/2012

UZGTL-F1-PRO-PD-76053 2381-76-SP-0000-01
UZGTL-F1-PCC-RP-76051 2381-76-JSD-0000-09
UZGTL-F1-PRO-EL-76051 2381-76-EL-001
UZGTL-F1-PRO-PD-76055 2381-76-CN-0004-01
UZGTL-F1-PRO-PD-76056 2381-76-CN-0003-01

27
27
27
27
27

o
o
o
o
o

1
1
2
1
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-F1-PRO-PD-76057 2381-76-NM-0005-01
UZGTL-F1-PRO-PD-76058 2381-76-NM-0006-01
UZGTL-F1-PRO-PD-76059 2381-76-NM-0050-01
UZGTL-F1-LOS-HS-76051 2381-76-ML-201
UZGTL-F1-PRO-PD-76060 2381-76-JSD-0000-05
UZGTL-F1-PRO-PD-76051 2381-76-SP-0000-10
UZGTL-F1-PRO-PD-76062 2381-76-SP-0000-11

27
27

o
o

1
1

9/11/2012
9/11/2012

27
27
27
27
27

1
1
1
1
1

UZGTL-F1-PRO-PD-77001
UZGTL-F1-PRO-HM-77001
UZGTL-F1-PRO-EL-77001
UZGTL-F1-PRO-PD-77002
UZGTL-F1-PRO-03-77001
UZGTL-F1-PRO-03-77002
UZGTL-F1-PRO-03-77003
UZGTL-F1-PRO-03-77004
UZGTL-F1-PRO-PS-77001
UZGTL-F1-PRO-PS-77002

28
28
28
28
28
28
28
28
28
28

UZGTL-F1-PRO-PD-78001
UZGTL-F1-PRO-HM-78001
UZGTL-F1-PRO-EL-78001
UZGTL-F1-PRO-PD-78002
UZGTL-F1-PRO-03-78001
UZGTL-F1-PRO-03-78002
UZGTL-F1-PRO-03-78003

28
28
28
28
28
28
28

UZGTL-F1-PRO-PD-81051 2381-81-SP-0000-06
UZGTL-F1-PRO-PS-81052 2381-81-SP-0000-07
UZGTL-F1-PRO-PS-81053 2381-81-SP-0000-08
UZGTL-F1-PRO-PS-81051 2381-81-JSD-0001-01
UZGTL-F1-PRO-HM-81051 2381-81-CN-0001-01
UZGTL-F1-PRO-03-81051 2381-81-PFD-0010-01-01
UZGTL-F1-PRO-03-81052 2381-81-PFD-0010-02-01

29
29
29
29
29
29
29

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
2
1
1
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-81053 2381-81-PFD-0010-03-01

29

9/11/2012

UZGTL-F1-PRO-03-81054 2381-81-PFD-0010-04-01
UZGTL-F1-PRO-05-81051 2381-81-MSD-0011-01-01
UZGTL-F1-PRO-05-81052 2381-81-MSD-0011-02-01

29
29
29

o
o
o

1
1
1

9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-05-81053 2381-81-MSD-0011-03-01

29

9/11/2012

UZGTL-F1-PRO-05-81054 2381-81-MSD-0011-04-01
UZGTL-F1-PRO-PD-81052 2381-81-SP-0000-01
UZGTL-F1-PCC-RP-81051 2381-81-JSD-0000-09
UZGTL-F1-PRO-EL-81051 2381-81-EL-001
UZGTL-F1-PRO-PD-81056 2381-81-CN-0003-01
UZGTL-F1-PRO-PD-81057 2381-81-NM-0005-01
UZGTL-F1-PRO-PD-81059 2381-81-NM-0050-01
UZGTL-F1-LOS-HS-81051 2381-81-ML-201
UZGTL-F1-PRO-PD-81060 2381-81-JSD-0000-05
UZGTL-F1-PRO-PD-81014 2381-81-SP-0000-10
UZGTL-F1-PRO-PD-81062 2381-81-SP-0000-11

29
29
29
29
29
29
29
29
29
29
29

1
1
1
1
1
1
1
1
1
1
1

UZGTL-F1-PRO-PD-82051 2381-82-SP-0000-06
UZGTL-F1-PRO-PS-82052 2381-82-SP-0000-07
UZGTL-F1-PROPSD-82053 2381-82-SP-0000-08
UZGTL-F1-PRO-PS-82051 2381-82-JSD-0001-01
UZGTL-F1-PRO-HM-82051 2381-82-CN-0001-01
UZGTL-F1-PRO-03-82051 2381-82-PFD-0010-01
UZGTL-F1-PRO-05-82051 2381-82-MSD-0011-01-01

29
29
29
29
29
29
29

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

2
4
2
2
3
3
3
3
1
1
2
2
2
2
3
3
3

1
1
1
2
1
1
1

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-F1-PRO-PD-82052 2381-82-SP-0000-01
UZGTL-F1-PCC-RP-82051 2381-82-JSD-0000-09
UZGTL-F1-PRO-EL-82051 2381-82-EL-001
UZGTL-F1-PRO-PD-82056 2381-82-CN-0003-01
UZGTL-F1-PRO-PD-82058 2381-82-NM-0006-01
UZGTL-F1-PRO-PD-82059 2381-82-NM-0050-01
UZGTL-F1-LOS-HS-82051 2381-82-ML-201
UZGTL-F1-PRO-PD-82060 2381-82-JSD-0000-05
UZGTL-F1-PRO-PD-82061 2381-82-SP-0000-10
UZGTL-F1-PRO-PD-82062 2381-82-SP-0000-11

29
29

o
o

1
1

9/11/2012
9/11/2012

29
29
29
29
29
29
29
29

1
1
1
1
1
1
1
1

UZGTL-F1-PRO-PD-83051 2381-83-SP-0000-06
UZGTL-F1-PRO-PS-83052 2381-83-SP-0000-07
UZGTL-F1-PRO-PS-83053 2381-83-SP-0000-08
UZGTL-F1-PRO-PS-83051 2381-83-JSD-0001-01
UZGTL-F1-PRO-HM-83051 2381-83-CN-0001-01

30
30
30
30
30

o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
2
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-83051 2381-83-PFD-0010-01-01

30

9/11/2012

UZGTL-F1-PRO-83052 2381-83-PFD-0010-02-01

30

9/11/2012

UZGTL-F1-PRO-05-83051 2381-83-MSD-0011-01-01

30

9/11/2012

UZGTL-F1-PRO-05-83052 2381-83-MSD-0011-02-01

30

9/11/2012

UZGTL-F1-PRO-PD-83052 2381-83-SP-0000-01
UZGTL-F1-PCC-RP-83051 2381-83-JSD-0000-09
UZGTL-F1-PRO-EL-83051 2381-83-EL-001
UZGTL-F1-PRO-PD-83056 2381-83-CN-0003-01
UZGTL-F1-PRO-PD-83057 2381-83-NM-0005-01
UZGTL-F1-PRO-PD-83058 2381-83-NM-0006-01
UZGTL-F1-PRO-PD-83059 2381-83-NM-0050-01
UZGTL-F1-LOS-HS-83051 2381-83-ML-201
UZGTL-F1-PRO-PD-83060 2381-83-JSD-0000-05
UZGTL-F1-PRO-PD-83061 2381-83-SP-0000-10
UZGTL-F1-PRO-PD-83062 2381-83-SP-0000-11

30
30
30
30
30
30
30
30
30
30
30

1
1
1
1
1
1
1
1
1
1
1

UZGTL-F1-PRO-PD-84051 2381-84-SP-0000-06
UZGTL-F1-PRO-PS-84052 2381-84-SP-0000-07
UZGTL-F1-PRO-PD-84053 2381-84-SP-0000-08
UZGTL-F1-PRO-PS-84051 2381-84-JSD-0001-01
UZGTL-F1-PRO-HM-84051 2381-84-CN-0001-01

30
30
30
30
30

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

1
1
1
2
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

UZGTL-F1-PRO-03-84051 2381-84-PFD-0010-01-01

30

9/11/2012

UZGTL-F1-PRO-03-84052 2381-84-PFD-0010-02-01

30

9/11/2012

UZGTL-F1-PRO-03-84053 2381-84-PFD-0010-03-01

30

9/11/2012

UZGTL-F1-PRO-05-84051 2381-84-MSD-0011-01-01

30

9/11/2012

UZGTL-F1-PRO-05-84052 2381-84-MSD-0011-02-01

30

9/11/2012

UZGTL-F1-PRO-05-84053 2381-84-MSD-0011-03-01

30

9/11/2012

UZGTL-F1-PRO-PD-84052 2381-84-SP-0000-01
UZGTL-F1-PCC-RP-84051 2381-84-JSD-0000-09
UZGTL-F1-PRO-EL-84051 2381-84-EL-001
UZGTL-F1-PRO-PD-84055 2381-84-CN-0004-01
UZGTL-F1-PRO-PD-84056 2381-84-CN-0003-01
UZGTL-F1-PRO-PD-84057 2381-84-NM-0005-01
UZGTL-F1-PRO-PD-84058 2381-84-NM-0006-01

30
30
30
30
30
30
30

o
o
o
o
o
o
o

1
1
1
1
1
1
1

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/25/2012
9/11/2012

UZGTL Doc. No. / TPIT Doc. No

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-F1-PRO-PD-84059 2381-84-NM-0050-01
UZGTL-F1-LOS-HS-84051 2381-84-ML-201
UZGTL-F1-PRO-PD-84060 2381-84-JSD-0000-05
UZGTL-F1-PRO-PD-84061 2381-84-SP-0000-10
UZGTL-F1-PRO-PD-84062 2381-84-SP-0000-11

30
30

o
o

1
1

9/11/2012
9/11/2012

30
30
30

1
1
2

UZGTL-F1-PRO-PD-85051 2381-85-SP-0000-06
UZGTL-F1-PRO-PS-85051 2381-85-JSD-0001-01
UZGTL-F1-PRO-HM-85051 2381-85-CN-0001-01
UZGTL-F1-PRO-03-85051 2381-85-PFD-0010-01
UZGTL-F1-PRO-05-85051 2381-85-MSD-0011-01
UZGTL-F1-PRO-PD-85052 2381-85-SP-0000-01
UZGTL-F1-PCC-RP-85051 2381-85-JSD-0000-09
UZGTL-F1-PRO-EL-85051 2381-85-EL-001
UZGTL-F1-PRO-PD-85056 2381-85-CN-0003-01
UZGTL-F1-PRO-PD-85059 2381-85-NM-0050-01
UZGTL-F1-LOS-HS-85051 2381-85-ML-201
UZGTL-F1-PRO-PD-85060 2381-85-JSD-0000-05
UZGTL-F1-PRO-PD-85062 2381-85-SP-0000-11

31
31
31
31
31
31
31
31
31
31
31
31
31

UZGTL-F1-PRO-PD-86051 2381-86-SP-0000-06
UZGTL-F1-PRO-PS-86052 2381-86-SP-0000-07
UZGTL-F1-PRO-PS-86053 2381-86-SP-0000-08
UZGTL-F1-PRO-PS-86051 2381-86-JSD-0001-01
UZGTL-F1-PRO-HM-86051 2381-86-CN-0001-01
UZGTL-F1-PRO-03-86051 2381-86-PFD-0010-01
UZGTL-F1-PRO-05-86051 2381-86-MSD-0011-01
UZGTL-F1-PRO-PD-86052 2381-86-SP-0000-01
UZGTL-F1-PCC-RP-86051 2381-86-JSD-0000-09
UZGTL-F1-PRO-EL-86051 2381-86-EL-001
UZGTL-F1-PRO-PD-86055 2381-86-CN-0004-01
UZGTL-F1-PRO-PD-86056 2381-86-CN-0003-01
UZGTL-F1-PRO-PD-86058 2381-86-NM-0006-01
UZGTL-F1-PRO-PD-86059 2381-86-NM-0050-01
UZGTL-F1-LOS-HS-86051 2381-86-ML-201
UZGTL-F1-PRO-PD-86060 2381-86-JSD-0000-05
UZGTL-F1-PRO-PD-86061 2381-86-SP-0000-10
UZGTL-F1-PRO-PD-86062 2381-86-SP-0000-11

31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31

UZGTL-F1-PRO-PD-87051 2381-87-SP-0000-06
UZGTL-F1-PRO-PS-87051 2381-87-JSD-0001-01
UZGTL-F1-PRO-HM-87051 2381-87-CN-0001-01
UZGTL-F1-PRO-03-87051 2381-87-PFD-0010-01
UZGTL-F1-PRO-05-87051 2381-87-MSD-0011-01UZGTL-F1-PRO-PD-87052 2381-87-SP-0000-01
UZGTL-F1-PCC-RP-87051 2381-87-JSD-0000-09
UZGTL-F1-PRO-EL-87051 2381-87-EL-001
UZGTL-F1-PRO-PD-87056 2381-87-CN-0003-01
UZGTL-F1-PRO-PD-87058 2381-87-NM-0006-01
UZGTL-F1-PRO-PD-87059 2381-87-NM-0050-01
UZGTL-F1-LOS-HS-87051 2381-87-ML-201
UZGTL-F1-PRO-PD-87060 2381-87-JSD-0000-05
UZGTL-F1-PRO-PD-87061 2381-87-SP-0000-10
UZGTL-F1-PRO-PD-87062 2381-87-SP-0000-11

32
32
32
32
32
32
32
32
32
32
32
32
32
32
32

SEE DESIGN PREMISE (B4-1 & C6-19)


SEE DESIGN PREMISE (B4-3 & C6-1)

32
32

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012

SEPT 01 2010

32

UZGTL Doc. No. / TPIT Doc. No

1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1

9/11/2012

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

UZGTL-F1-ELE-CA-00051 2381-00-CN-1620-01
SEE DESIGN PREMISE (C9-4)
UZGTL-F1-ELE-EL-00051 2381-00-NM-1601-01
SEE DESIGN PREMISE (B4-2)
INCLUDED IN B4-2-1
UZGTL-F1-ELE-CA-00052 2381-00-CN-1620-02

32

o
o

UZGTL-F1-CIV-RP-00091 2381-00-RT-1410-01
SEE DESIGN PREMISE (C6-5)
SEE DESIGN PREMISE (C6-7)
SEE DESIGN PREMISE (C6-8 & C6-18)
SEE DESIGN PREMISE (C6-8 & C6-14)
SEE DESIGN PREMISE (C6-15)
SEE DESIGN PREMISE (C6-16)

32
32
32
32
32
32
32

SEE DESIGN PREMISE (C8-1)


SEE DESIGN PREMISE (C8-1 & C8-8)
SEE DESIGN PREMISE (C8-9)
SEE DESIGN PREMISE (C8-10)
SEE DESIGN PREMISE (B4-4)

32
32
32
32
32

UZGTL-F1-PIP-51-00051 2381-00-DW-0051-01
UZGTL-F1-PIP-51-97051 2381-97-DW-0051-01
UZGTL-F1-PRO-RP-00058 2381-00-ML-265
SEE DESIGN PREMISE (C7-2) (C11-3)
UZGTL-F1-PMC-SL-00051 2381-00-SL-0000-01
UZGTL-F1-PCC-RP-00052 2381-00-ML-904

32
32
32
32
32
32

SEE DESIGN PREMISE (C2)


SEE DESIGN PREMISE (C9)
SEE DESIGN PREMISE (C8)
SEE DESIGN PREMISE (C3-C4-C5)
SEE DESIGN PREMISE (C7)
SEE DESIGN PREMISE (C6)

32
32
32
32
32
32

UZGTL-00-3
UZGTL-01-1
UZGTL-01-2
UZGTL-02-1
UZGTL-02-2
UZGTL-02-3
UZGTL-03-1
UZGTL-03-2
UZGTL-04-0
UZGTL-04-1
UZGTL-04-2
UZGTL-04-3
UZGTL-04-4
UZGTL-04-5
GTL-04-6
UZGTL-04-7
UZGTL-04-8
UZGTL-04-9
UZGTL-04-10
UZGTL-04-11
UZGTL-04-14
UZGTL-04-15
UZGTL-04-16

33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33

UZGTL Doc. No. / TPIT Doc. No

32
32
32
32
32

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

Rev. No.
1
1

1
1

2
1
2
1
1

A
2
A
2
2
2
2
2
2
1
A
A
A
1
B
A
2
2
1
A
1
1
A

Receive
date
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
9/11/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-05-1
GTL-05-1-1
GTL-05-1-2
GTL-05-1-3
GTL-05-1-4
UZGTL-05-1-5
GTL-05-1-6
GTL-05-1-7
GTL-05-1-8
GTL-05-1-9
GTL-05-1-10
GTL-05-1-11
GTL-05-1-12
GTL-05-1-13
UZGTL-05-1-14
GTL-05-1-15
GTL-05-1-16
GTL-05-1-17
UZGTL-05-2
UZGTL-05-3
UZGTL-06-1
UZGTL-06-2
UZGTL-10-1
UZGTL-10-2
GTL-10-3
UZGTL-11-1
UZGTL-13-1
UZGTL-13-2
UZGTL-21-1
UZGTL-22-1
UZGTL-23-1
UZGTL-26-1
UZGTL-26-2
UZGTL-28-1
UZGTL-30-2
UZGTL-31-1
UZGTL-31-2
UZGTL-31-3
UZGTL-31-4
UZGTL-31-5
UZGTL-32-1
UZGTL-32-2
UZGTL-32-3
UZGTL-33-1
UZGTL-36-1

34
34

o
o

2
B

10/25/2012
10/25/2012

34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
35
35
35
35
35
35
35
35
35
35
35
35
35
35
36
36
36
36
36
36
36
36
36
36
36

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

B
B
B
A
A
B
B
B
B
B
B
B
A
B
B
B
A
A
A
A
A
A
B
A
A
A
A
A
A
1
1
A
A
A
A
A
A
A
A
A
A
A
A

10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012

UZGTL-36-2

36

10/25/2012

UZGTL-37-1
UZGTL-38-2
UZGTL-39-1
UZGTL-40-1
UZGTL-40-2
UZGTL-40-3
UZGTL-41-1
UZGTL-41-3
UZGTL-42-1
UZGTL-43-1
UZGTL-43-2
UZGTL-43-4
UZGTL-43-5

36
36
36
36
36
36
36
36
36
37
37
37
37

o
o
o
o
o
o
o
o
o
o
o
o
o

A
A
A
A
A
A
A
A
A
A
A
A
A

10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012

UZGTL Doc. No. / TPIT Doc. No

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-43-6
UZGTL-43-7
UZGTL-43-8
UZGTL-44-1
UZGTL-45-1
UZGTL-45-2
UZGTL-46-1
UZGTL-46-2
UZGTL-47-1
UZGTL-47-2
UZGTL-50-1
UZGTL-51-2
UZGTL-52-1
UZGTL-55-1
UZGTL-60-2
UZGTL-60-3
UZGTL-61-1
UZGTL-61-3
UZGTL-61-4
UZGTL-61-5
UZGTL-62-1
UZGTL-62-2
UZGTL-62-4
UZGTL-63-2
UZGTL-64-1
UZGTL-64-2
UZGTL-64-3
UZGTL-64-4
UZGTL-64-5
UZGTL-64-6
UZGTL-64-7
UZGTL-64-8
UZGTL-71-1
UZGTL-71-2
UZGTL-71-3
UZGTL-71-4
UZGTL-72-2
UZGTL-72-3
UZGTL-73-1
UZGTL-74-1
UZGTL-74-2
UZGTL-74-3
UZGTL-74-4
UZGTL-75-1
UZGTL-75-2
UZGTL-75-4
UZGTL-75-5
UZGTL-76-1
UZGTL-77-1
UZGTL-77-2
UZGTL-77-3
UZGTL-77-4
UZGTL-77-5
UZGTL-77-6
UZGTL-78-1
UZGTL-78-2
UZGTL-78-3
UZGTL-78-4

37
37

o
o

A
A

10/25/2012
10/25/2012

37
37
37
37
37
37
37
37
37
37
37
37
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
39
39
39
39
39
39
39
39
39
39
39
39
39
39
39
39
39
39
39
39
40
40
40
40
40
40

o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012

UZGTL-78-5

40

10/25/2012

UZGTL Doc. No. / TPIT Doc. No

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Vol.

Rev. No.

Receive
date

UZGTL-81-1
UZGTL-81-2
UZGTL-83-1
UZGTL-83-2
UZGTL-84-1
UZGTL-84-2
UZGTL-84-6
UZGTL-85-1
UZGTL-86-1
UZGTL-86-2
UZGTL-86-3

40
40

o
o

A
A

10/25/2012
10/25/2012

40
40
40
40
41
41
41
41
41

o
o
o
o
o
o
o
o
o

A
A
A
A
A
A
A
A
A

10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012

GTL-91-1

41

10/25/2012

1
1
1
1

10/25/2012
10/25/2012
10/25/2012
10/25/2012

1
1

10/25/2012
10/25/2012

UZGTL Doc. No. / TPIT Doc. No

2381-MOC-019
2381-MOC-020

49
49

o
o
o
o
o
o
o

2381-MOC-021

49

10/25/2012

2381-MOC-022

49

10/25/2012

2381-MOC-023

49

10/25/2012

2381-MOC-024

49

10/25/2012

2381-MOC-025

49

10/25/2012

2381-MOC-026

49

10/25/2012

2381-MOC-027

49

10/25/2012

2381-MOC-028

49

10/25/2012

2381-MOC-029

49

10/25/2012

2381-00-ML-271 UZGTL-F1-PRO-TN-00051

49

10/25/2012

2381-00-ML-272 UZGTL-F1-PRO-TN-00052

49

10/25/2012

2381-00-ML-274 UZGTL-F1-PRO-TN-00054

49

10/25/2012

2381-00-ML-275 UZGTL-F1-PRO-TN-00055
2381-00-ML-276 UZGTL-F1-PRO-TN-00056
2381-00-ML-277 UZGTL-F1-PRO-TN-00057
2381-00-ML-279 UZGTL-F1-PRO-TN-00059

49
49
49
49

o
o
o
o

1
1
1
1

10/25/2012
10/25/2012
10/25/2012
10/25/2012

2381-00-ML-280 UZGTL-F1-PRO-TN-00060

49

10/25/2012

2381-00-ML-281 UZGTL-F1-PRO-TN-00061

49

10/25/2012

2381-00-ML-282 UZGTL-F1-PRO-TN-00062

49

10/25/2012

2381-00-ML-284 UZGTL-F1-PRO-TN-00064

49

10/25/2012

2381-00-ML-285 UZGTL-F1-PRO-TN-00065

49

10/25/2012

2381-00-ML-286 UZGTL-F1-PRO-TN-00066
2381-00-ML-292 UZGTL-F1-PRO-TN-00072
2381-00-ML-294 UZGTL-F1-PRO-TN-00074
2381-00-ML-296 UZGTL-F1-PRO-TN-00076

49
49
49
49

o
o
o
o

1
1
1
1

10/25/2012
10/25/2012
10/25/2012
10/25/2012

May 2010

50

41
42
43~45

10/25/2012

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

Receive
date

Vol.

50-51

HL-C-183-REP-001 24 may 2010

52

10/25/2012

24 may 2010

52

10/25/2012

UZGTL-TPI-PMT-F1-0048-M

52

10/25/2012

UZGTL-TPI-PMT-F1-0009-M
UZGTL-TPI-PMT-F1-0011-M
UZGTL-F1-PMC-RP-00051 2381-00-ML-160
UZGTL-TPI-PMT-F1-0016-M

53
53
53
53

o
o
o
o

0
0
1
F

10/25/2012
10/25/2012
10/25/2012
10/25/2012

UZGTL-F1-PRO-RP-00072 2381-00-ML-242

53

10/25/2012

UZGTL-TPI-PMT-F1-0018-M
UZGTL-F1-PRO-RP-00070 2381-00-ML-240
UZGTL-TPI-PMT-F1-0023-M
UZGTL-TPI-PMT-F1-0025-M
UZGTL-F1-PRO-RP-00071 2381-00-ML-241
UZGTL-TPI-PMT-F1-0028-M
UZGTL-F1-ELE-RP-00051 2381-00-ML-161
UZGTL-TPI-PMT-F1-0032-M
UZGTL-F1-ELE-RP-00051 2381-00-ML-161
UZGTL-TPI-PMT-F1-0030-M
UZGTL-TPI-PMT-F1-0033-M
UZGTL-TPI-PMT-F1-0045-M

53
53
53
53
53
54
54
54
54
54
54
54

o
o
o
o
o
o
o
o
o
o
o
o

1
1
0
1
1
1
1
1
1
0
0
1

10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012

UZGTL-F1-PRO-RP-00073 2381-00-ML-243

54

10/25/2012

UZGTL-TPI-PMT-F1-0054-M
UZGTL-F1-PRO-RP-00060 2381-00-ML-266
UZGTL-TPI-PMT-F1-0046-M
UZGTL-F1-PRO-RP-00058 2381-00-ML-265
UZGTL-TPI-PMT-F1-0051-M
UZGTL-F1-PIP-RP-00053 2381-00-ML-268
UZGTL-F1-LOS-RP-00051 2381-00-ML-206
UZGTL-TPI-PMT-F1-0052-M
UZGTL-F1-CON-RP-00052 2381-00-ML-801
Table issued by PMT on Aug.6th
UZGTL-F1-EST-RP-00053 2381-00-ML-153
UZGTL-TPI-PMT-F1-0059-M

54
54
54
55
55
55
55
55
55
56
56
56

o
o
o
o
o
o
o
o
o
o
o
o

1
1
F
2
0
1
1
0
1
1
--

10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012
10/25/2012

UZGTL-F1-PCC-RP-00053 2381-00-ML-905

56

10/25/2012

By PMT
UZGTL-F1-LOS-RP-00052 2381-00-ML-210
UZGTL-F1-PRO-RP-00059 2381-00-ML-250

56
56
56

o
o
o

1
1

10/25/2012
10/25/2012
10/25/2012

UZGTL-F1-PMC-RA-00051 2381-00-NM-305
UZGTL-F1-PMC-RA-00052 2381-00-NM-306
UZGTL-TPI-PMT-F1-0037-M
UZGTL-F1-PMC-RP-00008

56
56
56
56

o
o
o
o

1
1
1
2

10/25/2012
10/25/2012
10/25/2012
10/25/2012

10/25/2012

10/25/2012

9/21/2012

9/21/2012

UZGTL Doc. No. / TPIT Doc. No


April 2010

Rev. No.

10/25/2012

o
o
o
o
o
o
o
o
X

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

UZGTL Doc. No. / TPIT Doc. No

Vol.

Rev. No.

Receive
date

10/25/2012

10/25/2012

10/25/2012

X
o
o
o
o
o
o
UZGTL-COM-F2-0148

UZGTL-ENG-F2-0133
UZGTL-ENG-F2-0134

UZGTL-E8S1.0-Rev0
UZGTL-E8S1.1-Rev0
UZGTL-E8S1.1A1-Rev0
UZGTL-E8S2.1-Rev0
UZGTL-E8S2.1A1-Rev0
UZGTL-E8S2.1A2-Rev0
UZGTL-E8S2.1A3-Rev0
UZGTL-E8S2.1A4-Rev0
UZGTL-E8S2.1A5-Rev0
UZGTL-E8S2.2-Rev0
UZGTL-E8S2.2A1-Rev0
UZGTL-E8S2.3-Rev0
UZGTL-E8S2.3A1-Rev0
UZGTL-E8S2.3A2-Rev0
UZGTL-E8S2.3A3-Rev0
UZGTL-E8S2.4-Rev0
UZGTL-E8S2.4A1-Rev0
UZGTL-E8S2.4A2-Rev0
UZGTL-E8S2.4A3-Rev0
UZGTL-E8S2.4A4-Rev0
UZGTL-E8S2.5-Rev0
UZGTL-E8S2.5A1-Rev0
UZGTL-E8S2.5A2-Rev0
UZGTL-E8S2.5A3-Rev0
UZGTL-E8S2.5A4-Rev0
UZGTL-E8S2.6-Rev0
UZGTL-E8S2.7-Rev0
UZGTL-E8S3.0-Rev0
UZGTL-E8S4.0-Rev0
UZGTL-00-0
UZGTL-00-1
UZGTL-00-3
UZGTL-00-4
UZGTL-01-1
UZGTL-01-2
UZGTL-02-1
UZGTL-02-2
UZGTL-02-3
UZGTL-03-1
UZGTL-03-2
UZGTL-04-0
UZGTL-04-1
UZGTL-04-2
UZGTL-04-3

o
X
X
o
o
X
X
o
X

X
o
o
o
o
o
o
o
o
o
o
o
o
o
o
X
o
o
o
o
o
o
o
o
o
o
o
o
X
X

O
X
X
O
X
X
X
O
X
X
X
X
O
X
O

10/26/2012

0
0

11/20/2012
11/20/2012

10/26/2012
11/1/2012

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01

11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/3/2012
11/3/2012
11/3/2012
11/3/2012
11/3/2012

11/1/2012
11/1/2012

11/1/2012

11/1/2012

2
3
3

11/1/2012

11/1/2012

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

UZGTL Doc. No. / TPIT Doc. No

Vol.

Rev. No.

Receive
date

11/1/2012

11/1/2012

2
2

11/1/2012
11/1/2012

4
3
3

11/1/2012
11/1/2012
11/1/2012

4
3
3
2
4
2
2
3

11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012

2
2

11/1/2012
11/1/2012

11/1/2012

2
4
4
3
3

11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012

11/1/2012

4
3
3
3
4
2
2
2

11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012

UZGTL-04-4
UZGTL-04-5
UZGTL-04-6
UZGTL-04-7
UZGTL-04-8
UZGTL-04-9
UZGTL-04-10
UZGTL-04-11
UZGTL-04-14
UZGTL-04-15
UZGTL-04-16
UZGTL-05-1-1
UZGTL-05-1-2
UZGTL-05-1-3
UZGTL-05-1-4
UZGTL-05-1-5
UZGTL-05-1-6
UZGTL-05-1-7
UZGTL-05-1-8
UZGTL-05-1-9
UZGTL-05-1-10
UZGTL-05-1-11
UZGTL-05-1-12
UZGTL-05-1-13
UZGTL-05-1-14
UZGTL-05-1-15
UZGTL-05-1-16
UZGTL-05-1-17
UZGTL-05-2
UZGTL-05-3
UZGTL-06-1
UZGTL-06-2
UZGTL-06-5
UZGTL-07-1
UZGTL-10-1
UZGTL-10-2
UZGTL-10-3
UZGTL-11-1
UZGTL-13-1
UZGTL-13-2
UZGTL-21-1
UZGTL-22-1
UZGTL-23-1
UZGTL-26-1
UZGTL-26-2
UZGTL-28-1
UZGTL-30-2
UZGTL-31-1
UZGTL-31-2
UZGTL-31-3
UZGTL-31-4
UZGTL-31-5
UZGTL-32-1
UZGTL-32-2
UZGTL-32-3
UZGTL-33-1
UZGTL-36-1

X
X
X
X
O
X
O
X
X
O
O
X
X
O
O
O
X
O
O
O
O
O
O
O
O
X
O
O
X
O
X
X
X
O
O
O
O
O
X
X
O
X
X
X
X
X
X
O
O
O
O
O
O
O
O
X
X

UZGTL-36-2

11/1/2012

UZGTL-37-1
UZGTL-38-2
UZGTL-39-1
UZGTL-40-1
UZGTL-40-2
UZGTL-40-3
UZGTL-41-1
UZGTL-41-2

O
O
O
X
X
X
X
X

3
2
2

11/1/2012
11/1/2012
11/1/2012

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

UZGTL Doc. No. / TPIT Doc. No


UZGTL-41-3
UZGTL-42-1
UZGTL-43-1
UZGTL-43-2
UZGTL-43-4
UZGTL-43-5
UZGTL-43-6
UZGTL-43-7
UZGTL-43-8
UZGTL-44-1
UZGTL-45-1
UZGTL-45-2
UZGTL-46-1
UZGTL-46-2
UZGTL-47-1
UZGTL-47-2
UZGTL-50-1
UZGTL-51-2
UZGTL-52-1
UZGTL-54-2
UZGTL-55-1
UZGTL-60-2
UZGTL-60-3
UZGTL-60-4
UZGTL-61-1
UZGTL-61-3
UZGTL-61-4
UZGTL-61-5
UZGTL-61-6
UZGTL-62-1
UZGTL-62-2
UZGTL-62-4
UZGTL-62-5
UZGTL-62-6
UZGTL-62-8
UZGTL-62-9
UZGTL-63-1
UZGTL-63-2
UZGTL-63-3
UZGTL-64-1
UZGTL-64-2
UZGTL-64-3
UZGTL-64-4
UZGTL-64-5
UZGTL-64-6
UZGTL-64-7
UZGTL-64-8
UZGTL-64-9
UZGTL-71-1
UZGTL-71-2
UZGTL-71-3
UZGTL-71-4
UZGTL-72-2
UZGTL-72-3
UZGTL-73-1
UZGTL-74-1
UZGTL-74-2
UZGTL-74-3
UZGTL-74-4
UZGTL-75-1
UZGTL-75-2
UZGTL-75-4
UZGTL-75-5
UZGTL-76-1
UZGTL-77-1
UZGTL-77-2

Vol.

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
O
X
X
X
O
X
O
O
O
X
O
X
X
O
O
O
O
X
X
O
O
X
O
O
O
O
X
O
O
X
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
X
X

Rev. No.

Receive
date

11/1/2012

11/1/2012

3
3
3

11/1/2012
11/1/2012
11/1/2012

11/1/2012

3
1
1
1

11/1/2012
11/1/2012
11/1/2012
11/1/2012

1
2

11/1/2012
11/1/2012

2
3
3
3

11/1/2012
11/1/2012
11/1/2012
11/1/2012

3
1

11/1/2012
11/1/2012

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012

UzGTL ITB Index


11/20

(O: Recived, X: Missing, :Partial)

UZGTL Doc. No. / TPIT Doc. No

Vol.

Rev. No.

Receive
date

4
4
3
3
3

11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012

3
3
4
3
3

11/1/2012
11/1/2012
11/1/2012
11/1/2012
11/1/2012

3
3
3
3

11/1/2012
11/1/2012
11/1/2012
11/1/2012

UZGTL-77-3
UZGTL-77-4
UZGTL-77-5
UZGTL-77-6
UZGTL-78-1
UZGTL-78-2
UZGTL-78-3
UZGTL-78-4
UZGTL-78-5
UZGTL-81-1
UZGTL-81-2
UZGTL-81-3
UZGTL-83-1
UZGTL-83-2
UZGTL-84-1
UZGTL-84-2
UZGTL-84-6
UZGTL-84-7
UZGTL-85-1
UZGTL-86-1
UZGTL-86-2
UZGTL-86-3

X
X
X
X
O
O
O
O
O
X
X
X
O
O
O
O
O
X
O
O
O
O

UZGTL-91-1

11/1/2012

UZGTL-91-5
UZGTL-91-6
UZGTL-E8S5.0-Rev0

O
O
o
o
o
o
o
X
o
X
X
X
X
o
o
X
o

2
4
0
0
0

11/1/2012
11/1/2012
11/1/2012
10/25/2012
11/1/2012
10/5/2012
10/5/2012

11/20/2012

0
0

11/20/2012
11/20/2012

11/20/2012

UZGTL-E8S6.0-Rev0
UZGTL-E8S7.0-Rev0
UZGTL-E8S8.0-Rev0
UZGTL-CON-0040
UZGTL-E8S10.0-Rev0
UZGTL-E8S11.0-Rev0
UZGTL-E8S12.0-Rev0
UZGTL-ENG-F2-0140
UZGTL-ENG-F2-0141
UZGTL-ENG-F2-0143

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian

As of 2012-11-20

Remark
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian

As of 2012-11-20

Remark
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian

As of 2012-11-20

Remark
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian
Russian

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

As of 2012-11-20

Remark

Das könnte Ihnen auch gefallen