Session 3
Narahari H.S.
www.a2zmba.com
Market situation
Competitive situation
Distribution situation
Macro environment
Marketing strategy
Target segment, Positioning, Product line, Price, Distribution, Sales
Technical Analysis
Need to choose between two or more technologies
Choice of Technology
Plant capacity
Principal inputs
Investment outlay and production cost
Use by other firms
Product mix
Latest developments
Ease of absorption (training)
Appropriateness of Technology
Suitable to local economic, social and cultural conditions
www.a2zmba.com
Technical Analysis
Technical arrangements
Arrangements to obtain needed technical know-how
Details of collaborations (if any) must be chalked out
Material Inputs and Utilities
Raw materials
Agricultural, mineral, livestock & forest and marine products
Product Mix
Based on market requirements
Production facilities should have some flexibility so that mix can be
changed
www.a2zmba.com
Technical Analysis
Plant Capacity
Technological requirement
Input constraints
Investment cost
Market conditions
Resources of the firm
Governmental policy
Location and Site
Location (broad) ; Site (specific)
Proximity to raw materials and markets
Availability of infrastructure
Labour situation (availability and productivity)
Governmental policies
Other factors
www.a2zmba.com
Technical Analysis
Machineries and Equipment
Estimate likely production levels over time
Define various machining and other operations
Calculate machine hours required for each operation
Based on above, select equipment
Structures and Civil Works
Site preparation and development
Buildings and structures
Outdoor works
Environmental Aspects
www.a2zmba.com
Technical Analysis
Project charts and layouts
General functional layout
Material flow diagram
Production line diagram
Transport layout
Utility consumption layout
Communication layout
Organisational layout
Plant layout
Consistency with production technology
Smooth flow of goods from one stage to another
Proper utilisation of space
Scope for expansion
Minimisation of production cost
Safety of personnel
www.a2zmba.com
Technical Analysis
Schedule of project implementation
List all possible activities from project planning to commencement of
production
Sequence of various activities
Time required for performing various activities
Resources normally required for various activities
Implications of putting more resources or less resources than are normally
required
PERT / CPM usually used
Draw up work Schedule
www.a2zmba.com
Technical Analysis
Need for considering alternatives
Nature of project
Production process
Product quality
Scale of operation and time phasing
Location
www.a2zmba.com
Technical Analysis
Key Project Interlinkages
Product / Service
Demand
Size
Technology
Location
Selling Price
Production Costs
Financial
Requirements
Profitability
www.a2zmba.com
Investment
Outlay