Beruflich Dokumente
Kultur Dokumente
Agenda
1.
2.
3.
4.
5.
6.
7.
Introduction
Project Background
Project Scope
Proposed Commercial Structure
Procurement Process and Timeline
Pre-Qualification Bid Assessment
Q&A
www.hllnl.com
Section 1: Introduction
www.hllnl.com
Introduction
Tender Committee - PDAM Way Rilau, Municipal
Government of Bandar Lampung ("MGBL")
Indonesia Infrastructure Guarantee Fund ("IIGF")
Hogan Lovells Lee & Lee (International Legal Counsel)
Castalia (Financial / Technical Adviser)
www.hllnl.com
www.hllnl.com
Project Background
www.hllnl.com
www.hllnl.com
www.hllnl.com
PPP1
PPP1 comprises two main components:
PPP2
PPP2 is a project for the management,
operation and maintenance of the
Distribution System constructed under
PPP1.
Three phases:
www.hllnl.com
LEGEND
PPP1
www.hllnl.com
Main
Transmission
Pipeline
Secondary &
Tertiary
Distribution
Pipeline
Last Mile
Connection to End
Users
10
LEGEND
PPP1
PPP2
Main
Transmission
Pipeline
Secondary &
Tertiary
Distribution
Pipeline
Last Mile
Connection to End
Users
www.hllnl.com
11
www.hllnl.com
PPP2
Operation of
Distribution
Network to
Consumers
12
www.hllnl.com
13
41MLD
28 km
Water quality
Potable to
specified
standard
40 kms
Estimated operations
commencement
2015/2016
340 kms
Number of existing
connections (2010)
7,000
Duration of PPP1
27 years
44,000
Duration of PPP2
www.hllnl.com
Pre-COD: 2 years
Post-COD: 8 - 10
years
14
PPP1 - Timeline
Concess
Financial Close
Signing of
PPP1
Cooperation
Agreement
P
Com
Op
Phase 1
Commercial
Operation
2013
2014
2016
n of
d
of
GBL
2019
2041
LEGEND
Phase 1 Construction
Phase 2 Construction
Operation Period
www.hllnl.com
PPP2 - Timeline
Optional
renewal period
CP Satisfaction
Date
Signing of the
Cooperation
Agreement
2013 2013/14
econd
ration
d
Ph
Com
Ope
Termination
of the
agreement
Phase 1
Commercial
Operation
2016
2019
2024-26
LEGEND
Period to CP Satisfaction
(short period anticipated)
Pre-Operation Period
www.hllnl.com
16
Managing Network
Services
Design, Build and
Finance
Operation
www.hllnl.com
17
Raw Water
Fee
Payment
Product Water
www.hllnl.com
Product Water
18
www.hllnl.com
19
www.hllnl.com
20
New Connections
Promote connection to the
Distribution System
Build and maintain a Customer
Database.
Sign up new Customers.
Despatch instructions
Assist in the authorisation of
despatch from the bulk treated
water reservoir.
Develop the systems and plan
to manage Distribution System
Build and maintain
Management Information
System
Prepare standard operating
procedures / manual
SCADA system
www.hllnl.com
21
www.hllnl.com
22
Contract Structure
High Level Risk Allocation
Payment Mechanism
Escrow Arrangement
www.hllnl.com
23
Contract Structure
Project structure developed in conjunction with market
consultations. Project is being progressed as a PPP under
Indonesia's PPP Regulations in parallel with PPP1.
Private sector will enter into the Cooperation Agreement with
MGBL as the Government Contracting Agency.
Project commences on signing and will expire 8-10 years
from handover of Phase 1 Distribution System (subject to
MGBL's right to extend).
Cooperation Agreement will follow internationally accepted
water distribution O&M services agreements as well as
relevant Indonesian regulations.
www.hllnl.com
24
Allocated to:
Government
Delay in construction of
Distribution System
PPP2 Co
Management of non-revenue
water
Illegal connections
25
www.hllnl.com
Allocated to:
Government
PPP2 Co
26
www.hllnl.com
Payment Mechanism
The Payment Mechanism is being developed by MGBL / PDAM.
The following is the indicative view for the payment terms:
Pre-Operation Period Fee
Fee to cover demand analysis, design input, marketing.
Fixed Fee
Fee to cover regular cost of operations.
Subject to meeting technical (NRW, water quality, pressure, etc.) and
commercial (e.g. number of connections, volume sold, etc.) targets.
www.hllnl.com
27
New
connections
per year
Number of
connection at
beginning year
of operation
7,000 *)
7,000
7,000
14,000
10,000
24,000
10,000
34,000
10,000
44,000
www.hllnl.com
28
NRW Tolerance
5.0%
7.00%
9.00%
11.00%
13.00%
15.00%
15.25%
15.50%
15.75%
16.00%
16.25%
www.hllnl.com
29
Escrow Arrangement
www.hllnl.com
30
www.hllnl.com
31
www.hllnl.com
32
21 May
2013
25 May
2013
PQ
PQ
documents
Conference
made
available for
collection by
interested
investors
Deadline for
submission
of questions
on PQD
July 2013
Aug 2013
4 June
2013
4 June 18
June 2013
PQ
Evaluation of
submission bidders
Sept 2013
18 June
2013
18 June
25 June
2013
Announcement
of PQ results
Objection
period
Bidders to be
shortlisted
Oct 2013
Nov 2013
Contd
Release of Consultation
Release of final ITT bid
Appointment
draft ITT
with shortlisted
ITT documents submission of preferred
documents to bidders on draft
to shortlisted
bidder
shortlisted
ITT documents
bidders
bidders
Nov/Dec 2013
Cooperation
Agreement
signed
www.hllnl.com
33
www.hllnl.com
34
3. Personnel including:
Resident project manager with at lease 3 years' experience working in
similar market conditions in such a position; and
Indonesian recruited management staff with at least 10 years experience in
water distribution network O&M.
www.hllnl.com
35
PQ Evaluation Assessment
The Tender Committee assisted by the PQ Working Group will evaluate
the PQ submissions.
Assessment method for all criteria will be on a "Pass / Fail" basis.
Criteria to be considered achievable for appropriately qualified
Indonesian and / or international entities and partnering is permitted.
www.hllnl.com
36
Pre-Qualification Document
www.hllnl.com
37
www.hllnl.com
38
www.hoganlovells.com
Hogan Lovells has offices in:
Alicante
Amsterdam
Baltimore
Beijing
Berlin
Brussels
Budapest*
Caracas
Colorado Springs
Denver
Dubai
Dusseldorf
Frankfurt
Hamburg
Hanoi
Ho Chi Minh City
Hong Kong
Houston
Jakarta*
Jeddah*
London
Los Angeles
Madrid
Miami
Milan
Moscow
Munich
New York
Northern Virginia
Paris
Philadelphia
Prague
Riyadh*
Rome
San Francisco
Shanghai
Silicon Valley
Singapore
Tokyo
Ulaanbaatar
Warsaw
Washington DC
Zagreb*
"Hogan Lovells" or the "firm" is an international legal practice that includes Hogan Lovells International LLP, Hogan Lovells US LLP and their affiliated businesses.
The word "partner" is used to describe a partner or member of Hogan Lovells International LLP, Hogan Lovells US LLP or any of their affiliated entities or any employee or consultant with equivalent standing. Certain individuals, who are designated as partners, but
who are not members of Hogan Lovells International LLP, do not hold qualifications equivalent to members.
For more information about Hogan Lovells, the partners and their qualifications, see www.hoganlovells.com.
Where case studies are included, results achieved do not guarantee similar outcomes for other clients. Attorney Advertising.
Hogan Lovells 2013. All rights reserved.