Sie sind auf Seite 1von 6

AMADO VILLADOS AGUILON, JR.

98 Villamayor Compd. Brgy. Pag-asa


Binangona, Rizal, Philippines
Contact Number: +447463448148
Email: jun_aguilon@yahoo.com

POSITION DESIRED

LINEMAN

OBJECTIVE:
This entry level apprenticed lineman performing entry level work in the construction,
operation maintenance and repair of electrical distribution lines. The incumbent exercise little to
no independent decision making in accomplishing specific assignments and works under
immediate supervisor or direction. Spends much time of learning apprenticeship type skills and
learning principles and procedures required of apprenticeship training. As experienced /
knowledge us obtained, may exercise more independence in accomplishing routine job tasks
under closed supervision. After successful completion if the probation period the incumbent will
be required the journeyman lineman level.
PERSONAL DATA:
Date of Birth
Place of Birth
Civil Status
Height
Weight
Citizenship
Religion
Languages Spoken

:
:
:
:
:
:
:
:

April 7, 1971
Makati City
Married
58
220 lbs.
Filipino
Catholic
English and Tagalog

Elementary

Don Jose Ynares Elementary School


Year: 1979- 1984

Secondary

Makati High School


Makati City
Year: 1984- 1988

Vocational Course

Rizal Technologinal Intstitute

EDUCATION:

SEMINAR & TRAINING:


September 13, 2012

Plant and Vehicle Marshal


Balfour Beaty United Kingdom

September 14, 2012

Winch and Capstan Tractor


(John Deere 5090)
Balfour Beaty United Kingdom

September 14, 2012

3 Tonne Service Winch


Balfour Beaty United Kingdom

July 16, 2012

Permanent Attachment
Voltcom Group

July 16, 2012

Health and Safety Responsibilities


Voltcom Group

July 16, 2012

Demarcation
Voltcom Group

July 16, 2012

Correct Use and Inspection of PPE


Voltcom Group

July 17, 2012

Lifting and lowering Operations


Voltcom Group

July 18, 2012

Manual Handling
Voltcom Group

July 18, 2012

Climbing Aptitude
Voltcom Group

July20, 2012

Emergency Procedures
And Tower Rescue Techniques
Voltcom Group

July 23, 2012

Safe Use of Electric Spacer Trolley


Voltcom Group

July 26, 2012

Clamping In All Conductors


And Bundle Types
Voltcom Group

July 30, 2012

Earthing Procedures
Voltcom Group

August 8, 2012

First Aid at Work


Voltcom Group

October 23, 2013

Operator Training Certificate


IPAF

September 5, 2013

Emergency First Aid at Work


United Kingdom

November 4, 2013

Pole Top Rescue


United Kingdom

July 17, 2012-August 03, 2012

Transmission Line

January 21, 2012

Balfour Beaty Training Center


Carlmelry Industrial Park Calamba Laguna
Philippines.
International English Language Testing System
Band Score: 5.0

September 20 21, 2005

Special Equipment Seminar


Meralco Center
Ortigas Avenue, Pasig City

May 21 July 11, 2001

Meralco Lineman Training Program IV


Meralco Center
Ortigas Avenue, Pasig City

July 3 6, 2001

Computer Literacy Program Crash Course


(MS Word 95 & MS Excel 95)
Meralco Center
Ortigas Avenue, Pasig City

August 29 30, 1998

Change Through Team Work Workshop


Meralco Center
Ortigas Avenue, Pasig City

September 15 November 15, 1997

Meralco Lineman Training Program Course III


Meralco Center
Ortigas Avenue, Pasig City

September 9 11, 1996

Customer Service Excellence Workshop


Meralco Cener
Ortigas Avenue, Pasig City

August 20 24, 1996

Hydraulic Equipment Operation


Seminar # 45

April 26 30, 1993

Hydraulic Equipment Operation Seminar


Meralco Center
Ortigas Avenue, Pasig City

September 1 December 15, 1991

Advance Lineman Training Program I


Meralco Center
Ortigas Avenue, Pasig City

JOB EXPERIENCE:

Assembly of different kinds of towers: D, DL, D10, D25, D55, D90


Erecting towers. We use tele handler 3600 50T crane erecting manually.
Wiring and payout of big band with conductor 700 mcm AAAC.
We use spacing chair for installing spacer on 2 bundle conductor.
Blocking or dressing. Assembling of suspension insulator and fittings.
Earth wire. Payout earth wire ( fiber optic )
Clamping or clipping and back hang.
Install and replaced transformer cutouts, arresters, b.o. transformers
Replacement of broken insulator, 20KV, 345KV done it hot.
Reinforcement of blasted wires and jumpers, 20KV, 34.5KV done hot.
Line clearing and line patrolling.
Assist with installation, operation, maintenance and repair of overhead and underground
electrical power lines and systems, such work is generally performed on the ground.
Assist in the construction, operation, maintenance and repair of transmission and
substation facilities.
Assists with service calls concerning power outages and electrical problems.
Receive training both in books / classroom skills and on the job skills. Must continue to
pass ongoing to proceed to higher skill / job levels.
Learns to operate motorized equipment, use hand tools, and perform routine shop areas
maintenance on electrical equipment, machinery and tools.
Follows safety guidelines as part of training.
May stock and services vehicles to be equipped to respond to emergency situations.
When on call, must be able to respond to calls within thirty (30) minutes.
May be required to work nights, weekends, and holidays for extended periods; may be
required to perform duties as part of the Citys recovery force during emergencies and
disasters.
Perform other duties as assigned.
Assembling of Steel poles for transmission lines 105 ft. 3 stages 10m/stage.
Assist on wire stringing and reconductoring 795 ACSR, 115 KV
Installing of Guy Wire.
Knowledge of electricity as applied to distribution system is preferred. Basic knowledge
of electricity.
Basic knowledge of occupational hazards and proper safety precautions of the line
repairer trade / profession.
Ability to learn to climb poles with a climbing belt and hook and perform strenuous
duties in all kinds of weather.
Ability to understand and follow or and written instructions quickly and accurately, and
under adverse conditions.

Must be able to make simple mathematical computations and tabulations accurately and
with reasonable speed and have capacity to learn more complex mathematical
computations.

EMPLOYMENT:
August Present

August 7, 2012- July 2013-

Power Networks Group


3N2 Cooper House/ 2 Michael Road London SW62AD
Voltcom Group Pty U.K
TY Cynon Navigation Park Abercynon Mountain Ash
CF45 4SN United Kingdom

Oct. 2010 -2011

Estrabo Eletrical and Allied


Service Company
Angono, Rizal

2005 2008

Acting Lead Man / Meralco Rizal Sector


Angono, Rizal

Duties and Responsibilities:


Supervising and working on both energized and de-energized primary and
secondary lnes.
Attend to troubles and emergency calls maintenance of line equipment and
maintaining assigned line circuit from interruption
May do other jobs necessary even not included in the duties and responsibilities
listed above with outmost precaution, and with the approval of the higher
authority to the satisfaction of the team as a whole and the most of all, the
customer.
Follow instruction from supervisor in performing construction and maintenance
of energized or de-energized overhead power, secondary, service and other lines.
Make decision in troubleshooting reported customer complaints, such as wire
down, burnout transformer, single phasing, house no light, and other overhead
line problems.
Can independent perform and assume responsibility in the effective execution of
any job in the absence of the Lead Man.
Able to perform and meet sector set goals.
Strictly applies safety precaution in every execution of assigned jobs.
1995 2005

Lineman Frist Class / Rizal Sector


Angono, Rizal

Duties and Responsibilities:


Follow instruction from supervisor in performing construction and maintenance
of energized or de-energized overhead power, secondary, service and other lines.
Make decision in troubleshooting reported customer complaints, such as wire
down, burnout transformer, single phasing, house no light, and other overhead
line problems.
Can independent perform and assume responsibility in the effective execution of
any job in the absence of the Lead Man.
Able to perform and meet sector set goals.
Strictly applies safety precaution in every execution of assigned jobs.

1993 1994

Lineman Third Class / Meralco


Sta. Rosa, Laguna

1992 1993

Meter Inspector / Meralco


Ortigas Avenue, Pasig City

Duties and Responsibilities:


Act as an apprentice, normally as a ground man, work only or de-energized lines.
Can work on live secondary line and service with supervision and assistance of a
lineman second class.
Act as a tool and materials keeper and maintains crew vehicle good housekeeping
Strictly applies safety precaution in every execution of assigned jobs.

CHARACTER REFERENCES:
Mr. Benito Cruzit
Foreman
Voltcom Group LTD
United Kingdom
Contact # 07741737754
Mr. William Yap
Leading Hand
Voltcom Group LTD
United Kingdom
Contact # 07776695551
Mr. Alvin Prodigalidad
LE1
Voltcom Group LTD
United Kingdom
Contact # 07776697154

Das könnte Ihnen auch gefallen