TYPES OF SAP PROJECTS & TESTING


METHODS

Store

Search the Community

Join Us

Activity

Communications

Actions

Brow se

Version 1

created by Siva Prasad on Sep 9, 2013 8:53 PM, last modified by Siva Prasad on Sep 9, 2013 9:16 PM
Share

Tw eet

Like

Purpose : Explanation of different types of SAP projects .


1. SAP Implementation Project. :
Company wants to implement SAP Module( Ex :HCM/MM/SD/FI/CO etc) for the first time. In implementation projects
consultant from various modules do configuration based on company requirements. Role of consultants are
configuration, integration of several modules, Data migration from Legacy system to SAP system, prepare
interfaces/RFC's to interact with sap/3rd party systems,testings, document preparation, end user training etc
Methodology suggests by SAP for implementation is ASAP.
There are 5 stages in the ASAP methodology
1. Project Initial Preparation
2.Business Blueprint - Preparation of AS-IS and TO BE documents , MoM , workshops....
3.Realization - complete configuration settings in backend
4.Final Preparation- Unit testing, integration testing, UAT and end user training
5.Golive And Support : data migrations
2. SAP Support Project.
After implementation of SAP modules customer/business need assistance of consultants in their day to day
business operations using SAP software. The end user raise their concerns,issues,errors etc through a ticket
handling tool. A ticket handing tool is must for a support project ,it helps to track the status of tickets. Basically there is
no phases in it. Roles of a consultant Accept /Acknowledge the tickets, analysis the issue, document it ,solve, provide
solutions to client,Get confirmation from the user & close the ticket.
Change request and service request is the main roles in support projects.
there is a different tools to update the tickets like SM7, USD or ticket tools and so on.
3. SAP Roll-Out Project.
Company has upgraded/implemented SAP HR & wants to rollout country specific changes in different countries.
4. SAP Up gradation Project.
Customers are moving from the older versions to new versions. It is called as SAP Migration Projects.
Example : Company migrating from older versions like 4.5,4.6b, 4.6c to ECC 5.0 / ECC 6.0 . SAP HR EHP3 to SAP HR
EHP 5 .

TESTING METHODS IN SAP PROJECTS:


1.Development Unit Testing This is done by developer .Unit test is executed in development system. This
tests alone pieces of functionality.
For example, you have configured the absence quotas,special absences(maternity leave or military leaves) ,
custom pcrs or FMLA in development system, you dont know whether the output is coming correct or not , for
that you have to login another client in same development system , do the copy from client by using
transaction code SCC1 ,here you have to give your transport request and execute , whatever you have
configured in main system all objects are copied to testing client, Now hire the employee , run the time eval
and test the output .
2. Security Testing Security testing ensures the SAP security roles and authorization roles provided based on the
requirements. Test IDs will be created of different job roles and used to both confirm what a user can do and what a
user cannot do. The tester will perform both Positive and Negative testing of the of job roles that are assigned to
user test ids.
3. Integration Testing In a multiple plat form environment integration testing is mandatory .All integrated areas need
to test by a tester. It is testing of SAP transactions (for example , Hr is integrated with Sales and distribution(creation
of order and raise a invoice for billable resources, HR is integrated with Controlling or Project system, you need to test
all accordingly.
4.Parallel Testing During parallel testing all the existing data in the legacy system will transfer to SAP system &
perform same process in both systems. A successful Parallel test shows identical results when both the legacy
system and new system results are compared. Tester will run the programs / transaction repeatedly in both system ,

http://scn.sap.com/docs/DOC-46232

1/4

1/15/2015

TYPES OF SAP PROJECTS & TESTING METHODS | SCN

resolve issues with the help of other team if any issues, continue perform tests till gets the identical results in both.
Example : Parallel payroll process. Run payrolls in SAP & legacy system for 2-3 months & analyze the payroll
results

TheAnswerFinder Advertisement

5.User Acceptance Testing(UAT) User Acceptance testing is conducted in by a group of business end users to
validate that the new developed SAP system meets all requirements. During User acceptance testing the system end
users separately execute test cases & find out the results are as expected. The test team will guide the UAT team in
their testing activities. UAT will ensure that the system is acceptable from the users perspective, performing as per
the requirement & if the users are satisfied they provide a sign off.
Regards
Siva

4867 View s
Categories: Training and Event Management, Personnel Administration and Organizational Management , Time Management

Average User Rating


(3 ratings)

Share

Tw eet

Like

16 Comments
MALYADRI JWALA G Sep 9, 2013 10:06 PM

GUD INFO .....KEEP IT UP


Like (0)

Siva Prasad Sep 10, 2013 9:54 AM (in response to MALYADRI JWALA G)

Thanks Malyadri jwala.


Like (0)

omid daghdar Sep 10, 2013 7:42 AM

Hi Siva,
Thanks for your time and sharing your knowledge.
What does "MoM" stand for in BP phase of ASAP?
I would have more information about different tools for ticketing. What do you mean by "to update the
tickets like SM7, USD or ticket tools and so on."? What are SM7 and USD?
Regards,
Omid
Like (0)

Siva Prasad Sep 10, 2013 9:52 AM (in response to omid daghdar)

Hi Omid,
MoM is Mints of meeting (once we prepared the BBP and handover to client, Client has
review the document if any gaps identified in BBP , we will sit with client and discuss more
points , for that we've to prepare the MoM.
SM7 and USD both are ticket tool , In my support experience I worked two different tools. all
incident tickets are updated in SM7 or USD tool, consultant review the incident ticket and if
there is any changes needed ,we will convert to incident ticket to change ticket than make
changes in sap.
Regards
Siva
Like (0)

omid daghdar Sep 11, 2013 8:31 AM (in response to Siva Prasad)

Hi Siva,
Are SM7 and USD third party tools or SAP standard tools?
I know SOLMAN for this issue. Why you don't use it?

http://scn.sap.com/docs/DOC-46232

2/4

1/15/2015

TYPES OF SAP PROJECTS & TESTING METHODS | SCN


Regards,
Omid
Like (0)

SAP HR Sep 10, 2013 2:46 PM

Good Information Siva.


Thank you!
Like (0)

Vijay Shankar Sep 12, 2013 9:01 AM

Thanks Siva... and it is very good info...


Bhaskar
Like (0)

Madhav B Sep 12, 2013 9:19 AM

Hi Siva,
Its very informative.
Thanks,
Madhav.
Like (0)

Mahendra M Sep 17, 2013 11:27 PM

Good Information Siva...


Thanks
Mahendra
Like (0)

Siva Prasad Nov 5, 2013 8:25 PM

Thanks to all....
Siva
Like (0)

Katsia Barshchynskaya Nov 6, 2013 1:00 AM

Hi Siva,
Appreciate your knowledge sharing. Would like to offer my input:
- I would not normally consider SAP support as a project since it is more of an ongoing activity
whereas project by definition is a temporary activity
- under Testing Methods recommend to add regression testing and performance/stress testing
Regards, Katsia
Like (0)

Siva Prasad Nov 6, 2013 4:11 PM (in response to Katsia Barshchynskaya)

Hi Katsia,
Thanks for sharing your inputs,
Sure , i will add rest of testing with examples.
Thanks
Siva
Like (0)

Arun Kumar Sep 11, 2014 3:21 PM

Hi Siva,
Thanks for knowledge sharing about various testing performed in SAP system.
i have question here, if any one wants to move from support project to other project what will you
suggest among upgrade, roll out & implementation, have it for Functional consultant.
Like (0)

Anil Thankan Sep 15, 2014 6:51 AM

Regression testing:
Regression testing can be applied two ways. First, when a code problem has been fixed, a

http://scn.sap.com/docs/DOC-46232

3/4

1/15/2015

TYPES OF SAP PROJECTS & TESTING METHODS | SCN


regression test runs tests to verify that the defect is in fact fixed; "Imagine finding an error, fixing it,
and repeating the test that exposed the problem in the first place. This is a regresson test" (Kaner in
Testing Computer Software). Second, regression testing is the counterpart of integration testing:
when new code is added to existing code, regression testing verifies that the existing code continues
to work correctly, whereas integration testing verifies that the new code works as expected.
regression testing can describes the process of testing new code to verify that this new code hasn't
broken any old code.
BR
Anil
Like (1)

vivek ravi Dec 3, 2014 10:09 AM

Thanks for the info buddy


Like (0)

Bhagyashree Naik Dec 3, 2014 10:33 AM (in response to vivek ravi)

Thanks Siva for the valuable inputs. What does testing in Quality server called? is it UAT??
Regards,
Bhagyashree
Like (0)

Site Index
Privacy

Contact Us
Terms of Use

http://scn.sap.com/docs/DOC-46232

SAP Help Portal


Legal Disclosure

Copyright

Follow SCN

4/4

Das könnte Ihnen auch gefallen