Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
Notes:
Table of Contents
1. Input Data
2. Loading
3. Statical system and calculation of reaction forces, section forces, deflections
4. Load combinations (LC)
5. Relevant actions for design
6. Design of facade elements
7. Remarks, Warnings
8. Remarks, Your Cooperation Duties
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
1. Input Data:
1.1 Building Geometry
Building length:
20,000 m
Building width:
15,000 m
Building height:
10,000 m
10,000 m
Facade area:
580,0 m
Concrete
Material:
C20/25
Insulation thickness:
50,0 mm
65,0 mm
Wind foil:
Non-loadbearing Layer Thickness:
0,0 mm
1.3 Facade
Orientation:
lying
Facade, Manufacturer:
Ceramic, Grespania
Weight:
24,000 kg/m
Vertical
HRD-H10x80
MFT-MFI L 65 / MFT-MFI M 65
With Isolator:
Fastener bracket - profile:
Profile 1:
200
150
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
2
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
3
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
2. Loading
2.1 Wind load
Country (Region), relevant standard:
Wind zone:
29,00 m/s
0,526 kN/m,
Terrain category, k, L, Z:
600,0 mm
600,0 mm
qb =
1
r v2b
2
A=
Edge
B=
Normal
Area
cpe,+
cpe,-
w+
w-
0,000 m - 10,000 m
Edge
1,00
-1,40
1,236 kN/m
-1,731 kN/m
0,000 m - 10,000 m
Normal
1,00
-1,10
1,236 kN/m
-1,360 kN/m
Area
w+
w-
0,000 m - 10,000 m
Edge
0,742 kN/m
-1,039 kN/m
0,000 m - 10,000 m
Normal
0,742 kN/m
-0,816 kN/m
Profile 1:
0,021 kN
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
4
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
3.1.1 Distribution of shear forces (V), bending moments (M), deflections (f) under unit load: Wind uplift/pressure (for
pressure: multiply values with -1)
3.1.2 Maximum/minimum reaction forces, bending moments, deflections under unit load: Wind uplift/pressure (for
pressure: multiply values with -1)
Max. support reaction RS = -1,14316 kN
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
5
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
3.2.1 Distribution of shear forces (V), bending moments (M), deflections (f) under unit moment: Weight
3.2.2 Maximum/minimum reaction forces, bending moments, deflections under unit moment: Weight
Max. support reaction RS = 1,36364 10-6 kN
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
6
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
w = 1,5
Dead load:
G = 1,35
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
7
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
GSd,fix
HSd,slide
MX,max
MX,min
fX,field
fX,cant.
HSd,fix
GSd,fix
HSd,slide
MX,max
MX,min
Position
Position
Position
Position
Position
0,019 kN
0,600 kN
-0,022 kN
4,12396 Nm
-16,4959 Nm
300,0 mm
300,0 mm
1400,0 mm
1400,0 mm
300,0 mm
-0,863 kN
0,600 kN
-1,295 kN
77,5231 Nm
-139,098 Nm
300,0 mm
300,0 mm
1400,0 mm
810,0 mm
2500,0 mm
1,253 kN
0,600 kN
1,758 kN
194,737 Nm
-125,878 Nm
300,0 mm
300,0 mm
1400,0 mm
2500,0 mm
780,0 mm
-0,867 kN
0,444 kN
-1,289 kN
79,3265 Nm
-139,098 Nm
300,0 mm
300,0 mm
1400,0 mm
800,0 mm
2500,0 mm
1,248 kN
0,444 kN
1,764 kN
194,737 Nm
-123,934 Nm
300,0 mm
300,0 mm
1400,0 mm
2500,0 mm
780,0 mm
HSd,slide
MX,max
MX,min
HSd,fix
GSd,fix
Position
Position
Position
Position
Position
0,019 kN
0,600 kN
-0,022 kN
4,12396 Nm
-16,4959 Nm
300,0 mm
300,0 mm
1400,0 mm
1400,0 mm
300,0 mm
-0,863 kN
0,600 kN
-1,295 kN
77,5231 Nm
-139,098 Nm
300,0 mm
300,0 mm
1400,0 mm
810,0 mm
2500,0 mm
0,988 kN
0,600 kN
1,377 kN
153,007 Nm
-100,511 Nm
300,0 mm
300,0 mm
1400,0 mm
2500,0 mm
780,0 mm
-0,867 kN
0,444 kN
-1,289 kN
79,3265 Nm
-139,098 Nm
300,0 mm
300,0 mm
1400,0 mm
800,0 mm
2500,0 mm
0,983 kN
0,444 kN
1,383 kN
153,007 Nm
-98,567 Nm
300,0 mm
300,0 mm
1400,0 mm
2500,0 mm
780,0 mm
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
8
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
fX,field
fX,cant.
fX,field (Profile 2)
fX,cant. (Profile 2)
Position
Position
Position
Position
0,129872 mm
0,206336 mm
720,0 mm
0,0 mm
0,849949 mm
1,63907 mm
820,0 mm
3000,0 mm
1,23989 mm
2,31435 mm
820,0 mm
3000,0 mm
fX,cant.
fX,field (Profile 2)
fX,cant. (Profile 2)
Position
Position
Position
Position
0,129872 mm
0,206336 mm
720,0 mm
0,0 mm
0,849949 mm
1,63907 mm
fX,field
820,0 mm
3000,0 mm
0,947434 mm
1,80789 mm
820,0 mm
3000,0 mm
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
9
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
Resistance
Utilization
LC
Status
Fixpoint: HRD-H10x80
1,194 kN
4,500 kN
27 %
3 / ULS
OK
Slidepoint: HRD-H10x80
1,764 kN
2,997 kN
59 %
5 / ULS
OK
Fixpoint: MFT-MFI L 65
1,540 kN
3,328 kN
46 %
3 / ULS
OK
Slidepoint: MFT-MFI M 65
1,764 kN
1,808 kN
98 %
5 / ULS
OK
0,454 kN
1,245 kN
36 %
3 / ULS
OK
1,764 kN
2,490 kN
71 %
5 / ULS
OK
115,92 N/mm
181,82 N/mm
64 %
3 / ULS
OK
2,31435 mm
3,33333 mm
70 %
3 / SLS
OK
Fixpoint: HRD-H10x80
1,003 kN
4,500 kN
22 %
3 / ULS
OK
Slidepoint: HRD-H10x80
1,383 kN
2,997 kN
46 %
5 / ULS
OK
Fixpoint: MFT-MFI L 65
1,275 kN
3,328 kN
38 %
3 / ULS
OK
Slidepoint: MFT-MFI M 65
1,383 kN
1,808 kN
76 %
5 / ULS
OK
0,392 kN
1,245 kN
32 %
3 / ULS
OK
1,383 kN
2,490 kN
56 %
5 / ULS
OK
Bracket
Profile Fastener
Bracket
Profile Fastener
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
10
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
Action
Resistance
Utilization
LC
Status
91,08 N/mm
181,82 N/mm
51 %
3 / ULS
OK
1,80789 mm
3,33333 mm
55 %
3 / SLS
OK
Design OK!
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
11
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
6.2 Design of the brackets, bracket base fasteners and bracket profile fasteners
Fixpoint
Slidepoint
HRd,1 =
sRd
h - nL 11) 42
(
HSd + GSd
e
h'
HRd,1
Rd
nL
3,328 kN
181,82 N/mm
160,0 mm
18,5 mm
HSd
GSd
h'
1,253 kN
0,600 kN
55,0 mm
115,0 mm
Slidepoint
Area Edge, height: 0,000 m - 10,000 m, position: 1400,0 mm, relevant LC: 5 / ULS
HRd,1 =
sRd
(h - nL 11) 42
6
HSd
HRd,1
Rd
nL
1,808 kN
181,82 N/mm
80,0 mm
18,5 mm
HSd
1,764 kN
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
12
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
FH =
(G2
Sd
f+d
e HSd
+
f
h'
2
FV =
FRd,D
GSd
HSd
h'
4,500 kN
0,600 kN
1,253 kN
55,0 mm
115,0 mm
FV
FH
36,9 mm
18,5 mm
0,300 kN
1,156 kN
Slidepoint
Area Edge, height: 0,000 m - 10,000 m, position: 1400,0 mm, relevant LC: 5 / ULS
HRd,D = n FRd,D
f
HSd
f+d
HRd,D
FRd,D
HSd
2,997 kN
4,500 kN
1,764 kN
36,9 mm
18,5 mm
6.2.3 Bracket profile fastener proof
Fixpoint
Area Edge, height: 0,000 m - 10,000 m, position: 300,0 mm, relevant LC: 3 / ULS
FRd,S
( ) + (
GSd
m
GSd e h1 HSd
+
2 (h21 + h24) m
FRd,s
GSd
HSd
h1
1,245 kN
0,600 kN
1,253 kN
55,0 mm
140,0 mm
h4
20,0 mm
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
GSd
2
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
Slidepoint
Area Edge, height: 0,000 m - 10,000 m, position: 1400,0 mm, relevant LC: 5 / ULS
FRd,s
HSd
2,490 kN
1,245 kN
1,764 kN
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
13
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
14
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
Moments:
sz,i =
Mz
M
s
dTh,i - h dTz,i sRd = Rk
Iz
Ih
gM
My
194,737 Nm
0,000 Nm
194,737 Nm
81427 mm
dT
dT
0,000 Nm
138193 mm
0,0 mm
48,5 mm
115,92 N/mm
Rk
Rd
200,00 N/mm
1,10
181,82 N/mm
My
153,007 Nm
0,000 Nm
153,007 Nm
81427 mm
dT
dT
0,000 Nm
138193 mm
0,0 mm
48,5 mm
91,08 N/mm
Rk
Rd
200,00 N/mm
1,10
181,82 N/mm
fadm =
l
f
Vin max
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
Vin
fadm
fmax
500,0 mm
150,00
3,33333 mm
2,31435 mm
Vin
fadm
fmax
500,0 mm
150,00
3,33333 mm
1,80789 mm
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
15
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
16
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
7. Remarks, Warnings
For the installation of the selected system the installation instructions and technical information from HILTI and EUROFOX need
to be considered.
The design of the substructure must correspond to the statical calculations, installation guidelines and technical information.
The design of the system, MFT-MFI, is based on the calculation of PRAHER SCHUSTER ZT-GmbH, Bauingenieurwesen,
Bandgasse 21/8, A-1070 Wien.
The design of the aluminum parts is according to DIN EN 1999-1-1: Design of aluminum structures Part 1-1: General
structural rules + National appendix.
Planning, Design and Construction principles are according to DIN 18516-1 Cladding for external walls, ventilated at rear Part
1: Requirements, principles of testing.
This calculation deals with the static load capacity of the fasteners, brackets and supporting profiles regarding the effects of
wind and weight. Any restraint in the sub-structure due to temperature changes has to be considered separately!
The structural analysis of the facade panels is not considered. The specifications and installation instructions of the panel
producers need to be considered.
The influence of the orography (EN 1991-1-4, Chapter 4.3.3) to determine the wind load is not taken into account.
The influence of higher neighboring structures (EN 1991-1-4, Chapter 4.3.4) to determine the wind load is not taken into
account.
The influence of closely spaced buildings and obstacles (EN 1991-1-4, Chapter 4.3.5) to determine the wind load is not taken
into account.
The weight of the screws, brackets, and the profiles of the second layer are not taken into account.
The indicated loads of the screw Hilti S-AD01S 5,5x19 to connect the profiles to the brackets are valid if the boundary
conditions stated in the approval P-BWU02-128002 are fulfilled.
The indicated loads are valid without any limitation for concrete classes C16/20 up to C50/60 for anchors in compliance with the
boundary conditions given in the approval ETA-07/0219 (edge distance> = [100mm], anchor spacing> = [85mm], member
thickness > = [100mm], etc.).
The structure consisting of panels, profiles and brackets is assumed as a redundant system
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen
www.hilti.com
Company:
Address:
Phone | Fax
E-Mail:
Page:
Project:
Location:
Date:
Editor:
17
Polideportivo Sant Rafel
Ibiza
12/09/2014
Grespania
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Facade 2012 EUROFOX GmbH, Gewerbepark 10, AT-2821 Lanzenkirchen