Beruflich Dokumente
Kultur Dokumente
Department
Responsibility/Role
File Name 27759697.doc
Revision
Document Generation Date 18/01/2010 09:38:00
Date Modified 1/18/2010 09:38:00 AM
Last Changed by
Status
Concept
In a routing, you can define the completion subinventory and locator where you store finished
assemblies upon completion. When you define a job or repetitive schedule, Work in Process uses
these values as the default, and you can change the completion subinventory and locator if
necessary. Upon completion of assemblies, the completion subinventory and locator you defined
for the job and repetitive schedule is the default, and you can change these values if necessary.
The Locator field enables you to define the exact row and rack where the finished good of the
assembly is stored.
You can use the Routings page to navigate to the Routing Details page to enter the completion
details.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Routings page.
Step Action
2. Click the Manufacturing and Distribution Manager link.
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Routings link.
Step Action
5. Use the Organizations page to select your organization.
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OK button.
or Press [Alt+O].
Step Action
8. Use the Routings page to define the operations for a routing and the sequence to
perform them.
Step Action
9. Click in the Item field.
Step Action
10. Press [F11].
Step Action
11. Enter the desired information into the Item field. Enter "RT_Routing".
Step Action
12. Press [Ctrl+F11].
Step Action
13. Click the Routing Details button.
or Press [Alt+D].
Step Action
14. Use the Routing Details page to enter the details of where you store the finished
assemblies upon completion.
Step Action
15. Click in the Subinventory field.
Step Action
16. Enter the desired information into the Subinventory field. Enter "FGI".
Step Action
17. Click in the Locator field.
Step Action
18. Use the Completion Locator page to enter the row and rack where the finished
goods should be stored.
Step Action
19. Click in the Row REQUIRED: A field.
Step Action
20. Enter the desired information into the Row REQUIRED: A field. Enter "A".
Step Action
21. Click in the Rack field.
Step Action
22. Enter the desired information into the Rack field. Enter "1".
Step Action
23. Click the OK button.
or Press [Alt+O].
Step Action
24. Click the Save button.
Step Action
25. Click the Close Form button.
Step Action
26. Click the Save button.
Step Action
27. You have completed the Assigning a Completion Subinventory and Locator
procedure.
End of Procedure.