Beruflich Dokumente
Kultur Dokumente
Evelyn R. Laurito
University of Santo Tomas
Economic Analysis
Direct Cost, CD = Cost of Power (pump)
Fixed Cost, CF = Cost of maintenance and depreciation
TotalCosts
CT=CF+CD
Annual Cost, C
Fixed
Costs, CF
CTmin
Diopt
Pipe Diameter (Di)
1/2/2011
Variable
Costs, CD
by
Nomenclature
f = fanning friction factor
V= ave linear velocity of fluid, m/s
L = length of pipe, m
Le=equivalent length of valves,
fittings,m
Di = inside pipe diameter, m
qf = volumetric flow rate, m3/s
= density of fluid, kg/m3
c= viscosity of fluid, Pa.s
K = cost of power, $/kWh
Hy = hours of operation/yr
J= Le/L
1/2/2011
by
K .12478
Cpumping
1/2/2011
4.84
Di
1.84
.16
qf
L ( 1. J) q f Hy
.16
B1
E 1000
by
Di opt
f
c
n ( 1 F) X E K F
( 4.84 n)
0.1628(.0254) n q f 2 c K (1 J ) Hy
Diopt
n(1 F ) XEK F
1/2/2011
by
1/2/2011
by
EQN. 9-72
To 9-75
EQN. 9-76
To 9-79
Example 1
A flotation plant requires water amounting to 25 m3/h
at 276 kPa. The water must be pumped from a lake
600 m from the plant and the total pump lift is 10 m;
neglect entrance and exit losses, friction due to the
meter. Calculate the optimum pipe diameter (Std steel
pipe) if the initial cost is $ 2.5/m-in diameter; power
cost is $ 0.01/kWh. Pump efficiency is 60%; money
is worth 8% with life of installation equal to 20 years.
1/2/2011
by
SOLUTION
3
flowrate 25
X 2.5
hr
i .08
q f flowrate
K 0.01
E .6
n 20
Assume
a) Turbulent Flow Diopt
b) Di > 0.0254 m
.448 .132
qf
6
.025
1.63 10 K ( 1 J) Hy
m3
q f 0.00694
3600
.158
( 1 F) X E KF
at 25o C
62.244
1000
62.4
0.898
1000
Hy 8760
.448 .132
Diopt q f
F 1.4
KF
( 1 i) 1
.025 1.63 10 K ( 1 J) Hy
.158
( 1 F) X E KF
Diopt 0.087
qf
Diopt
NRe
KF 0.022
Diopt
Diinches 3.431
NRe 112705.267
1/2/2011
Diopt
Diinches
.0254
by
SOLUTION
V1 0
V2
qf
Vol
Diopt
n 1.5
V2 1.164
L 610
CT
1.24810
2.84
qf
0.84
K ( 1 J) Hy
CT
1.24810
If Di 4.026
CT
1.24810
2.84 0.84
qf
Di
2.84
0.84
.16
qf
4.84
Di
P2 276
P1 101
B 0.529
B ( 1 F) X Diopt KF
CT 0.797
.16
K ( 1 J) Hy
4.84
g 32.2
Di 3.068
z 10
.16
4.84
Diopt
If
g 32.2 g c 1
2
2
1 V2 V1
g
B
Vol P2 P1 z
L 2 g c
g c
K ( 1 J) Hy
B ( 1 F) X Di KF
CT 1.23
B ( 1 F) X Di KF
CT 1.59
1/2/2011
by