Sie sind auf Seite 1von 11

webMethods Software Deployment Document

201765 FCP_ALU_HK
71159-02

Document Change Control Log


The following information is used to control and track modifications made to this
document:
Versio
n
01

Date

Description of
change

Developer, SM
& DM Name

Remarks

2014-10-06

F_ALU_FCP 1.1.6-p01

Anton, Norbert,
Daniel

Changes to be deployed
are highlighted in yellow.

Document Owner: EIS Product


Management

1/11

Modification Date: 2015-0112

Table of Contents
1.
2.

Introduction..................................................................................2
Project Summary..........................................................................2
2.1. Build Image................................................................................................ 2
2.2. Additional Information............................................................................... 2
2.3. Migration Order.......................................................................................... 2
3. Deployment Instructions...............................................................2
3.1. Trading Networks Requirements [DocTypes,PR,TPA and Others]................2
3.2. Xref Details................................................................................................ 2
3.3. Property Group........................................................................................... 2
3.4. Database Requirements............................................................................. 2
3.5. Port ACLs Requirements............................................................................. 2
3.6. Process Models / Optimize for Process Requirements................................2
3.6.1. Process models.................................................................................... 2
3.6.2. Event maps......................................................................................... 2
3.7. Broker Requirements................................................................................. 2
3.8. My webMethods Requirements..................................................................2
3.9. Adapter Config........................................................................................... 2
3.10. IS Scheduler Jobs / Ports.........................................................................2
3.11. FTP Alias................................................................................................. 2
3.12. LOB Jobs / Configurations.......................................................................2
3.13. UNIX / NFS Requirements........................................................................2
3.14. Optimize for Infrastructure Configurations.............................................2
3.15. Miscellaneous Tasks................................................................................ 2
4. Additional Instructions..................................................................2
4.1. Post Deployment........................................................................................ 2
4.2. Line of Business (LOB) Application Interface Configuration.......................2
4.3. External Dependencies.............................................................................. 2
4.4. Additional Notes......................................................................................... 2
5. Appendix A...................................................................................2
6. Appendix B...................................................................................2
7. Appendix C...................................................................................2

Document Owner: EIS Product


Management

2/11

Modification Date: 2015-0112

1.

Introduction

The following document is used to guide the OPS Team to handle a specific
software deployment, where it will contain all necessary detailed instructions to
ensure a smooth software deployment.
For more detailed instructions on how to build and/or to deploy any software
components in general, please refer to the common build/deployment process
manual provided on our SVN server.
SVN Build/Deployment Documentation Location:
https://subversion.flextronics.com/svn/EIS/webMethods%207.x/Builds/Doc/BuildDeployment.doc
NOTE 1: Only add information as of chapter 2.
NOTE 2: Please remove any empty sections after applying all details This will
help to retrieve just the important instructions, hence it will avoid browsing thru
empty sections and making it easier while preparing for any deployment.

Document Owner: EIS Product


Management

3/11

Modification Date: 2015-0112

2.
2.1.

Project Summary
Build Image

To specify the build image use below table by using the specific row, specifying
the package/component and modifying the version number accordingly.
NOTE: Delete any unused rows and create new ones if required.
Package/Component

Version

F_ALU_FCP
(Flex_ALU_FCP.maps.outbound.shipment:mapB
aanShipmentToD97ADESADV)

1.1.6-p01

Target
B2B

Version information: 1.0-f01 = Full Build | 1.0.1-p01= Partial/Patch Build

2.2.

Additional Information

2.3.

Migration Order

Document Owner: EIS Product


Management

4/11

Modification Date: 2015-0112

3.

Deployment Instructions

Note: Instead of providing any manual deployment instructions, please provide


builds according our build/deployment process instead, wherever possible.
Highlight the points in Yellow color which needs to be deployed, if it is not a full
deployment to clearly identify any changes.

3.1.

Trading Networks Requirements


[DocTypes,PR,TPA and Others]

Note:
a) Use http://intranet.flextronics.com/it/wmtam/public/DeploymentTemplates/Connectivity%20Documents%20and%20templates for new
Profile requests.
b) Please mention Profile Group (FLEXTRONICS_CUSTOMERS /
FLEXTRONICS_SUPPLIERS) as per HLD.

TN Component
Profile Group

Details
FLEXTRONICS_CUSTOMER or
FLEXTRONICS_SUPPLIERS or
FLEXTRONICS_SUPPLIER

Profile Details
Document Types
Processing Rules
TPA

3.2.

Xref Details Change existing configuration in QA

Note: EXPORT ALL THE XREF TABLE AND USE THE SAME AS SQL SCRIPT TO
IMPORT DATA IN QA
InboundPartnerConfig

Sour
ce
Targ
et

EDI
BLANK

Group
OSRAM Mukachevo

Input Fields
SenderID

ReceiverID

DocumentType

Output Fields
Committee

PassThroug
h

MapType

ServiceName

ProcessName

InboundEDIToFlexCompany

Sour
ce
Targ
et

Customer
BLANK

Document Owner: EIS Product


Management

5/11

Modification Date: 2015-0112

Group
OSRAM Mukachevo

Input Fields
Reference

Output Fields
Company

Target

FlexCompanyToDirectory

Sour
ce
Targ
et
Group
OSRAM Mukachevo

Any
BAAN

Input Fields
Company

Server

Output Fields
Directory

OutboundPartnerConfig
Sour
BAAN
ce
Targ
BLANK
et
Change existing ID:
Group
OSRAM Mukachevo

SenderID

ReceiverID

MessageType

Version

Organization

PassThrough

MapType

BackendIdsToExternalI
ds
Sour
BAAN
ce
Targe
BLANK
t
Group

Table
Source
Target

Input Fields
BackendSend BackendReceiverID
erID

SenderID

BusinessDataConversio
n
Any
Any

Document Owner: EIS Product


Management

6/11

Modification Date: 2015-0112

Output
ReceiverID

Input Fields
Group

3.3.

Type

SiteID

SourceFormat

Property Group

Group
Name

Property
Name

3.4.

Property Value

Property Description

Database Requirements

SVN DB Location:
https://subversion.flextronics.com/svn/EIS/webMethods%207.x/DB%20Objects/
Script

3.5.

Revisi
on

Schema/Us
er

Comments

Port ACLs Requirements

HTTP Ports are set for Deny by Default. Any new services required to be added
should be listed here.
Port
Service to be added
Comments
5080

3.6.

Process Models / Optimize for Process


Requirements

3.6.1.

Process models

Note: This needs to be deployed to the target environment first before deploying
event
maps.
Deployer - DeploymentSet type should be selected as "Process Model"
Model Name

Versio
n

Project/Folder

Document Owner: EIS Product


Management

7/11

Comments

Modification Date: 2015-0112

3.6.2.

Event maps

Note: The corresponding process model (mentioned above) need to be deployed


to the
target environment first before deploying this.
Deployer - DeploymentSet type should be selected as "Optimize"
Process Name

Event Map

Document Owner: EIS Product


Management

Comments

8/11

Modification Date: 2015-0112

3.7.

Broker Requirements

3.8.

My webMethods Requirements

3.9.

Adapter Config

3.10.

IS Scheduler Jobs / Ports

3.11.

FTP Alias

Note: Use this template to provide all details


D:\
PROJ ECT_DATA_DOCU\IT- PRODUCT MANAGEMENT\Docu\WM templates\Other Templates\FTP Alias.dot

3.12.

LOB Jobs / Configurations

3.13.

UNIX / NFS Requirements

3.14.

Optimize for Infrastructure Configurations

3.15.

Miscellaneous Tasks

Document Owner: EIS Product


Management

9/11

Modification Date: 2015-0112

4.

Additional Instructions

4.1.

Post Deployment

4.2.

Line of Business (LOB) Application Interface


Configuration

4.3.

External Dependencies

4.4.

Additional Notes

Document Owner: EIS Product


Management

10/11

Modification Date: 2015-0112

5.

Appendix A

Support Escalation Matrix

6.

Appendix B

External References (Functional, Technical Requirements Document, Design &


Development Specifications, Process Support Document etc)

7.

Appendix C

External Connectivity Details

Document Owner: EIS Product


Management

11/11

Modification Date: 2015-0112

Das könnte Ihnen auch gefallen