Beruflich Dokumente
Kultur Dokumente
,
-
Date :
,
- 2014
Building / Area :
Location : ( For Location / Grid please refer Location plan attached herewith )
Structure Member/ ID / No. : Footing / Raft
Plinth Beam
KMT - X - CD - KJM -
Checking Status
- B0__
Remarks
Ok
Rectification Required
Ok
Rectification Required
Ok
Rectification Required
Ok
Rectification
Required
Ok
Rectification
Required
Ok
Ok
Ok
Ok
Rectification
Required
Rectification
Required
Rectification
Required
Rectification
Required
Rectification
Required
Ok
Ok
Rectification
Required
Ok
Rectification
Required
Ok
Rectification
Required
Ok
4.20 Check for Thickness & Top level of Stone dust filling
Ok
Rectification
Required
Rectification
Required
Ok
Rectification
Required
Ok
Rectification
Required
Other
Inspection Items
Sr.
No.
Pedestal
Inspection Items
Sr.
No.
Checking Status
Remarks
Ok
Ok
Ok
Ok
Rectification
Required
Rectification
Required
Rectification
Required
Rectification
Required
Abbrevation :
CECL : Coromandel Engineering Construction Limited
VRC : VR Earthmovers & Constructions (Pvt. Ltd.)
Inspection Items
Checking Record
Checking Status
Signature