Sie sind auf Seite 1von 2

fact sheet #16

Production & Facility Scheduler (PFS)


Leistungszhler bersicht
Leistungszhler bersicht

The scheduling of production processes should be exact, flexible


and easy to configure. The Production & Facility Scheduler (PFS)
is fully integrated into zenon. This factory calendar controls
equipment and production processes precisely, depending on
the date, time, event and production status. For equipment with
heavy consumption, considerable savings (for example, in energy
consumption) can be achieved using it.

Leistungszhler Einstellungen
P 103

P 104

P 205

P 206

3
12

16
20

2
10

9
12

LZ 205

Halle Nord

Halle Sd
LZ 105
LZ 101

Stz.:

285

Soll:

132

Stz.:

270

Ist:

135

Soll:

130

Ist:

131

LZ 103

P 101

5
10

Stz.:

265

Soll:

130

Ist:

131

LZ 201

P 101

9
18

285

Soll:

132

Ist:

135

LZ 203

P 201

Stz.:

14
18

Stz.:

290

Soll:

135

Ist:

138

Stz.:

305

Soll:

141

Ist:

P 207

P 101

P 107

8
16

LZ 102

P 108

Stz.:

285

Soll:

132

Ist:

135

4
16

LZ 104

P 102

8
12

14
22

LZ 202

270

Stz.:

305

Soll:

130

Soll:

140

Ist:

131

Ist:

140

8
10

LZ 204

P 202

Stz.:

142

6
12

Stz.:

290

Soll:

133

Ist:

130

Halle Ost
P 208

-3

5
10

LZ 106

Stz.:

265

P 105

P 106

P 203

P 204

Soll:

132

Ist:

136

12
18

5
12

4
14

7
14

LZ 206

Stz.:

290

Soll:

132

Ist:

137
5

Leistungs
zhler

AlarmStatistik

Logbuch

Schichtbuch

Wartungstool

DCMI

Report

System

Log on/off

System

the zenon production


& facility scheduler (pfs)

central control of complete


factories

The PFS executes user-defined actions at fixed or relative

zenon makes it very easy to control an entire factory with

switching times. For example, it can call up a function or

the PFS. For this, units belonging together are grouped to

set target values. These actions are executed once or cycli-

the equipment: e.g. the buildings of a production facility.

cally, depending on their definition. They are carried out at

Constructional or production-related situations are logically

a fixed point in time or are defined relatively. Relative times

replicated in this way.

such as start/end of production, pauses or start/end of shift


are combined with the zenon time models (for example, a 40

zenon scheduler

hour week). The execution times are then calculated from

Basic functions of the PFS are already included as standard

this. Which time-related actions are linked and the manner

in zenon as the zenon Scheduler. The scheduler offers a

in which they are linked is specified in the schedules. Sub-

clearly structured overview, in calendar form, via a comfor-

schedules automatically contain the times of the superor-

table user interface. The scheduler is network capable and

dinate schedule and can be expanded with their own time

fully integrated into the redundancy concept.

model. The calendar links the time models with the schedules and displays them in a clear form.

fast facts
Complete integration into zenon
Can be configured in the zenon Editor or in zenon Runtime
Fully networkable
Redundant execution Comprehensive issue of user rights
Can be configured flexibly and expanded

Production & Facility Scheduler (PFS)

Functions

Shift administration
Acts automatically
Absolute and relative time specifications
Handles special days and public holidays
Freely definable time models
User-defined events
Runtime user interface with calendar view provides a clear overview
Execution data independent of project configuration data
Switching point preview in list view for offline tests
Breakdown of the equipment structure that corresponds to the
construction or production-related situation
Data created online can be read back to the zenon Editor

Das könnte Ihnen auch gefallen