DATA :
Ht of Drop =
1.00 m
Description
U/S
D/S
0.125 m3/sec
0.125 m3/sec
0.40 m
0.40 m
0.30 m
0.30 m
0.15 m
0.15 m
EL 482.191 m
EL 481.191 m
EL 482.491 m
EL 481.491 m
EL 482.641 m
EL 481.641 m
Ground Level
EL 482.778 m
EL 482.778 m
0.49 m/sec
0.49 m/sec
Velocityin Canal
HYDRAULIC DESIGN :
1. Length of Crest (L)
L=
0.40 m
The length of the crest is same as the U/S bed width of the canal
2. Determination of Crest Level
Rectangular type crest wall is designed
Discharge , (Q)
0.30 m
1.84 x
0.400 x H5/3 / (
0.306 m
0.49 m/sec
Va2/ 2g
=
U/S T.E.L
0.30 )1/6
0.012 m
=
=
482.491
+ 0.012
= EL 482.503 m
R.L of Crest, CSL
CSL
U/S T.E.L - H
482.503
- 0.306
= EL 482.197 m
>
0.006 m
0.49 m/sec
Vd2/ 2g
0.012 m
=
=
481.491
= EL 481.503 m
+ 0.012
0.55
H2
=
=
Crest width at top, Bt =
=
Say
482.197 - 481.191
1.006
0.55
1.006
0.552
= 0.60 m
Depth of cistern =
(1/4) x (H x HL )2/3
X =
HL, Head Loss =
1.00 m
X =
0.11 m
Say 0.15 m
b)
By Varshney Method
X =
where ,
dc/3
dc=[q2/g]1/3
q = 0.313 cumec/m
dc=
Depth of cistern,dc/3 =
0.215 m
0.072 m
0.15 m
Cistern Level =
Cistern Level =
EL 481.041 m
Length of cistern
Length of cistern = 5H*HL
=
2.80 m
Say
3.00 m
b)
0.30 m
Depth of water
2
+ 0.60
0.3 / 2
+ 0.60
0.750 m
Say
0.75 m
Depth of water
3
+ 0.60
0.3 / 3
+ 0.60
0.700 m
Say
0.70 m
6. Impervious Floor
This extends from U/S Curtain Wall to D/S Curtain Wall . The floor shpuld be designed to resist the maximum Uplift pressure likely to be o
Upstream of the weir, the Impervious Floor may be of thk 0.3 m (nominal) as the depth of water itself will counter balance the Uplift Pressu
Floor Length =
1.5 x D
0.450 m
Say
0.50 m
1.007 m
(1/3) n +V
4.179 m
1. Creep length at pt A
= 1/3 (0.5 + 0 .3) + ( 0.7 + 0.00618761467893592 + 1.006 + 0.15)
=
2.129 m
uplift = Hu x ( 1- LA / Lw)
uplift Pressure =
0.494 m
0.353 m
2. Creep length at pt B
= 1/3 (0.5 + 0.6 + 3 + 0 .3) + ( 0.7 + 0.00618761467893592 + 1.006 + 0.15)
=
3.329 m
uplift = Hu x ( 1- Lw / LA)
uplift Pressure =
0.205 m
0.146 m
EL 482.197 m
EL 482.191 m
0.4
0.70 m
1.156
0.3
0.50 m
0.750
EL 481.041 m
3.00 m
0.3
EL 482.197 m
1.156 m
EL 481.041 m
= BC Soil
:
= 30o
= 1.80 t / m3
=
0.333
Height of Crest wall , H
Pa
=
Overturning Moment :
Mo =
(1.80 - 1.0) x
0.178
= 1.16 m
0.178 x
(1.156 )2
(SH )
t/m
1.156 / 3
= 0.069 t - m
Stabilizing Moment :
Ms =
F.O.S. against overturning
- EL 481.041
EL 482.197
= 0.5 Ka (gt - gw ) H2
= 0.5 x 0.333 x
Wt of concrete
0.333
= 1.665 t
1.665 x 0.60 / 2
Ms
/ Mo
= 0.50 t - m
0.5 / 0.069
= 7.25
>1.5
(Safe)
0.65 x 1.665
= 6.07
>1.5
(Safe)
m = 0.65,
F.O.S. against overturning
m x SV
SH
0.178
Base Pressure :
Unbalanced Moment
MS - MO
=
Bt
x
0.50 - 0.069
= 0.43
t-m
0.259
= 0.041 m
= 0.600 m
=
MS - MO
= 0.259 m
SV
e
Pmax,min
= B/2 - x
= 0.60 / 2 ( SV / B ) x (1 + 6e/B)
=
=
3.91 t / m2
1.64 t / m2
Discharge/m, q
3.3/10
f = Silt Factor
2.0
Scour Depth,
1.5 R
Depth of Scour below nala bed level =
=
=
=
=
=
Say
Though required Scour depth is 0.5m , due to presence of B C Soil Scour depth of 0.8m is adopted.
(assumed)
EL 481.491 m
Hence OK
ll to D/S Curtain Wall . The floor shpuld be designed to resist the maximum Uplift pressure likely to be occured.
us Floor may be of thk 0.3 m (nominal) as the depth of water itself will counter balance the Uplift Pressure.
1/3 (0.5 + 0.6 + 3 + 0.3 + 0 .3) + ( 0.7 + 0.00618761467893592 + 1.006 + 0.15+ 0.75)
0.75 m
(SV )
>1.5
(Safe)
>1.5
(Safe)
= 0.041 m
10
0.330
Cumecs/m
0.51
0.76
0.46
m
0.50 m
quired Scour depth is 0.5m , due to presence of B C Soil Scour depth of 0.8m is adopted.