CONSTRUCTION PROJECT STAGES

Schematic Design

Design Development

Construction Documents

Bidding

Construction

Close-Out

Schematic Design
Administrative

Government Application

Aerial Photos

Graphics

Architecture / Engineer Agreement

Hydraulic Design

Background

Introduction

Borings logs

Investigation

Boundary Survey

MBE Program

Calculation

Mapping

Code Analysis

Meetings

Computer Operation Analysis

Observation

Consultation

Observation Services

Control Survey

Photos / Videotapings

Coordination

Physical Survey

Cost Estimates

Planning

Cost-Effective Analysis

Plot Plan

Data Preparation

Problem Solving

Drafting

Program Costs

Easements

Programming

Environmental Assessment (SEQRA)

Project Management

Environmental Impact

Public Hearings

Estimate

Public Notice

Exhibits

Recommendations

Financing

Renderings

Reports

Supervision

Research

Supplementary Drawings

Scheduling

Survey

Seminars

Test Borings

Site Layout

Topographical Survey

Site Visit

Travel

Soil Analysis

Typing

Study
Summaries

Design Development
Administrative

Piping & Pump Design

Alternates

Plumbing Design

Correspondence

Progress Reports

Design

Project Management

Drafting

Redesign

Editing

Revisions

Electrical Design

Site Visit

Financing

Structural Design

HVAC Design

Supervision

Improvement

Travel

Meetings

Typing

Photo Copying

Vouchers

Construction Documents
Approvals (DEC. DEP, ECHD, EPA. etc.)

Construction Documents

Bid Documents

Consultation

Contract Conditions

Project Management

Design (All Displays)

Proposal

Detail

Public Hearings

Drafting

Redesign

Easements

Review

Final Revision

Revisions

Financing

Specifications

General Construction Specs

Supervision

Photo Copying

Typing

Printing

Vouchers

Bidding
Addendum

Receipt of Bids

Approvals

Recommendation

Bid Tabulation

Review Low Bidder

Consultation

Summaries

Estimate

Supervision

Pre-Bid Conference

Typing

Construction
Administrative

Inspection

Beneficial Occupancy

Installation

Change Orders

MBE Program

Completion Date

Maintenance

Contracts

Observation Services

Contractor Completion Schedule

Offset

Correspondence

Photo Copying

Preconstruction Conference

Review Shop Drawings

Progress Reports

Review Submittals

Project Costs

Revisions

Project Management

Samples / Color Schedule

Project Photos

Site Layout

Punch List

Site Visit

Realignment

Stake Out

Requisitions

Typing

Restoration

Vouchers

Close-Out
Administrative

MBE Program

Audit / Certificate of Completion

Maintenance Bond

Change Orders

0 & M Manual

Cleaning

Photos

Correspondence

Program Costs / Financing

Cost Distribution

Record Drawings (As Builts)

Exit Conference

Supervision

Final Accounting