DAILY / WEEKLY SAFETY INSPECTION

REPORT
Date
Name of person Undertaking
Inspection
Job Title
Work Location
Safety Checklist:
House Keeping
Material Storage
Access/egress

14/01/2015
Aftab Majeed
Sr. HSE Officer
SANG Villas

Power tools

Electrical

Waste disposal

General Health and

st
First aid (equipment,1

Office safety

Sub-contractors

Safety Induction

(guards,training)
Manual handling

issues(Cables,110V)
Barricades/barriers

safety
Working at height

Plant &
machinery(Hoists etc)
Edge Protection
Ladders/stairwells
Scaffold towers
Safety harness/fall
arrest
PPE

aiders)
Trained operatives

Welfare facilities

SMS documentation
Emergency procedures

Safety signage

Slips, trips and falls

Excavations

Vibration

Control of noise

Toolbox talks

Smoking at site/office

Protection of the public


Fire (exits, assembly

Fire extinguishers (in


date)

points etc)

Observations

Action required

Scaffolding

Temporary

electricity
COSHH/MSDS
Lifting
equipment
Pedestrian/
traffic routes

Close out
Name / Date

1# In Dev.# 5, zone#3 cluster#2,


unit# 3 electrical workers are
using small ladder as a means of
access to reach top of the roof and
also no appropriate edge
protection is provided, tool box is
placed at edge point.

2# In Dev.# 5, Zone# 3, cluster#


2, unite# 13 electrical workers
found using power tools with
broken male and female sockets
and also damaged cables are
being used at site.

3# In Dev.# 5, zone# 3, cluster#


2, unit#13 electrical workers are
performing their job very close to
free standing walls and also loose
placed concrete blocks on walls.

All Site Engineers and


supervisors and foreman
are responsible to ensure
prior to start any activity
on top roof that
adequate means of
access and egress is
provided or not.
All site engineers and
supervisors foreman are
also responsible to
ensure that appropriate
edge protection is
provided at edge point of
roof.
Only competent workers
are allowed to perform
work at height activity.
All Supervisors are
responsible to make sure
that workers have full
body harness for work at
height activity.
All Supervisors/
Storekeepers and HSE
staff is responsible to
ensure that workers are
provided with adequate
hand tools, power tools
in good working
condition and with
appropriate plug In/out
system
All Supervisors and store
Incharge are responsible
to ensure no damage
cable is being used at
site.
All Engineers/Supervisors
and HSE staff are
responsible to ensure
that working area is clear
2

3# in dev.# 5. Zone#4,cluster# 3
unit#8 electrical workers are
performing their conduting activity
without maintaining appropriate
housekeeping.

and free from any hazard


prior to start activity.
All Engineers/ supervisor
should ensure that all
free standing walls are
secured by Arabtec
Company before starting
MEP work in the area.

All Supervisors and


foreman are responsible
to ensure that work area
is clean and tidy prior to
start activity, during and
after work finished.

Distribution:
Name:

Signature:

____________________________
_____________________________ Close out meeting: The purpose of a close out meeting is
to discuss issues raised during the inspection, apportion responsibility to close the issue with
a degree of urgency attached and a timescale, whether it be urgent, or routine.