LEARNING POINTS
TESORO
HANA Overview
Choose Start -> All Programs -> SAP HANA -> Studio to open SAP HANA
studio.
In HANA Studio -> Window menu-> Open Perspective and choose Modeler
Value
Field
Value
Calendar Type
Gregorian
Calendar Type
Fiscal
From Year:
1995
From Year:
1995
To Year:
2020
To Year:
2020
Granularity
Day
Variant
K4:010
Number of Replay Jobs: The jobs that will be used to retrieve data, as a basic starting point you should configure 1 job per 20
tables
DD02L
DD02T
RS_LOG_FILES
RS_MESSAGES
RS_ORDER
RS_SCHEMA_NAME
RS_STATUS
Schema Validation
Authorization Roles
Schema Mapping
Quick Launch tab -> Setup -> choose Schema Mapping -> Add
Field
Value
Authoring Schema SAP_ERP
Physical Schema
<schema>
Import models
Go to Link: https://websmp109.sap-ag.de/swdc
Navigate to:
SQL Script
Validate model
Configuration parameter
Navigation tab -> double click on schema -> Configuration tab -> filter
content
Define contect_vendor
Delivery Unit
In the navigator panel, expand schema -> Content -> sap -> ecc -> select
model -> right click -> open
To edit model click on Switch version -> Edit imported model
Make changes - > Validate -> Save and Activate
BOBJ configuration
HANA Client
HANA connection for BI reporting
SAP BO-BI tools Overview
HANA Client
Open Information Design Tool (IDT) -> Create new project -> Create new
relational connection -> Enter name for HANA connection -> Click Next
Select "SAP" -> "SAP HANA database 1.0" -> "JDBC Drivers" -> Next
Enter required fields for user name, password, and server for HANA
Change the Connection Pool Mode to "Disconnect after each transaction"
then Click "Finish"
SQL
SAP BW / Data Warehouse concept
Basic SAP ECC
KEY LEARNINGS
To enhance RDS model, copy it into a different package and then make
changes
If you have less space in non-prod HANA database, you can filter the data
in table in SLT system (based on year)
Upgrade / play with BI tools before HANA implementation
Set Schema name as ECC system + client (example QC6010)
BEST PRACTICES
Have a war room for non-prod and prod implementation. Involve all teams
in every activity because responsibilities are interdependent.
Client team must shadowing the consultants during RDS implementation.
It helps a lot in learning and understanding the HANA studio.
SAP publish improved RDS and you might have to re-import the newer
version.
Table replication takes a week (depending on the data in source), so plan
security task in parallel with replication