Benguet Corporation
Balatoc, Itogon,
Benguet
Attention
Subject
Dear Sir;
With reference to the above subject and our series of discussion at your office, we are
submitting herewith our proposal based on the scope of work listed below.
I.
11. Fabrication/Installation of 1 unit quench tank (dished head top cover and conical
bottom);
12. Fabrication/Installation of 1 unit thermal heater (equivalent to 100 boiler horsepower)
complete with its accessories and control;
13. Fabrication/Installation of 2 units 600mm x 600mm x 1.8 meter, 12 cathodes, 11
anodes with rectifier (2 4 volts, 500 ampere);
14. Fabrication/Installation of 1 unit LPG fire tilting type graphite furnace, complete with
high temperature refractory, mild steel casing (graphite to be supplied by Benguet);
15. Fabrication/Installation of furnace hood, exhaust fan and wet scrubber with exhaust fan;
16. Fabrication/Installation of 2 units Stainless steel tube & shell heat exchanger;
I.c. ELECTRICAL WORKS:
1. Supply of Motor Control Panels and installation of local push bottom for the above items
for Item I.a and Item I.b;
2. Supply of lighting wirings for the above Items I.a and I.b;
II.
PRICE:
Our price exclusive of VAT for the above scope of work and supply broken down as
follows:
I.a. GOLD REFINERY AREA:
Item1. Construction of Gold Refinery
Building........................................................................
P 12,320,000.00
Item 2. Fabrication/Installation of
1unit elution tower.............. ......................................
P 1,064,000.00
Item 3. Fabrication/Installation of
1unit loaded carbon holding tanks.............................. P 504,000.00
Item 4. Fabrication/Installation of
2units single deck vibrating screen............................. P 504,000.00
Item 5. Fabrication/Installation of
1 unit sieve screen........................................................ P 196,000.00
Item 6. Fabrication/Installation of
1 unit single deck vibrating screen............................... P 252,000.00
Item 7. Fabrication/Installation of
1 unit stripped carbon hopper....................................... P 504,000.00
Item 8. Fabrication/Installation of
1 unit stripped carbon vibrating feeder......................... P 224,000.00
Item 9. Fabrication/Installation of
1 unit 250 kg/hr., LPG fired carbon.............................. P 3,920,000.00
Item 10. Fabrication/Installation of carbon
discharge controlled vibrating screen............................. P 224,000.00
Item 11. Fabrication/Installation of 1 unit quench tank................ P 224,000.00
Item 12. Fabrication/Installation of 1 unit thermal heater............ P 1,680,000.00
Item 13. Fabrication/Installation of 2 units
600mm x 600mm x 1.8 meter electrowinning cell.......... P 19,936,000.00
P 9,520,000.00
P 3,360,000.00
VALIDITY:
AUXIN offer is valid within August 30, 2012 after which is subject to our review and
confirmation.
We trust the foregoing Terms of Reference adequately promotes our mutual interests and
should this proposal merit your approval.
ANTONIO B. CUMPIO
President & CEO
AUXIN Process Techology & Construction, Inc.
Tel. No. 520 8168
Mobile: 0922 8724708