Introduction
The building starts in the year 1954 and finish in 1966 in the presidency
of Coronel Oscar Osorio. The constructor is Harza Ingeneering Company.
Dam type gravity (is one in which its own weight is responsible for
resisting the thrust of the water).
The Electricity can be dangerous. But if you use common sense and
follow prescribed safety measures, you will come to no harm. The basic
rule is: always shut off electrical power to the area in which you are
working.
Objetives
Page 9
Hydroelectric Central 5 de
Noviembre
Page 9
of
the
de
River
every
The
name
hydroelectric
for
Commission
the
Executive
the
management
Lempa
operation
and
the
efficient
the
modernized
constructor
is
Harza
Ingeneering Company.
through
reservoir.
year
raising
the
executed
by
the
consortium VATECH-ELIN Y
VATECH HYDRO VEVE.
Characteristics of dam
Page 9
responsible
level.
Early Warning: 179.50
for
resisting
bounce is 56 meters.
Maximum
volume
107.70
dammed
of
Cubics
Millimeters.
Cubics
Millimeters
dammed.
Page 9
Principal Systems
Intake
(5
radial
gates
AC
emergency shutdown).
Turbine (5 units of
converters
the
blades
and
DC
with
thyristor
three-phase
2
groups
power
Page 9
Speed
Regulator
(5
PID
electro
pneumatic
governor.
Generator (5 units of
the
following
maximum
capacities: 25 MW U1, U2
46.6; U3: 50 MW; U4: 46.6
MW; U5: 46.7 MW).
Auxiliary System.
Lubrication System
Lifting turbine system.
Cooling System
System drains prey.
(Pumping
from
galleries
and
basement)
Landfills
Page 9
2000-2002
Repotenciacin a
99.4 MW
Future Projects:
Page 9
Remove the fuse or turn off the breaker that controls the circuit you are
working on. Post a note on the box to warn the others not to touch it
voltage tester.
Never stand on a damp floor when working with electricity. If the floor
around your fuse or breakers box is even occasionally wet, keep some
Conclusion
Page 9
Translation
Introduccin
ningn
dao.
La
regla
bsica
es:
siempre
Page 9
Objetivos
Page 9
CENTRAL HIDROELECTRICA
5 DE NOVIEMBRE
La central Hidroelctrica 5
direccin de la presidencia
de Noviembre corresponde
al
Los
primer
proyecto
Hidroelctrico
Lempa
de
del
la
Fue
construida
1954-1966
bajo
fueron
Ingeneering
Company.
Comisin
Ro Lempa (CEL).
Harza
Rio
constructores
entre
la
capacidad
de
almacenamiento,
sin
Page 9
embargo
es
capaz
suministrar
repotenciada
potencia
durante
todo
travs
del
operacin
de
el
ao
manejo
eficiente
modernizada, elevando la
capacidad
del
instalada
de
En el periodo 2000-2002
VATECH
HYDRO
VEVEY
Caractersticas de Presa
Salto diferencial
de 56.00 metros
mximo
Volmen
embalsado
MMC
de
mximo
107.70
Volmen
mnimo
embalsado de 65.10 MMC
Cota
mnima
de
operacin : 176.00 msnm
Cota
mxima
de
operacin: 180.00 msnm
Page 9
Sistemas Principales
Page 9
Bocatoma (5 compuertas
cierre electromecnico de
de 20 MW; U4 : 18 MW; y
emergencia).
U5 de 21.4 MW.
Turbina
(5 unidades
del
Excitacin (5 unidades a
base
de
convertidores
AC/DC
trifsicos
grupos
de
con
tiristores
semiconductores
de
de
respaldo,
sobre
(OEL)
baja
Regulador de Velocidad (5
equipos
electrnicos
PID
integrado a un gobernador
electrohidroneumtico.
Transformador
unidades en la actualidad
excitacin (UEL).
Page 9
Sistemas Auxiliares
Sistema de Lubricacin
Sistema de Enfriamiento
Vertederos
Sistema SCADA
Historia de Repotenciacin de la
Central
2000-2002
Repotenciacin a
99.4 MW
Proyectos a futuro:
Capacitacin
tecnolgico.
continua
al
personal,
conforme
al
avance
Conclusin