Beruflich Dokumente
Kultur Dokumente
Project concepts positively appraised should be further developed into full project documents, following
the LFA.
Region
Regional/Cooperat
ive Agreement (if
applicable)
Project Title
Field of Activity
Regional Project
Category1
Transnational
Regional standard setting
Capacity building for developing countries
Joint TC activities with a regional entity
Names and
contact details of
Counterparts and
Counterpart
Institutions
Why should it be a
regional project?
Stakeholder
Analysis and
Partnerships
Overall Objective
(or Developmental
Objective)
Objectives
analysis
Role of nuclear
technology and
IAEA
Project Logical
Framework Matrix
Physical
Infrastructure and
Human Resources
What physical infrastructure and human resources are available to support the
project? Include examples, e.g. existing laboratories, suitable buildings, staff that
will be directly involved in this project and logistics (i.e. transport for
implementation of field studies/trials). List any national resource centres that
would play a major role in the implementation of the project.
Indicate whether or not the safety infrastructure and associated standards and
procedures at the institutional level are adequate to ensure that the project will
be implemented in a safe manner. If not, specify the gaps and indicate how they
will be addressed.
Safety and
Regulatory
Infrastructure
Requirements for
Participation
Participating
Member States
Other
considerations,
e.g. environment,
gender
Project duration
Funding and
project budget
TOTAL
What steps will be taken to achieve the expected results in order to ensure the
projects success and sustainability?
Describe the project milestones, the role of implementing institutions and other
stakeholders.
State how project ownership will be ensured through effective leadership and the
commitment of resources during project implementation, as well as after project
completion to ensure its sustainability.
Monitoring and
Reporting
Risk Management
Describe the risks that could affect the success and sustainability of the project
in the short and medium terms. Indicate appropriate mitigation measures (e.g.
change in national policies / priorities, institutional restructuring, reallocation of
resources, etc.).
SECTION-4: WORKPLAN
Project Workplan