Sie sind auf Seite 1von 23

FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE

DESCRIPTION

PROJECT/JOB NO.

ACI_SI

PROJECT/JOB NAME

ACI

CLIENT NAME

SI

SITE NAME

5-6

DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME

ISO SAMPLE

LOAD COMBINATION GROUP


REV

DATE

DESCRIPTION

Copyright (c) GS E&C. All Rights Reserved

PREP'D

CHK'D

APPR'D

APPR'D

2/9/2015

Calculation Sheet
of
Foundation

Project Na. : ACI


Project No. : ACI_SI
Client : SI

Page 1

FOUNDATION LISTS
GROUP NAME : ISO1P
No.

Description

F3

F4

Copyright (c) GS E&C. All Rights Reserved

No.

Description

No.

Description

2/9/2015

Calculation Sheet
of
Foundation

CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING DATA
3.2 PIER DATA
3.3 SECTION DATA
3.4 LOAD CASE
3.5 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved

Project Na. : ACI


Project No. : ACI_SI
Client : SI

Page 2

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : ACI_SI


Client : SI

Page 3

1. GENERAL
1.1 CODE & STANDARD
Items

Description

Design Code

American Concrete Institute (ACI 318)

Horizontal Force for Wind

UNIFORM BUILDING CODE (UBC-1997)

Horizontal Force for Seismic

UNIFORM BUILDING CODE [UBC-1997]

Unit System

Input : SI,

Output : IMPERIAL,

Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items
Concrete (fck : compressive strength)

Value (Input Unit system / Output Unit System)


2

27.46 N/mm

3982.590 psi

Lean Concrete (Lfck : compressive strength)

0.00 N/mm

Reinforcement (D10 ~ D16 , yield strength)

274.59 N/mm

Reinforcement (D19 ~ , yield strength)

0.000 psi
2

39825.900 psi

59738.130 psi

411.88 N/mm
3

Rs (Soil unit weight)

19.613 kN/m

Rc (Concrete unit weight)

23.536 kN/m

124.854 lb/ft

Es (Steel Modulus of Elasticity)


Ec (Concrete Modulus of Elasticity)

149.827 lb/ft
2

196.13 kN/mm

28446.250 ksi

24.61 kN/mm

3570.103 ksi

- Pile Capacity
Items

Value (Input Unit system / Output Unit System)

Pile Name

PHC Pile

Footing List

F3, F4

Diameter

400 mm

15.7 in

Length

8m

26.2 ft

Thick

20 mm

0.8 in

Shape

Circle

Capacity ( Ha , Ua , Va )

19.6 , 98.1 , 294.2 kN

4.4 , 22 , 66.1 kips

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items

Description (Input/Output)

Allowable Increase of Soil (Wind)

0%

Allowable Increase of Soil (Seismic)

0%

Allowable Increase of Soil (Test)

0%

Allowable Increase of Pile Horizontal (Wind)

0%

Allowable Increase of Pile Horizontal (Seismic)

0%

Allowable Increase of Pile Horizontal (Test)

0%

Allowable Increase of Pile Vertical (Wind)

0%

Allowable Increase of Pile Vertical (Seismic)

0%

Allowable Increase of Pile Vertical (Test)

0%

Allowable Increase of Pile Uplift (Wind)

0%

Allowable Increase of Pile Uplift (Seismic)

0%

Allowable Increase of Pile Uplift (Test)

0%

Safety factor against overturning for OVM1(FO1)

Copyright (c) GS E&C. All Rights Reserved

2/9/2015

Calculation Sheet
of
Foundation
Safety factor against overturning for OVM2(FO2)

Safety factor against overturning for OVM3(FO3)

Safety factor against overturning for OVM4(FO4)

Safety factor against sliding for the SL1(FS1)

1.5

Safety factor against sliding for the SL2(FS2)

1.5

Safety factor against sliding for the SL3(FS3)

1.5

Safety factor against sliding for the SL4(FS4)

1.5

Friction factor (m)

0.35

1.4 LOAD COMBINATION


Comb . ID

Load Combination for stability

1.0 SW + 1.0 DL + 1.0 LL

.6 SW + .6 DL + 1.0 WL

.6 SW + .6 DL + .7 SL2

1.0 SW + 1.0 DL + .75 LL + .75 WL

1.0 SW + 1.0 DL + .75 LL + .525 SL2

Comb . ID

Load Combination for Reinforcement

101

1.2 SW + 1.2 DL + 1.6 LL

102

.9 SW + .9 DL + 1.6 WL

103

.9 SW + .9 DL + 1.0 SL2

104

1.2 SW + 1.2 DL + 1.0 LL + 1.6 WL

105

1.2 SW + 1.2 DL + 1.0 LL + 1.0 SL2

Copyright (c) GS E&C. All Rights Reserved

Project Na. : ACI


Project No. : ACI_SI
Client : SI

Page 4

2/9/2015

Calculation Sheet
of
Foundation

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

Copyright (c) GS E&C. All Rights Reserved

Project Na. : ACI


Project No. : ACI_SI
Client : SI

Page 5

2/9/2015

Page 6

REFERENCE DWGS
NO.

A01 A02

A03

1200

DWG NO.

DWG TITLE

A04

3250

04
03

1000

12050

NOTES
F2

* OUTPUT UNIT : mm

13000

F3

ACI PROJECT

FOUNDATION LOCATION PLAN


ISO SAMPLE

01

F4

Y
F1

SQUAD CHECK

1500

02

PROCESS PIPING

SCALE

AS SHOWN

Copyright (c) GS E&C. All Rights Reserved

VESSELS STRUCT.

JOB NO.

ACI_SI

ELEC.

INST.

MICROFILM NO.

2/9/2015

Page 7

OUTPUT UNIT : mm
Copyright (c) GS E&C. All Rights Reserved

2/9/2015

Page 8

REFERENCE DWGS
NO.

DWG NO.

DWG TITLE

CL FOOTING

4200

D16@300

5200

1000x3

3600

600

50
TYP.

1400

500x2

NOTES

600

* PILE
21-\o400 PHC Pile
* ANCHOR BOLT
1X20-M16 ANC. BOLTS (TYPE TYPE L)

600

500x2
1000

600

* OUTPUT UNIT : mm

1000

D22@400

FOOTING REINF. PLAN

ACI PROJECT
100 75

700
100x7

100x7

FOUNDATION DETAIL FOR


F3

D10
SQUAD CHECK

100

700

D25

700

50
TYP.

D10
@200

1800

TOG EL. + 1100

75 PROJ.

25 GR.

FOUNDATION PLAN

700

24-D25

LEAN CONC. 50 THK

150

PEDESTAL

PROCESS PIPING

SECTION

SCALE
REV.

Copyright (c) GS E&C. All Rights Reserved

DATE

DESCRIPTION

DRWNCHKD APPD APPD APPD

AS SHOWN

VESSELS STRUCT.

JOB NO.

ACI_SI

ELEC.

INST.

MICROFILM NO.

2/9/2015

Page 9

OUTPUT UNIT : mm
Copyright (c) GS E&C. All Rights Reserved

2/9/2015

Page 10

REFERENCE DWGS
4500

4500

DWG TITLE

D16@200

D19@200

TOP

2250x2

3250

3500

CL FOOTING
BOTTOM

DWG NO.

50
TYP.

NO.

NOTES
* PILE
12-\o400 PHC Pile

2250x2

( PCD = 2000, 3800 )


* ANCHOR BOLT
1X8-M12 ANC. BOLTS (TYPE TYPE L)

D19@300
D19@300

* OUTPUT UNIT : mm

ACI PROJECT
100 75

700
550
75

75 50
TYP.
22.5

45

FOUNDATION DETAIL FOR


F4

D16

6-D19

600

50
100

D19

SQUAD CHECK

700

D16
@200

1500

TOG EL. + 800

FOOTING REINF. PLAN

75 PROJ.

25 GR.

FOUNDATION PLAN

LEAN CONC. 50 THK

150

PEDESTAL

PROCESS PIPING

SECTION

SCALE
REV.

Copyright (c) GS E&C. All Rights Reserved

DATE

DESCRIPTION

DRWNCHKD APPD APPD APPD

AS SHOWN

VESSELS STRUCT.

JOB NO.

ACI_SI

ELEC.

INST.

MICROFILM NO.

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : ACI_SI


Client : SI

Page 11

3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : ft

F3

Ft. Type

ISO

Area

235.084 ft

Ft. Thickness

2.30 ft

Ft. Volume

539.891 ft

Ft. Weight

80.890 kips

Soil Height

2.30 ft

Soil Volume

527.778 ft

Soil Weight

65.895 kips

Buoyancy

Not Consider

Self Weight (except Pr.SW)

146.786 kips

2.3

5.91

17.06

13.78

Ft. Name

2.3

The Origin coordinate


The Center of Gravity (0,0) ft
The Center of Pile (0,-0.23) ft

F4

Ft. Type

ISO

Area

217.969 ft
1.97 ft

Ft. Volume

429.073 ft

Ft. Weight

64.287 kips

Soil Height

2.30 ft

Soil Volume

491.086 ft

Soil Weight

61.314 kips

Buoyancy

Not Consider

Self Weight (except Pr.SW)

125.601 kips

The Center of Gravity & Pile (0,0) ft

Copyright (c) GS E&C. All Rights Reserved

1.97

The Origin coordinate

Ft. Thickness

4.92

14.76

14.76

Ft. Name

2.3

Unit : ft

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : ACI_SI


Client : SI

Page 12

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : ft , Weight : kips , Area : ft )

Ft.Name

Pr.Name

Shape

F3

Rectangle

Pl
2.297

Pw
2.297

Ph
5.906

Area
5.274

Weight
4.667

Off X
-2.297

Off Y
-3.281

F4

Circle

2.297

2.297

4.921

4.142

3.054

4.101

-3.281

3.3 SECTION DATA


Ft.Name / Sec.Name

F3 / S1

Ft.Name / Sec.Name

F4 / S1

Unit : ft

Unit : ft

14.76

14.76

17.06

13.78

Direction

All Direct

F.Volume

539.891 ft

Section Area

235.084 ft

Direction

All Direct

F.Weight

80.890 kips

F.Volume

429.073 ft

Section Area

217.969 ft

3
3

F.Weight

64.287 kips

S.Volume

527.778 ft

S.Weight

65.895 kips

S.Volume

491.086 ft

S.Weight

61.314 kips

Pier Wt

4.667 kips

Total Weight

151.452 kips

Pier Wt

3.054 kips

Total Weight

128.655 kips

3.4 LOAD CASE


Fz
Fy

Mz

Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch)
are based on the right hand rule.

My
Fx
Mx

Index

Load Case Name

SW

DL

LL

WL

SL2

Unit( kips , kips-ft )

Ft.Name

F3

Pr.Name

Load Case

Fy

Fz

Mx

My

0.000

0.000

-4.667

0.000

0.000

0.000

0.000

-88.185

0.000

0.000

0.000

0.000

-220.462

0.000

0.000

88.185

0.000

0.000

0.000

578.641

0.000

154.324

0.000

-361.651

0.000

0.000

0.000

-146.786

0.000

0.000

0.000

0.000

-3.054

0.000

0.000

Footing SW
F4

Fx

Copyright (c) GS E&C. All Rights Reserved

2/9/2015

Calculation Sheet
of
Foundation

Project Na. : ACI


Project No. : ACI_SI
Client : SI

Page 13

0.000

0.000

-132.277

0.000

0.000

0.000

-264.555

0.000

0.000

-44.092

0.000

0.000

0.000

-506.311

0.000

-66.139

0.000

289.320

0.000

0.000

0.000

-125.601

0.000

0.000

Footing SW

0.000

3.5 LOAD COMBINATION


In Pier Top
without Self Weight

In Footing Bottom
In Footing Bottom Center
with Pier Self Weight,
with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.5.1 Load Combination in Pier Top (Without SW)


Ft.Name

F3

F4

SFx

SFy

SFz

SMx

SMy

0.000

0.000

-308.647

0.000

0.000

88.185

0.000

-52.911

0.000

578.641

0.000

108.026

-52.911

-253.155

0.000

66.139

0.000

-253.532

0.000

433.981
0.000

Pr.Name L.Comb.

Unit( kips , kips-ft )

0.000

81.020

-253.532

-189.867

101

0.000

0.000

-458.561

0.000

0.000

102

141.096

0.000

-79.366

0.000

925.826

103

0.000

154.324

-79.366

-361.651

0.000

104

141.096

0.000

-326.284

0.000

925.826

105

0.000

154.324

-326.284

-361.651

0.000

0.000

0.000

-396.832

0.000

0.000

-44.092

0.000

-79.366

0.000

-506.311

0.000

-46.297

-79.366

202.524

0.000

-33.069

0.000

-330.693

0.000

-379.733

0.000

-34.723

-330.693

151.893

0.000

101

0.000

0.000

-582.020

0.000

0.000

102

-70.548

0.000

-119.050

0.000

-810.097

103

0.000

-66.139

-119.050

289.320

0.000

104

-70.548

0.000

-423.287

0.000

-810.097

105

0.000

-66.139

-423.287

289.320

0.000

3.5.2 Load Combination in Footing Bottom (With Pier SW)


Ft.Name
F3

Unit( kips , kips-ft )

SFx

SFy

SFz

SMx

SMy

0.000

0.000

-313.314

0.000

0.000

88.185

0.000

-55.711

0.000

1301.942

0.000

108.026

-55.711

-1139.199

0.000

66.139

0.000

-258.198

0.000

976.457

0.000

81.020

-258.198

-854.400

0.000

101

0.000

0.000

-464.161

0.000

0.000

102

141.096

0.000

-83.566

0.000

2083.108

Pr.Name L.Comb.

Copyright (c) GS E&C. All Rights Reserved

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

F4

Project No. : ACI_SI


Client : SI

Page 14

103

0.000

154.324

-83.566

-1627.428

0.000

104

141.096

0.000

-331.884

0.000

2083.108

105

0.000

154.324

-331.884

-1627.428

0.000

0.000

0.000

-399.886

0.000

0.000

-44.092

0.000

-81.199

0.000

-810.097

0.000

-46.297

-81.199

521.500

0.000

-33.069

0.000

-333.748

0.000

-607.573
0.000

0.000

-34.723

-333.748

391.125

101

0.000

0.000

-585.686

0.000

0.000

102

-70.548

0.000

-121.799

0.000

-1296.156

103

0.000

-66.139

-121.799

745.000

0.000

104

-70.548

0.000

-426.953

0.000

-1296.156

105

0.000

-66.139

-426.953

745.000

0.000

3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
: PileType
- C.G. of Load is coordinate from left bottom. Unit : ft
p

Ft.Name

F3 p

F4 p

L.Comb.

SFx

Unit( kips , kips-ft )

SFy

SFz

SMx

SMy

C.G. of Loads

0.000

0.000

-460.099

920.140

-719.553

5.3 , 6.3

88.185

0.000

-143.782

149.089

1173.997

6.3 , 7.6

0.000

108.026

-143.782

-990.110

-127.945

6.3 , 7.6

66.139

0.000

-404.984

752.225

383.482

5.4 , 6.4

0.000

81.020

-404.984

-102.174

-592.975

5.4 , 6.4

0.000

0.000

-525.487

1311.963

1639.954

10.5 , 4.9

-44.092

0.000

-156.560

266.401

-477.096

9.0 , 6.1

0.000

-46.297

-156.560

787.901

333.001

9.0 , 6.1

-33.069

0.000

-459.349

1094.973

761.143

10.4 , 5.0

0.000

-34.723

-459.349

1486.098

1368.716

10.4 , 5.0

Load Combination of Ultimate Condition


: PileType
- C.G. of Load is coordinate from left bottom. Unit : ft
p

Ft.Name

F3 p

F4 p

Sec.Na

S1

S1

L.Comb.

SFx

Unit( kips , kips-ft )

SFy

SFz

SMx

SMy

C.G. of Loads

101

0.000

0.000

-464.161

1414.109

-1065.988

5.1 , 6.0

102

141.096

0.000

-83.566

254.593

1891.190

6.1 , 7.3

103

0.000

154.324

-83.566

-1372.835

-191.918

6.1 , 7.3

104

141.096

0.000

-331.884

1011.114

1320.906

5.3 , 6.3

105

0.000

154.324

-331.884

-616.314

-762.201

5.3 , 6.3

101

0.000

0.000

-585.686

1921.540

2401.926

10.8 , 4.7

102

-70.548

0.000

-121.799

399.602

-796.654

9.4 , 5.8

103

0.000

-66.139

-121.799

1144.602

499.502

9.4 , 5.8

104

-70.548

0.000

-426.953

1400.764

454.798

10.6 , 4.8

105

0.000

-66.139

-426.953

2145.764

1750.954

10.6 , 4.8

Copyright (c) GS E&C. All Rights Reserved

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : ACI_SI


Client : SI

Page 15

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Bi-Axial)
4.1.1 Formula
if footing is checked in Buoyancy SFz means SFz - Fb
SFz
SMy X
SMx Y
a. Vertical - Bi Axial : R =
2
2
S Xi
S Yi
Np
- Ru = Rmax
- Uf = Min[ 0 , Rmin ]
- Ru < Va => OK
2
2
(SHxi + SHyi )
b. Horizontal - Hmax =
< Ha => OK
Np
c. Uplift - Uf < Ua => OK
Ver. / Uf. = Vertical / Uplift

4.1.2 Check of Vertical & Uplift Reaction


Ft.Name

Np(EA)

Fl (ft)

Fw (ft)

SXi (ft )

SYi (ft )

F3

21

13.78

17.06

306.77

448.24

F4

12

14.76

14.76

176.96

176.96

Unit( kips )

Ft.Name

F3

F4

L.Comb.

Pile

R Max

PHC Pile

PHC Pile

Uf

Ra

Ua

Result

46.441

-3.584

66.139

22.046

OK

27.785

-14.247

66.139

22.046

OK

-9.182

23.911

-9.182

66.139

22.046

OK

1.728

36.055

66.139

22.046

OK

30.347

66.139

22.046

OK

117.319

-29.738

66.139

22.046

NG

31.566

-5.473

66.139

22.046

OK

40.967

-14.874

66.139

22.046

OK

84.513

-7.954

66.139

22.046

NG

109.389

-32.831

66.139

22.046

NG

R Min

Ru

46.441

-3.584

27.785

-14.247

PHC Pile

23.911

PHC Pile

36.055

PHC Pile

30.347

8.33

PHC Pile

117.319

-29.738

PHC Pile

31.566

-5.473

PHC Pile

40.967

-14.874

PHC Pile

84.513

-7.954

PHC Pile

109.389

-32.831

4.1.3 Check Of Horizontal Reaction


Ft.Name

F3

F4

L.Comb.

Pile

Hmax (kips)

Ha (kips)

Result

PHC Pile

4.409

OK

PHC Pile

4.199

4.409

OK

PHC Pile

5.144

4.409

NG

PHC Pile

3.149

4.409

OK

PHC Pile

3.858

4.409

OK

PHC Pile

4.409

OK

PHC Pile

3.674

4.409

OK

PHC Pile

3.858

4.409

OK

PHC Pile

2.756

4.409

OK

PHC Pile

2.894

4.409

OK

Copyright (c) GS E&C. All Rights Reserved

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : ACI_SI


Client : SI

Page 16

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data
Ft.Name
F3

Unit( ft , kips , kips-ft )

Sec.Na

Dir.

L.Comb.

Fl or Fw

Sl or Sw

SFz

SM

SQ

101

13.78

17.06

464.161

-1065.99

464.161

102

13.78

17.06

83.566

1891.19

83.566

103

13.78

17.06

83.566

-191.92

83.566

104

13.78

17.06

331.884

1320.91

331.884

105

13.78

17.06

331.884

-762.20

331.884

101

17.06

13.78

464.161

1414.109

464.161

102

17.06

13.78

83.566

254.593

83.566

103

17.06

13.78

83.566

-1372.835

83.566

104

17.06

13.78

331.884

1011.114

331.884

105

17.06

13.78

331.884

-616.314

331.884

101

14.76

14.76

585.686

2401.93

585.686

102

14.76

14.76

121.799

-796.65

121.799

103

14.76

14.76

121.799

499.50

121.799

104

14.76

14.76

426.953

454.80

426.953

105

14.76

14.76

426.953

1750.95

426.953

101

14.76

14.76

585.686

1921.540

585.686

102

14.76

14.76

121.799

399.602

121.799

103

14.76

14.76

121.799

1144.602

121.799

104

14.76

14.76

426.953

1400.764

426.953

105

14.76

14.76

426.953

2145.764

426.953

S1

S1

F4 p

S1

S1

5.1.2 Design Parameters


Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation)
Loc. : Location of Critical Point from left side of footing
Unit(psi,in)

f(Flexure)

f(Shear)

fck

fy1

fy2

f_cl

f_clt

fp_clb

0.9

0.85

3982.59

39825.90

59738.13

2.0

2.0

5.9

Copyright (c) GS E&C. All Rights Reserved

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : ACI_SI


Client : SI

Page 17

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage And Temperature Reinforcement
---- ACI CODE 7.12.2
As As1 = fac b h
, fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used ........................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used....................................0.0018
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used .......................................................................................................
fy
- Required Reinforcement by Analysis
As As2 = r.req b d
- At every section of flexural members where tensile reinforcement is required
3 fck
200
As (As5 =
bw d) (As4 =
b d)
---- ACI Eq (10-3)
fy
fy
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis
---- ACI CODE 10.5.3
As3 = 1.333 r.req b d
Asmax = 0.75 rb b d
fck
0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
2Rn
Rn =
, r.req =
1- 12 , f = 0.9
fbd
fy
0.85fck

5.2.2 Check of Footing Reinforcement


Footing Name : F3
GroupType : Isolated
- X direction (Unit Width)

Sec.Nam

L.Comb.

Loc. (ft)

Width b (ft)

d (in)

As (in )

105

top

Not Used

6.890

1.000

25.591

0.000

104

botom

1.02 - D16 @ 11.81

5.741

1.000

21.341

0.314

S1

Sec.Nam

L.Comb.

Mu (kips-ft)

r.Req

Rn

105

top

104

bottom

306.394

747.527

0.0215

S1

Sec.Nam

Using Bar (in)

L.Comb.

As1(in )

As2(in )

As3(in )

As4(in )

As5(in )

Asmax(in )

105

top

104

bottom

0.661

5.502

7.334

1.286

1.217

9.461

S1

Sec.Nam

L.Comb.

Using As(in )

Select As(in )

Result

105

top

104

bottom

0.314

5.502

NG

S1

Copyright (c) GS E&C. All Rights Reserved

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : ACI_SI


Client : SI

Page 18

- Y direction (Unit Width)

Sec.Nam

L.Comb.
105

top

105

botom

Loc. (ft)

Width b (ft)

d (in)

As (in )

Not Used

8.530

1.000

24.841

0.000

0.76 - D22 @ 15.75

6.398

1.000

20.591

0.456

S1

Sec.Nam
S1

Sec.Nam
S1

Sec.Nam

Using Bar (in)

Mu (kips-ft)

Rn

r.Req

105

top

105

bottom

347.384

910.397

0.0272

L.Comb.

L.Comb.

As1(in )

As2(in )

As3(in )

As4(in )

As5(in )

Asmax(in )

105

top

105

bottom

0.661

6.725

8.964

1.241

1.175

9.129

L.Comb.

Using As(in )

Select As(in )

Result

105

top

105

bottom

0.456

6.725

NG

S1

Footing Name : F4
GroupType : Isolated
- X direction (Unit Width)

Sec.Nam

L.Comb.

Loc. (ft)

Width b (ft)

d (in)

As (in )

101

top

1.52 - D19 @ 7.87

7.087

1.000

21.278

0.675

104

botom

1.52 - D16 @ 7.87

10.466

1.000

17.404

0.468

S1

Sec.Nam

Mu (kips-ft)

Rn

r.Req

101

top

62.325

152.959

0.0026

104

bottom

257.981

946.391

0.0286

L.Comb.

S1

Sec.Nam

Using Bar (in)

L.Comb.

As1(in )

As2(in )

As3(in )

As4(in )

As5(in )

Asmax(in )

101

top

0.255

0.669

0.892

0.855

0.809

5.426

104

bottom

0.283

5.965

7.951

1.049

0.993

7.716

S1

Sec.Nam

L.Comb.

Using As(in )

Select As(in )

Result

101

top

0.675

0.855

NG

104

bottom

0.468

5.965

NG

S1

- Y direction (Unit Width)

Sec.Nam

L.Comb.

Loc. (ft)

Width b (ft)

d (in)

As (in )

103

top

1.02 - D19 @ 11.81

5.118

1.000

20.589

0.453

101

botom

1.02 - D19 @ 11.81

5.118

1.000

16.715

0.453

S1

Sec.Nam

L.Comb.

Mu (kips-ft)

Rn

r.Req

103

top

104.643

274.293

0.0048

101

bottom

81.599

324.527

0.0086

S1

Sec.Nam

Using Bar (in)

L.Comb.

As1(in )

As2(in )

As3(in )

As4(in )

As5(in )

Asmax(in )

103

top

0.255

1.185

1.579

0.827

0.783

5.250

101

bottom

0.283

1.721

2.294

1.007

0.953

7.410

S1

Copyright (c) GS E&C. All Rights Reserved

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation
Sec.Nam

L.Comb.

Project No. : ACI_SI


Client : SI

Page 19

Using As(in )

Select As(in )

Result

103

top

0.453

1.185

NG

101

bottom

0.453

1.721

NG

S1

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.85 2 fck B'w d
(eq 11-3)
- Vu <= f Vc , then OK!!

5.3.2 Check of One-Way Shear


Footing Name : F3

GroupType : Isolated

PileType : True
Unit : in

93.15

204.72

165.35

68.9

- X direction One-Way Shear (Unit Width)

Sec.Nam

S1

d (in)

Bw (in)

fVc (kips)

Vu (kips)

Result

101

41.34

21.3

12

27.474

13.788

OK

102

73.86

21.3

12

27.474

15.247

OK

103

41.34

21.3

12

27.474

2.482

OK

104

68.9

21.3

12

27.474

20.003

OK

105

41.34

21.3

12

27.474

9.858

OK

d (in)

Bw (in)

fVc (kips)

Vu (kips)

Result

L.Comb.

Loc. (in)

- Y direction One-Way Shear (Unit Width)

Sec.Nam

S1

L.Comb.

Loc. (in)

101

49.21

20.6

12

26.508

16.185

OK

102

49.21

20.6

12

26.508

2.914

OK

103

93.15

20.6

12

26.508

12.841

OK

104

49.21

20.6

12

26.508

11.573

OK

105

93.15

20.6

12

26.508

17.972

OK

Copyright (c) GS E&C. All Rights Reserved

2/9/2015

Calculation Sheet
of
Foundation
Footing Name : F4

GroupType : Isolated

Project Na. : ACI


Project No. : ACI_SI
Client : SI

Page 20

PileType : True
Unit : in

37.01

177.17

177.17

125.59

- X direction One-Way Shear (Unit Width)

Sec.Nam

S1

L.Comb.

Loc. (in)

d (in)

Bw (in)

fVc (kips)

Vu (kips)

Result

101

125.59

17.4

12

22.405

11.808

OK

102

118.7

17.4

12

22.405

11.089

OK

103

125.59

17.4

12

22.405

2.455

OK

104

125.59

17.4

12

22.405

17.132

OK

105

125.59

17.4

12

22.405

8.607

OK

d (in)

Bw (in)

fVc (kips)

Vu (kips)

Result

- Y direction One-Way Shear (Unit Width)

Sec.Nam

S1

L.Comb.

Loc. (in)

101

37.01

16.7

12

21.518

15.552

OK

102

37.01

16.7

12

21.518

3.234

OK

103

37.01

16.7

12

21.518

6.482

OK

104

37.01

16.7

12

21.518

11.337

OK

105

37.01

16.7

12

21.518

14.585

OK

Copyright (c) GS E&C. All Rights Reserved

2/9/2015
Project Na. : ACI

Calculation Sheet
of
Foundation

Project No. : ACI_SI


Client : SI

Page 21

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.85 2 (1 + 2/b c) fck bo d
(eq 11-33) <- Vc1
(b) f Vc2 = 0.85 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.85 4 fck bo d
(eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3)
ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear


Ft.Name
13.78

Pr.Name

101 f Vc2

1424.996 kips

Pl

27.56 in f Vc3

895.638 kips

Pw

27.56 in f Vc

895.638 kips

17.06

bo / d
bc / as
Ft.Name
Pr.Name

14.76

1 / 40 Result
F4 Punching Area
4 Pile effect

452.936 kips

OK
2

1585.239 in

11 / 12
790.893 kips

101 f Vc2

913.517 kips

Pl

27.56 in f Vc3

527.262 kips

Pw

27.56 in f Vc

527.262 kips

L.Comb.

bo / d
bc / as

Copyright (c) GS E&C. All Rights Reserved

195.6 / 21.34 in Vu

Circle f Vc1

Shape

20.492 / 21
1343.458 kips

L.Comb.

14.76

3 Pile effect

2391.171 in

Rectangle f Vc1

Shape

F3 Punching Area

141.2 / 17.4 in Vu
1 / 40 Result

536.878 kips

NG

2/9/2015

Calculation Sheet
of
Foundation

Project Na. : ACI


Project No. : ACI_SI
Client : SI

Page 22

5.5 PILE PUNCHING SHEAR FORCE


5.5.1 Pile Punching Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.85 2 (1 + 2/bc)

fck bo d

(b) f Vc2 = 0.85 2 (1 + as d / 2 b o)


(c) f Vc3 = 0.85 4

(eq 11-33)

fck bo d (eq 11-34)

fck bo d

(eq 11-35)

f Vc = Min(f Vc1 , f Vc2 , f Vc3)

<- Vc1
<- Vc2

<- Vc3

ACI 318-05 CODE 11.12.2.1

f Vc , then OK

Vu

where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
b o = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.5.2 Check of Pile Punching Shear

13.78

Ft.Name

F3 Punching Area

Pile No.

15 bc / as

17.06

10

11

12

13
14
15

16
17
18

800.293 kips

101 f Vc2

1243.941 kips

PileName

PHC Pile f Vc3

533.528 kips

Diameter

15.75in f Vc

533.528 kips

L.Comb.

19
20
21

bo
d

14.76

12

14.76

Pile No.

11 bc / as

3
8

66.970 kips

OK
2

823.701 in

1 / 30

Circle f Vc1

473.179 kips

101 f Vc2

645.141 kips

PileName

PHC Pile f Vc3

315.453 kips

Diameter

15.75in f Vc

315.453 kips

bo

84.48in Vu

145.978 kips

L.Comb.
11

21.34in Result
F4 Punching Area

Shape
1

116.52in Vu

Ft.Name

5
6

1 / 40

Circle f Vc1

Shape
1

1080.365 in

10
9

Copyright (c) GS E&C. All Rights Reserved

17.4in Result

OK

Das könnte Ihnen auch gefallen