Sie sind auf Seite 1von 3

VAPOUR RECOVERY SYSTEM TO COMPLY EMISSION NORMS

AT TALEGAON DEPOT

SPECIFICATIONS FOR
STRUCTURAL WORKS

Page 1 of 3

VAPOUR RECOVERY SYSTEM TO COMPLY EMISSION NORMS


AT TALEGAON DEPOT
SPECIFICATION FOR STRUCTURAL WORKS
1. Wind Loads
Wind loads shall generally be as per IS: 875.
The basic wind speed of the site is taken as 47 m/s.
Values of coefficients k1, k3 shall be as:
k1 = 1 for permanent structures
k3 = 1 Value of coefficient k2, as in IS: 875, shall be suitably taken for relevant class of structure
with Category 3 terrain w.r.t. actual height of the structure for UNITS and Category 2 for
remaining areas. The mean probable design life of all structures (units & offsite) shall be taken
as 50 years. To account for surface area of piping, platforms and other attachments fixed to the
equipment the surface area of the equipment (vessel/column) exposed to wind shall be increased
by 20%.
2. Seismic Loads
Seismic forces shall designed as per Zone 4 of IS: 1893

3. Anchor Bolt Design


- Grade of concrete is M30 for foundations and M25 for superstructure conforming to IS:
456:2000
- Permissible bearing Stress in concrete is 12 & 10 N/mm2 for M30 & M25 respectively.
- Maximum Permissible stresses in mild steel bolts of property class 4.6 (IS: 1367-1967) shall
be:
Axial Tension 120 N/mm2
Shear 80 N/mm2
Bearing 250 N/mm2
4. Structural Steel Materials:
Hot Rolled Structural Steel Sections shall conform to the following BIS Codes of practice:
IS: 808 Indian Standard on dimensions of Hot Rolled Steel Beams, Columns, Channel and
Angles
IS: 12778Indian Standard on Hot Rolled Parallel Flanged Steel Sections for Beams,
Columns and Bearing Piles
IS: 2062Indian Standard on Steel for General Structure purposes Specifications
5. GRATINGS
Floor gratings shall be fabricated from mild steel. These shall be honey combed type and as per
attached standard drawing.
6. HANDRAILS
Hand rails shall be pipe conforming to IS: 1239 with top rail as 32 NB (M) and vertical stands of
ISA 75 x 75 @ 1.5 M Centre to centre with toe guard of 100 mm flat section and mid guard of 50
mm flat section.
Page 2 of 3

VAPOUR RECOVERY SYSTEM TO COMPLY EMISSION NORMS


AT TALEGAON DEPOT
7. LADDERS
Ladders shall be as per bidders standard specifications and a copy of the same shall be attached
to offer.
8. LOADING
Live loading on service Platform shall be - 3.0 kN/m2
9. PAINTING
All steel structures, equipment, vessels, pipelines, the underside of the skid and bought in item
MS must be shot blast to (SA 2 ), prior to painting. One coat (DFT 60 microns) of inorganic
Zinc Silicate primer followed by one suitable intermediate epoxy based tie coat (DFT 50 microns
max) and two coats (each 75 micron DFT) of high built polyamide cured epoxy paint will be
provided (total DFT 260 microns max).Underside of skid and vessel skirts to be painted with two
coats of coal tar epoxy paint, total DFT 200 microns after shot blasting to SA 2 .
10. STRUCTURAL DRAWINGS TO BE REVIE WED
Following drawings shall be got reviewed by Owner/Owners representative:
i. General Arrangement of skids
ii. General Arrangement of platforms
iii. Foundation Loading Plan

Page 3 of 3