Beruflich Dokumente
Kultur Dokumente
Captulo 2: VARADA
Captulo 2: Varada
Introduccin
La princesa varada
Captulo 2: Varada
Captulo 2: Varada
Captulo 2: Varada
Captulo 2: Varada
May 23, 2007: Pasha Bulker anchored about two miles off the coast near Newcastle
(Australia) and joined the queue of 57 ships to wait its turn for loading coal.
June 7: The Bureau of Meteorology issued a gale warning for the area. At midday, Pasha
Bulker's master deployed additional anchor cable and decided to monitor the weather and
the ship's anchor position. By midnight, the southeast wind was gusting to 30 knots and
ships began dragging their anchors.
6am, June 8: Pasha Bulker is amongst 27 ships still at anchor despite gusting winds of
nearly 50 knots.
6.37am: The master of the Pasha Bulka was certain that the anchor was dragging and he
decided to weigh anchor.
7.48am: The carrier got underway for more than an hour, moving in a northeast direction
parallel to the coast.
9.06am: The master decided to alter course in a southerly direction. The course change in
the extreme weather was poorly controlled and the ship then rapidly approached Nobbys
Beach.
http://www.smh.com.au/interactive/2008/national/pasha-bulker/index.html
Captulo 2: Varada
Captulo 2: Varada
Accidental.
Captulo 2: Varada
Generalidades
Al varar, el buque queda soportado en
parte por el empuje del agua y en parte
por el fondo, siendo en este caso el
equilibrio
de
fuerzas
entre
el
desplazamiento y el empuje y la reaccin.
Captulo 2: Varada
Captulo 2: Varada
11
Clculo de la reaccin
Captulo 2: Varada
I I
e
R
Tc Tc
Captulo 2: Varada
D=E1+e
D=E1+R
13
Clculo de la reaccin
Captulo 2: Varada
I I av
14
R
Tc
Rd V
a
Mu
dV V F
I
Captulo 2: Varada
Rd V
Rd V
a
dV
av dV
MuE
MuE
E
2
Rd V
R
I I av
Tc MuE
I TcEMu
2
EMu TcdV
I valor negativo
15
Captulo 2: Varada
16
Captulo 2: Varada
Rd vertical
GG f
Di R
d vertical KV KGi KGi
KG f KGi GG f
GM f KM f KG f
17
Captulo 2: Varada
18
Captulo 2: Varada
tan
LCG f
GM cf
Rdt
GGt
( Di R )
dt LCV LCGi
Normalmente LCGi 0
LCG f LCGi GGt
19
Captulo 2: Varada
1.Clculo de la reaccin
ITcEMu
R
2
EMuIT
TcdEMu
V
C
R
I valorEMu
negativo
TCdv2
dv V F
20
Captulo 2: Varada
(R)
R
I
I T
Tc C
(R)
TC
Mu
dV V F
Mu
a
av a dv
a
av EdV
av dv
E
E
II
II a av
v
I I av
21
Captulo 2: Varada
Rd vertical
GGV
Di R
d v KV KGi 0 KGi KGi
KG f KGi GGv
GM f KM f KG f
22
Captulo 2: Varada
tan
LCG f
GM cf
Rdt
GGt
( Di R )
dt LCV LCGi
LCG f LCGi GGt
23
Ejercicio 1
Captulo 2: Varada
24
Ejercicio 2
Captulo 2: Varada
25
Ejercicio 3
Captulo 2: Varada
26
Captulo 2: Varada
28
Captulo 2: Varada
29
Captulo 2: Varada
30
Captulo 2: Varada
31
Captulo 2: Varada
Captulo 2: Varada
32
Captulo 2: Varada
33
Captulo 2: Varada
34
Ejercicio 5
Captulo 2: Varada
35
Ejercicio 6
Captulo 2: Varada
36
Captulo 2: Varada
Descarga de pesos
Traslado de pesos
Carga de pesos
Combinacin de las operaciones anteriores
37
Captulo 2: Varada
p ( R)
38
Captulo 2: Varada
I I ' av'
I bajada de la marea
Bajada de la marea
I' inmersion producida por la descarga de
Inmersin producida
' por la descarga de los pesos, que ser
negativa
v
av
de los pesos
39
40
Captulo 2: Varada
Captulo 2: Varada
p
I'
Tc
Cml Cm I
Si las Tc son muy diferentes entre Cm y Cm l se deber coger un valor intermedio
pd F
a'
datos de las C.H. con el Cm l
Mu
a 'Mu
dF
p
a'V E
a 'V EMu
a'
dF
dV
dV p
dV V F
41
Captulo 2: Varada
42
Captulo 2: Varada
p
I'
Tc
pd F dV
a 'V
EMu
p pd F dV
I I ' a'V
Tc
EMu
43
Captulo 2: Varada
ITcEMu
p
EMu TcdFdV
dF g F
dV V F
44
Captulo 2: Varada
p ( pd
Tc
)dV
EMu
45
Traslado de pesos
Captulo 2: Varada
I aV'
a'
( pd )
l
Mu
d l distancia longitudin al entre la posicin inicial y la inical de cada uno de los pesos
Para un solo peso :
pd l
a'
Mu
46
Captulo 2: Varada
aV'
a'
dV
E
a'V
pd l dV
EMu
Si la incgnitaes la dl :
dl
IEMu
pdV
Captulo 2: Varada
Traslado de pesos
48
Captulo 2: Varada
Carga de pesos
49
Captulo 2: Varada
Ejercicio 7
Captulo 2: Varada
51
Entrada a dique
Dique Seco. Esclusa donde se introduce el buque y
una vez cerrada, se bombea el agua del interior hasta
dejar apoyada la embarcacin sobre una cama o
picadero.
Captulo 2: Varada
52
Entrada a dique
Captulo 2: Varada
53
Entrada a dique
Captulo 2: Varada
Captulo 2: Varada
Entrada en dique
55
Captulo 2: Varada
Mtodos de clculo
A partir de los cuales la altura metacntrica efectiva podra
ser calculada en cualquier momento durante el proceso de
entrada en dique.
Captulo 2: Varada
57
Captulo 2: Varada
Rdl Mua
Mua
R
dl
58
Captulo 2: Varada
59
Captulo 2: Varada
60
Captulo 2: Varada
61
Captulo 2: Varada
(W P)y Px
(W P)MM 1 sin PKM 1 sin
(W P)MM 1 PKM 1
W MM 1 PMM 1 PKM 1
W MM 1 PKM 1 PMM 1 P( KM 1 MM 1 ) P(KM )
P(KM )
MM 1
W
62
W actuando en M1
W actuando en G
Captulo 2: Varada
W GM1sin
La altura metacntrica original se ha reducido a GM1, y MM1
es la prdida virtual de la altura metacntrica producida por la
varada en dique seco.
63
Ejercicio 8
Captulo 2: Varada
64
Captulo 2: Varada
Ejercicio 9
Un buque de 3000 Tm de desplazamiento tiene 100 m
de eslora, un KM=6m, KG=5,5m. El centro de flotacin
est a 2 metros de popa de la cuaderna maestra,
Mu=40 Tmm/cm.
Hallar el asiento mximo para que el buque pueda
entrar en dique seco si la altura metacntrica en el
instante crtico antes de que el buque se asiente del
todo no puede ser inferior a 0,3 m.
(A=120 cm desde la popa)
65
Ejercicio 10
Captulo 2: Varada
(prdida virtual=1,44m)
66
Captulo 2: Varada
Ejercicio 11
Un buque de 8000 Tm vara en un banco de arena
cuando disminuye la marea con un calado de 5,2m y
un KG=4m. Se calcula que la sonda bajar hasta los
3,2m. Calcular el GM en este momento asumiendo que
el KM ser de 5m y que el Tc medio es de 15 Tm/cm.
(GM=-0,88m)
67