KMAC PERSONNEL
Item
SUBCONTRACTOR
DESCRIPTION
Jayasankar
Arun
1.0
HULL LOADOUT
Tony B
Tony K
Bill
Ramon
Richard
Manoj
Anatoily
Loadout of Hull
1.6
1.7
Sendhil
Snehal
Ravi
Ronnie
Al Jaber
Dry Docks
Varco
Load Master
MES
Amasco
AST
S
S
2.4
2.5
2.6
2.7
2.8
2.9
JACK HOUSE
S
S
RigFit
Thermo
ATHE
STS
2.3
3.0
Gulf Engg
IGOMS
1.5
2.0
Ajai
S
S
S
S
3.1
3.2
3.3
4.0
JACKING SYSTEM
S
S
4.1
Cable Installation
4.2
Equipment Installation
4.3
4.4
Motor Installation
5.0
S
S
S
S
HELIDECK
5.1
Support Structure
5.2
5.3
5.4
Helideck Lighting
5.5
5.6
6.0
PIPING
6.1
S
S
S
All Systems
7.0
SECONDARY STRUCTURES
S
S
7.1
Accommodation Walkways
7.2
Hull Handrails
7.3
7.4
7.5
7.6
7.7
7.8
Pipe Penetraions
S
S
Page 1 of 2
Responsibility Matrix
KMAC PERSONNEL
Item
SUBCONTRACTOR
DESCRIPTION
8.0
CANTILEVER
Tony B
Tony K
Bill
Ramon
Richard
Manoj
Anatoily
Jayasankar
Arun
Ajai
Sendhil
Ravi
Ronnie
Al Jaber
Dry Docks
Varco
Load Master
MES
Amasco
AST
IGOMS
Gulf Engg
RigFit
Thermo
ATHE
8.1
Structure
8.2
Secondary Steel
8.3
8.4
Pipe Rack
8.5
S
S
S
8.6
Hydraulic Piping
9.1
Structure
9.2
Equipment Foundation
9.3
9.4
Wind Wall
9.5
Hydraulic Piipng
9.6
9.7
HP System Piping
9.8
9.0
DRILL FLOOR
10.0
S
DERRICK
S
S
10.1 Structure
10.2 Piping
10.3 Cable
Snehal
S
S
LEGS
S
S
S
S
S
S
11.0
Page 2 of 2
STS