Jebel Ali LII Desalination Plant Dubai

One EDL boiler F5 480 t/h.

Plant info
Dubai Electricity & Water Authority (DEWA) owns and operates a large power and
desalination station complex at Jebel Ali, Dubai. To meet the ever growing demand of
power and water, DEWA is adding a Power and Desalination Station L which will consist
of two identical phases, Phase I & II. The estimated total installed capacity of Station L
when both Phases I & II are completed shall be around 1400 MW power and 140 MIGD
water. Station LII includes 4 HRSGs and one Auxiliary boiler. NEM Industrial & Utility
boilers will supply the 480 t/h auxiliary boiler, NEM Leiden will supply the 4 HRSGs.

NEM scope of supply

Design
Manufacture
Delivery
Feed Water system incl. Pumps and deaerator
Air preheater
Site advisory services.

Jebel Ali LII

18 nov 05

Page 1 of 2

Specific project data


General
Project name:
Plant location:
Customer:
End user:
Year of operation:

Jebel Ali LII


Jebel Ali, Dubai
Hyundai Engineering & Construction.
DEWA
2007

Auxiliary Boiler
Number of units: 1
Type:
EDL
Output:
480 t/h
Main fuel:
NG
Back-up fuel:
Light Fuel Oil
Performance:
Steam flow [k/s]
Steam pressure [bara]
Steam Temperature [oC]

Jebel Ali LII

133.3
104
565

18 nov 05

Page 2 of 2

Rabigh Refinery Plant Saudi Arabia


One Flue Gas Cooler for FCC unit 230 t/h

Plant info
Petro Rabigh, A Joint Venture of Saudi Aramco and Sumitomo Chemical are planning the
worlds largest integrated refining and petrochemical complex at Rabigh. The High Olefin
FCC and Ethane Cracker are the main facilities of the Complex, producing approximately
1.3 million tons per year of ethylene and 900,000 tons per year of propylene. JGC from
Japan is constructing the High Olefins plant according to the Stone & Webster FCC
technology. The plant will be built on the Red Sea coast at Rabigh, approximately 140
kilometers north of Jeddah. Construction work on this plant will start in 2006. NEM will
provide the Flue Gas Cooler to cool down the gases coming from the HOFCC unit.

NEM scope of supply

Design
Manufacture
Delivery

OSF Fertilizer plant

17 nov 05

Page 1 of 2

Specific project data


General
Project name:
Plant location:
Customer:
End user:
Year of operation:

Rabigh Refinery Project


Rabigh, Saudi Arabia
JGC Corporation
Petro Rabigh
2007

Flue Gas Cooler


Number of units:
Type:
Output:
Main fuel:

1
FGC
229 t/h
Unfired

Performance:
Steam flow [k/s]
Steam pressure [bara]
Steam Temperature [oC]

OSF Fertilizer plant

63.6
41
360

17 nov 05

Page 2 of 2

SOHAR Refinery Plant Oman


One CO boiler for RFCC unit 327 t/h

Plant info
The Sohar Refinery Company was set up in 2003 to construct, commission and operate a
new grass roots refinery in Wilayat of Sohar, Oman (250km northwest of the capital
Muscat). The company is 20% owned by the Oman Oil Company and 80% by the
government of Oman.
The refinery is designed to process a mixed feedstock of Oman crude oil and atmospheric
residue from the Oman Refining Company. The refinery will have a Residue Fluidised
Catalytic Cracking (RFCC) unit with a capacity of 75,260b/d. Standard Fasel Lentjes has
provided the CO boiler that oxidizes the CO content in the flue gas from the RFCC unit and
produce steam from this flue gas. This experience of Standard Fasel Lentjes has been
transferred to NEM.

NEM scope of supply

Design
Manufacture
Delivery

OSF Fertilizer plant

17 nov 05

Page 1 of 2

Specific project data


General
Project name:
Plant location:
Customer:
End user:
FCC Licensor:
Year of operation:

SOHAR Refinery Project


Sohar, Oman
JGC Corporation
Sohar Refinery Company
UOP
2006

CO Boiler
Number of units: 1
Type:
CO oxidizer with FGC
Output:
327 t/h
Main fuel:
Refinery gas, Natural gas
Performance:
Steam flow [k/s]
Steam pressure [bara]
Steam Temperature [oC]

OSF Fertilizer plant

90.8
42
390

17 nov 05

Page 2 of 2

SOHAR Fertilizer Plant Oman


One EDL boiler, 150 t/h, 2 HRSG for H25 GT.

Plant info
Construction work on the first phase of SIUCI's ammonia and urea project, involving an
investment of around $650 million, is under way at the Sohar Industrial Port. When
operational in the second quarter of 2008, the state-of-the-art plant will produce 1.225
million tonnes of granular urea for the world markets.
The energy requirements of the plant will be met by using two H25 Gas turbines with Heat
Recovery Steam Generators (HRSGs) and one direct fired auxiliary boiler of 150 t/h.

NEM scope of supply

Design
Manufacture
Delivery

Specific project data


General
Project name:
Plant location:
Customer:
End user:
Year of operation:

OSF Fertilizer Plant


Sohar, Oman
Mitsubishi Heavy Industries Ltd.
SIUCI
2007

Auxiliary Boiler
Number of units: 1
Type:
EDL
Output:
150 t/h
Main fuel:
NG
Back-up fuel:
LG
Performance:
Steam flow [k/s]
Steam pressure [bara]
Steam Temperature [oC]

41.6
115
515

Gas Turbine
Number of units: 2
Type:
Hitachi H25
Output:
25 MW
Main fuel:
NG
Back-up fuel:
LG

OSF Fertilizer plant

17 nov 05

Page 1 of 2

Heat Recovery Steam Generator


Number of units:
Type:
Pressure levels:
Special features:
Performance:

2
Horizontal, Natural Circulation
2
N/A
HP
Steam flow [k/s]
Steam pressure [bara]
Steam Temperature [oC]

OSF Fertilizer plant

17 nov 05

H-RH

IP

LP

20.8
41
380