2/11/2014
ERPC, KOLKATA
2/11/2014
ERPC, KOLKATA
SL No
EXISTING UI RATE
f>=50.20Hz, RUI=0
Maximum UI Rate
= 900 p/u
871.88 p/u at 49.5 Hz
ERPC, KOLKATA
SL No
f>=50.05Hz, RDC=0
f<49.7,RDC=824.04p/u
800
700
600
500
400
300
200
178 paise/unit at 50 Hz
100
50.2
50.16
50.12
50.08
50.04
50
49.96
49.92
49.88
49.84
49.8
49.76
49.72
49.68
49.64
49.6
49.56
49.52
0
2/11/2014
ERPC, KOLKATA
BUYERs/SELLERs
1.
Overinjection/Underdrawal:
Charges
for
Deviation
receivable
for
overinjection/underdrawal in a time block within
the volume capping of 12% of Schedule or 150MW
whichever is less in normal Deviation Charge
depending on freq.
For any overinjection/underdrawal beyond the
volume capping limit in a time block, the charges
receivable is zero.
Additional
Charges
for
Deviation
for
overinjection/underdrawal in any time block when
f>=50.10Hz at 178 p/u
2/11/2014
ERPC, KOLKATA
2. Overdrawal/Underinjection:
A. Charges
for
Deviation
payable
for
overdrawal/underinjection in a time block in normal
Deviation Charge depending on freq.
B. Additional charges for Deviation levied for
overdrawal/underinjection beyond the volume capping
limit as follows:
12-15%
15-20%
Above 20%
20 % of Normal
Deviation Charge
depending on
average freq of that
block
40 % of Normal
Deviation Charge
depending on
average freq of that
block
100 % of Normal
Deviation Charge
depending on
average freq of that
block
2/11/2014
ERPC, KOLKATA
150-200MW
Additional Charges
for Deviation
20 % of Normal
Deviation Charge
depending on
average freq of
that block
200-250MW
40 % of Normal
Deviation Charge
depending on
average freq of
that block
Above 250MW
100 % of Normal
Deviation Charge
depending on
average freq of that
block
ERPC, KOLKATA
ILLUSTRATION:
Buyer/Seller : Underdrawal/Overinjection:
Sch
Act
Dev
Freq
Dev Rate
Min
(12% of
Col2,15
0)
Dev Charge
Receivable
Quantum of
Deviation for
Addl Dev
Charge
Additional
Dev
Charge
Payable
1450
1480
30
49.9
407.24
150
30*407.24
1450
1680
230
50
178
150
150*178
1200
1380
180
49.96
261.36
144
144*261.36
1300
1350
50
50.12
150
50
50*178
-120
-100
20
49.9
407.24
14.4
14.4*407.24
-1300
-1210
90
50
178
150
90*178
-1300
-1140
160
49.96
261.36
150
150*261.36
-1150
-1010
140
49.84
511.44
138
138*511.44
-300
-240
60
50.18
36
60
60*178
2/11/2014
ERPC, KOLKATA
Buyer/Seller: Overdrawal/Underinjection:
Sch
Act
Dev
Freq
Dev Rate
Min
(12%
of
Col2,
Dev Charge
Payable
Quantum of
Deviation for
Addl Dev
Charge
Additional Dev
Charge Payable
150)
1
1450
1420
-30
49.9
407.24
150
30*407.24
1450
1190
-260
49.8
594.8
150
260*594.8
110
50*0.2*594.8+50*0.4
*594.8+10*594.8
1180
940
-240
49.75
678.16
141.6
240*678.16
98.4
35.4*0.2*678.16+59*
0.4*678.16+4*678.16
1180
1150
-30
49.68
824.04
141.6
30*824.04
30
30*824.04
-400
-435
-35
50.01
142.40
48
35*142.4
-400
-485
-85
49.86
469.76
48
85*469.76
37
12*0.2*469.76+20*0.
4*469.76+5*469.76
-1400
-1665
-265
49.91
365.56
150
265*365.56
115
50*0.2*365.56+50+0.
4*365.56+15+365.56
-250
-282
-32
49.61
824.04
30
32*824.04
32
32*824.04
2/11/2014
ERPC, KOLKATA
2/11/2014
(250-200)*40% of
Dev Rate of that
time block=
50*0.4*594.8
paisa/unit
ERPC, KOLKATA
Above 250MW
(200-150)*20% of
Dev Rate of that
time block=
50*0.2*594.8
paisa/unit
200-250MW
150-200MW
(110-5050)*100% of
Dev Rate of
that time
block=
10*1*594.8
paisa/unit
10
2/11/2014
5% of Sch*40%
of Dev Rate of
that time block=
20*0.4*469.76
paisa/unit
ERPC, KOLKATA
Above 20 %
3% of Sch*20%
of Dev Rate of
that time block=
12*0.2*469.76
paisa/unit
15-20%
12-15%
(37-8% of
Sch)*100% of
Dev Rate of that
time block=
5*1*469.76
paisa/unit
11
400
350
300
250
200
165 p/u at 50Hz
150
Existing UI Rate
(paise/unit)
100
50
50.3
50.26
50.22
50.18
50.14
50.1
50.06
50.02
49.98
49.94
49.9
49.86
49.82
49.78
49.74
49.7
49.66
49.62
49.58
49.54
49.5
0
2/11/2014
ERPC, KOLKATA
12
300
250
200
178 paise/unit at 50 Hz
150
100
50
49.55
ERPC, KOLKATA
49.6
49.65
49.7
49.75
49.8
49.85
49.9
49.95
50
50.05
2/11/2014
50.1
50.15
50.2
0
13
Overinjection:
2/11/2014
ERPC, KOLKATA
14
3.
Underinjection:
A. Charges for Deviation payable for underinjection
in a time block in normal Deviation Charge
subject to a capping of 303.04p/u depending on
freq.
B. Additional charges for Deviation levied for
underinjection beyond the volume capping limit
as follows:
Freq ---- 49.7 Hz and above
a. 12% of Sch in a time block < = 150 MW
Underinjection
12-15%
15-20%
Above 20%
Additional Charges
for Deviation
20 % of
MIN(303.04p/u ,
Normal Deviation
Charge)
40 % of
MIN(303.04p/u ,
Normal Deviation
Charge)
100 % of
MIN(303.04p/u ,
Normal Deviation
Charge)
2/11/2014
ERPC, KOLKATA
15
150-200MW
200-250MW
Above 250MW
Additional Charges
for Deviation
20 % of
MIN(303.04p/u ,
Normal Deviation
Charge)
40 % of
MIN(303.04p/u ,
Normal Deviation
Charge)
100 % of
MIN(303.04p/u ,
Normal Deviation
Charge)
ERPC, KOLKATA
16
ILLUSTRATION:
1) Overinjection
Sch
Freq
Dev Rate
Dev
Rate
Applic
-able
1 1450 1480 30
49.9
407.24
303.04 150
30*303.04
50
178
178
150*178
49.96
261.36
261.36 144
144*261.36 0
4 1300 1350 50
50.12
178
2/11/2014
Act
Dev
ERPC, KOLKATA
Min (12% of
Col2,150)
150
50*178
17
UNDERINJECTION
Sch
Act
Dev
Freq
Dev Rate
Dev
Rate
Applicable
Min
(12% of
Col2,15
0)
Dev Charge
Payable
1450
1420
-30
49.9
407.24
303.04
150
30*303.04
1450
1280
-170
50
178
178
150
170*178
20*.2*178
1450
1240
-210
49.96
261.36
261.36
150
210*261.36
50*0.2*261.36+10*0.4
*261.36
1450
1190
-260
49.8
594.8
303.04
150
260*303.04
50*0.2*303.04+50*0.4
*303.04+10*303.04
1180
1150
-30
49.75
678.16
303.04
141.6
30*303.04
1180
1000
-180
49.98
219.68
219.68
141.6
180*219.68
35.4*0.2*219.68+3*0.4
*219.68
1180
940
-240
49.88
428.08
303.04
141.6
240*303.04
35.4*0.2*303.04+59*0.
4*303.04+4*303.04
1180
1075
-105
49.70
803.2
303.04
141.6
105*303.04
1180
1075
-105
49.69
824.04
303.04
141.6
105*303.04
105*303.04
2/11/2014
ERPC, KOLKATA
18
2/11/2014
(250-200)*40% of
MIN(Normal Dev
Rate of that time
block,303.04)=
50*0.4*303.04pa
isa/unit
ERPC, KOLKATA
Above 250MW
(200-150)*20% of
MIN(Normal Dev
Rate of that time
block,303.04)=
50*0.2*303.04pa
isa/unit
200-250MW
150-200MW
(110-5050)*100% of
MIN(Normal
Dev Rate of
that time
block,303.04)=
10*1*303.04p
aisa/unit
19
2/11/2014
5% of Sch*40%
MIN(Normal Dev
Rate of that time
block,303.04)=
59*0.4*303.04
paisa/unit
ERPC, KOLKATA
Above 20 %
3% of Sch*20%
MIN(Normal Dev
Rate of that time
block,303.04)=
35.4*0.2*303.04
paisa/unit
15-20%
12-15%
20
Infirm power:
1. Injection:
2. Drawal:
2/11/2014
ERPC, KOLKATA
21
ERPC, KOLKATA
22
ERPC, KOLKATA
23
ERPC, KOLKATA
24
Schedule of Payments:
Payment to be made within 10 days of issue of statement by RPC
For delay of more than 2 days i.e beyond 12 days of issue of statement by
RPC, simple interest @ 0.04% to be levied for each day of delay
Payments to receivable entities to be made within 2 working days of
receipt of payments in the fund
In the event of delay of payment by Payable entities, the receivable entities
shall be paid from the balance in the fund. If sufficient fund not
there, payment to be made on pro rata basis
Utilities defaulting at any time in previous FY shall open an LC equal to
110% of its average payable weekly liability in favour of the concerned
RLDC within a fortnight of date these regulations come into force
Utilities defaulting at any time in current FY shall open an LC equal to 110%
of its weekly outstanding liability in favour of the concerned RLDC within a
fortnight from the due date of payment
LC to be increased to 110% of the payable weekly liability for Deviation in
any week during the year, if it exceeds the previous LC amount by more
than 50%
For payments not received within 12 days, RLDC entitled to encash the LC
to the extent of default which has be recouped within 3 days
2/11/2014
ERPC, KOLKATA
25
ERPC, KOLKATA
26
Clause 4(2)(7): The SLDC, SEB / distribution licensee shall always restrict the net
drawl of the state from the grid within the drawl schedule keeping the deviations
from the schedule within the limits specified in the Deviation Settlement
Mechanism Regulations. The concerned SEB/distribution licensee/User, SLDC shall
ensure that their automatic demand management scheme mentioned in clause
5.4.2 acts to ensure that there is no over-drawl. If the automatic demand
management scheme has not yet been commissioned, then action shall be taken as
per manual demand management scheme to restrict the net drawal from grid to
within schedules and all actions for early commissioning of Automatic Demand
Management Scheme (ADMS) shall be initiated
Clause 4(3)(10): The ISGS is normally expected to generate power according to the
daily schedules advised to them barring any inadvertent deviations. Maximum
deviation allowed during a time block shall not exceed the limits specified in the
Deviation Settlement Mechanism Regulations. Such deviations should not cause
system parameters to deteriorate beyond permissible limits and should not lead to
unacceptable line loadings. Inadvertent deviations, if any, from the ex-power plant
generation schedules shall be appropriately priced in accordance with Deviation
Settlement Mechanism Regulations. In addition, deviations from schedules causing
congestion, shall also be priced in accordance with the Central Electricity Regulatory
Commission (Measure to relieve congestion in real time operation)
Regulations, 2009
2/11/2014
ERPC, KOLKATA
27
ERPC, KOLKATA
28
2/11/2014
ERPC, KOLKATA
29