Beruflich Dokumente
Kultur Dokumente
Management
- Overview -
Terminology
Time Based Equipment
Example
- Cranes
Performance Based
Equipment
Example
- Excarvators
Multi-Part Equipment
Example
- Formwork
- Scaffolding
Example
- Nails, Bolts
- Drilling Maschines
- Screwdrivers
Equipment
Planning
Rental
Agreements
Equipment Owner
Equipment
Owner
Administrator
Deployment
Management
Settlement and
Billing
Equipment belongs
to the owner.
Administrator is
responsible for the
planning and usage of
equipment
Equipment
Administrator
Construction Site
Site Manager
Customer
Customer
Recepient
Parties involved
Reports requirements
Pays rental fee
Buys and sells back tools and materials
Equipment Manager
Leases Equipment from owner
Maintains the Equipment
Plans requirements, manages stocks
Rents equipment and charges recepient
Owner
Purchasing and Insurance
Equipment as Asset
Depreciation posting
Recipient
Construction site
Administrator
Periodical settlement
Periodical billing
1.
2.
Requisition note
Availability?
Requirement from
Site Manager
Equipment
Manager
3.
Shipping
document
Recipient, e.g.
Construction site
Requisition Note
Specifies type of the required equipment
Requisition Period
Site Manager
creates Requistion note
Requisition Note 18
Recipient:
Construction Site X
Requisition Period: 08/08/2001 - 12/10/2001
Notes:
Pos.
10
20
30
Class/Equipment Values
Excarvator
Crane
Scaffolding
p>150 kW
h> 40 m
Quantity
2 pc
1 pc
300 m
Equipment Manager
Equipment planning
Assigns equipment to requirement
Shipping document
Equipment Manager
Operators Reports
Shipping
Document
Operators
Report
. . . Versus . . .
Shipping Document
Shipping of Equipment and
Material
Billing based on Time and type of
use on site
Counter Readings
Operation Time
Owner
Lease
Deprec.
Profit
Equipment
Manager
700,-
Rent
2.000,-
-300,-
Lease
-700,-
400,-
Profit
1.300,-
Site Manager
Rent ext.
3000,-
Rent intern
-2000,-
Profit
1000,-
Debtor
Invoice 3000,-
Scenarios
Administrator
Handling of equipment and material
Recipient
Construction site A
Debtor
External Customer of Recipient
Asset
Equipment
Revenue rental
Owner / Administrator
Internal Billing
Cost rental
Cost loading
Cost provision fee
Deprecation cost
Maintenance cost
External Billing
Revenue rental
Revenue loading
Revenue provision fee
Recipient
Cost rental
Cost loading 15
Cost provision fee
Debtor
Warehouse
Administrator
Equipment
Recipient
Debtor
Site location
of Recipient
Asset
Recipient
Periodically deprecation 80
Cost center
PM Order
WBS Element
Debtor
Cost deprecation 80
Revenue rental 100
Revenue loading 10
Cost loading 10
Revenue loading 15
Cost loading 15
Administrator
Handling of equipment and material
Recipient
Construction site A
Deprecation cost
Maintenance cost
Asset
Owner / Administrator
Equipment
Internal Billing
Cost rental
Cost loading
Cost provision fee
Recipient
Revenue rental
Revenue loading
Revenue provision fee
Revenue rental
Warehouse
Administrator
Equipment
Recipient
Site location
Asset
Recipient
Periodically deprecation 80
Cost center
PM Order
WBS Element
Cost deprecation 80
Revenue rental 100
Revenue loading 10
Cost loading 10
Revenue loading 15
Material
Material
Warehouse
Recipient B
Recipient A
Shipping document
Site location
Shipping document
Site location
Cost center
WBS element
Material sales
Revenue 100
Cost 100
Material repurchase
Revenue 80
Cost 80
Material sales
Revenue 100
Cost 100
Shipment of material
Warehouse
Shipping document
Recipient A
Site location
WBS element
Cost
Summary
mySAP E&C provides a solution for
equipment management, covering
Internal Rental
Joint Ventures
Major Benefits