3.3.5.

- ZAPATA AISLADA
De Lindero
E-SHEET: Arq. Hctor Jess Meja Soria

Datos :
P=
a =
H=
r=
d=
FC =
f'c =
fy =

Ton
Ton/m
m.
m.

1.02
7.50
0.15
0.05
0.10

m.

B
Dado :
C1 = 30 cm
C2 = 30 cm

1.5
200 Kg/cm
4200 Kg/cm

=
=

0.85
0.90

Corte
Flexin

1.-Determinacin de cargas
Peso:

1.02

ton

Zapata
Dado

0.90
0.30

X
X

0.90
0.30

X
X

0.15
0.80

X
X

2.40
2.40

=
=

0.29
0.17

ton
ton

Suelo:
PT

0.90

0.90

1.60

1.60

=
=

2.07
3.56

ton
ton

2.-Dimensiones de la zapata
Tomando un a mas bajo que el permisible =
5.00 Ton/m
PT
Tomando B =
0.90 m
A=
= 0.71 m
a
L=A/B=
0.79 m 0.90
rea real Ar =
0.90 = 0.81 m
0.90 x
Excentricidad, e = B/2-(C1/2) =
0.30 m
M = Pe =
0.31

3.-Revisin de las presiones de contacto


=

PT
Ar

Max =
Min =

6M
B x L

6.91
1.87

>

>

Cumple
Cumple

1 =

Max

3.36

60

5.-Obtencin de elementos mecnicos


C'
0.30

Lado Corto
V = 1C/2 =
M = 1C/6 =

Max
Verificacin como viga ancha
Vdu = [MaxC(C'-d)] FC =
1.24

Lado Largo
V =MaxC*C' =

1.24

Ton

M = V*C'/2 =

0.19

Ton-m

Ton

0.80

D
CCD

Cumple

C1 =

0.30

m.

C2 =

0.30

m.

d=

0.10

m.

Fraccin de Momento Transmitido Por Corte del Dado a la Losa

1
1 +

C1

+ d

C2

+ d

3
cm.

20

cm.

Usar # 3 @ 20 cm.
Usar # 3 @ 20 cm

0.90

0.90

CAB

Sv = 1 -

0.85 f'c
Se tomara Min

0.15

Dim. del Dado

C2 C2 + d

<
0.0152
3.33 cm

2 (Mu / 100d)

0.95

d
g

1 -

0.30

6.-Verificacin de la Penetracin por Corte


C1

8.- Detallado Final


1.01 Ton/m
0.20 Ton-m

Fuerza de Corte que Resiste el Concreto


Vc = Vc b d =
6.37 Ton
Vdu < Vc

[1

Ton-m

0.28 Ton-m
Mu = MFC =
0.001
=
0.0152
<
0.0033 <
Se tomara Min
3.33 cm
As = bd =
3
Separacin con #
Av100
S=
= 21 cm. 20 cm.
As

Min

As = bd =

0.30

7.- Diseo por flexin lado largo

B
Ton/m

1
30

7.- Diseo por flexin lado corto

Separacin con #
Av100
S=
= 21
As

(Max-Min) C

1 =

Momento Polar de Inercia de la Seccin Sometida al Efecto de la


Penetracin por Corte
d (C1 + d/2)
CCD = (C1+d/2) - CAB =
0.24 m
CAB =
= 0.11 m.
AC
(C1 + d/2)d
2d
JC =
CAB+CCD+(C2+d)dCAB =
+
0.002 m
6
3

Mu = MFC =
0.21 Ton-m
Vu = (Peso + Peso del Dado)(FC) =
1.7892 Ton
Vu
Sv (Mu - Vug) CAB
VuAB =
+
= 17.71 Ton/m
Ac
Jc
Vu
Sv (Mu - Vug) CCD
VuCD =
= 13.17 Ton/m
Ac
Jc
Vmax =
17.71 Ton/m
= 1.77 kg/cm
Vmin =
13.17 Ton/m
= 1.32 kg/cm
VPC =
1.1 f'c = 13.223 Kg/cm
VPC > Vmax
Cumple

Mu = MFC =
0.85 f 'c
T-m
=
fy
<
0.0033

4.-Obtencin de esfuerzos
C

ACI 318-08

rea de la Seccin Crtica a Corte Por Penetracin


AC = bod = d (2C1 +C2+2d) =
0.11 m

Zapata propuesta
B=
0.90
L = 0.90

0.80

Z-1

TEL: 311-107-23-26

0.40

m.

]=

0.0008