KIEHI'S @ THE DUBAI MALL


Pre-construction works
General
Work order confirmation
Kick off meeting
Shop drawing submission & approval
Preparation of shop drawing for submission
Submission of shop drawings
Approval for shop drawings
Material sample submission & approval
Preparation of sample for submission
Submission of samples
Approval for samples
Procurement & production of joinery works
Procurement & production of joinery works
Authority approval
Preparation of documents for submission
Submission of documents
Approval for documents
Construction works
Priliminaries
Site mobilisation
Site survey & marking layout
Civil works
Cement sand screed on floor
Mep 1st & 2nd fix
Conduting & wiring
AC ducting works
Cable tray & trunking
DB installation
Gypsum cladding,partition & ceiling
Wall partition framework
Ceiling framework
Inspection for ceiling closure
Gypsum boarding,taping & jointing
Wall & Floor finishes

Project: keigh dubai mall


Date: Apr 24 '13

Start

55 days
43 days
2 days
1 day
1 day
19 days
14 days
1 day
4 days
15 days
10 days
1 day
4 days
30 days
30 days
15 days
7 days
1 day
7 days
48 days
2 days
1 day
1 day
2 days
2 days
13 days
8 days
8 days
8 days
5 days
11 days
3 days
3 days
1 day
4 days
8 days

Apr 22 '13
Apr 22 '13
Apr 22 '13
Apr 22 '13
Apr 23 '13
Apr 24 '13
Apr 24 '13
May 12 '13
May 13 '13
Apr 24 '13
Apr 24 '13
May 6 '13
May 7 '13
May 7 '13
May 7 '13
Apr 24 '13
Apr 24 '13
May 2 '13
May 4 '13
Apr 30 '13
Apr 30 '13
Apr 30 '13
May 1 '13
May 2 '13
May 2 '13
May 5 '13
May 5 '13
May 5 '13
May 8 '13
May 15 '13
May 19 '13
May 22 '13
May 19 '13
May 26 '13
May 27 '13
Jun 2 '13

Finish

13
7

14

21

May '13
28
5
12

Jun 29 '13
Jun 13 '13
Apr 23 '13
Apr 22 '13
Apr 23 '13
May 18 '13
May 12 '13
May 13 '13
May 18 '13
May 13 '13
May 6 '13
May 7 '13
May 13 '13
Jun 13 '13
Jun 13 '13
May 13 '13
May 2 '13
May 4 '13
May 13 '13
Jun 29 '13
May 2 '13
May 1 '13
May 2 '13
May 5 '13
May 5 '13
May 21 '13
May 15 '13
May 15 '13
May 19 '13
May 21 '13
Jun 2 '13
May 26 '13
May 22 '13
May 27 '13
Jun 2 '13
Jun 11 '13

Task

Rolled Up Task

External Tasks

Critical Task

Rolled Up Critical Task

Project Summary

Progress

Rolled Up Milestone

Group By Summary

Milestone

Rolled Up Progress

Deadline

Summary

Split
Page 1

19

26

Jun '13
2
9

16

23

Jul '
30

ID

Task Name

37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

Project: keigh dubai mall


Date: Apr 24 '13

Duration

Start

Brick wall cladding


2 days
Installation of timber flooring
4 days
Installation of mosaic tiles
1 day
Painting works
6 days
Primer & stucco application
4 days
Painting for all areas
2 days
Shop front & signage works
8 days
Installation of shop front bulkhead, signage support & signage
3 days
Install black roller curtain
3 days
Installation of polycarbonate roller shutter
3 days
Installation of decorative frames
5 days
Installation of door & ironmongery
3 days
Fixture installation
5 days
Joinery works
5 days
MEP final fix
11 days
Grills & diffusers fixing
3 days
Switches & sockets fixing
3 days
Light fixing
2 days
Installation of sanitary wares
2 days
FF & FA devices fixing
3 days
Testing,commissioning & final works
5 days
Testing & comissioning
2 days
Final cleaning & snagging
1 day
Authority inspection
1 day
Completion & handover
1 day

Jun 2 '13
Jun 6 '13
Jun 6 '13
Jun 2 '13
Jun 2 '13
Jun 6 '13
Jun 6 '13
Jun 6 '13
Jun 10 '13
Jun 10 '13
Jun 6 '13
Jun 12 '13
Jun 13 '13
Jun 13 '13
Jun 9 '13
Jun 9 '13
Jun 12 '13
Jun 17 '13
Jun 17 '13
Jun 19 '13
Jun 23 '13
Jun 23 '13
Jun 25 '13
Jun 26 '13
Jun 27 '13

Finish

13
7

14

21

May '13
28
5
12

Jun 4 '13
Jun 11 '13
Jun 8 '13
Jun 9 '13
Jun 6 '13
Jun 9 '13
Jun 16 '13
Jun 10 '13
Jun 13 '13
Jun 13 '13
Jun 12 '13
Jun 16 '13
Jun 19 '13
Jun 19 '13
Jun 23 '13
Jun 12 '13
Jun 16 '13
Jun 18 '13
Jun 18 '13
Jun 23 '13
Jun 29 '13
Jun 25 '13
Jun 26 '13
Jun 27 '13
Jun 29 '13

Task

Rolled Up Task

External Tasks

Critical Task

Rolled Up Critical Task

Project Summary

Progress

Rolled Up Milestone

Group By Summary

Milestone

Rolled Up Progress

Deadline

Summary

Split
Page 2

19

26

Jun '13
2
9

16

23

Jul '
30

Das könnte Ihnen auch gefallen