The purpose of this worksheet is to assist project team members in the development of BIM Goals
and the selection of BIM Uses based on project and team characteristics.

ment of BIM Goals

BIM Goal and Use Worksheet - Version 2.0

Priority (1-3)

BIM Goals Worksheet


Goal Description

1- Most
Important

Value added objectives

BIM Goals Worksheet


Potential BIM Uses

BIM Goals Worksheet


Priority (1-3)
Goal Description
1- Most
Important Value added objectives
2

Increase Field Productivity

Increase effectiveness of Design

Accurate 3D Record Model for FM Team

3
2

Increase effectiveness of Sustainable Goals


Track progress during construction

1
3

Identify concerns accosiated with phasing on campus


Review Design progress

3
2

Quickly Asses cost associated with design changes


Eliminate field conflicts

BIM Goals Worksheet


Potential BIM Uses
Design Reviews, 3D
Coordination
Design Authoring, Design
Reviews, 3D Coordination
Record Model, 3D
Coordination
Engineering Analysis, LEED
Evaluation
4D Modeling
4D Modeling
Design Reviews
Cost Estimation
3D Coordination

BIM USE ANALYSIS


Version 2.0

Value to
Resp Party

Capability
Rating

High / Med / Scale 1-3


Low
(1 = Low)
Resources

High / Med / Low

Responsible Party

Maintenance Scheduling

Building Systems Analysis

Record Modeling

Cost Estimation

4D Modeling

Site Utilization Planning

Layout Control & Planning

3D Coordination (Construction)

Engineering Analysis

Site Analysis

Design Reviews

3D Coordination (Design)

Existing Conditions Modeling

Design Authoring

Programming

Experience

Value to
Project

Competency

BIM Use*

Additional Resources / Competencies


Required to Implement

Notes

BIM USE ANALYSIS

BIM Use*

Value to
Project

Responsible Party

Value to
Resp Party

Capability
Rating

Resources

Competency

Experience

Record Modeling

HIGH

Contractor
Facility Manager
Designer

MED
HIGH
MED

2
1
3

2
2
3

2
1
3

Cost Estimation

MED

Contractor

HIGH

4D Modeling

HIGH

Contractor

HIGH

3D Coordination (Construction)

HIGH

Contractor
Subcontractors
Designer

HIGH
HIGH
MED

3
1
2

3
3
3

3
3
3

Engineering Analysis

HIGH

MEP Engineer
Architect

HIGH
MED

2
2

2
2

2
2

Design Reviews

MED

Arch

LOW

3D Coordination (Design)

HIGH

Architect
MEP Engineer
Structural Engineer

HIGH
MED
HIGH

2
2
2

2
2
2

2
1
1

Design Authoring

HIGH

Architect
MEP Engineer
Structural Engineer
Civil Engineer

HIGH
MED
HIGH
LOW

3
3
3
2

3
3
3
1

3
3
3
1

MED

Notes

High / Med / Scale 1-3


Low
(1 = Low)

High / Med / Low

Programming

Additional Resources / Competencies


Required to Implement

Requires training and software


Requires training and software

Need training on latest software


Infrastructure needs

High value to owner due to


phasing complications
Use for Phasing & Construction

conversion to Digital Fab required

Modeling learning curve possible

Reviews to be from design model


no additioanl detail required

Coordination software required

Contractor to facilitate Coord.

Large learning curve

Civil not required


Planning Phase Complete