Beruflich Dokumente
Kultur Dokumente
Associates
Bill No. 06
Mosque
Description
Amount
216,023.89
6.1.0
SUB STRUCTURE
6.2.0
SUPER STRUCTURE
96,395.89
6.3.0
MASONRY
12,878.96
6.4.0
METALS
Nil
6.5.0
Nil
6.6.0
12,409.10
6.7.0
18,997.36
6.8.0
INTERNAL FINISHES
89,354.09
6.9.0
6.10.0
262349481.xlsBld 6 Sum
3,021.55
-
Engineering
Associates
Bill No. 06
Mosque
262349481.xlsBld 6 Sum
449,080.85
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
SUB STRUCTURE SUMMARY
Item
Ref.
Description
6.1.0
6.1.1
6.1.2
6.1.3
262349481.xls6.1-Sum
Unit
Quantity
Rate
Engineering
Associates
Item
Ref.
Description
Unit
Carried to Summary
Quantity
Total
262349481.xls6.1-Sum
Bill No. 06
Mosque
BILL OF QUANTITIES
Rate
Engineering
Associates
Amount
10,379.94
145,822.78
59,821.17
262349481.xls6.1-Sum
Bill No. 06
Mosque
Engineering
Associates
Amount
216,023.89
262349481.xls6.1-Sum
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
50%
i)
M
M
600
284
540
354
5.67
7.09
-
i)
80.00
262349481.xls6.1.1
M
M
350
215
4.29
811
16.23
-
425
194
3.88
-
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
Total
262349481.xls6.1.1
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
3,403
3,828
1,502
Rate only
1,647
262349481.xls6.1.1
Bill No. 06
Mosque
Engineering
Associates
Amount
10,380
262349481.xls6.1.1
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
6.1.0
SUB STRUCTURE
6.1.2
Unit
Quantity
60%
a)
80.00
CONCRETE
b)
740
471
9.42
-
c)
95
3,697
73.95
-
67
5,658
113.15
23
6,364
127.28
400
6,187
123.75
i)
Footing
262349481.xls6.1.2
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Carried to Collection
Quantity
60%
80.00
Total
Page No. 6.1.3
d)
60
4,853
FORMWORK
e)
Footing
130
269
5.38
194
484
9.69
2,000
377
7.53
475
484
9.69
-
REINFORCEMENT
f)
97.06
-
Collection
262349481.xls6.1.2
35
Total
62,500
1,250.00
Engineering
Associates
Item
Ref.
Description
Unit
262349481.xls6.1.2
Bill No. 06
Mosque
BILL OF QUANTITIES
Quantity
60%
80.00
Engineering
Associates
Amount
6,967
7,025
7,581
2,927
49,498
262349481.xls6.1.2
Bill No. 06
Mosque
Engineering
Associates
Amount
73,999
5,823
700
1,879
15,070
4,602
43,750
71,824
73,999
262349481.xls6.1.2
Bill No. 06
Mosque
Engineering
Associates
Amount
71,824
145,823
262349481.xls6.1.2
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
80.00
50%
b)
c)
2,325
861
-
17.22
-
875
238
-
4.77
-
1,450
538
10.76
-
262349481.xls6.1.3
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
Total
262349481.xls6.1.3
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
40,042
4,171
15,608
262349481.xls6.1.3
Bill No. 06
Mosque
Engineering
Associates
Amount
59,821
262349481.xls6.1.3
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
SUPER STRUCTURE SUMMARY
Item
Ref.
Description
Unit
Quantity
Rate
Amount
Carried to Summary
262349481.xls6.2-Sum
96,395.89
Total
96,395.89
Engineering
Associates
262349481.xls6.2-Sum
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
80.00
a)
CONCRETE
b)
Column
34
6,364
127.28
-
40
5,206
104.12
ii) Slab
54
5,206
104.12
iii) Domb
5,706
114.12
i)
Beams
262349481.xls6.2 .1
Engineering
Associates
Item
Ref.
Description
Unit
Carried to Collection
Quantity
Total
262349481.xls6.2 .1
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
M
M
M
M
Quantity
60%
80.00
FORMWORK
c)
270
350
367
35
484
484
484
1,284
REINFORCEMENT
d)
Collection
Total Page - 6.2.2
Total This Page
262349481.xls6.2 .1
9.69
9.69
9.69
25.69
-
57
Total
62,500
1,250.00
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
Total
262349481.xls6.2 .1
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
4,327
4,165
5,622
571
262349481.xls6.2 .1
Bill No. 06
Mosque
Engineering
Associates
Amount
14,685
262349481.xls6.2 .1
Bill No. 06
Mosque
Engineering
Associates
Amount
2,616
3,391
3,555
899
71,250
81,711
14,685
81,711
262349481.xls6.2 .1
Bill No. 06
Mosque
Engineering
Associates
Amount
96,396
262349481.xls6.2 .1
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
MASONRY SUMMARY
Item
Ref.
Description
262349481.xls6.3-Sum
Unit
Quantity
Rate
Amount
12,878.96
Engineering
Associates
Carried to Summary
Total
Page No. 6.3.1
262349481.xls6.3-Sum
Bill No. 06
Mosque
12,878.96
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
80.00
b)
c)
500mm thick
i) Basement
ii) Ground Floor
iii) First Floor
iv) Roof Floor
M
M
M
M
2,336
2,336
2,336
2,336
300mm thick
i) Basement
ii) Ground Floor
iii) First Floor
iv) Roof Floor
M
M
M
M
153
153
-
1,698
1,698
1,698
1,698
46.73
46.73
46.73
46.73
33.97
33.97
33.97
33.97
-
262349481.xls6.3.0
M
M
M
M
975
975
975
975
19.51
19.51
19.51
19.51
-
Engineering
Associates
Item
Ref.
Description
Unit
Carried to Collection
Quantity
Total
Page No. 6.3.2
262349481.xls6.3.0
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
Basement
Ground Floor
First Floor
Roof Floor
100mm thick walls
i) Basement
ii) Ground Floor
iii) First Floor
iv) Roof Floor
Carried to Collection
Collection
262349481.xls6.3.0
M
M
M
M
102
-
839
839
839
839
M
M
M
M
55
703
703
703
703
Total
80.00
16.79
16.79
16.79
16.79
14.05
14.05
14.05
14.05
-
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
Total
262349481.xls6.3.0
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
Rate only
Rate only
Rate only
Rate only
5,197
5,197
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
262349481.xls6.3.0
Bill No. 06
Mosque
Engineering
Associates
Amount
10,394
262349481.xls6.3.0
Bill No. 06
Mosque
Engineering
Associates
Amount
Rate only
1,712
Rate only
Rate only
Rate only
Rate only
Rate only
773
2,485
10,394
2,485
262349481.xls6.3.0
Bill No. 06
Mosque
Engineering
Associates
Amount
12,879
262349481.xls6.3.0
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
METALS SUMMARY
Item
Ref.
Description
262349481.xls6.4-Sum
Unit
Quantity
Rate
Amount
Nil
Engineering
Associates
Carried to Summary
Total
Page No. 6.4.1
262349481.xls6.4-Sum
Bill No. 06
Mosque
Nil
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
Item
Ref.
Description
Unit
Quantity
60%
80.00
SECTION
SECTION
SECTION
SECTION
a)
05120
05500
05530
09912
STRUCTURAL STEEL
METAL FABRICATIONS
GRATINGS
INTERIOR PAINTING
262349481.xls6.4.0
RM
2,500
50.00
-
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
Total
262349481.xls6.4.0
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
Rate only
262349481.xls6.4.0
Bill No. 06
Mosque
Engineering
Associates
Amount
Nil
262349481.xls6.4.0
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
WOOD AND PLASTIC SUMMARY
Item
Ref.
6.5.0
Description
262349481.xls6.5-Sum
Unit
Quantity
Rate
Engineering
Associates
Carried to Summary
Total
Page No. 6.5.1
262349481.xls6.5-Sum
Bill No. 06
Mosque
Engineering
Associates
Amount
Nil
262349481.xls6.5-Sum
Bill No. 06
Mosque
Engineering
Associates
Nil
262349481.xls6.5-Sum
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
6.5.0
Description
Unit
Quantity
02361
06200
06401
06402
09931
TERMITE CONTROL
FINISH CARPENTRY
EXTERIOR ARCHITECTURAL WOOD WORK
INTERIOR ARCHITECTURAL WOOD WORK
WOOD STAINS AND TRANSPARENT FINISHES
262349481.xls6.5.0
Bill No. 06
Mosque
BILL OF QUANTITIES
Rate
Amount
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
Total
262349481.xls6.5.0
Bill No. 06
Mosque
BILL OF QUANTITIES
Rate
Amount
Nil
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
THERMAL & MOISTURE PROTECTION SUMMARY
Item
Ref.
6.6.0
Description
Unit
262349481.xls6.6-Sum
Quantity
Rate
Engineering
Associates
Carried to Summary
Total
Page No. 6.6.1
262349481.xls6.6-Sum
Bill No. 06
Mosque
Engineering
Associates
UMMARY
Amount
12,409.10
262349481.xls6.6-Sum
Bill No. 06
Mosque
Engineering
Associates
12,409.10
262349481.xls6.6-Sum
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
Item
Ref.
Description
6.6.0
Unit
Quantity
60%
80.00
SECTION
SECTION
SECTION
SECTION
SECTION
a)
07115
07210
07530
07620
07920
400
1,551
31.02
-
RM
No.
ii)
iii)
iv)
v)
262349481.xls6.6.0
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
262349481.xls6.6.0
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
12,409.10
Included
Included
Included
Included
Included
Included
Included
262349481.xls6.6.0
Bill No. 06
Mosque
Engineering
Associates
Amount
12,409.10
262349481.xls6.6.0
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
DOORS & WINDOWS SUMMARY
Item
Ref.
6.7.0
Description
262349481.xls6.7-Sum
Unit
Quantity
Rate
Engineering
Associates
Carried to Summary
Total
Page No. 6.7.1
262349481.xls6.7-Sum
Bill No. 06
Mosque
Engineering
Associates
Amount
18,997.36
262349481.xls6.7-Sum
Bill No. 06
Mosque
Engineering
Associates
18,997.36
262349481.xls6.7-Sum
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
6.7.0
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
80.00
50%
b)
c)
48.36
48.36
48.36
48.36
36.55
36.55
36.55
36.55
-
RM
RM
RM
RM
13
-
2,418
2,418
2,418
2,418
RM
RM
RM
RM
1,827
1,827
1,827
1,827
RM
812
16.24
-
RM
758
15.16
-
262349481.xls6.7.0
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Carried to Collection
Quantity
60%
80.00
Total
Page No. 6.7.2
d)
e)
h)
Basement
Ground Floor
First Floor
Roof Floor
Basement
Ground Floor
First Floor
Roof Floor
222.41
222.41
222.41
222.41
-
M
M
M
M
11,676
11,676
11,676
11,676
233.53
233.53
233.53
233.53
-
M
M
M
M
5,267
5,267
5,267
5,267
105.35
105.35
105.35
105.35
-
RM
60
Providing, making and fixing 2" wide and 3/8" average thick
teak wood architrave fixing with nails including polishing /
painting etc.,at any height or floor, complete in all respect,
as per specifications & relevant drawings, and to the entire
satisfaction of the Engineer.
492
Basement
262349481.xls6.7.0
11,120
11,120
11,120
11,120
Making & providing 1" thick flush door solid core shutters
veneered with 5mm thick teak ply deodar wooden edge
lipping, including supply of and fixing with S.S. hinges,
screw, bolts etc. including polishing / painting etc., complete
in all respect, as per specifications & relevant drawings, and
to the entire satisfaction of the Engineer.
i)
ii)
iii)
iv)
g)
10
-
Making & providing 1" thick Teak wood partly solid and
partly glazed paneled shutters including supply of and fixing
with S.S. hinges, screw, bolts including clear stained
polishing etc., complete in all respect, as per specifications
& relevant drawings, and to the entire satisfaction of the
Engineer.
i)
ii)
iii)
iv)
f)
Basement
Ground Floor
First Floor
Roof Floor
M
M
M
M
5,382
9.84
-
107.64
-
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
80.00
-
Carried to Collection
Total
Page No. 6.7.3
j)
Ground Floor
Type A
i)
36
5,382
First Floor
Type B
i)
Type C
ii)
iii) Type D
iv) Type E
v) Type F
M
M
M
M
M
16
20
20
20
16
5,382
5,382
5,382
5,382
5,382
15
5,920
Carried to Collection
Collection
262349481.xls6.7.0
107.64
107.64
107.64
107.64
107.64
107.64
-
Total
118.40
-
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
Total
Page No. 6.7.4
262349481.xls6.7.0
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
629
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
262349481.xls6.7.0
Bill No. 06
Mosque
Engineering
Associates
Amount
629
2,224
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
591
Nil
262349481.xls6.7.0
Bill No. 06
Mosque
Engineering
Associates
Amount
2,815
3,875
1,722
2,153
2,153
2,153
1,722
1,776
15,554
629
2,815
15,554
262349481.xls6.7.0
Bill No. 06
Mosque
Engineering
Associates
Amount
18,997
262349481.xls6.7.0
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
INTERNAL FINISHES SUMMARY
Item
Ref.
Description
6.8.0
6.8.1
FLOOR FINISHES
6.8.2
WALL FINISHES
6.8.3
CEILING
262349481.xls6.8-Sum
Unit
Quantity
Rate
Engineering
Associates
Carried to Summary
Total
Page No. 6.8.1
262349481.xls6.8-Sum
Bill No. 06
Mosque
Engineering
Associates
Amount
63,255.40
17,689.10
8,409.59
262349481.xls6.8-Sum
Bill No. 06
Mosque
Engineering
Associates
89,354.09
262349481.xls6.8-Sum
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
6.8.0
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
50%
FLOOR FINISHES
SECTION 09310 - CERAMIC TILES
SECTION 09400 - TERRAZZO
SECTION 09638 - STONE PAVING AND FLOORING
SECTION 09640 - WOOD FLOORING
SECTION 09642 - FLOOR ASSEMBLIES
SECTION 09671 - RESINOUS FLOORING
SECTION 09680 - CARPET
a)
b)
271
273
271
271
5.43
5.46
5.43
5.43
-
2,108
2,108
2,108
2,108
42.15
42.15
42.15
42.15
-
482
-
6,306
6,306
6,306
6,306
M
M
M
M
455
-
M
M
M
M
M
M
M
M
c)
Basement
Ground Floor
First Floor
Roof Floor
Basement
Ground Floor
First Floor
Roof Floor
80.00
262349481.xls6.8.1
Basement
Ground Floor
First Floor
Roof Floor
126.11
126.11
126.11
126.11
-
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Carried to Collection
Quantity
60%
80.00
Total
Page No. 6.8.2
d)
e)
Basement
Ground Floor
First Floor
Roof Floor
1,623
1,623
1,623
1,623
Nos.
Nos.
M
2,889
1,243
7,705
Providing and fixing 1" thick pre polish best quality imported
marble of approved shade and type set in 1:2 cement sand
mortar base including bullnosing / chmfering edges, marble
apron, RCC slab, masonry, plaster and making hole for wash
basin, grouting with coloured matching sealant etc., complete
in all respect as per specifications & drawings and as
directed by the Engineer .
i)
Providing and fixing 1" thick pre polish best quality imported
marble of approved shade and type for stair case with class
"C" concrete base including grouting with coloured matching
sealant etc., complete in all respect as per specifications &
drawings and as directed by the Engineer .
Ground Floor
i) Tread (Size 1250mm x 300mm)
ii) Riser (Size 1250mm x 150mm)
iii) Landing
f)
M
M
M
M
Type F4 - Providing and laying 1" thick pre polish best quality
imported Granite of approved shade and type for entrance
floor and steps / where required at any height / floor with
2mm grove or S.S strip as per required details laid over 2"
thick 1:4 cement sand screed
as per specification,
maintaining proper slopes as required with grouting and
protecting of surfaces etc, complete in all respect, as per
specifications & relevant drawings and all works to be carried
out the satisfaction of the Engineer.
262349481.xls6.8.1
12,713
12,713
6,306
32.46
32.46
32.46
32.46
-
57.79
24.86
154.10
-
254.26
254.26
-
126.11
-
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
80.00
-
Carried to Collection
Total
Page No. 6.8.3
h)
j)
10,764
M
M
M
M
3,767
3,767
3,767
3,767
Basement
Ground Floor
First Floor
Roof Floor
Carried to Collection
Collection
262349481.xls6.8.1
Total
215.28
-
75.35
75.35
75.35
75.35
-
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
262349481.xls6.8.1
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
2,470
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
60,785
Rate only
Rate only
262349481.xls6.8.1
Bill No. 06
Mosque
Engineering
Associates
Amount
63,255
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
262349481.xls6.8.1
Bill No. 06
Mosque
Engineering
Associates
Amount
Rate only
Rate only
Rate only
Rate only
Rate only
-
63,255
262349481.xls6.8.1
Bill No. 06
Mosque
Engineering
Associates
Amount
63,255
262349481.xls6.8.1
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
6.8.0
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
80.00
6.8.2
WALL FINISHES
SECTION 09220 - PORTLAND CEMENT PLASTER
SECTION 09250 - GYPSUM BOARD
SECTION 09310 - CERAMIC TILES
SECTION 09720 - WALL COVERING
SECTION 09751 - INTERIOR STONE FACING
SECTION 09841 - ACCOUSTIC WALL PANELS
SECTION 09910 & 09912 - PAINTING
SECTION 09931 - WOOD STAINS AND TRANSPARENT FINISHES
SECTION 09945 - MULTICOLOUR INTERIOR COATINGS
SECTION 09960 - HIGH PERFORMANCE COATINGS
SECTION 09963 - ELASTOMERIC COATINGS
SECTION 09975 - HIGH-TEMPERATURE- RESISTANT COATINGS
SECTION 09981 - CEMENTITIOUS COATINGS
a)
i)
ii)
iii)
iv)
b)
c)
Basement
Ground Floor
First Floor
Roof Floor
M
M
M
M
660
1,125
-
262349481.xls6.8.2
Basement
Ground Floor
First Floor
Roof Floor
M
M
M
M
660
1,125
-
248
248
248
248
-
4.96
4.96
4.96
4.96
-
118
-
2.37
-
140
140
140
140
-
2.80
2.80
2.80
2.80
-
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Carried to Collection
Quantity
60%
80.00
Total
Page No. 6.8.5
d)
e)
2.80
-
Basement
Ground Floor
First Floor
Roof Floor
RM
RM
RM
RM
345
345
345
345
6.91
6.91
6.91
6.91
-
RM
RM
RM
RM
254
-
673
673
673
673
13.47
13.47
13.47
13.47
-
Basement
Ground Floor
First Floor
Roof Floor
RM
RM
RM
RM
272
272
272
272
5.43
5.43
5.43
5.43
-
M
M
M
1,351
1,351
1,351
h)
140
g)
f)
finish of
surface
as per
by the
Basement
Ground Floor
First Floor
Roof Floor
262349481.xls6.8.2
27.02
27.02
27.02
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
80.00
1,351
M
M
M
M
1,997
1,997
1,997
1,997
39.94
39.94
39.94
39.94
-
RM
RM
RM
RM
338
338
338
338
6.76
6.76
6.76
6.76
-
M
M
M
M
6,087
6,087
6,087
6,087
121.75
121.75
121.75
121.75
-
RM
RM
RM
RM
175
-
121
121
121
121
2.42
2.42
2.42
2.42
-
Carried to Collection
27.02
-
Total
Page No. 6.8.6
j)
k)
l)
Basement
Ground Floor
First Floor
Roof Floor
n)
Basement
Ground Floor
First Floor
Roof Floor
m)
Basement
Ground Floor
First Floor
Roof Floor
Basement
Ground Floor
First Floor
Roof Floor
262349481.xls6.8.2
Engineering
Associates
Item
Ref.
Description
i)
ii)
iii)
iv)
Bill No. 06
Mosque
BILL OF QUANTITIES
Basement
Ground Floor
First Floor
Roof Floor
60%
80.00
Unit
Quantity
RM
RM
RM
RM
673
673
673
673
13.47
13.47
13.47
13.47
632
632
632
632
12.63
12.63
12.63
12.63
-
RM
RM
RM
RM
Basement
Ground Floor
First Floor
Roof Floor
Carried to Internal Finishes Summary
Collection
262349481.xls6.8.2
Total
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
262349481.xls6.8.2
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
3,272
5,576
Rate only
Rate only
Rate only
1,847
3,148
Rate only
Rate only
262349481.xls6.8.2
Bill No. 06
Mosque
Engineering
Associates
Amount
13,844
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
3,421
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
262349481.xls6.8.2
Bill No. 06
Mosque
Engineering
Associates
Amount
Rate only
3,421
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
424
Rate only
Rate only
Rate only
262349481.xls6.8.2
Bill No. 06
Mosque
Engineering
Associates
Amount
Rate only
Rate only
Rate only
Rate only
424
Rate only
Rate only
Rate only
Rate only
-
13,844
3,421
424
-
262349481.xls6.8.2
Bill No. 06
Mosque
Engineering
Associates
Amount
17,689
262349481.xls6.8.2
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
6.8.0
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
60%
6.8.3
CEILING
SECTION 09220 - PORTLAND CEMENT PLASTER
SECTION 09250 - GYPSUM BOARD
SECTION 09265 - GYPSUM BOARD SHAFT-WALL ASSEMBLIES
SECTION 09271 - GLASS REINFORCED GYPSUM FABRICATIONS
SECTION 09511 - ACOUSTICAL PANEL CEILING
SECTION 09512 - ACOUSTICAL TILE CEILING
SECTION 09513 & 09514 - ACOUSTICAL METAL PAN CEILING
SECTION 09547 - LINEAR METAL CEILINGS
SECTION 09549 - SECURITY CEILING SYSTEM
SECTION 09580 - SUSPENDED DECORATIVE CEILING
SECTION 09912 - INTERIOR PAINTING
SECTION 09975 - HIGH-TEMPERATURE- RESISTANT COATINGS
a)
b)
Basement
Ground Floor
First Floor
Roof Floor
M
M
M
M
456
585
-
264
264
264
264
5.28
5.28
5.28
5.28
-
M
M
M
M
456
585
-
140
140
140
140
2.80
2.80
2.80
2.80
-
M
M
M
M
592
592
592
592
11.84
11.84
11.84
11.84
-
c)
80.00
Basement
Ground Floor
First Floor
Roof Floor
262349481.xls6.8.3
Basement
Ground Floor
First Floor
Roof Floor
Engineering
Associates
Item
Ref.
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Carried to Collection
Quantity
60%
80.00
Total
Page No. 6.8.9
d)
e)
f)
Basement
Ground Floor
First Floor
Roof Floor
Carried to Collection
Collection
262349481.xls6.8.3
M
M
M
M
1,076
1,076
1,076
1,076
21.53
21.53
21.53
21.53
-
969
19.38
2,045
40.90
-
Total
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
262349481.xls6.8.3
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
2,408
3,089
Rate only
Rate only
1,276
1,637
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
262349481.xls6.8.3
Bill No. 06
Mosque
Engineering
Associates
Amount
8,410
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
8,410
-
262349481.xls6.8.3
Bill No. 06
Mosque
Engineering
Associates
Amount
8,410
262349481.xls6.8.3
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
EXTERNAL FINISHES (BUILDING) SUMMARY
Item
Ref.
6.9
Description
Unit
262349481.xls6.9-Sum
Quantity
Rate
Engineering
Associates
Carried to Summary
Total
Page No. 6.9.1
262349481.xls6.9-Sum
Bill No. 06
Mosque
Engineering
Associates
MMARY
Amount
3,021.55
262349481.xls6.9-Sum
Bill No. 06
Mosque
Engineering
Associates
3,021.55
262349481.xls6.9-Sum
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
Item
Ref.
Description
6.9.0
Unit
Quantity
60%
80.00
b)
c)
Providing and laying 3/4" thick 1:4 cement sand plaster (in
white cement) on walls, columns, beams, lintels, projection,
soffits at any floor / height etc., using expanded metal mesh
on joints, electrical conduits, corner beads, chamfered
edges, rouding off corner etc. including scaffolding, curing
etc. cmplete in all respect, as per specification & relevant
drawings and as directed by Engineer.
M
338
286
5.71
-
338
161
3.23
-
2,421
48.42
-
262349481.xls6.9.0
Engineering
Associates
Item
Ref.
Description
Unit
Quantity
262349481.xls6.9.0
Bill No. 06
Mosque
BILL OF QUANTITIES
60%
80.00
Engineering
Associates
Amount
1,930
1,091
Rate only
262349481.xls6.9.0
Bill No. 06
Mosque
Engineering
Associates
Amount
3,022
262349481.xls6.9.0
Bill No. 06
Mosque
Engineering
Associates
Bill No. 06
Mosque
BILL OF QUANTITIES
BUILDER'S WORK SUMMARY
Item
Ref.
Description
Unit
262349481.xls6.10-Sum
Quantity
Rate
Engineering
Associates
Carried to Summary
Total
Page No. 6.10.1
262349481.xls6.10-Sum
Bill No. 06
Mosque
Engineering
Associates
Amount
Not Applicable
-
262349481.xls6.10-Sum
Bill No. 06
Mosque
Engineering
Associates
262349481.xls6.10-Sum
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
Description
262349481.xls6.10.1
Bill No. 06
Mosque
BILL OF QUANTITIES
Unit
Quantity
Rate
Engineering
Associates
Item
Ref.
Description
Unit
262349481.xls6.10.1
Bill No. 06
Mosque
BILL OF QUANTITIES
Quantity
Total
Rate
Engineering
Associates
Amount
Not Applicable
262349481.xls6.10.1
Bill No. 06
Mosque
Engineering
Associates
Amount
Not Applicable
262349481.xls6.10.1
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
Description
262349481.xls6.10.2
Bill No. 06
Mosque
BILL OF QUANTITIES
Unit
Quantity
Rate
Engineering
Associates
Item
Ref.
Description
Unit
262349481.xls6.10.2
Bill No. 06
Mosque
BILL OF QUANTITIES
Quantity
Total
Rate
Engineering
Associates
Amount
262349481.xls6.10.2
Bill No. 06
Mosque
Engineering
Associates
Amount
-
262349481.xls6.10.2
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
262349481.xls6.10.3
Bill No. 06
Mosque
BILL OF QUANTITIES
Description
Unit
Quantity
Rate
Engineering
Associates
Item
Ref.
Description
Unit
262349481.xls6.10.3
Bill No. 06
Mosque
BILL OF QUANTITIES
Quantity
Total
Rate
Engineering
Associates
Amount
262349481.xls6.10.3
Bill No. 06
Mosque
Engineering
Associates
Amount
-
262349481.xls6.10.3
Bill No. 06
Mosque
Engineering
Associates
Item
Ref.
Description
262349481.xls6.10.4
Bill No. 06
Mosque
BILL OF QUANTITIES
Unit
Quantity
Rate
Engineering
Associates
Item
Ref.
Description
Unit
262349481.xls6.10.4
Bill No. 06
Mosque
BILL OF QUANTITIES
Quantity
Total
Rate
Engineering
Associates
Amount
262349481.xls6.10.4
Bill No. 06
Mosque
Engineering
Associates
Amount
-
262349481.xls6.10.4
Bill No. 06
Mosque