Sie sind auf Seite 1von 8

PWPL-UH4

Report Date: 04-MAR-2015 20:48


Discrete Job Value Report
Detail with Requirements based on Actual Quanti
ty Completed (INR)
Sort By: Job
Report Type: Detail with Requirements based on Actual Quantit
y
Class Type: Standard Discrete
Include Bulk Requirements: Yes
Include Vendor Requirements: Yes
Classes From:
To:
Jobs From: MTO-WO-1496-0007-01128
To: MTO-WO-1496-0007-01128
Status:
Assemblies From:
To:
Currency Code: INR
Exchange Rate: 1

PWPL-UH4
Report Date: 04-MAR-2015 20:48
Discrete Job Value Report
1 of
3
Detail with Requirements based on Actual Quanti

Page:
ty Completed (INR)
Sort by: Job

Job: MTO-WO-1496Job Desc: W-INMVIS00089


ard
Status: Complete
0007-01128

Job Type: Stand

Assembly: W-INMVIS00089
15

Revision: 0

25-FEB-

UOM: MTR
Accounting Class: PWPL-UH4
Start Quantity: 3,000.00
Start Date: 25-FEB-15
Class Type: Standard Discrete
Quantity Completed: 3,000.00
Date Released: 26-FEB-15
Class Description: PWPL-UH4
Quantity Scrapped: 0.00
Scheduled Completion Date: 25-FEB-15
Date Closed:
Material
-------Quantity

Supply
Op
Quantit
y
Unit
Extended
Component Item Description
Type
UOM Seq
Required
Issue
d
Cost
Cost Usage Variance
--------------- -------------------- --------- --- ---- ------------ ----------- ---------------- ---------------- ---------------W-ST-AL-00017 CoASC-400 sq.mm(752/ Operation MTR 10
3,000.00
3,000.0
0
11.93
35,791.05
0.00
R-CDX03003
XLPE Insulation Cata Operation KG 10
90.00
90.0
0
40.00
3,600.00
0.00
R-CDS01001
Bonded Semicon Compo Operation KG 10
270.00
270.0
0
20.00
5,400.00
0.00
R-CDX02002
XLPE Insulation Comp Operation KG 10
1,530.00
1,530.0
0
30.00
45,900.00
0.00
---------------- ---------------- ---------------Total Material Costs:
101.93
90,691.05
0.00
Resource and Outside Processin
g
-----------------------------Op
Auto
Std
Required
Applie
d
Unit
Extended
Efficiency
Seq Department Resource UOM Basis
Charge Rate
Res Units
Res Unit
s
Cost
Cost
Variance
---- ---------- ---------- --- ---------- -------- ---- ------------ ----------- ---------------- ---------------- ---------------10 633
1066330397 HR Item
Manual No
6.60
1.0
0
5,109.00
5,109.00
-28,610.40
10 633
1066330398 HR Item
Manual No
6.60
0.0
0
0.00
0.00
0.00

---------------- ---------------- ---------------Total Resource Costs:


5,109.00
5,109.00
-28,610.40
Total Costs Incurred:
95,800.05
================

Completions and other Transacti


ons
--------------------------------Op
Transaction
Transaction Action
Seq UOM
Quantity
Unit Cost
Extended Cost
-------------------------------- ---- --- --------------------------- ---------------Assembly completion
10 MTR
3,000.00
-52.71
-158,129.85
-------------------------------Total Costs Relieved:
-52.71
-158,129.85
Total Job Balance:
-62,329.80

================

PWPL-UH4
Report Date: 04-MAR-2015 20:48
Discrete Job Value Report
2 of
3
Detail with Requirements based on Actual Quanti

Page:
ty Completed (INR)
Sort by: Job

Period-To-Date Summary
---------------------Elemental

Single Level

Variances
Variances
Element/Variance
Accounts
Costs Incurred Costs Relieve
d
Relieved
Relieved Period Activity
--------------------- ------------------------- ---------------- --------------- ---------------- ---------------- ---------------Material
044.22012.0000.000.000.00
67,113.40
67,113.4
0
0.00
0.00
00.0000
Material Overhead
044.22025.0000.000.000.00
0.00
0.0
0
0.00
0.00
00.0000
Resource
044.22026.0000.000.000.00
28,686.65
91,016.4
5
0.00
-62,329.80
00.0000
Outside Processing
044.22027.0000.000.000.00
0.00
0.0
0
0.00
0.00
00.0000
Overhead
044.22028.0000.000.000.00
0.00
0.0
0
0.00
0.00
00.0000
Material Variance
044.40510.0000.000.000.00
0.00
00.0000
Resource Variance
044.40530.0000.000.000.00
0.00
00.0000
Outside Process Var 044.40540.0000.000.000.00
0.00
00.0000
Overhead Variance
044.40550.0000.000.000.00
0.00
00.0000

---------------- --------------- ---------------- ---------------- ---------------Total Costs:


95,800.05
158,129.8
5
0.00
0.00
-62,329.80
================ ===============
= ================ ================ ================
Cumulative-To-Date Summary
-------------------------Elemental

Single Level

Variances
Variances
Element/Variance
Accounts
Costs Incurred Costs Relieve
d
Relieved
Relieved Period Activity
--------------------- ------------------------- ---------------- --------------- ---------------- ---------------- ---------------Material
044.22012.0000.000.000.00
67,113.40
67,113.4
0
0.00
0.00
00.0000
Material Overhead
044.22025.0000.000.000.00
0.00
0.0
0
0.00
0.00

Resource
5

0.00

Outside Processing
0
0.00
Overhead
0

0.00

00.0000
044.22026.0000.000.000.00
-62,329.80
00.0000
044.22027.0000.000.000.00
0.00
00.0000
044.22028.0000.000.000.00
0.00
00.0000

28,686.65

91,016.4

0.00

0.0

0.00

0.0

PWPL-UH4
Report Date: 04-MAR-2015 20:48
Discrete Job Value Report
3 of
3
Detail with Requirements based on Actual Quanti

Page:
ty Completed (INR)
Sort by: Job

Cumulative-To-Date Summary
-------------------------Elemental

Single Level

Variances
Variances
Element/Variance
Accounts
Costs Incurred Costs Relieve
d
Relieved
Relieved Period Activity
--------------------- ------------------------- ---------------- --------------- ---------------- ---------------- ---------------Material Variance
044.40510.0000.000.000.00
0.00
00.0000
Resource Variance
044.40530.0000.000.000.00
0.00
00.0000
Outside Process Var 044.40540.0000.000.000.00
0.00
00.0000
Overhead Variance
044.40550.0000.000.000.00
0.00
00.0000
---------------- --------------- ---------------- ---------------- ---------------Total Costs:
95,800.05
158,129.8
5
0.00
0.00
-62,329.80
================ ===============
= ================ ================ ================

Das könnte Ihnen auch gefallen