PRESUPUESTO GENERAL DEL PROYECTO

CONSTRUCCION CENTRO DE ACOPIO Y BODEGA,


AO 2,013

TRABAJOS PRELIMINARES
Mano de obra, Delimitacin y Trazo
RENGLON

UNIDAD

CANTIDAD

COSTO
UNITARIO

LIMPIEZA, DESTRONQUE Y DELIMITACION

M2

372.00

Q4.25

PUENTES

UNIDAD

30.00

Q12.00

TRAZOS Y NIVELES

ML

79.60

Q11.25

MARCAR TRAZOS

ML

124.40

Q1.95

PEONES

GLOBAL

1.00

Q385.20

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Madera de 1" X 3" X 10 PIES

UNIDAD

25.00

Q10.00

Madera de 2"X 3" X 10 PIES

UNIDAD

25.00

Q10.00

Clavo de 3"

LIBRAS

25.00

Q7.00

Clavo de 4"

LIBRAS

25.00

Q7.00

Cal

SACOS

4.00

Q30.00

Carretillas de mano

UNIDAD

2.00

Q240.00

Palas

UNIDAD

6.00

Q56.00

Piochas

UNIDAD

6.00

Q78.00

Machetes

UNIDAD

2.00

Q24.00

10

Hacha

UNIDAD

1.00

Q128.00

11

Martillo de bola

UNIDAD

2.00

Q34.00

12

Nivel

UNIDAD

2.00

Q65.00

13

Plomo de centro

UNIDAD

2.00

Q35.00

14

Cinta mtrica de 15 mts.

UNIDAD

1.00

Q125.00

15

Cinta mtrica de 5 mts.

UNIDAD

4.00

Q28.00

16

Lpiz

UNIDAD

6.00

Q5.00

17

Hilo de pescar grueso

UNIDAD

4.00

Q22.00

18

Escuadrilon

UNIDAD

4.00

Q120.00

Material, herramienta y equipo:

CIMENTACION
Mano de Obra, Cimientos y Columnas
1

Zanja de 0.40x0.20 para cimiento corrido

ML

164.40

Q20.00

Zanja para Z-1 de 1.00x1.00X0.30 mts.

Armado Cimiento Corrido, 3 No.3 y Eslabon No.2 @ 0.20

UNIDAD

12.00

Q25.00

ML

164.40

Q15.00

Armado de Z-1, 8 No. 5, @ 0.12 en ambos sentidos

UNIDAD

12.00

Q35.00

Armado de C-1, 8 No. 5 y Est. No. 3 @ 0.12

ML

16.80

Q35.00

Fundicin de Cimiento Corrido. 0.40 * 0.20

ML

164.40

Q21.00

Fundicin de Z-1, de 1.00X1.00X0.30 mts

UNIDAD

12.00

Q35.00

Fundicion C-1, de 0.35X0.35 mts.

ML

16.80

Q52.00

Colocacin de pernos de anclaje 3/4"x11/2"+ganchos de 3/4"x10"

UNIDAD

72.00

Q7.00

Peones

Global

1.00

Q1,500.00

10

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Hierro No. 5, grado 40 legitimo

qq

15.00

Q490.00

Hierro No. 3, grado 40 legitimo

qq

10.00

Q485.00

Hierro No. 2, grado 40 legitimo

qq

5.00

Q485.00

Pernos de anclaje 3/4"x11/2"+ganchos de 3/4"x10"

UNIDAD

72.00

Q75.00

Cemento gris

SACOS

140.00

Q75.00

Arena de rio

M3

15.00

Q150.00

Piedrn 3/8"

M3

15.00

Q200.00

Tabla rustica de 1"X10"X10 PIES

UNIDAD

10.00

Q56.00

Paral de madera 3" X 3"X10 PIES

UNIDAD

8.00

Q38.00

10

Paral de madera 2" X 3"X 10 PIES

UNIDAD

8.00

Q26.00

11

Fletes

UNIDAD

4.00

Q950.00

12

Caimn pequeo

UNIDAD

2.00

Q190.00

13

Caimn grande

UNIDAD

2.00

Q285.00

14

Maros para sierra

UNIDAD

4.00

Q38.00

15

Sierras diente fino

UNIDAD

12.00

Q9.00

16

Tenazas

UNIDAD

4.00

Q35.00

17

Tenacin

UNIDAD

4.00

Q60.00

18

Banco de trabajo

UNIDAD

1.00

Q190.00

19

Cubetas concreteras

UNIDAD

10.00

Q22.00

20

Maquina concretera

UNIDAD

1.00

Q8,000.00

21

Combustible

GLS.

15.00

Q40.00

Material, herramienta y equipo:

MUROS
Mano de Obra de Muros:
1

Levantado de muro de block de 0.15 (Dos hiladas Areaa de Bodega)

m2

17.76

25.00

Levantado de muro de block de 0.15 (Estructuras de Carga)

m2

152.00

35.00

Levantado de muro de block de 0.15 (Estructuras de Pilas)

m2

73.87

35.00

Levantado de muro block de 0.10 (Baos)

m2

42.00

35.00

Solera hidrfuga (Baos)

ml

16.30

30.00

Soleras intermedia (Baos)

ml

16.30

30.00

Solera final (Baos)

ml

16.30

15.00

Material, Herramienta y Equipo:


1

Hierro No. 3, grado 40 legitimo

qq

15.00

Q490.00

Hierro No. 2, grado 40 legitimo

qq

5.00

Q485.00

Cemento gris

SACOS

30.00

Q75.00

Arena de rio

M3

7.00

Q150.00

Piedrn 3/8"

M3

7.00

Q200.00

Tabla rustica de 1"X10"X10 PIES

UNIDAD

10.00

Q56.00

Paral de madera 3" X 3"X10 PIES

UNIDAD

5.00

Q38.00

Paral de madera 2" X 3"X 10 PIES

UNIDAD

5.00

Q26.00

Fletes

UNIDAD

1.00

Q950.00

10

Caimn pequeo

UNIDAD

2.00

Q190.00

11

Caimn grande

UNIDAD

2.00

Q285.00

12

Marcos para sierra

UNIDAD

4.00

Q38.00

13

Sierras diente fino

UNIDAD

12.00

Q9.00

14

Tenazas

UNIDAD

4.00

Q35.00

15

Tenacin

UNIDAD

4.00

Q60.00

16

Banco de trabajo

UNIDAD

1.00

Q190.00

17

Cubetas concreteras

UNIDAD

10.00

Q22.00

18

Combustible

GLS.

15.00

Q40.00

Material, herramienta y equipo:

PISO Y BANQUETAS
Mano de Obra Piso Interior:
1

Nivelacin

M2

404.48

Q6.25

Relleno de selecto combinado con piedra desintegrada

M3

325.50

Q12.45

Compactacin Controlada

M2

404.48

Q12.00

electro malla grado 70, 6 * 6, 10/10

M2

404.48

Q8.00

Fundicin de de piso de concreto de 0.12 mts.

M2

404.48

Q45.00

Peones

GLOBAL

1.00

Q2,500.00

Sub Total Mano de Obra

102.40

Q6.25

Mano de Obra Banqueta:


1

Nivelacin banqueta C de A + banqueta servicios sanitarios

M2

Relleno de selecto combinado con piedra desintegrada

M3

5.40

Q12.45

electro malla grado 70, 6 * 6, 10/10

M2

102.40

Q8.00

Fundicin de banqueta de 0.12 mts.

M2

18.80

Q28.00

Peones

GLOBAL

1.00

Q1,600.00

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Electro malla grado 70, 6 * 6, 10/10

UNIDAD

24.00

Q55.00

Selecto combinado con piedra desintegrada

M3

386.11

Q35.00

Cemento gris 3000 PSI

SACOS

225.00

Q75.00

Arena de rio

M3

12.00

Q150.00

piedrn de 3/8"

M3

15.00

Q200.00

Antisol

Gls.

15.00

Q125.00

Flete

UNIDAD

3.00

Q950.00

Combustible

Gls.

15.00

Q40.00

Sub Total: Material, Herramienta y Equipo.

ESTRUCTURA DE TECHO DE METAL


Mano de Obra, Estructura de Techo:
1

Piezas de 7.50 ML c/u, Seccion W10X22

ML

90.00

Q175.00

Piezas de 5.59 ML c/u, Seccion W10X33

ML

67.08

Q200.00

Platinas base de col. 11"X11"X1/4", 6 hoyos 3/4"

UNIDAD

12.00

Q130.00

Platinas Rodilla de col. de 11"X11"X1/4", 6 hoyos 1/2"

UNIDAD

24.00

Q145.00

Platinas cumbrera, Viga, de 11"X11"X1/2", 4 hoyos de 3/4"

UNIDAD

12.00

Q175.00

Platinas porta voladizo de 15"X 6"x2"X1/4"

UNIDAD

22.00

Q50.00

Porta costanera de angular de 4"X4"X1/8", 4 sodadas

UNIDAD

108.00

Q60.00

Tensores de 3/8" Lisos y fijadores

ML

180.00

Q45.00

Instalacion de platinas de union de columnas y vigas

UNIDAD

24.00

Q50.00

10

Instalacion de pernos de platinas de columnas/vigas

UNIDAD

72.00

Q20.00

11

Instalacion de platinas en cumbrera

UNIDAD

12.00

Q55.00

12

Instalacion de pernos de platinas de cumbrera

UNIDAD

24.00

Q25.00

13

Aplicacin de 2 manos de pintura anticorrosiva y dos de esmalte

UNIDAD

6.00

Q1,200.00

14

Montaje

M2

404.48

Q96.90

15

Enlaminado

M2

404.48

Q20.00

16

Peones

GLOBAL

1.00

Q3,800.00

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Piezas de 7.5 ML c/u, Seccion W10X22

UNIDAD

19.00

Q375.00

Piezas de 5.59 ML c/u, Seccion W10X33

UNIDAD

15.00

Q450.00

Tornillo de 3/4" X 1 1/2" grado 5

UNIDAD

72.00

Q22.00

Tornillo de 3/8" * 1" grado 5

UNIDAD

2,500.00

Q2.25

Costanera de 2"X6"X1/16"

UNIDAD

90.00

Q125.00

Tensores, varillas lisa de 3/8"

ML

180.00

Q40.00

Lamina prepintada galv. de 27, I-101 cal. 26 (techo)

UNIDAD

60.00

Q405.00

Cumbrera lamina galvanizada calibre 26

ML

12.00

Q35.00

Malla con cuados de 2"X2"x 2.6 mts de altura, Cal 10

M2

39.00

Q15.00

10

Tubo HG de 21/2" para fijar malla

UNIDAD

15.00

Q275.00

11

Platinas base de col. 11"X11"X1/4", 6 hoyos 3/4"

UNIDAD

12.00

Q115.00

12

Platinas Rodilla de col. de 11"X11"X1/4", 6 hoyos 1/2"

UNIDAD

24.00

Q115.00

13

Platinas cumbrera, Viga, de 11"X11"X1/2", 4 hoyos de 3/4"

UNIDAD

12.00

Q150.00

14

Porta costanera de angular de 4"X4"X1/8", 4 sodadas

UNIDAD

108.00

Q65.00

15

Platinas de union de columnas y vigas

UNIDAD

24.00

Q110.00

16

Instalacion de pernos de platinas de columnas/vigas

UNIDAD

72.00

Q25.00

17

Instalacion de platinas en cumbrera

UNIDAD

12.00

Q50.00

18

Instalacion de pernos de platinas de cumbrera

UNIDAD

24.00

Q28.00

19

Aplicacin de 2 manos de pintura anticorrosiva y dos de esmalte

UNIDAD

6.00

Q850.00

20

Platina combinada de 6"x1/4" para fijacion de viga-col-costanera

UNIDAD

12.00

Q185.00

21

Cemento

BOLSAS

100.00

Q75.00

22

Arena

M3

3.00

Q150.00

23

Piedrin

M3

4.00

Q200.00

24

Hierro No. 3, grado 40 legitimo

qq

12.00

Q485.00

25

Hierro No. 2, grado 40 legitimo

qq

4.00

Q485.00

26

Tornillo polster con empaque de 1 1/2"* 1/4"

UNIDAD

100.00

Q0.60

27

Cumbrera lamina galvanizada calibre 26

UNIDAD

14.00

Q35.00

28

Sika flex 1A

UNIDAD

12.00

Q85.00

29

Electrodo punto caf

LBRS.

75.00

Q18.00

30

Sierras diente fino

UNIDAD

25.00

Q13.00

31

Disco de corte 14"

UNIDAD

8.00

Q52.00

32

disco de corte 9"

UNIDAD

10.00

Q35.00

33

Disco de pulir 9"

UNIDAD

6.00

Q65.00

34

Pintura anticorrosiva

GLS.

10.00

Q200.00

35

Pintura de aceite

GLS.

10.00

Q250.00

36

Brochas de 4"

UNIDAD

8.00

Q25.00

37

Thiner

GLS.

8.00

Q65.00

38

Wipe

LBRS.

20.00

Q10.00

39

Fletes

UNIDAD

2.00

Q1,200.00

Sub Total: Material, Herramienta y Equipo.

CANALES DE CONCRETO Y REJILLAS


Mano de Obra, Canales de Concreto y Rejillas
1

Excavacin h= variable 0.15-0.40 por 0.44 de ancho

M3

3.96

Q65.00

Colocacin electro malla 10/10 permetro

M2

24.00

Q11.00

Fundicin de canal

ML

30.00

Q18.00

Fabricacin rejillas, angular 1 1/2"X1 1/2"X1/8"

ML

30.00

Q80.00

Ayudantes

GLOBAL

1.00

Q1,316.55

Q275.00

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Electro mallas 10/10

UNIDAD

5.00

Cemento

Sacos

48.00

Q75.00

Arena de rio

M3

3.00

Q150.00

Piedrn de 3/4"

M3

4.00

Q200.00

Hierro plano de 1 1/4"*3/16

UNIDAD

20.00

Q167.00

Hierro plano de 1"* 3/16"

UNIDAD

50.00

Q45.00

Electrodo punto caf

lbs.

75.00

Q18.00

Sierras diente fino

UNIDAD

25.00

Q13.00

Disco de corte 14"

UNIDAD

8.00

Q52.00

10

disco de corte 9"

UNIDAD

10.00

Q35.00

11

Disco de pulir 9"

UNIDAD

6.00

Q65.00

12

Pintura anticorrosiva

Gls.

10.00

Q200.00

13

Pintura de aceite

Gls.

10.00

Q250.00

14

Brochas de 4"

UNIDAD

8.00

Q25.00

15

Thiner

Gls.

8.00

Q65.00

16

Wipe

UNIDAD

20.00

Q10.00

17

Flete

UNIDAD

1.00

Q3,500.00

18

Antisol

Gls.

4.00

Q135.00

Sub Total Mano de Obra

SERVICIOS SANITARIOS PARA DAMAS Y CABALLEROS


DOS POR GENERO
Mano de Obra, Delimitacin y Trazo
UNIDAD

RENGLON

COSTO

CANTIDAD

UNITARIO
1

LIMPIEZA, DESTRONQUE Y DELIMITACION

M2

21.60

Q4.25

PUENTES

UNIDAD

10.00

Q45.00

TRAZOS Y NIVELES

ML

18.80

Q11.25

MARCAR TRAZOS

ML

18.40

Q1.95

PEONES

GLOBAL

1.00

Q2,150.75

Sub Total Mano de Obra

Mano de obra, Cimientos, Zapatas, Columnas y Muros


1

Zanja de 0.20x0.30 para cimiento corrido

ML

22.80

Q25.00

Zanja para Z-1 de 0.50x0.50X0.20 mts.

Armado Cimiento Corrido, 3 No.3 y Eslabon No.2 @ 0.20

UNIDADES

6.00

Q55.00

ML

22.80

Q50.00

Armado de Z-1, 5 No. 3, @ 0.12 en ambos sentidos

Armado de C-A, 4 No. 3 y Est. No. 2 @ 0.12

UNIDADES

6.00

Q65.00

ML

37.35

Q50.00

Fundicin de Cimiento Corrido de 0.20*0.40

ML

22.80

Q50.00

Fundicin de Z-1, de 0.50X0.50X0.20 mts

UNIDADES

6.00

Q60.00

Fundicion C-A, de 0.10X0.10 mts. (14 columnas)

ML

37.25

Q65.00

Fundicin 4 tablas de C-1, de 0.10X0.10 mts.

M2

5.40

Q53.00

10

Armado de sol de humedad, 4 No. 3 y Est. No. 2 @ 0.20

ML

22.80

Q65.00

11

Fundacion de sol de humedad, de 0.10X0.15 mts.

ML

22.80

Q60.00

12

Armado de C-B, 4 No. 3 y Est. No. 2 @ 0.12

UNIDADES

3.00

Q75.00

13

Fundicion de C-B, 4 No. 3 y Est. No. 2 @ 0.12

UNIDADES

3.00

Q60.00

14

Muros de Block de 0.10

M2

42.00

Q60.00

15

Solera tipo "U" de 0.10

ML

22.80

Q85.00

16

Solera de corona

ML

22.80

Q105.00

17

Montaje

M2

21.60

Q75.00

18

Enlaminado

M2

21.60

Q20.00

19

Instalacion de Inodoros

UNIDADES

4.00

Q600.00

20

Fundicin de 0.10 mts.

M2

22.80

Q28.00

21

Peones

GLOBAL

1.00

Q2,333.15

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Hierro No. 3, grado 40 legitimo

qq

5.00

Q485.00

Hierro No. 2, grado 40 legitimo

qq

2.50

Q485.00

Costaneras de 2"X4"X1/16"

UNIDAD

6.00

Q120.00

Pernos de anclaje diam. 1/2"X2"

UNIDAD

12.00

Q25.00

Cemento gris

SACOS

95.00

Q75.00

Arena de rio

M3

5.00

Q150.00

Piedrn 3/8"

M3

6.00

Q200.00

Lamina prepintada galv. de 7, I-101 cal. 26 (techo)

UNIDAD

6.00

Q405.00

Cumbrera lamina galvanizada calibre 26

UNIDAD

4.00

Q35.00

10

Paral de madera 3" X 3"X10 PIES

UNIDAD

5.00

Q38.00

11

Fletes

UNIDAD

1.00

Q950.00

12

Caimn pequeo

UNIDAD

1.00

Q190.00

13

Caimn grande

UNIDAD

1.00

Q285.00

14

Maros para sierra

UNIDAD

2.00

Q38.00

15

Sierras diente fino

UNIDAD

6.00

Q9.00

16

Tenazas

UNIDAD

2.00

Q35.00

17

Tenacin

UNIDAD

2.00

Q60.00

18

Banco de trabajo

UNIDAD

1.00

Q190.00

19

Cubetas concreteras

UNIDAD

6.00

Q22.00

20

Combustible

GLS.

35.00

Q40.00

21

Fletes

UNIDAD

1.00

Q1,200.00

Material, herramienta y equipo:

AREA DE CARGA (CUATRO UNIDADES)


Mano de obra, Cimientos, Zapatas, Columnas y Muros
UNIDAD

RENGLON

CANTIDAD

COSTO
UNITARIO

Zanja de 0.30x0.15 para cimiento corrido

ML

64.00

Q30.00

Zanja para Z-2 de 0.40x0.40X0.20 mts.

UNIDAD

20.00

Q35.00

Armado Cimiento Corrido, 2 No.3 y Eslabon No.2 @ 0.20

ML

64.00

Q15.00

Armado de Z-2, 4 No. 2, @ 0.10 en ambos sentidos

UNIDAD

20.00

Q75.00

Armado de C-2, 4 No. 3 y Est. No. 3 @ 0.15

ML

30.40

Q35.00

Armado de losa

M2

43.00

Q20.00

Armado de Viga-2, No. 3 en ambos sentidos

ML

64.00

Q50.00

Fundicin de Cimiento Corrido. 0.30 * 0.15

ML

64.00

Q21.00

Fundicin de Z-2, de 0.40X0.40X0.20

UNIDAD

20.00

Q35.00

10

Fundicion C-2, de 0.15X0.15 mts.

ML

33.60

Q52.00

11

Fundicion de Viga-2

ML

32.50

Q65.00

12

Planchas de metal de 1/4" (area de bodega) de 4'x8'

UNIDAD

32.00

Q55.00

13

Angular de 4"x4" 1/8" (para proteccion de aristas A de C)

UNIDAD

11.00

Q20.00

14

Hembra de 4"x1/8" (para proteccion de aristas)

UNIDAD

3.00

Q15.00

15

Muros Block de 0.15, para levantado de muros de area de carga

M2

16

Peones

Global

17

Sub Total Mano de Obra

152.00

Q60.00

1.00

Q2,100.00

9.00

Q485.00

Material, Herramienta y Equipo


1

Hierro No. 3, grado 40 legitimo

qq

Hierro No. 2, grado 40 legitimo

qq

2.50

Q485.00

Costaneras de 2"X4"X1/16"

UNIDAD

10.00

Q120.00

Pernos de anclaje diam. 1/2"X1/8 completo

UNIDAD

24.00

Q125.00

Azulejo de 0.20x0.20m color blanco.

M2

30.00

Q50.00

Cemento gris

SACOS

75.00

Q75.00

Arena de rio

M3

5.00

Q150.00

Muros Block de 0.15, para levantado de muros de area de carga

UNIDAD

1,980.00

Q3.00

Piedrn 3/8"

M3

6.00

Q200.00

10

Tabla rustica de 1"X10"X10 PIES

UNIDAD

10.00

Q56.00

11

Paral de madera 3" X 3"X10 PIES

UNIDAD

10.00

Q38.00

12

Paral de madera 2" X 3"X 10 PIES

UNIDAD

10.00

Q26.00

13

Alambre de amarre

LBS

15.00

Q7.00

14

Fletes

UNIDAD

1.00

Q950.00

15

Caimn pequeo

UNIDAD

1.00

Q190.00

16

Caimn grande

UNIDAD

1.00

Q285.00

17

Arcos para sierra

UNIDAD

2.00

Q38.00

18

Sierras diente fino

UNIDAD

6.00

Q9.00

19

Tenazas

UNIDAD

2.00

Q35.00

20

Tenacin

UNIDAD

2.00

Q60.00

21

Banco de trabajo

UNIDAD

1.00

Q190.00

22

Cubetas concreteras

UNIDAD

6.00

Q22.00

23

Soldadura

UNIDAD

1.00

Q8,000.00

24

Combustible

GLS.

35.00

Q40.00

Material, herramienta y equipo:

PILAS (DOS UNIDADES)


Mano de obra, Cimientos, Zapatas, Columnas y Muros
RENGLON

UNIDAD

CANTIDAD

COSTO
UNITARIO

Zanja de 0.30x0.15 para cimiento corrido

ML

36.80

Q30.00

Zanja para Z-2 de 0.40x0.40X0.20 mts.

UNIDAD

12.00

Q35.00

Armado Cimiento Corrido, 2 No.3 y Eslabon No.2 @ 0.15

ML

36.80

Q15.00

Armado de Z-2, 4 No. 2, @ 0.10 en ambos sentidos

UNIDAD

12.00

Q75.00

Armado de C-2, 4 No. 3 y Est. No. 3 @ 0.15

ML

30.40

Q35.00

Armado de losa

M2

38.50

Q75.00

Armado de Viga-2,

ML

43.20

Q50.00

Fundicin de Cimiento Corrido. 0.30 * 0.15

ML

43.20

Q21.00

Fundicin de Z-2, de 0.40X0.40X0.20

UNIDAD

20.00

Q35.00

10

Fundicion C-2, de 0.15X0.15 mts.

ML

30.40

Q52.00

11

Fundicion de Viga-2

ML

43.20

Q65.00

12

Block de 0.15

M2

73.87

Q80.00

13

Azulejo de 0.20x0.20m color blanco.

M2

53.00

Q22.00

14

Peones

Global

1.00

Q4,560.00

15

Sub Total Mano de Obra

Material, Herramienta y Equipo


1

Hierro No. 3, grado 40 legitimo

qq

5.00

Q485.00

Hierro No. 2, grado 40 legitimo

Costaneras de 2"X4"X1/16"

qq

2.00

Q485.00

UNIDAD

10.00

Q120.00

Pernos de anclaje diam. 1/2"X1/8 completo

UNIDAD

24.00

Q125.00

Azulejo de 0.20x0.20m color blanco.

M2

53.00

Q50.00

Cemento gris

SACOS

75.00

Q75.00

Arena de rio

M3

5.00

Q150.00

Piedrn 3/8"

M3

6.00

Q200.00

Tabla rustica de 1"X10"X10 PIES

UNIDAD

10.00

Q56.00

10

Paral de madera 3" X 3"X10 PIES

UNIDAD

10.00

Q38.00

11

Paral de madera 2" X 3"X 10 PIES

UNIDAD

10.00

Q26.00

12

Alambre de amarre

LBS

15.00

Q7.00

13

Fletes

UNIDAD

1.00

Q950.00

14

Caimn pequeo

UNIDAD

1.00

Q190.00

15

Caimn grande

UNIDAD

1.00

Q285.00

16

Arcos para sierra

UNIDAD

2.00

Q38.00

17

Sierras diente fino

UNIDAD

6.00

Q9.00

18

Tenazas

UNIDAD

2.00

Q35.00

19

Tenacin

UNIDAD

2.00

Q60.00

20

Banco de trabajo

UNIDAD

1.00

Q190.00

21

Cubetas concreteras

UNIDAD

6.00

Q22.00

22

Reeposadera de bronce de 4"

UNIDAD

2.00

Q35.00

23

Combustible

GLS.

35.00

Q40.00

Material, herramienta y equipo:

ACABADOS
Mano de Obra y Acabados:
1

Alisado gris en rincones del interior redondeados

ML

99.20

Q30.00

Alisado gris en rincones del canal redondeados

ML

99.20

Q21.00

Alisado en canal de rejillas

ML

49.60

Q24.00

Alisado gris en piso interior

M2

372.00

Q15.00

Cernido remolineado gris en banquetas

M2

164.40

Q23.00

Cernido remolineado gris en columnas

ML

10.80

Q23.00

Col. W10X33 pintura anticorrosiva 1 mano + 2 de aceite

ML

90.00

Q20.00

Vig W10X22 pintura anticorrosiva 1 mano + 2 de aceite

ML

67.08

Q18.00

Costaneras pintura anticorrosiva 1 mano + 2 de aceite

ML

12.00

Q500.00

10

Ayudantes

Global

1.00

Q3,300.00

11

Sub Total Mano de Obra

Arena de rio cernida

M3

15.00

Q125.00

Arena de amarilla cernida

M3

7.00

Q275.00

Material, Herramienta y Equipo:

Cemento gris

SACOS

48.00

Q75.00

Flete

UNIDAD

2.00

Q1,200.00

Pintura Anticorrosiva

cubetas

5.00

Q550.00

Pintura de Aceite

cubetas

5.00

Q550.00

Aditivos para adherencia

cubetas

5.00

Q255.00

Sub Total: Material, Herramienta y Equipo.

INSTALACIONES AGUA POTABLE


Mano de Obra de Instalaciones Hidrulicas:
1

Zanja, 0.20 m. de alto inicio, uniforme, por 0.20 mts. de


ancho e instalacin pvc. dimetro 1". 160 PSI

ML

79.00

Q20.00

e instalacin pvc. dimetro 3/4", 250 PSI.

ML

30.00

Q25.00

Instalacin de grifos

UNIDAD

10.00

Q75.00

Instalacin de lavamanos

UNIDAD

2.00

Q125.00

Instalacin de sanitarios

UNIDAD

4.00

Q175.00

Zanja, 0.20 de alto inicio, uniforme de 0.20 mts. de ancho

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Codos 90 de 3/4", pvc (baos)

Unidad

9.00

Tee reductora de 3/4"X1/2" (baos)

Unidad

6.00

8.50

Llave de cheque de 3/4" (baos)

Unidad

1.00

45.00

Llave de paso de 3/4" (baos)

Unidad

1.00

40.00

Codos 90 de 1", pvc (bodega)

Unidad

3.00

3.00

Tee de 3/4" , pvc (bodega)

Unidad

8.00

8.50

Tee reductora de 1"X3/4" (bodega)

Unidad

8.00

15.00

Llave de paso de 1" (bodega)

Unidad

1.00

85.00

Llave de cheque de 1" (bodega)

80.00

2.50

Unidad

1.00

10

Tefln de 3/4"

Unidad

12.00

11

Pegamento de unin pvc. (de galn)

Unidad

1.00

Q550.00

12

Llave de paso dimetro 1"

Unidad

2.00

Q175.00

13

Llave de cheque dimetro 1"

Unidad

2.00

Q185.00

14

Grifos

Unidad

6.00

Q130.00

15

Lavamanos con llave de pedal

Unidad

2.00

Q1,900.00

80.00

Sub Total Mano de Obra

INSTALACIONES SANITARIAS
Mano de Obra e Instalaciones Sanitarias:
1

Zanja, 0.30 de alto inicio resto conforme la pendiente


por 0.40 m. de ancho e instalacin pvc. dimetro. 4", para BAP

ML

77.00

25.00

Instalacio de tuberia de 4" para BAP , pvc 160 psi

ML

48.00

Q30.00

Zanja, 0.30 de alto inicio resto conforme la pendiente por 0.40 mts.

ML

27.00

Q40.00

de ancho e instalacin pvc. dimetro. 6", para aguas residuales.

Instalacio de tuberia de 4" para bajada de aguas residuales de las

ML

8.00

Q40.00

ML

31.00

Q25.00

agua quimicas

ML

18.00

Q35.00

Caja para tratameinto de quimicos

UNIDAD

2.00

Q900.00

Biodigestor con capacidad de uso par 12 personas

UNIDAD

3.00

Q700.00

Construccin y conexin de cajas de registro fundidas


UNIDAD

2.00

Q175.00

UNIDAD

1.00

Q200.00

pilas

Zanja, 0.30 de alto inicio resto conforme la pendiente por 0.40 mts.
de ancho e instalacin pvc. dimetro. 6" para aguas quimicas

Instalacio de tuberia de 4" para bajada de aguas residuales de las

de 0.80 m. * 0.80 m. terminada


10

Construccin y conexin de caja sifon fundida


de 1.30 m. * 0.80 m. terminada

11

Tee de 2", pvc para baos

Unidad

1.00

10.00

12

Codos 90 de 2", pvc para baos

Unidad

2.00

12.00

13

Codos 90 de 4", pvc para baos

Unidad

4.00

18.00

14

Reducidor de 4"x2", pvc para baos

Unidad

1.00

45.00

15

Codos 90 de 4" pvc, para bodega, incluye pilas

Unidad

12.00

18.00

16

Tee de 4" pvc, para bodega, incluye pilas

Unidad

6.00

20.00

17

Codos 90 de 6" pvc, para bodega, incluye pilas

Unidad

30.00

32.00

18

Tee de 6" pvc, para bodega, incluye pilas

Unidad

13.00

45.00

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Caja para tratameinto de quimicos

UNIDAD

2.00

Q1,200.00

Biodigestor con capacidad de uso par 12 personas

Tubos pvc. 160 psi. dimetro 6", BAP y Sanitaria

UNIDAD

3.00

Q7,000.00

UNIDAD

20.00

Q250.00

Tubos pvc. 160 psi. dimetro 4"

UNIDAD

3.00

Q180.00

Tee pvc. Dimetro 6"

UNIDAD

20.00

Q185.00

Reducidores pvc. de 4"x6"

UNIDAD

20.00

Q67.00

Codo pvc. A 90 dimetro 4"

UNIDAD

20.00

Q32.00

Pegamento de unin pvc. (de galn)

GLS.

1.00

Q462.10

Canal lamina aluzinc calibre 26, 0.20*0.20*0.15+BAP

ML

51.20

Q250.00

10

Cemento

SACOS

6.00

Q75.00

11

Piedrn

M3

1.00

Q200.00

12

Arena de rio

M3

1.00

Q150.00

13

Flete

UNIDAD

1.00

Q1,200.00

Sub Total: Material, Herramienta y Equipo.

INSTALACIONES ELECTRICAS
Mano de Obra e Instalaciones Elctricas :
1

Lamparas Industriales de sodio 100 Watts, 240V, Lux Lite (Centro de Acopio)

UNIDAD

16.00

Q1,300.00

instalacin de reflectores dobles de 110 v.

UNIDAD

5.00

Q115.00

Instalacin de acometida 110 y caja de circuitos

UNIDAD

1.00

Q550.00

Instalacin de tomacorrientes simples 110 v.

UNIDAD

4.00

Q110.00

Sub Total Mano de Obra

Material, Herramienta y Equipo:


1

Tubo flexible dimetro para acometida 3" PVC

ML

125.00

Q9.50

Tubo rgido pvc dimetro 3/4"

UNIDAD

150.00

Q11.20

Vueltas pvc dimetro 3/4"

UNIDAD

50.00

Q8.50

Vueltas pvc dimetro 3"

UNIDAD

5.00

Q12.75

Conectores dimetro 3/4"

UNIDAD

50.00

Q1.95

Cajas rectangulares de 2" *3"

UNIDAD

26.00

Q2.25

Cajas cuadradas de 4" *4"

UNIDAD

6.00

Q12.00

Cajas octogonales

UNIDAD

20.00

Q3.80

Pegamento para unin pvc

GLS.

1.00

Q467.50

10

Plafoneras

UNIDAD

4.00

Q17.25

11

bases para reflectores dobles 110 v.

UNIDAD

3.00

Q47.60

12

Interruptor doble

UNIDAD

4.00

Q47.00

13

Caja de circuitos de 14 polos 220 v.

UNIDAD

1.00

Q480.00

14

Lmparas ahorradoras tipo bombilla de 25 W.

UNIDAD

3.00

Q42.00

15

Reflectores para exterior

UNIDAD

3.00

Q32.00

16

Cinta aislar

UNIDAD

4.00

Q17.50

17

Cable No. 4 para acometida

ML

200.00

Q35.00

18

Cable No 12 para instalaciones

ML

800.00

Q5.00

19

Flip-on de 2X100 Amp (General)

UNIDAD

1.00

Q84.00

20

Flip-on de 1*20 Amp. (Colocados en el tablero)

GLS.

8.00

Q37.00

21

Tomacorrientes dobles polarizados

UNIDAD

12.00

Q34.00

22

Abrazaderas ducto 3/4"

UNIDAD

100.00

Q0.45

23

Tornillos No 8 X2"

UNIDAD

200.00

Q0.25

24

Tarugos plsticos

UNIDAD

200.00

Q0.27

Unidad

2.00

Q1,850.00

Unidad

4.00

Q2,500.00

Sub Total: Material, Herramienta y Equipo.

PUERTAS
Material, Herramienta y Equipo
1

Suministro de materiales, fabricacin e instalacin de


2 puertas corredizas con marco de tubo HG, de 21/2" de
2.50X2.10 con riel y doble rodos Stanley.

Suministro de materiales, fabricacin e instalacin de


4 puertas de metal.

CERRAMIENTO DE LAMINA TROQUELADA Y MALLA EN AREA DE BODEGA

Mano de Obra e Instalacion de Lamina y Malla:


1

Bases de Cimentacion

Lamina Troquelada I-101

Unidades

28.00

15.00

m2

104.00

405.00

Malla de Alambre Galvanizado No, 10

m2

39.60

65.00

Costaneras de 4"X2"X1/16" (para fijacion de lamina)

Unidades

11.00

150.00

Tubo Galvanizado de 21/2" HG (para fijacion de malla)

Unidades

7.00

175.00

Cemento

Sacos

8.00

Q75.00

Arena de rio

M3

1.00

Q150.00

Piedrn de 3/4"

M3

2.00

Q10.00

Hierro de 1/4"

UNIDAD

3.00

Q9.00

Electrodo punto caf

lbs.

5.00

Q18.00

Pintura anticorrosiva

Gls.

2.00

Q200.00

Pintura de aceite

Gls.

2.00

Q250.00

Brochas de 4"

UNIDAD

2.00

Q25.00

Thiner

Gls.

2.00

Q65.00

10

Wipe

UNIDAD

5.00

Q10.00

11

Flete

UNIDAD

1.00

Q1,500.00

1.00

2,078.90

1.00

2,247.37

Material, Herramienta y Equipo:

Sub Total Mano de Obra

LIMPIEZA FINAL
1

Limpieza Final

Unidad

ROTULO
1

Rotulo

Unidad

Sub Total: Material, Herramienta y Equipo.


TOTAL COSTO DIRECTO ( materiales + equipo + combustibles + mano de obra + otros ):

TOTAL COSTO INDIRECTO: ( administrativos+fianzas +supervision + Utilidad ) :

52%

SUB-TOTAL (suma de directos + indirectos )


IVA:

TOTAL:

12%

COSTO
TOTAL (Q)
1,581.00
360.00
895.50
242.58
385.20
3,464.28

250.00
250.00
175.00
175.00
120.00
480.00
336.00
468.00
48.00
128.00
68.00
130.00
70.00
125.00
112.00
30.00
88.00
480.00
3,533.00

3,288.00
300.00
2,466.00
420.00
588.00
3,452.40

420.00
873.60
504.00
1,500.00
13,812.00

7,350.00
4,850.00
2,425.00
5,400.00
10,500.00
2,250.00
3,000.00
560.00
304.00
208.00
3,800.00
380.00
570.00
152.00
108.00
140.00
240.00
190.00
220.00
8,000.00
600.00
51,247.00

444.00
5,320.00
2,585.45
1,470.00
489.00
489.00
244.50
11,041.95

7,350.00
2,425.00
2,250.00
1,050.00

1,400.00
560.00
190.00
130.00
950.00
380.00
570.00
152.00
108.00
140.00
240.00
190.00
220.00
600.00
18,905.00

2,528.00
4,052.48
4,853.76
3,235.84
18,201.60
2,500.00
35,371.68

640.00
67.23
819.20
526.40
1,600.00
3,652.83

1,320.00
13,513.85
16,875.00
1,800.00
3,000.00
1,875.00
2,850.00
600.00
41,833.85

15,750.00
13,416.00
1,560.00
3,480.00
2,100.00
1,100.00
6,480.00
8,100.00
1,200.00
1,440.00
660.00
600.00
8,100.00
39,194.11
8,089.60
3,800.00
111,269.71

7,125.00
6,750.00
1,584.00
5,625.00
11,250.00
7,200.00
24,300.00
420.00
585.00
4,125.00
1,380.00
2,760.00
1,800.00
7,020.00
2,640.00
1,800.00
600.00
672.00
5,100.00
2,220.00
7,500.00
450.00
800.00
5,820.00

1,940.00
60.00
490.00
1,020.00
1,350.00
325.00
416.00
350.00
390.00
2,000.00
2,500.00
200.00
520.00
200.00
2,400.00
123,687.00

257.40
264.00
540.00
2,400.00
1,316.55
7,545.45

1,375.00
3,600.00
450.00
800.00
3,340.00
2,250.00
1,350.00
325.00
416.00
350.00
390.00
2,000.00
2,500.00
200.00
520.00
200.00
3,500.00
540.00

24,106.00

EROS

COSTO
TOTAL (Q)
91.80
450.00
211.50
35.88
2,150.75
2,939.93

s
570.00
330.00
1,140.00
390.00
1,867.50
1,140.00
360.00
2,421.25
286.20
1,482.00
1,368.00
225.00
180.00
2,520.00
1,938.00
2,394.00
1,620.00
432.00
2,400.00
638.40
2,333.15
26,035.50

2,425.00
1,212.50
720.00
300.00

7,125.00
750.00
1,200.00
2,430.00
140.00
190.00
950.00
190.00
285.00
76.00
54.00
70.00
120.00
190.00
132.00
1,400.00
1,200.00
21,159.50

ros
COSTO
TOTAL (Q)
1,920.00
700.00
960.00
1,500.00
1,064.00
860.00
3,200.00
1,344.00
700.00
1,747.20
2,112.50
1,760.00
220.00
45.00
9,120.00
2,100.00
29,352.70

4,365.00

1,212.50
1,200.00
3,000.00
1,500.00
5,625.00
750.00
5,940.00
1,200.00
560.00
380.00
260.00
105.00
950.00
190.00
285.00
76.00
54.00
70.00
120.00
190.00
132.00
8,000.00
1,400.00
37,564.50

ros
COSTO
TOTAL (Q)
1,104.00
420.00
552.00
900.00
1,064.00
2,887.50
2,160.00
907.20
700.00
1,580.80
2,808.00
5,909.60
1,166.00
3,100.00

25,259.10

2,425.00
970.00
1,200.00
3,000.00
2,650.00
5,625.00
750.00
1,200.00
560.00
380.00
260.00
105.00
950.00
190.00
285.00
76.00
54.00
70.00
120.00
190.00
132.00
70.00
1,400.00
22,662.00

2,976.00
2,083.20
1,190.40
5,580.00
3,781.20
248.40
1,800.00
1,207.44
6,000.00
3,300.00
28,166.64

1,875.00
1,925.00

3,600.00
2,400.00
2,750.00
2,750.00
1,275.00
16,575.00

1,580.00

750.00
750.00
250.00
700.00
4,030.00

22.50
51.00
45.00
40.00
9.00
68.00
120.00
85.00
80.00
960.00
550.00
350.00
370.00
780.00
3,800.00
7,330.50

1,925.00
1,440.00

1,080.00

320.00

775.00

630.00
1,800.00
2,100.00

350.00

200.00
10.00
24.00
72.00
45.00
216.00
120.00
960.00
585.00
10,771.00

2,400.00
21,000.00
5,000.00
540.00
3,700.00
1,340.00
640.00
462.10
12,800.00
450.00
200.00
150.00
1,200.00
26,482.10

20,800.00
575.00

550.00
440.00
22,365.00

1,187.50
1,680.00
425.00
63.75
97.50
58.50
72.00
76.00
467.50
69.00
142.80
188.00
480.00
126.00
96.00
70.00
7,000.00
4,000.00
84.00
296.00
408.00
45.00
50.00
54.00
17,236.55

3,700.00

10,000.00
13,700.00

DE BODEGA
420.00
42,120.00

2,574.00
1,650.00
1,225.00
47,989.00

600.00
150.00
20.00
27.00
90.00
400.00
500.00
50.00
130.00
50.00
1,500.00
3,517.00

2,078.90

2,247.37

816,932.04
424,804.66
1,241,736.70
149,008.40
1,390,745.10

PRESUPUESTO GENERAL DEL PROYECTO


CONSTRUCCION CENTRO DE ACOPIO Y BODEGA,
AO 2,013

CANTIDAD

1.- TRABAJOS PRELIMINARES

1
1.1

Limpieza, Destronque, trazo de niveles par evitar rellenos innesesarios y definir el area de
trabajo. Inclluye Cebtro de Acopio y baos.

393.60

M2

2.- CIMENTACION Y COLUMNAS

2
2.1

UNIDAD

Relleno selecto combinado con piedra desintegrada, para

359.82

m3

baos y Centro de Axopio

2.2

Cimiento Corrido (Baos)

22.05

ml

2.3

Zapatas (Baos)

6.00

2.4

Zapatas Z-1 (Centro de Acopio)

12.00

2.5

Columna Corta C-1 (Centro de Acopio)

14.76

ml

2.6

Columna C- A (Baos)

37.35

ml

2.7

Columna Corta, C- B (Baos)

2.40

ml

3.1

Levantado de muro de block de 0.15 (Una hiladas Areaa de Bodega)

8.88

m2

3.2

Levantado de muro de block de 0.15 (Una hiladas U Areaa de Bodega)

8.88

m3

3.3

Levantado de muro de block de 0.15 (Estructuras de Carga)

54.72

m2

3.4

Levantado de muro de block de 0.15 (Estructuras de Pilas)

45.36

m2

3.5

Levantado de muro block de 0.10 (Baos)

26.11

m2

3.6

Solera hidrfuga (Baos)

22.05

ml

3.7

Soleras intermedia (Baos)

19.25

ml

3.8

Solera final (Baos)

22.05

ml

MUROS

PISOS Y BANQUETAS

4
4.1

Piso de Concreto Alizado (Centro de Acopio)

372.00

M2

4.2

Banqueta Remolineada (Centro de Acopio)

83.60

M2

4.3

Piso de Concreto Alizado Baos

13.20

M2

4.4

Banquetas Remolineada Baos

8.40

M2

5
5.1

ESTRUCTURA METALICA Y TECHOS


Marcos estructrurales WX10X22 (Vigas) y WX10X33,(columnas), platinas,pernos, tensores, voladizos de
costanera doble, soldadura, (Centro de Acopio)

6.00

Unidad

5.2

Marcos de Costaneras dobles de 4"x2"x1/16" (Vigas) y de 4"x2"x1/16" dobles (Columnas)., platinas,pernos,


tensores,
soldadura, (para baos)

5.3

Cubierta de Bodega de Centro de Acopio, costaneras 2"x6"x1/16", portacostaneras, lamina I-101 Cal 26
prepintada, Platinas, Capote, tornillos, soldadura

5.4

Cubierta de Baos de Centro de Acopio, costaneras 2"x4"x1/16", portacostaneras, lamina I-101 Cal 26
prepintanda, platinas, cumbrera, tornillos

Canal de techo para BAP de lamina de zinc cal 24 leg

6
6.1

3.00

Unidad

404.48

m2

21.60

m2

51.20

ml

CANALES DE CONCRETO MAS REJILLA


Canales de Concreto + Rejilla

25.00

ML

ACABADOS

7
7.1

Seccion W10X22 para Vigas 1 Anticorrosiva+2 Aceite. Cen de Aco.

7.2

Seccion W10X33 para Col 1 Anticorrosiva+2Aceite. Cen de Aco.

7.3

Costaneras de 6", 1 Anticorrosiva + 2 Aceite Centro de Acopio

7.4

93.00

ml

64.2

ml

316.00

ml

Costaneras de 4", 1 Anticorrosiva + 2 Aceite para Baos

32.40

ml

7.5

Alizado gris e pilas

48.84

m2

7.6

Alizado gris en canales y rincones de Canal de Concreto

31.00

ml

7.7

Cernido remolineado gris en banquetas (Bodega)

83.60

m2

7.8

Cernido remolineado gris en banquetas (Baos)

8.40

m2

7.9

Cernido remolineado gris en soleras (baos)

69.50

ml

7.10

Cernido remolineado gris en columnas (baos)

42.00

ml

7.11

Cernido remolineado gris en columnas cortas (Centro de Acopio)

7.38

ml

7.12

Alizado en Piso de Centro de Acopio

372.00

m2

7.13

Alisado en Piso de Baos

13.20

m2

7.14

Aplicacon pintura anticorrosiva de planchas (Areas de Carga)

32.00

m2

7.15

Aplicacon pintura anticorrosiva de Angulares (Areas de Carga)

67.20

ml

7.16

Instalacion de azulejo blanco de 0.20x0.20 mts en pilas

53.12

m2

SERVICIO SANITARIO PARA DAMAS Y CABALLEROS


DOS POR GENERO

8
8.1

Instalacin de indoros de porcelana color blanco con todos sus accesorios.

4.00

Unidad

8.2

Instalacin de lavamnos de porcelana color blanco con mezcladora de un chorro


cromada y todos sus accesorios

2.00

Unidad

AREA DE CARGA, CUATRO UNIDADES

9
9.1

Cimiento Corrido

45.60

ml

9.2

Zapatas

24.00

9.3

Columna C- 2

48.48

9.4

Viga V-2 y Solera de Humedad

91.20

ml

9.5

Fundicion de losa de concreto de 0.12 mts. Incluye formaleta y refuerzo.

32.00

m2

9.6

Angular de 4"x4"x1/8" de 6.00 m.

11.00

9.7

Planchas atornilladas de 1/4" de 4x8

11.00

9.8

Hembra de 4"x2"x1/8" para proteccion de aristas, incluye tornillos

8.00

ml

PILA , DOS UNIDADES

10
10.1

Cimiento Corrido

36.80

ml

10.2

Zapatas

12.00

10.3

Columna C- 2

16.44

ml

10.4

Viga V-2

36.80

ml

10.5

Solera de block "U" perimetral

36.80

ml

10.6

Block "U" para bordillo de desage en pila.

12.00

ml

10.7

Fundicion de losa de concreto de 0.12 mts.

38.40

m2

INSTALACIONES SANITARIAS

11
11.1

Tuberia de 6" pvc para conduccion de Agua Pluvial y Sanitarias, qumicas. Incluye todos los
accesorios de acoplamiento, reduccin y direccin.

11.2

Tuberia de 4" pvc para conduccion de Agua para bajadas de pilas y BAP, qumicas. Agua s
residuales. Incluye todos los accesorios de acoplamiento, reduccin y direccin.

11.3

Tuberia de 2" pvc de para aguas residuales de baos

11.4

Incluye todos los accesorios de acoplamiento, reduccin y direccin.

11.5

58.00

ml

110.00

ml

18.00

ml

Cajas de registro

2.00

Unidad

11.6

Sifon

2.00

Unidad

11.7

Cajas Tratanientos de Quinicos

2.00

Unidad

11.8

Biodigestores

3.00

Unidad

11.9

Trampa de solidos

1.00

Unidad

12

INSTALACIONES AGUA POTABLE

12.1

Tuberia de 1" pvc de 160 psi, incluye todos sus accesorios de union y cambio de direccin
(Bodega)

82.00

ml

12.2

Tuberia de 3/4" pvc de 160 psi (Bodega)

62.50

ml

12.3

Tuberia de 1/2" pvc de 250 psi (Baos)

6.00

ml

12.4

Grifos en Centro de Acopio

8.00

Unidad

12.5

Llave de cheque de 3/4" (baos)

1.00

Unidad

12.6

Llave de paso de 3/4" (baos)

1.00

Unidad

12.7

Llave de paso de 1" (bodega)

1.00

Unidad

12.8

Llave de cheque de 1" (bodega)

1.00

Unidad

INSTALACIONES ELECTRICAS

13
13.1

Lamparas Industriales de sodio 100 Watts, 240V, Lux Lite (Centro de Acopio)

8.00

Unidad

13.2

Unidades de iluminacion de plafonera con lamparas ahorradoras de energa

5.00

Unidad

13.3

Unidades de iluminacion con reflectores

3.00

Unidad

13.4

Unidades de fuerza, tomacorrientes 110 v.

22.00

Unidad

13.5

Construccin poste de luz, incluye caja socket, caja RH y todos sus accesorios
(Alambre No. 00 de aluminio)

1.00

Unidad

13.6

Acometida interna del poste de luz al tablero del centro de acopio; incluye tuberia
pvc de 3" enterrada, alambre de aluminio Cal 00, excavacion, dos tableros de 8
flipones y 5 flipones de 2x30 A.

1.00

Unidad

13.7

Acometida interna de centro de acopio a baos; incluye tuberia pvc de 3"


enterrada, alambre de aluminio Cal 00 , excavacion, tablero para cuatro flipones
y dos flipones de 20 A.

1.00

Unidad

PUERTAS

14
14.1

Puertas de malla corredizas con marco de tubo HG, de 21/2"

2.00

Unidad

14.2

Puertas de matal y marco de tubo de 1"x1" Chapa 16

4.00

Unidad

CERRAMIENTO DE LAMINA TROQUELADA Y MALLA EN AREA DE BODEGA

15
15.1

Bases de Cimentacion

23.00

Unidades

15.2

Lamina Troquelada I-101

66.00

m2

15.3

Malla de Alambre Galvanizado No, 10

22.40

m2

Costaneras de 4"X2"X1/16" de 6.00 m de largo (para fijacion de lamina)

23.00

Unidades

7.00

Unidades

15.4
15.5

Tubo Galvanizado de 2 1/2" HG de 6.00 m. de longitud (para fijacion de malla)

LIMPIEZA FINAL

16
16.1

Limpieza Final centro de acopio y baos

Unidad

ROTULO

17
17.1

1.00

Rotulo

1.00

Unidad

PRECIO
UNITARIO

TOTAL

S
Q

15.00

5,904.00

SUBTOTAL:

5,904.00

55.00

19,790.10

250.00

5,512.50

1,500.00

9,000.00

2,000.00

24,000.00

250.00

3,690.00

125.00

4,668.75

75.00

180.00

SUBTOTAL:

66,841.35

125.00

1,110.00

125.00

1,110.00

195.00

10,670.40

250.00

11,340.00

275.00

7,180.25

110.00

2,425.50

125.00

2,406.25

175.00

3,858.75

SUBTOTAL:

40,101.15

175.00

65,100.00

175.00

14,630.00

175.00

2,310.00

175.00

1,470.00

SUBTOTAL:

1,470.00

51,275.25

307,651.50

AS

HOS
Q

8,335.25

25,005.75

450.00

182,016.00

1,300.00

28,080.00

285.00

14,592.00

SUBTOTAL:

542,753.25

2,233.00

55,825.00

SUBTOTAL:

55,825.00

224.00

20,832.00

185.00

11,877.00

30.00

9,480.00

30.00

972.00

35.00

1,709.40

60.00

1,860.00

65.00

5,434.00

25.00

210.00

35.00

2,432.50

35.00

1,470.00

33.00

243.54

20.00

7,440.00

20.00

264.00

15.00

480.00

15.00

1,008.00

80.00

4,249.60

SUBTOTAL:

69,962.04

4,230.00

16,920.00

2,200.00

4,400.00

SUBTOTAL:

21,320.00

470.00

21,432.00

1,200.00

28,800.00

EJILLA
Q

ABALLEROS

ADES

235.00

11,392.80

Q
Q

185.00

16,872.00

350.00

11,200.00

150.00

1,650.00

450.00

4,950.00

175.00

1,400.00

SUBTOTAL:

97,696.80

470.00

17,296.00

1,200.00

14,400.00

235.00

3,863.40

185.00

6,808.00

625.00

7,500.00

625.00

24,000.00

SUBTOTAL:

73,867.40

80.00

4,640.00

75.00

8,250.00

42.00

756.00

1,350.00

2,700.00

1,555.00

3,110.00

3,500.00

7,000.00

7,000.00

21,000.00

1,635.00

1,635.00

SUBTOTAL:

49,091.00

80.00

6,560.00

75.00

4,687.50

80.00

480.00

75.00

600.00

45.00

45.00

40.00

40.00

85.00

85.00

80.00

80.00

LE

SUBTOTAL:

12,577.50

1,500.00

12,000.00

800.25

4,001.25

950.00

2,850.00

625.00

13,750.00

10,000.00

10,000.00

12,519.00

12,519.00

12,850.25

12,850.25

SUBTOTAL:

67,970.50

2,100.00

4,200.00

2,500.00

10,000.00

SUBTOTAL:

14,200.00

Q
Q

A EN AREA DE BODEGA
Q

45.00

1,035.00

550.00

36,300.00

315.00

7,056.00

189.00

4,347.00

450.00

3,150.00

SUBTOTAL:

51,888.00

2,500.00

2,500.00

SUBTOTAL:

2,500.00

2,000.00

2,000.00

SUBTOTAL:

2,000.00

1,161,767.99

TOTAL:

CRONOGRAMA DE EJECUCION
CONSTRUCCION CENTRO DE ACOPIO Y BODEGA,
AO 2,013

No.
1

RENGLONES

CANTIDAD

UNIDAD

MES 3

MES 2

TRABAJOS PRELIMINARES

1.1

Limpieza, Destronque y Delimitacion

372.00

m2

1.2

Trazos y Niveles

79.60

ml

1.3

Delimitacion y trazo

124.4

ml

325.5

m3

MES 1

5,580.00
3,582.00
995.20

CIMENTACION Y COLUMNAS
17,902.50
41,100.00
6,875.00
9,000.00
24,000.00
4,200.00
4,668.75
180.00

2.1

Relleno de selecto combinado con piedra desintegrada

2.2

Cimiento Corrido

164.40

ml

2.3

Cimiento Corrido (Baos)

27.50

ml

2.4

Zapatas (Baos)

6.00

2.5

Zapatas Z-1

12.00

2.6

Columna C-1

16.80

ml

2.7

Columna C- A (Baos)

37.35

ml

2.8

Columna C- B (Baos)

2.40

ml

17.76

m2

Levantado de muro de block de 0.15 (Estructuras de Carga)

152.00

m2

29,640.00

Levantado de muro de block de 0.15 (Estructuras de Pilas)

73.87

m2

3.4

Levantado de muro block de 0.10 (Baos)

42.00

m2

3.5

Solera hidrfuga (Baos)

16.30

ml

3.6

Soleras intermedia (Baos)

16.30

ml

3.7

Solera final (Baos)

16.30

ml

18,467.00
11,565.00
1,793.00
2,037.50
2,852.50

3
3.1
3.2
3.3

MUROS
Levantado de muro de block de 0.15 (Dos hiladas Areaa de Bodega)

PISOS Y BANQUETAS

2,220.00

MES 4

MES 5

4.1

5
5.1

Pisos y Banquetas

426.08

M2

6.00

Unidad

3.00

Unidad

ESTRUCTURA METALICA Y TECHOS

Marcos estructruralesWX10X22 (Vigas) y WX10X33,(columnas), platias,pernos,


tensores, soldadura, rodillas, (Centro de Acopio)

5.2

Marcos de Costaneras dobles de 4"x2"x1/16" (Vigas) y de 4"x2"x1/16" dobles


(Columnas)., platinas,pernos, tensores,
soldadura, (para baos)

5.3

Cubierta de Bodega de Ceentro de Acopio, costaneras 2"x6"x1/16", lamina I-101 Cal 26,
tornillos

404.48

m2

5.4

Cubierta de Baos de Ceentro de Acopio, costaneras 2"x6"x1/16", lamina I-101 Cal 26,
platinas, tornillos (para baos)

21.60

m2

25.00

ML

6
6.1

Canales de Concreto + Rejilla

25,005.75
182,016.00
28,080.00
55,825.00

ACABADOS
Seccion W10X22 para Vigas

90.00

ml

7.2

Seccion W10X33 para Columnas

67.08

ml

7.3

Costaneras co acabados para Centro de Acopio

442.44

ml

7.4

Costaneras con acabados para Baos

133.56

ml

7.5

Alizado gris en area de carga, pilas, baosy piso

523.20

m2

7.6

Alizado gris en canales y rincones

158.60

ml

7.7

Cernido remolineado gris en banquetas

101.00

m2

7.8

Cernido remolineado gris en soleras y columnas

56.55

ml

7.9

Cernido remolineado gris en soleras y columnas

56.55

ml

7.10

Instalacion de azulejo blanco de 0.20x0.20 mts

53.12

m2

20,160.00
12,409.80
13,273.20
4,006.80
18,312.00
9,516.00
6,565.00
3,110.25
1,866.15
4,249.60

SERVICIO SANITARIO PARA DAMAS Y CABALLEROS, DOS


POR GENERO

8.1

Servicios Sanitarios Completos

4.00

Unidad

8.2

Relleno de selecto combinado con piedra desintegrada

4.32

m3

8.3

Cimiento Corrido

27.50

ml

8.4

Zapatas

6.00

8.5

Columna C- A

37.35

ml

8.6

Columna C- B, incluye instalacion de platina

2.40

ml

8.7

Fundicion de piso de concreto de 0.12 mts.

12.97

m2

8.8

Accessorios baos (tee, codos y reducidores)

8.00

307,651.50

CANALES DE CONCRETO MAS REJILLA

7.1

74,564.00

AREA DE CARGA DOS UNIDADES

16,920.00
690.34
12,925.00
16,920
0 8,777.25
338.4
4,510.97

9.1

Cimiento Corrido

64.00

ml

9.2

Zapatas

20.00

9.3

Columna C- 2

33.60

ml

9.4

Viga V-2

32.50

ml

9.5

Fundicion de losa de concreto de 0.12 mts.

43.00

m2

9.6

Angular de 4"x4"x1/8"

11.00

9.7

Planchas atornilladas de 1/4" de 4x8

32.00

9.8

Hembra de 4"x1/8" para proteccion de aristas, incluye tornillos

3.00

30,080.00
24,000.00
7,896.00
6,012.50
15,050.00
1,650.00
14,400.00
525.00

10 PILA , DOS UNIDADES


10.1

Cimiento Corrido

36.80

ml

10.2

Zapatas

12.00

10.3

Columna C- 2

16.44

ml

10.4

Viga V-2

36.80

ml

10.5

Fundicion de losa de concreto de 0.12 mts.

38.40

m2

11

INSTALACIONES SANITARIAS

11.1

Tuberia de 6" pvc de

27.00

ml

11.2

Tuberia de 4" pvc de para BAP

48.00

ml

11.3

Tuberia de 4" pvc de

8.00

ml

11.4

Tuberia de 6" pvc de para aguas quimicas

31.00

ml

11.5

Canales de techo de recepcion de aguas pluviales

51.20

Unidad

11.6

Cajas de registro

2.00

Unidad

11.7

Sifon

2.00

Unidad

11.8

Cajas Tratanientos de Quinicos

2.00

Unidad

11.9

Biodigestores

3.00

Unidad

11.10

Trampa de solidos

1.00

17,296.00
14,400.00
3,863.40
6,808.00

2,160.00
3,600.00
600
###
###
2,700.00
7,000.00
21,000.00
###

12 INSTALACIONES AGUA POTABLE


12.1

Tuberia de 1" pvc de 160 psi (Centro de Acopio)

82.00

ml

12.2

Tuberia de 3/4" pvc de 160 psi (Ceentro de Acopio)

10.00

ml

12.3

Tuberia de 3/4" pvc de 160 psi (Baos)

13.50

ml

12.4

Tuberia de 1/2" pvc de 250 psi (Baos)

5.00

ml

12.5

Grifos ( 8 en el Centro de Acopio y 2 en Baos)

10.00

Unidad

6,560.00
750
1,012.50
400.00
750.00

13 INSTALACIONES ELECTRICAS
13.1

Lamparas Induatriales de sodio 100 Watts, 240V, Lux Lite (Centro de Acopio)

13.2

16.00

Unidad

Unidades de iluminacion con lamparas lamparas

5.00

Unidad

13.3

Unidades de iluminacion co reflectores

3.00

Unidad

13.4

Unidades de fuerza, interuptores

8.00

Unidad

13.5

Unidades de fuerza, tomacorrientes 110 v.

22.00

Unidad

13.6

Acometida auxiliar con tablero de circuitos

1.00

Unidad

14 PUERTAS
14.1

Puertas de malla corredizas con marco de tubo HG, de 21/2"

2.00

ml

14.2

Puertas de matal y marco de tubo de 1"x1"

4.00

ml

15

CERAMIENTODE LAMINA TROQUELADA Y MALLA EN AREA DE BODEGA

15.1

Bases de Cimentacion

28.00

Unidades

15.2

Lamina Troquelada I-101

104.00

m2

15.3

Malla de Alambre Galvanizado No, 10

39.60

m2

15.4

Costaneras de 4"X2"X1/16" (para fijacion de lamina)

11.00

Unidades

15.5

Tubo Galvanizado de 21/2" HG (para fijacion de malla)

7.00

Unidades

###

13 INSTALACIONES ELECTRICAS
13.1

Lamparas de sodio 100 Watts, 240V, Lux Lite (Centro de Acopio)

16.00

Unidad

13.2

Unidades de iluminacion con lamparas lamparas

5.00

Unidad

13.3

Unidades de iluminacion co reflectores

3.00

Unidad

13.4

Unidades de fuerza, interuptores

8.00

Unidad

13.5

Unidades de fuerza, tomacorrientes 110 v.

22.00

Unidad

13.6

Acometida auxiliar con tablero de circuitos

1.00

Unidad

14 PUERTAS
14.1

Puertas de malla corredizas con marco de tubo HG, de 21/2"

2.00

Unidad

14.2

Puertas de matal y marco de tubo de 1"x1"

4.00

Unidad

15
15.1

CERRAMIENTODE LAMINA TROQUELADA Y MALLA EN AREA DE BODEGA

Bases de Cimentacion

15.2

Lamina Troquelada I-101

104.00

m2

15.3

Malla de Alambre Galvanizado No, 10

39.60

m2

15.4

Costaneras de 4"X2"X1/16" (para fijacion de lamina)

11.00

Unidades

###

15.5

Tubo Galvanizado de 21/2" HG (para fijacion de malla)

7.00

Unidades

1.00

Unidad

1.00

Unidad

16 LIMPIEZA TOTAL
16.1

Limpieza Final

17 ROTULO
17.1

Rotulo

MES 5

MES 6

6,808.00
24,000.00

###
###
###

24,000.00
4,001.25
2,850.00
4,400.00
13,750.00
5,000.00
4,200.00
10,000.00

###
###
2,079.00
3,150.00
2,500.00
2,000.00

###
###

2,079.00
2,500.00
2,000.00

CRONOGRAMA
CONSTRUCCION CENTRO
AO

CANTI-DAD

PRECIO UNITARIO

TOTAL

TRABAJOS PRELIMINARES

1.1

Limpieza, Destronque y Delimitacion

372.00

15.00

5,580.00

1.2

Trazos y Niveles

79.60

45.00

3,582.00

1.3

Delimitacion y trazo

124.4

8.00

995.20

325.5

55.00

17,902.50

CIMENTACION Y COLUMNAS

2.1

Relleno de selecto combinado con piedra desintegrada

2.2

Cimiento Corrido

164.40

250.00

41,100.00

2.3

Cimiento Corrido (Baos)

27.50

250.00

6,875.00

2.4

Zapatas (Baos)

6.00

1,500.00

9,000.00

2.5

Zapatas Z-1

12.00

2,000.00

24,000.00

2.6

Columna C-1

16.80

250.00

4,200.00

2.7

Columna C- A (Baos)

37.35

125.00

4,668.75

2.8

Columna C- B (Baos)

2.40

75.00

180.00

17.76

125.00

2,220.00

MUROS

3.1

Levantado de muro de block de 0.15 (Dos hiladas Areaa de Bodega)

3.2

Levantado de muro de block de 0.15 (Estructuras de Carga)

152.00

195.00

29,640.00

3.3

Levantado de muro de block de 0.15 (Estructuras de Pilas)

73.87

250.00

18,467.50

3.4

Levantado de muro block de 0.10 (Baos)

42.00

275.00

11,550.00

3.5

Solera hidrfuga (Baos)

16.30

110.00

1,793.00

3.6

Soleras intermedia (Baos)

16.30

125.00

2,037.50

3.7

Solera final (Baos)

16.30

175.00

2,852.50

426.08

175.00

74,564.00

6.00

51,275.25

307,651.50

4
4.1

5
5.1

PISOS Y BANQUETAS
Pisos y Banquetas

ESTRUCTURA METALICA Y TECHOS

Marcos estructruralesWX10X22 (Vigas) y WX10X33,(columnas), platias,pernos, tensores,


soldadura, rodillas, (Centro de Acopio)

5.2

Marcos de Costaneras dobles de 4"x2"x1/16" (Vigas) y de 4"x2"x1/16" dobles (Columnas).,


platinas,pernos, tensores,
soldadura, (para baos)

3.00

8,335.25

25,005.75

5.3

Cubierta de Bodega de Ceentro de Acopio, costaneras 2"x6"x1/16", lamina I-101 Cal 26,
tornillos

404.48

450.00

182,016.00

5.4

Cubierta de Baos de Ceentro de Acopio, costaneras 2"x6"x1/16", lamina I-101 Cal 26,
platinas, tornillos (para baos)

21.60

1,300.00

28,080.00

25.00

2,233.00

55,825.00

90.00

224.00

20,160.00

6
6.1

7
7.1

CANALES DE CONCRETO MAS REJILLA


Canales de Concreto + Rejilla

ACABADOS
Seccion W10X22 para Vigas

7.2

Seccion W10X33 para Columnas

67.08

185.00

12,409.80

7.3

Costaneras co acabados para Centro de Acopio

442.44

30.00

13,273.20

7.4

Costaneras con acabados para Baos

133.56

30.00

4,006.80

7.5

Alizado gris en area de carga, pilas, baosy piso

523.20

35.00

18,312.00

7.6

Alizado gris en canales y rincones

158.60

60.00

9,516.00

7.7

Cernido remolineado gris en banquetas

101.00

65.00

6,565.00

7.8

Cernido remolineado gris en soleras y columnas

56.55

55.00

3,110.25

7.9

Cernido remolineado gris en soleras y columnas

56.55

33.00

1,866.15

7.10

Instalacion de azulejo blanco de 0.20x0.20 mts

53.12

80.00

4,249.60

SERVICIO SANITARIO PARA DAMAS Y CABALLEROS DOS/GENERO

8.1

Servicios Sanitarios Completos

4.00

4,230.00

16,920.00

8.2

Relleno de selecto combinado con piedra desintegrada

4.32

159.80

690.34

8.3

Cimiento Corrido

27.50

470.00

12,925.00

8.4

Zapatas

6.00

2,820.00

16,920.00

8.5

Columna C- A

37.35

235.00

8,777.25

8.6

Columna C- B, incluye instalacion de platina

2.40

141.00

338.40

8.7

Fundicion de piso de concreto de 0.12 mts.

12.97

347.80

4,510.97

8.8

Accessorios baos (tee, codos y reducidores)

8.00

18.87

150.96

AREA DE CARGA DOS UNIDADES

9.1

Cimiento Corrido

64.00

470.00

30,080.00

9.2

Zapatas

20.00

1,200.00

24,000.00

9.3

Columna C- 2

33.60

235.00

7,896.00

9.4

Viga V-2

32.50

185.00

6,012.50

9.5

Fundicion de losa de concreto de 0.12 mts.

32.00

350.00

11,200.00

9.6

Angular de 4"x4"x1/8"

11.00

150.00

1,650.00

9.7

Planchas atornilladas de 1/4" de 4x8

32.00

450.00

14,400.00

9.8

Hembra de 4"x1/8" para proteccion de aristas, incluye tornillos

3.00

175.00

525.00

10 PILA , DOS UNIDADES


10.1

Cimiento Corrido

36.80

470.00

17,296.00

10.2

Zapatas

12.00

1,200.00

14,400.00

10.3

Columna C- 2

16.44

235.00

3,863.40

10.4

Viga V-2

36.80

185.00

6,808.00

10.5

Fundicion de losa de concreto de 0.12 mts.

38.40

625.00

24,000.00

10.5

Accessorios pilas (tee, codos)

61.00

30.86

1,881.00

11 INSTALACIONES SANITARIAS
11.1

Tuberia de 6" pvc de

27.00

80.00

2,160.00

11.2

Tuberia de 4" pvc de para BAP

48.00

75.00

3,600.00

11.3

Tuberia de 4" pvc de

8.00

75.00

600.00

11.4

Tuberia de 6" pvc de para aguas quimicas

31.00

80.00

2,480.00

11.5

Canales de techo de recepcion de aguas pluviales

51.20

285.00

14,592.00

11.6

Cajas de registro

2.00

1,350.00

2,700.00

Sifon

2.00

1,555.00

3,110.00

11.7

11.8

Cajas Tratanientos de Quinicos

2.00

3,500.00

7,000.00

11.9

Biodigestores

3.00

7,000.00

21,000.00

11.10

Trampa de solidos

1.00

1,635.00

1,635.00

12 INSTALACIONES AGUA POTABLE


12.1

Tuberia de 1" pvc de 160 psi (Bodega)

82.00

80.00

6,560.00

12.2

Tuberia de 3/4" pvc de 160 psi (Bodega)

24.00

75.00

1,800.00

12.3

Tuberia de 3/4" pvc de 160 psi (Baos)

38.50

75.00

2,887.50

12.4

Tuberia de 1/2" pvc de 250 psi (Baos)

6.00

80.00

480.00

12.5

Grifos ( 8 en el Centro de Acopio y 2 en Baos)

10.00

75.00

750.00

16.00

1,500.00

24,000.00

13 INSTALACIONES ELECTRICAS
13.1

Lamparas Induatriales de sodio 100 Watts, 240V, Lux Lite (Centro de Acopio)

13.2

Unidades de iluminacion con lamparas lamparas

5.00

800.25

4,001.25

13.3

Unidades de iluminacion co reflectores

3.00

950.00

2,850.00

13.4

Unidades de fuerza, interuptores

8.00

550.00

4,400.00

13.5

Unidades de fuerza, tomacorrientes 110 v.

22.00

625.00

13,750.00

13.6

Acometida auxiliar con tablero de circuitos

1.00

5,000.00

5,000.00

14 PUERTAS
14.1

Puertas de malla corredizas con marco de tubo HG, de 21/2"

2.00

2,100.00

4,200.00

14.2

Puertas de matal y marco de tubo de 1"x1"

4.00

2,500.00

10,000.00

15

CERRAMIENTODE LAMINA TROQUELADA Y MALLA EN AREA DE BODEGA

1,260.00

15.1 Bases de Cimentacion

28.00

45.00

15.2 Lamina Troquelada I-101

104.00

550.00

57,200.00

15.3 Malla de Alambre Galvanizado No, 10

39.60

315.00

12,474.00

15.4 Costaneras de 4"X2"X1/16" (para fijacion de lamina)

11.00

189.00

2,079.00

15.5 Tubo Galvanizado de 21/2" HG (para fijacion de malla)

7.00

450.00

3,150.00

1.00

2,500.00

2,078.90

1.00

2,000.00

2,247.37

16 LIMPIEZA TOTAL
16.1

Limpieza Final

17 ROTULO
17.1

Rotulo

TOTAL:

1,390,745.10

CRONOGRAMA FINANCIERO
CONSTRUCCION CENTRO DE ACOPIO Y BODEGA,
AO 2,013

MES 1

MES 2

MES 3

MES 4

5,580.00
3,582.00
995.20
17,902.50
41,100.00
6,875.00
9,000.00
24,000.00
4,200.00
4,668.75
180.00
2,220.00
29,640.00
18,467.00
11,565.00
1,793.00
2,037.50
2,852.50
74,564.00
307,651.50
25,005.75
182,016.00
###

28,080.00

55,825.00
20,160.00

MES 5

12,409.80
13,273.20
4,006.80
18,312.00
9,516.00
6,565.00
3,110.25
1,866.15
4,249.60
16,920.00
690.34
12,925.00
16,920.00
0

8,777.25
338.40
4,510.97
150.96
30,080.00
24,000.00
7,896.00
6,012.50
11,200.00
1,650.00
14,400.00
525.00
17,296.00
14,400.00
3,863.40
6,808.00

2,160.00
3,600.00
600.00
2,480.00
14,592.00
2,700.00
3,110.00

7,000.00
21,000.00
1,625.00
6,560.00
1,800.00
2,887.50
480.00
750.00

1,260.00
57,200.00
12,474.00

MES 5

MES 6

6,808.00
24,000.00
1,881.00

2,480.00
14,592.00
3,110.00

24,000.00
4,001.25
2,850.00
4,400.00
13,750.00
5,000.00
5,000.00
4,200.00
10,000.00

57,200.00
12,474.00
2,079.00
3,150.00
2,078.90
2,247.37