Beruflich Dokumente
Kultur Dokumente
Rev 3
SAIC NUMBER
SAIC-N-2020
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
REFERENCE
A.
A1
SAES-N-100,
Para. 7.1.1
SAES-N-100,
Para. 7.1.3
See Attachment 1.
Castable refractory anchors received match SASD AC-036397:
A3
SAES-N-100,
Para. 8.2.3
A4
A5
SAES-N-100,
Para. 8.3.1
A6
SAES-N-100,
Para. 8.3.6
A7
SAES-N-100,
Para. 8.5.1
A8
SAES-N-100,
Para. 8.5.2
A9
SAES-N-110,
Para. 7.1
A10
SAES-N-110,
Para. 7.2
A11
Refractory material technical data sheets are available upon receipt &
reviewed to ensure materials received are handled & stored properly.
SAES-N-100,
Para. 7.2
A12
SAES-N-110,
Para. 11.6
Page 1 of 7
PLANT NO.
TRAVEL TIME
MECH-
SYSTEM ID.
QUANTITY INSP.
ACCEPTANCE CRITERIA
QR NUMBER
CONTRACTOR / SUBCONTRACTOR
A2
15-Dec-09
EQPT CODE
ITEM
No.
30-Jun-08
DATE APPROVED
PASS
FAIL
N/A
RE-INSP DATE
Rev 3
SAIC NUMBER
ITEM
No.
SAIC-N-2020
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
30-Jun-08
DATE APPROVED
REFERENCE
QR NUMBER
15-Dec-09
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
REMARKS:
REFERENCE
2. SAES-N-110DOCUMENTS:
Installation Requirements Castable Refractories. (30 Jan 2007)
3. SAES-N-120 Installation Requirements - Extreme Erosion Resistant Refractories. (30 Jan 2007)
ATTACHMENTS:
1. SAMS Catalogue Castable Refractory Types (SAES-N-100, Table 2 Notes)
2. SA Standard Drawing AC-036397 (Castable Refractory Anchor Details)
3. SA Standard Drawing AB-036396 (Hexsteel Details)
4. API 936 Appendix B (Color Coding for Metallic Anchors)
NOTES:
1. This checklist applies to materials for castable refractory systems (SAES-N-100) detailed in both SAES-N-110 & SAES-N-120.
2. Materials for specific equipment installations are per SAES-N-100 Table 3 "Mandatory Refractory Systems" (not attached) as checked on receipt.
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 2 of 7
N = NO F = FAILED
Rev 3
SAIC NUMBER
SAIC-N-2020
30-Jun-08
DATE APPROVED
15-Dec-09
QR NUMBER
MECH-
Page 3 of 7
Rev 3
Page 4 of 7
SAIC NUMBER
SAIC-N-2020
30-Jun-08
DATE APPROVED
15-Dec-09
QR NUMBER
MECH-
Rev 3
SAIC NUMBER
SAIC-N-2020
30-Jun-08
DATE APPROVED
QR NUMBER
15-Dec-09
MECH-
Rev 3
SAIC NUMBER
SAIC-N-2018
30-Jun-08
DATE APPROVED
15-Dec-05
QR NUMBER
MECH-
Page 6 of 7
Rev 3
SAIC NUMBER
SAIC-N-2018
Page 7 of 7
30-Jun-08
DATE APPROVED
15-Dec-05
QR NUMBER
MECH-