Beruflich Dokumente
Kultur Dokumente
Rev 3
SAIC NUMBER
SAIC-N-2032
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
SYSTEM ID.
MH's SPENT
REFERENCE
PASS
FAIL
N/A
A1
As Referenced
A2
As Referenced
A3
As Referenced
A4
SAES-N-100,
Para. 9.1
A5
B.
SAES-N-120,
Para. 12.1.1
See Attachment 1.
B2
C.
Specific Procedure Requirements Related to Materials & Environment for Application (SAES-N-120 Procedure)
C1
SAES-N-120,
Para. 10.1.1
C2
Packages were undamaged, dry & were not be opened until mixing.
SAES-N-120,
Para. 10.1.2
C3
SAES-N-120,
Para. 10.1.3
C4
SAES-N-120,
Para. 10.1.4
C5
Lining is installed indoors area, except for in-situ patching (tie-ins) and
repairs on site.
SAES-N-120,
Para. 10.1.5
C6
SAES-N-120,
Para. 10.1.6
Page 1 of 6
TRAVEL TIME
B1
PLANT NO.
A.
MECH-
CONTRACTOR / SUBCONTRACTOR
ACCEPTANCE CRITERIA
QR NUMBER
15-Dec-09
EQPT CODE
ITEM
No.
30-Jun-08
DATE APPROVED
SAES-N-120,
Para. 12.1.3
RE-INSP DATE
Rev 3
ITEM
No.
C7
SAIC NUMBER
30-Jun-08
DATE APPROVED
SAIC-N-2032
15-Dec-09
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
SAES-N-120,
Para. 10.1.7
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
C8
SAES-N-120,
Para. 10.1.8
C9
SAES-N-120,
Para. 10.1.9
C10
Lining surfaces are kept dry before, during, and after installation.
SAES-N-120,
Para. 10.1.10
D.
D1
SAES-N-120,
Para. 10.2.1
D2
For mixing, Hobart Model # D-33 commercial mixer (or approved equal)
& (2) 30-quart mixing bowls, beater & wire whip (all Stainless) are used.
SAES-N-120,
Para. 10.2.2
D3
SAES-N-120,
Para. 10.2.3
D4
Any mixed refractory that is not used within 15 minutes is discarded &
mixing does not continue after plastic stage occurs.
SAES-N-120,
Para. 10.2.3
D5
All equipment, mixing bowls & tools are kept clean and free of foreign
material & are cleaned thoroughly after each mix.
SAES-N-120,
Para. 10.2.4
E.
Sample Testing Prior to Application or "First Mix Sampling" (SAES-N-120, 9-Step Procedure)
E1
Select three packages at random from each batch or lot, then take 5 lbs
of dry and damp material from each batch or lot.
SAES-N-120,
Para. 10.3.1 (1)
E2
Reseal the packages that the samples were taken from and mark them
"Package Opened for Sampling".
SAES-N-120,
Para. 10.3.1 (2)
E3
Mix the three samples of the dry material together to give a uniform
mixture. Repeat this procedure with the damp material.
SAES-N-120,
Para. 10.3.1 (3)
E4
Take enough of the sample mix to prepare five 50 mm cubes for the cold
crushing strength tests.
SAES-N-120,
Para. 10.3.1 (4)
E5
SAES-N-120,
Para. 10.3.1 (5)
E6
Mix the two materials together, and add the required amount of water
(refer to mixing instructions in paragraph above) and cast five cubes.
SAES-N-120,
Para. 10.3.1 (6)
E7
Air cure & dryout the samples per procedure in SAES-N-120, Section 11
SAES-N-120,
Para. 10.3.1 (7)
Page 2 of 6
QR NUMBER
FAIL
N/A
RE-INSP DATE
Rev 3
SAIC NUMBER
SAIC-N-2032
WBS / BI / JO NUMBER
ITEM
No.
ACCEPTANCE CRITERIA
REFERENCE
E8
SAES-N-120,
Para. 10.3.1 (8)
E9
Any sample that does not meet the minimum published strength or
density will be cause for rejection of the complete batch.
SAES-N-120,
Para. 10.3.1 (9)
F.
F1
SAES-N-120,
Para. 10.4.1
F2
SAES-N-120,
Para. 10.4.2
G.
G1
Samples are taken during each shift that refractory is being applied.
G2
SAES-N-120,
Para. 10.5.1
SAES-N-120,
Para. 10.5.1
G3
SAES-N-120,
Para. 10.5.2
G4
Samples are hand packed into molds & a number is scratched carefully
onto the top of each sample using a small diameter rod.
SAES-N-120,
Para. 10.5.3
G5
SAES-N-120,
Para. 10.5.3
G6
Refractory Installer keeps a sketch & log showing clearly where each
batch of refractory was applied & locations where samples were taken.
SAES-N-120,
Para. 10.5.4
Page 3 of 6
QR NUMBER
15-Dec-09
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
COMPLETE SATR-N-2002.
30-Jun-08
DATE APPROVED
N/A
RE-INSP DATE
Rev 3
SAIC NUMBER
SAIC-N-2032
PROJECT TITLE
ITEM
No.
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
30-Jun-08
DATE APPROVED
REFERENCE
G7
After the 24 hour air set, samples are dried using muffle furnace dryingout temperatures and cycles for samples as follows:
A) Heat to 82C - 93C and hold for one hour.
B) Heat to 150C and hold for three hours.
C) Heat to 370C and hold for four hours.
D) Cool to ambient temperature.
SAES-N-120,
Para. 10.5.5
G8
After air curing & drying out, two density checks (results= not less than
2,400 kg/m) are obtained from each shift's samples per ASTM C134.
SAES-N-120,
Para. 10.5.6
G9
After air curing and drying out, all samples are subjected to cold-crush
strength tests in accordance with ASTM C133.
SAES-N-120,
Para. 10.5.7
G10
SAES-N-120,
Para. 10.5.8
G11
Physical properties are not less than 90% of published values & the
refractory below required values for properties after dryout is rejected.
SAES-N-120,
Para. 10.5.9
QR NUMBER
15-Dec-09
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-N-100 -- Refractory Systems (30 Jan 2007)
2. SAES-N-120 -- Installation Requirements-Extreme Erosion Resistant Refractories (30 Jan 2007)
ATTACHMENTS: 1. Attachment 1 -- SA INSP FORM 175-328110 (Refractories)
NOTES: 1. Use Table 2 & 3 Mandatory Refractory Systems of SAES-N-100 (Not Attached) for In-Process inspection checks of materials.
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 4 of 6
N = NO F = FAILED
Rev 3
SAIC NUMBER
SAIC-N-2032
30-Jun-08
DATE APPROVED
15-Dec-09
Page 5 of 6
QR NUMBER
MECH-
Rev 3
Page 6 of 6
SAIC NUMBER
SAIC-N-2032
30-Jun-08
DATE APPROVED
15-Dec-09
QR NUMBER
MECH-