Rev 3
SAIC NUMBER
SAIC-N-2036
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
15-Dec-09
PLANT NO.
MH's SPENT
TRAVEL TIME
REFERENCE
A.
General Requirements
A1
Sch Q,
Section 3.1
A2
Sch Q,
Section 3.1
A3
Sch Q,
Section 3.1
A4
Procedure Scope covers curing and dry out of installed fireclay bricks
refractory works.
SAES-N-130,
Para. 1.1
A5
SAES-N-100,
Para. 3.1
B.
B1
The Curing & Dryout Procedure prepared by the Refractory Installer has
met Inspection Requirements of SA Form 175-328110 & SAES-N-130.
(SA Form 175-328110 line item 01C)
See Attachment 1.
SAES-N-130,
Para. 8.1
B2
SAES-N-130,
Para. 8.1
B3
Procedure outlines hammer testing (before & after dryout) & visual
inspection requirements.(SA Form 175-328110 line item 26 & 27)
SAES-N-130,
Para. 8.1
B4
SAES-N-130,
Para. 8.1
Page 1 of 6
MECH-
SYSTEM ID.
ACCEPTANCE CRITERIA
QR NUMBER
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
ITEM
No.
30-Jun-08
DATE APPROVED
PASS
FAIL
N/A
RE-INSP DATE
Rev 3
SAIC NUMBER
SAIC-N-2036
PROJECT TITLE
WBS / BI / JO NUMBER
ITEM
No.
B5
B6
ACCEPTANCE CRITERIA
REFERENCE
30-Jun-08
DATE APPROVED
QR NUMBER
15-Dec-09
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
SAES-N-130,
Para. 8.1
SAES-N-130,
Para. 8.1
Other Requirements
C1
Water Quality (when used for cleanup & curing purposes) has met
SAES-N-110 Standards. (SA Form 175-328110 line item 24)
SAES-N-130,
Para. 8.1
C2
SAES-N-130,
Para. 8.1
C3
SAES-N-130,
Para. 8.1
C4
SAES-N-130,
Para. 8.1
The Dryout Plan specifies the following in addition to the heating source:
C5
D.
Repairs
D1
SAES-N-130,
Para. 8.1
SAES-N-130,
Para. 8.2
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (Project Specific)
2. SAES-N-100 -- Refractory Systems (30 Jan 2007)
3. SAES-N-130 -- Installation Requirements-Fireclay Bricks (30 Jan 2007)
ATTACHMENTS:
1. Attachment 1 -- SA Inspection Requirement Form 175-328110 (Refractories)
2. Attachment 2 -- ASTM Table C133 (Cold Crushing Strength) & ASTM Table C134 (Firebrick Precision Statistics)
NOTES:
1. Contractor shall develop a Curing and Dry out Procedure to be submitted to COMPANY.
2. See Attachments 2 Tables related to ASTM C33 old Crushing Strength & ASTM C34 Firebrick recision Statistics.
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
QC Inspector
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
PID Representative
Performed Inspection
QC Supervisor
T&I Witnessed
Name, Initials and Date:
Name, Organization,
Initials and Date:
Page 2 of 6
Rev 3
SAIC NUMBER
SAIC-N-2036
PROJECT TITLE
ITEM
No.
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
Quality Record Approved:
REFERENCE
30-Jun-08
DATE APPROVED
15-Dec-09
QR NUMBER
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
Y = YES
N = NO F = FAILED
Name, Organization,
Initials and Date:
Page 3 of 6
Rev 3
SAIC NUMBER
SAIC-N-2036
30-Jun-08
DATE APPROVED
QR NUMBER
15-Dec-09
Page 4 of 6
MECH-
Rev 3
SAIC NUMBER
SAIC-N-2036
30-Jun-08
DATE APPROVED
QR NUMBER
15-Dec-09
Page 5 of 6
MECH-
Rev 3
Page 6 of 6
SAIC NUMBER
SAIC-N-2036
30-Jun-08
DATE APPROVED
15-Dec-09
QR NUMBER
MECH-