SAIC NUMBER
SAIC-A-1002
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
31-Aug-10
DATE APPROVED
QR NUMBER
31-Aug-11
CIVIL-
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
ACCEPTANCE CRITERIA
Fill Materials
REFERENCE
A1
SAES-A-114
Sec. 6.2.1
A2
SAES-A-114
Sec. 6.2.1
A3
Fill Material' shall be used for all fills except where 'Select Fill Material' is
specified. As a minimum, 'Select Fill Material' shall be used within 0.6 m
(2 ft) of the bottom elevation of foundations, spread footings, or slabs-ongrade when fill is required to achieve final grade. 'Select Fill Material'
shall also be specified for backfill which will be in contact with concrete
or steel structures.
SAES-A-114
Sec. 6.2
B1
SAES-A-114
Sec. 6.2.2
B2
Select fill are composed only of inorganic materials and are free of
frozen lumps, trash, or other unsatisfactory materials.
SAES-A-114
Sec. 6.2
C1
Maximum size of marl materials being received shall be 75mm, and shall
have between 11-35% passing the No. 200 sieve. The capping material
shall have a maximum liquid limit of 35 and maximum plasticity index of
12, per D4318.
Page 1 of 2
SAES-A-114
Sec. 6.3.2.10
PASS
FAIL
N/A
RE-INSP DATE
Rev 5
SAIC NUMBER
ITEM
No.
C2
SAIC-A-1002
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
31-Aug-10
DATE APPROVED
QR NUMBER
31-Aug-11
CIVIL-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
SAES-A-114
Sec. 6.2.1
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 23 February 2010
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 2 of 2
N = NO F = FAILED