Excavation
Week 2
Week 3
Thu
Rock Drilling
Excavation
Rock Drilling
Airlifting
Cage
Concrete
Presentation Scope
Proactive Approach
The Way Forward
General Setup
Concrete
Truck
Skip
Concreting
Platform
Ramp
Tremie
Pipe
Concrete
Tremie
Pipe
Drop in
Concrete
Head
Temporary
Casing
(1)
Concrete
Overbreak
(2)
(3)
(4)
Concrete
Cement
Grout
QA / QC
10
11
12:00
14:00
21:00
18:00
Time (hours)
30
12
25
20
15
10
20
40
60
80
100
Slump
13
Time
14
Defects
15
Honeycomb
16
Air Voids
17
Air
Voids
18
(1)
(2)
(3)
Segregated Concrete
19
Remedial Actions
Grouting
High pressure water jet to remove weak
Stitched pile
20
Additional pile
Deficiencies in Current
Practice
21
1*
2
22
18
17
16
* Indicate order
of truckload
First few
truckloads
need to
remain
workable
throughout
concreting
23
Quality control
Need to Consider ..
Specification
Concrete volume (related to pile size
and depth)
2006 Gammon Construction Limited. All Rights Reserved.
24
environmental restrictions)
Pile
Acceptance
Concrete
Performance
25
Time
Concrete
Volume
Site
Constraints
Material
Consistency
Construction
Procedure
SUCCESS STORY
Delivery
~ 3 hours
26
Grade 45/20
Designed slump
200mm
Workability 5 hours
SUCCESS STORY
27
Way Forward
28
Concrete Triangle
Constructability
Designer
Consistency
29
Concrete
Supplier
Concrete Quality
/ Performance
Slump
Retention
Contractor
The End
30