Sie sind auf Seite 1von 39

Shipment

Plant 1
Plant 2
Plant 3
Project
Requirement

Project A
40

Project B
30
20

Project C

40

50

60

Cost
Plant 1
Plant 2
Plant 3
Project
Requirement

Project A
10
12
9

Project B
4
5
7

Project C
11
8
6

40

50

60

400
0
0

120
100
0

30
30

0
240
180

Plant Capacities
70
50
30
150
Plant Capacities
70
50
30
150

9.13

Transportation

Enter
Enter the
the transportation
transportation data
data in
in the
the shaded
shaded area.
area. Then
Then go
go to
to the
the DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in the
the Data
DataAnal
Ana
Group
Group and
and then
then click
click SOLVE.
SOLVE.
IfIf SOLVER
SOLVER isis not
not on
on the
the Data
Data Tab
Tab then
then please
please see
see the
the Help
Help file
file (Solver)
(Solver) for
for instructions.
instructions.

Data
COSTS
Plant 1
Plant 2
Plant 3
Demand
Shipments
Shipments
Plant 1
Plant 2
Plant 3
Column Total
Total Cost

Project 1
10
12
9
40

Project 2
4
5
7
50

Project 3
11
8
6
60

Supply
70
50
30
150 \ 150

Project 1

Project 2

Project 3

Row Total
0
70
50
50
10
30
60 150 \ 150

20
0
20
40

50
0
0
50

1040

Page 4

9.13

n the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in the
the Data
DataAnalysis
Analysis

structions.
structions.

Page 5

Plant 1
Plant 2
Plant 3
Project
Requirement

Plant 1
Plant 2
Plant 3
Project
Requirement

Project A
40

Project B
30
20

Project C

40

50

60

Project A
10
12
9

Project B
4
5
7

Project C
11
8
6

40

50

60

400
0
0

120
100
0

30
30

0
240
180

Plant Capacities
70
50
60

Shipment
Plant 1
Plant 2
Plant 3

Project A
40

Project B
30
20

150

Project
Requirement

40

50

Project A
10
12
9

Project B
4
5
7

40

50

Plant Capacities
70
50
60
150

Cost
Plant 1
Plant 2
Plant 3
Project
Requirement

Dummy 1
Dummy 2
1040

-1
-2

Project C
30
30
60

Project C
11
8
6
60

Dummy Project Plant Capacities


70
50
30
60
30

Dummy Project Plant


0
0
0
30

150

Capacities
70
50
60
150

Plant 1
Plant 2
Plant 3
Project
Requirement

Project A
40

40

Project B
30
20

Project C

50

60

0
60

Dummy Project Plant Capacities


70
30
50
0
60
30

150

apacities
Plant 1
Plant 2
Plant 3
Project
Requireme
nt

Plant 1
Plant 2
Plant 3
Project
Requireme
nt
Path 1
Path 2
Path 3

Project A
20

Project B
50
0

20
40

50

Project A
10
12
9

Project B
4
5
7

40

50

1
4
4

Project CDummy Project


20
40

30
0

60

30

Project CDummy Project


11
0
8
0
6
0
60

30

Plant Capacities
70
50
60
150

Plant Capacities
70
50
60
150

9.15
Enter
in
Enter the
the values
values
in the
the shaded
shaded area.
area. Then
Then go
go to
to the
the DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in
Linear, Integer and Mixed Integer
Programming
the
the Data
DataAnalysis
Analysis Group
Group and
and then
then click
click SOLVE.
SOLVE.
IfIf SOLVER
SOLVER isis not
not on
on the
the Data
Data Tab
Tab then
then please
please see
see the
the Help
Help file
file (Solver)
(Solver) for
for instructions.
instructions.
To
Touse
use Integer
Integer variables,
variables, define
define them
them in
in the
the Solver
Solver model
model as
as aa constraint.
constraint.

Signs
<
=
>

less than or equal to


equals (You need to enter an apostrophe fir
greater than or equal to

Data
Objective
Constraint 1
Constraint 2
Constraint 3
Constraint 4
Constraint 5
Constraint 6
Results
Variables
Objective

x11
10
1

x12
4
1

x13
11
1

x21
12

x22
5

x23
8

1
1

50
4

x32
7

x33
6

1
1

1
1

20
10

x31
9

0
11

1
1

0
12

0
5

Page 12

20
8

20
9

0
7

40
6

sign
<
<
<
=
=
=

RHS
70
50
60
40
50
60

980

9.15

nter an apostrophe first.)

Results
LHS

Slack/Surplus
980
70
20
60
40
50
60

0
30
0
0
0
0

Page 13

9.24
A
1

Assignment

2
3
4
5

Enter
Enter the
the assignment
assignment costs
costs in
in the
the shaded
shaded area.
area. Then
Then go
go to
to the
the DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on
Solver
Solver in
in the
the Data
Data Analysis
Analysis Group
Group and
and then
then click
click SOLVE.
SOLVE.
IfIf SOLVER
SOLVER isis not
not on
on the
the Data
Data Tab
Tab then
then please
please see
see the
the Help
Help file
file (Solver)
(Solver) for
for instructions.
instructions.

Data
COSTS
Job 1
Job 2
Job 3
11 Job 4
6

7
8
9
10

Machine 1

Machine 2
12
8
1
0

Machine 3
4
1
12
0

Machine 4
9
6
4
0

5
6
7
0

12
13
14
15
16
17
18
19

Assignments
Shipments
Job 1
Job 2
Job 3
Job 4
Column Total

Machine 1

Machine 2

Total Cost

Machine 4
1

1
1
1

20
21

Machine 3

22

Page 14

1
1

9.24
F

2
3
)r) for
instructions.
for instructions.4
5

Tab
Tab on
on the
the ribbon,
ribbon, click
click on
on

6
7
8
9
10
11
12
13
14
15
16
17
18
19

Row Total
1
1
1
1
4

20
21
22

Page 15

9.24
L

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Page 16

9.24 b

Transportation

Data
COSTS
Origin 1
Origin 2
Origin 3
Demand
Shipments
Shipments
Origin 1
Origin 2
Origin 3
Column Total
Total Cost

Enter
Enter the
the transportation
transportation data
data in
in the
the shaded
shaded area.
area. Then
Then go
go to
to the
the DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in the
the Data
DataAnal
Ana
Group
Group and
and then
then click
click SOLVE.
SOLVE.
IfIf SOLVER
SOLVER isis not
not on
on the
the Data
Data Tab
Tab then
then please
please see
see the
the Help
Help file
file (Solver)
(Solver) for
for instructions.
instructions.
Transportation:
0; Problem size

Dest 1

Dest 2
12
8
1
40

Dest 1

Dest 3
4
1
12
20

Dest 2
0
10
30
40

Dest 4
9
6
4
50

Dest 3
0
20
0
20

635

Page 17

5
55
6
45
7
30
20 130 \ 130

Dest 4
35
15
0
50

Supply

Row Total
20
55
0
45
0
30
20 130 \ 130

9.24 b

n the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in the
the Data
DataAnalysis
Analysis

structions.
structions.
Transportation: Submodel =
0; Problem size @ 3 by 4

Page 18

Shipment
Source 1
Source 2
Source 3
Source 4
Demand

Destination A Destination B Destination C


72
38
0
34
12
19
110
34
31

Cost
Source 1
Source 2
Source 3
Source 4
Demand

Destination A Destination B Destination C


8
9
4
5
6
8
7
8
6
5
3
7
110
34
31
304
0
0
550

0
204
0
102

0
96
114
217

Supply
72
38
46
19

Supply
72
38
46
19

1587

Simulation

Enter
Enter the
the values
values and
and the
the requencies
requencies in
in the
the top
top table.
table. Press
Press F9
F9 to
to run
run another
another simulation.
simulation. IfIf you
you
column
column labeled
labeled "Random
"Random number".
number".

Data
Random Number
Sorter

Category name
0 Category 1
2 Category 2
11 Category 3
21 Category 4
36 Category 5
61 Category 6
73 Category 7
85 Category 8
95 Category 9
Total

Simulation trials
Trial
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Random Number
48
84
21
13
72
85
93
13
93
68
18
72
93
82
8
60
77
87
55
26

Value

Frequency
3
4
5
6
7
8
9
10
11

Value
7
9
5
5
8
9
10
5
10
8
5
8
10
9
4
7
9
10
7
6

2
9
10
15
25
12
12
10
5
100

(a)

p table.
table. Press
Press F9
F9 to
to run
run another
another simulation.
simulation. IfIf you
you like,
like, you
you may
may enter
enter the
the random
random numbers
numbers in
in the
the

Expected Value

Probability

Trial
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Simulation results

Value *
Cumulative Probability
Frequency
0.02
0.02
6
0.09
0.11
36
0.1
0.21
50
0.15
0.36
90
0.25
0.61
175
0.12
0.73
96
0.12
0.85
108
0.1
0.95
100
0.05
1
55
Expected
7.16

Random Number
48
84
21
13
72
85
93
13
93
68
18
72
93
82
8
60
77
87
55
26

Value
7
9
5
5
8
9
10
5
10
8
5
8
10
9
4
7
9
10
7
6

Value
3
4
5
6
7
8
9
10
11
Totals

Trial
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

imulation results
Simulation
Occurrences
0
1
4
1
3
3
4
4
0
20
Average
Random Number
81
76
71
67
69
34
19
0
83
30
67
35
73
62
98
88
91
65
81
60

Occurences *
Value
0
0
0.05
4
0.2
20
0.05
6
0.15
21
0.15
24
0.2
36
0.2
40
0
0
1
151
7.55

Percentage

Value
9
9
8
8
8
6
5
3
9
6
8
6
9
8
11
10
10
8
9
7

Trial Random Number Value


1
43
7
2
19
5
3
28
6
4
41
7
5
31
6
6
56
7
7
72
8
8
3
4
9
22
6
10
50
7
11
44
7
12
67
8
13
51
7
14
65
8
15
9
4
16
16
5
17
46
7
18
97
11
19
92
10
20
10
4

Port of New Orleans Barge Unloadings


Day
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Previously
Delayed
0
0
0
1
0
0
0
0
0
0
2
2
4
5
5
19

Barge Arrivals
Demand
Probability
0
0.13
1
0.17
2
0.15
3
0.25
4
0.2
5
0.1

Random
Number
0.370
0.330
0.580
0.100
0.020
0.180
0.310
0.190
0.320
0.850
0.310
0.940
0.810
0.430
0.310

Lower
0
0.13
0.3
0.45
0.7
0.9

Arrivals
2
2
3
0
0
1
2
1
2
4
2
5
4
2
2
32
Cumulative
0.13
0.3
0.45
0.7
0.9
1

Total to be
unloaded
2
2
3
1
0
1
2
1
2
4
4
7
8
7
7

Demand
0
1
2
3
4
5

Random
Number
0.69
0.84
0.12
0.94
0.51
0.36
0.17
0.02
0.15
0.29
0.16
0.52
0.56
0.43
0.26

Possibly
unloaded
3
4
2
5
2
2
2
1
2
2
2
3
3
2
2

Unloaded
2
2
2
1
0
1
2
1
2
2
2
3
3
2
2

1.26666667
2.13333333
1.8

27
Unloading Rates
Number
Probability
1
0.03
2
0.12
3
0.4
4
0.28
5
0.12
6
0.05

Lower
0
0.12
0.52
0.8
0.92
0.97

Cumulative
0.03
0.15
0.55
0.83
0.95
1

Demand
1
2
3
4
5
6

Day
1
2
3
4
5
6
7
8
9
10

Unit
Received
0
0
0
0
10
0
0
0
0
10

Barge Arrivals
Demand
Probability
0
0.2
1
0.4
2
0.2
3
0.15
4
0.05

Beginning
Inventory
5
5
4
1
10
8
5
1
0
10

Lower
0
0.2
0.6
0.8
0.95

Random
Number
0.138
0.349
0.843
0.480
0.763
0.843
0.974
0.680
0.580
0.172

Cumulative
0.2
0.6
0.8
0.95
1

Demand
0
1
3
1
2
3
4
2
1
0

Demand
0
1
2
3
4

Reorder Point
Ending
Inventory
5
4
1
0
8
5
1
0
0
10
34

2 units
Lost Sales

Order

0
0
0
0
0
0
0
1
1
0
2

No
No
Yes
No
No
No
Yes
No
No
No

Random
Number

Lead Time

0.12

0.84

0.48571429
8
Unloading Rates
Number
Probability
1
0.15
2
0.35
3
0.5

Lower
0
0.35
0.85

Cumulative
0.15
0.5
1

Demand
1
2
3

1.26666667
0.13333333
0

0.13756389
0.34940288
0.84265656
0.12114585
0.76297536
0.84276626
0.97410761
0.18511753
0.58005037
0.17163759

Das könnte Ihnen auch gefallen