Plant 1
Plant 2
Plant 3
Project
Requirement
Project A
40
Project B
30
20
Project C
40
50
60
Cost
Plant 1
Plant 2
Plant 3
Project
Requirement
Project A
10
12
9
Project B
4
5
7
Project C
11
8
6
40
50
60
400
0
0
120
100
0
30
30
0
240
180
Plant Capacities
70
50
30
150
Plant Capacities
70
50
30
150
9.13
Transportation
Enter
Enter the
the transportation
transportation data
data in
in the
the shaded
shaded area.
area. Then
Then go
go to
to the
the DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in the
the Data
DataAnal
Ana
Group
Group and
and then
then click
click SOLVE.
SOLVE.
IfIf SOLVER
SOLVER isis not
not on
on the
the Data
Data Tab
Tab then
then please
please see
see the
the Help
Help file
file (Solver)
(Solver) for
for instructions.
instructions.
Data
COSTS
Plant 1
Plant 2
Plant 3
Demand
Shipments
Shipments
Plant 1
Plant 2
Plant 3
Column Total
Total Cost
Project 1
10
12
9
40
Project 2
4
5
7
50
Project 3
11
8
6
60
Supply
70
50
30
150 \ 150
Project 1
Project 2
Project 3
Row Total
0
70
50
50
10
30
60 150 \ 150
20
0
20
40
50
0
0
50
1040
Page 4
9.13
n the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in the
the Data
DataAnalysis
Analysis
structions.
structions.
Page 5
Plant 1
Plant 2
Plant 3
Project
Requirement
Plant 1
Plant 2
Plant 3
Project
Requirement
Project A
40
Project B
30
20
Project C
40
50
60
Project A
10
12
9
Project B
4
5
7
Project C
11
8
6
40
50
60
400
0
0
120
100
0
30
30
0
240
180
Plant Capacities
70
50
60
Shipment
Plant 1
Plant 2
Plant 3
Project A
40
Project B
30
20
150
Project
Requirement
40
50
Project A
10
12
9
Project B
4
5
7
40
50
Plant Capacities
70
50
60
150
Cost
Plant 1
Plant 2
Plant 3
Project
Requirement
Dummy 1
Dummy 2
1040
-1
-2
Project C
30
30
60
Project C
11
8
6
60
150
Capacities
70
50
60
150
Plant 1
Plant 2
Plant 3
Project
Requirement
Project A
40
40
Project B
30
20
Project C
50
60
0
60
150
apacities
Plant 1
Plant 2
Plant 3
Project
Requireme
nt
Plant 1
Plant 2
Plant 3
Project
Requireme
nt
Path 1
Path 2
Path 3
Project A
20
Project B
50
0
20
40
50
Project A
10
12
9
Project B
4
5
7
40
50
1
4
4
30
0
60
30
30
Plant Capacities
70
50
60
150
Plant Capacities
70
50
60
150
9.15
Enter
in
Enter the
the values
values
in the
the shaded
shaded area.
area. Then
Then go
go to
to the
the DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in
Linear, Integer and Mixed Integer
Programming
the
the Data
DataAnalysis
Analysis Group
Group and
and then
then click
click SOLVE.
SOLVE.
IfIf SOLVER
SOLVER isis not
not on
on the
the Data
Data Tab
Tab then
then please
please see
see the
the Help
Help file
file (Solver)
(Solver) for
for instructions.
instructions.
To
Touse
use Integer
Integer variables,
variables, define
define them
them in
in the
the Solver
Solver model
model as
as aa constraint.
constraint.
Signs
<
=
>
Data
Objective
Constraint 1
Constraint 2
Constraint 3
Constraint 4
Constraint 5
Constraint 6
Results
Variables
Objective
x11
10
1
x12
4
1
x13
11
1
x21
12
x22
5
x23
8
1
1
50
4
x32
7
x33
6
1
1
1
1
20
10
x31
9
0
11
1
1
0
12
0
5
Page 12
20
8
20
9
0
7
40
6
sign
<
<
<
=
=
=
RHS
70
50
60
40
50
60
980
9.15
Results
LHS
Slack/Surplus
980
70
20
60
40
50
60
0
30
0
0
0
0
Page 13
9.24
A
1
Assignment
2
3
4
5
Enter
Enter the
the assignment
assignment costs
costs in
in the
the shaded
shaded area.
area. Then
Then go
go to
to the
the DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on
Solver
Solver in
in the
the Data
Data Analysis
Analysis Group
Group and
and then
then click
click SOLVE.
SOLVE.
IfIf SOLVER
SOLVER isis not
not on
on the
the Data
Data Tab
Tab then
then please
please see
see the
the Help
Help file
file (Solver)
(Solver) for
for instructions.
instructions.
Data
COSTS
Job 1
Job 2
Job 3
11 Job 4
6
7
8
9
10
Machine 1
Machine 2
12
8
1
0
Machine 3
4
1
12
0
Machine 4
9
6
4
0
5
6
7
0
12
13
14
15
16
17
18
19
Assignments
Shipments
Job 1
Job 2
Job 3
Job 4
Column Total
Machine 1
Machine 2
Total Cost
Machine 4
1
1
1
1
20
21
Machine 3
22
Page 14
1
1
9.24
F
2
3
)r) for
instructions.
for instructions.4
5
Tab
Tab on
on the
the ribbon,
ribbon, click
click on
on
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Row Total
1
1
1
1
4
20
21
22
Page 15
9.24
L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Page 16
9.24 b
Transportation
Data
COSTS
Origin 1
Origin 2
Origin 3
Demand
Shipments
Shipments
Origin 1
Origin 2
Origin 3
Column Total
Total Cost
Enter
Enter the
the transportation
transportation data
data in
in the
the shaded
shaded area.
area. Then
Then go
go to
to the
the DATA
DATATab
Tab on
on the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in the
the Data
DataAnal
Ana
Group
Group and
and then
then click
click SOLVE.
SOLVE.
IfIf SOLVER
SOLVER isis not
not on
on the
the Data
Data Tab
Tab then
then please
please see
see the
the Help
Help file
file (Solver)
(Solver) for
for instructions.
instructions.
Transportation:
0; Problem size
Dest 1
Dest 2
12
8
1
40
Dest 1
Dest 3
4
1
12
20
Dest 2
0
10
30
40
Dest 4
9
6
4
50
Dest 3
0
20
0
20
635
Page 17
5
55
6
45
7
30
20 130 \ 130
Dest 4
35
15
0
50
Supply
Row Total
20
55
0
45
0
30
20 130 \ 130
9.24 b
n the
the ribbon,
ribbon, click
click on
on Solver
Solver in
in the
the Data
DataAnalysis
Analysis
structions.
structions.
Transportation: Submodel =
0; Problem size @ 3 by 4
Page 18
Shipment
Source 1
Source 2
Source 3
Source 4
Demand
Cost
Source 1
Source 2
Source 3
Source 4
Demand
0
204
0
102
0
96
114
217
Supply
72
38
46
19
Supply
72
38
46
19
1587
Simulation
Enter
Enter the
the values
values and
and the
the requencies
requencies in
in the
the top
top table.
table. Press
Press F9
F9 to
to run
run another
another simulation.
simulation. IfIf you
you
column
column labeled
labeled "Random
"Random number".
number".
Data
Random Number
Sorter
Category name
0 Category 1
2 Category 2
11 Category 3
21 Category 4
36 Category 5
61 Category 6
73 Category 7
85 Category 8
95 Category 9
Total
Simulation trials
Trial
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Random Number
48
84
21
13
72
85
93
13
93
68
18
72
93
82
8
60
77
87
55
26
Value
Frequency
3
4
5
6
7
8
9
10
11
Value
7
9
5
5
8
9
10
5
10
8
5
8
10
9
4
7
9
10
7
6
2
9
10
15
25
12
12
10
5
100
(a)
p table.
table. Press
Press F9
F9 to
to run
run another
another simulation.
simulation. IfIf you
you like,
like, you
you may
may enter
enter the
the random
random numbers
numbers in
in the
the
Expected Value
Probability
Trial
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Simulation results
Value *
Cumulative Probability
Frequency
0.02
0.02
6
0.09
0.11
36
0.1
0.21
50
0.15
0.36
90
0.25
0.61
175
0.12
0.73
96
0.12
0.85
108
0.1
0.95
100
0.05
1
55
Expected
7.16
Random Number
48
84
21
13
72
85
93
13
93
68
18
72
93
82
8
60
77
87
55
26
Value
7
9
5
5
8
9
10
5
10
8
5
8
10
9
4
7
9
10
7
6
Value
3
4
5
6
7
8
9
10
11
Totals
Trial
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
imulation results
Simulation
Occurrences
0
1
4
1
3
3
4
4
0
20
Average
Random Number
81
76
71
67
69
34
19
0
83
30
67
35
73
62
98
88
91
65
81
60
Occurences *
Value
0
0
0.05
4
0.2
20
0.05
6
0.15
21
0.15
24
0.2
36
0.2
40
0
0
1
151
7.55
Percentage
Value
9
9
8
8
8
6
5
3
9
6
8
6
9
8
11
10
10
8
9
7
Previously
Delayed
0
0
0
1
0
0
0
0
0
0
2
2
4
5
5
19
Barge Arrivals
Demand
Probability
0
0.13
1
0.17
2
0.15
3
0.25
4
0.2
5
0.1
Random
Number
0.370
0.330
0.580
0.100
0.020
0.180
0.310
0.190
0.320
0.850
0.310
0.940
0.810
0.430
0.310
Lower
0
0.13
0.3
0.45
0.7
0.9
Arrivals
2
2
3
0
0
1
2
1
2
4
2
5
4
2
2
32
Cumulative
0.13
0.3
0.45
0.7
0.9
1
Total to be
unloaded
2
2
3
1
0
1
2
1
2
4
4
7
8
7
7
Demand
0
1
2
3
4
5
Random
Number
0.69
0.84
0.12
0.94
0.51
0.36
0.17
0.02
0.15
0.29
0.16
0.52
0.56
0.43
0.26
Possibly
unloaded
3
4
2
5
2
2
2
1
2
2
2
3
3
2
2
Unloaded
2
2
2
1
0
1
2
1
2
2
2
3
3
2
2
1.26666667
2.13333333
1.8
27
Unloading Rates
Number
Probability
1
0.03
2
0.12
3
0.4
4
0.28
5
0.12
6
0.05
Lower
0
0.12
0.52
0.8
0.92
0.97
Cumulative
0.03
0.15
0.55
0.83
0.95
1
Demand
1
2
3
4
5
6
Day
1
2
3
4
5
6
7
8
9
10
Unit
Received
0
0
0
0
10
0
0
0
0
10
Barge Arrivals
Demand
Probability
0
0.2
1
0.4
2
0.2
3
0.15
4
0.05
Beginning
Inventory
5
5
4
1
10
8
5
1
0
10
Lower
0
0.2
0.6
0.8
0.95
Random
Number
0.138
0.349
0.843
0.480
0.763
0.843
0.974
0.680
0.580
0.172
Cumulative
0.2
0.6
0.8
0.95
1
Demand
0
1
3
1
2
3
4
2
1
0
Demand
0
1
2
3
4
Reorder Point
Ending
Inventory
5
4
1
0
8
5
1
0
0
10
34
2 units
Lost Sales
Order
0
0
0
0
0
0
0
1
1
0
2
No
No
Yes
No
No
No
Yes
No
No
No
Random
Number
Lead Time
0.12
0.84
0.48571429
8
Unloading Rates
Number
Probability
1
0.15
2
0.35
3
0.5
Lower
0
0.35
0.85
Cumulative
0.15
0.5
1
Demand
1
2
3
1.26666667
0.13333333
0
0.13756389
0.34940288
0.84265656
0.12114585
0.76297536
0.84276626
0.97410761
0.18511753
0.58005037
0.17163759