The FLX Series

8.3 FLX Installation training

Billion hours

Of real life experience


Has resulted in the FLX

8.3.5 Commissioning

Commissioning wizard

Danfoss Solar Inverters

This will show you the steps to


execute the initial inverter
configuration

Its a step by step guide through the


wizard from the display and the Web
Interface

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 2

Commissioning step 1

Commissioning can be executed either through the display or the buildin Web Interface

Select display and Web Interface language and press OK/Next

Select language
Language: English

IP: 192.168.1.100

To use the Web Interface, type in


the IP address found on the
Display and type it in on your
Web Browsers address line

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 3

Commissioning step 2

By clicking OK on the display it will bring you to the next view on the
display.

On the Web Interface it scans the network before showing the Master mode
selection option

Master mode
Master mode: Disabled
Ensure that only 1
Master is enabled
Next
IP: 192.168.1.100

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 4

Commissioning step 2

By clicking OK on the display it will bring you to the next view on the
display.

On the Web Interface it scans the network before showing the Master mode
selection option

Master mode
Master mode: Disabled
Ensure that only 1
Master is enabled
Next
IP: 192.168.1.100

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 5

Commissioning step 2

When selecting Master mode, the inverter initiates a network scan for
connected inverters

Display shows inverters found, whereas the Web server show a pop-up list with
connected inverters

Master mode
Network
Master network
Initiate
mode: Disabled
scan
Scan
Ensure
progress
that only
100.00%
1
Inverters
Master is
found:
enabled
2
Next
IP: 192.168.1.100

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 6

Commissioning step 2

Display shows inverters found, whereas the Web server show a pop-up
list with connected inverters

Button Test communication will just do a ping

Master mode
Network
Master network
Initiate
mode: Disabled
scan
Scan
Ensure
progress
that only
100.00%
1
Inverters
Master is
found:
enabled
2
Next
IP: 192.168.1.100

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 7

Commissioning step 3

Set date and time

On the display, these are two separate screens

From the web, remember to configure time zone accordingly

Set date
Date (d-m-y): 31-01-2011

IP: 192.168.1.100

Set time
Time (h-m-s): 09:54:00

IP: 192.168.1.100
Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 8

Commissioning step 4

Configure installed PV power

Insert the correct values, can be different from inverter to inverter

Used for performance calculations

Installed PV power
PV input 1: 8000 W
PV input 2: 8000 W
PV input 3: 8000 W
Confirm selection
IP: 192.168.1.100

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 9

Commissioning step 5

Grid code selection is 3-step, first select the country

Select country
Country: Denmark

IP: 192.168.1.100

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 10

Commissioning step 6

Now select Grid code and confirm it

On the display, these are two separate screens

Select grid code - DK


Grid: LV2 inst.>13.8 kVA

IP: 192.168.1.100

Confirm grid code - DK


Grid: LV2 inst.>13.8 kVA

Re-select grid to confirm


IP: 192.168.1.100
Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 11

Commissioning step 7

From step 7, when doing the commissioning from the Display its
actually finished

The display wizard does not offer the replication function

This must be done in setup

Service
Store settings
Restore settings

Replicate settings
NS Protection report
Restart comm.board
Restart controlboard
Auto restart: Portal FTP u..
Delete max. values
Lock configuration
View Status

Danfoss Solar Inverters

Log

Setup

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 12

Commissioning step 7

Note that when replication, the PV settings are also replicated hence
change these settings on an individual level if needed

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 13

Commissioning step 7

Pop-up dialog after replication is finished

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 14

Commissioning step 8

Final screen with overview

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 15

Commissioning changes

When you log in to the Web Interface after ending the Wizard you are
granted extended access for 5 hours

This allows for configuration changes without the need to type in an extended
password

Once you have finalized


the changes you should
lock the system to
prevent further changes

Danfoss Solar Inverters

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 16

Locking the Inverter

To prevent unwanted changes after final configuration, remember to lock


the inverters

This is done from the Master inverter

Service
Store settings
Restore settings

Replicate settings
NS Protection report
Restart comm.board
Restart controlboard
Auto restart: Portal FTP u..
Delete max. values
Lock configuration
View Status

Danfoss Solar Inverters

Log

Setup

| Confidential/Property of Danfoss Power Electronics| Tuesday, 03 March 2015 | 17